N00421-17-R-0014_-_Q&A_Part_2.pdf

PDF 138 KB Posted

Attached to
PMA-281 Systems Lifecyle Support
Solicitation number
N00421-17-R-0014
Issued by

About this file

N00421-17-R-0014 Questions and Answers (Q&As) - Part 2

View the file

Other files

File Type Posted
Attachment_P7__Annual_Fully_Burdened_Labor_.xlsx XLSX spreadsheet
N00421-17-R-0014-0001.pdf PDF
Attachment_P4_Past_Performance_Information_Form.docx DOCX document
Attachment_P6_CLIN_Breakout_Spreadsheet.xlsx XLSX spreadsheet
N00421-17-R-0014_-_Q&A.pdf PDF
Attachment_P5__Contractor_Performance_Assessment_(CPAQ)_.pdf PDF
N00421-17-R-0014.pdf PDF
Attachment_P6_CLIN_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_5_WD_15-4341_(Rev._-6).pdf PDF
Attachment_12_WD_15-5799_(Rev._-4)_.pdf PDF
Attachment_P4_Past_Performance_Information_Form.pdf PDF
Attachment_P7__Annual_Fully_Burdened_Labor_.xlsx XLSX spreadsheet
Attachment_1_DD_Form_254.pdf PDF
Attachment_7_WD_15-5547_(Rev._-4).pdf PDF
Attachment_3_Surveillance_Activity_Checklist_(SAC).pdf PDF
Attachment_11_WD_15-5781_(Rev.-3).pdf PDF
Attachment_4_JMPS_IGS_Schedule.pdf PDF
Attachment_8_WD_15-5597_(Rev._-4.pdf PDF
Exhibit_A_A001-A028.pdf PDF
Attachment_6_WD_15-4539_(Rev._-3).pdf PDF
Attachment_10_WD_15-5635_(Rev._-6).pdf PDF
Attachment_2_GFP.pdf PDF
Attachment_9_WD_15-5611_(Rev._-3).pdf PDF
Draft_RFP_N00421-17-R-001_Q&A_Part_2_of_2.pdf PDF
Draft_RFP_N00421-17-R-0014_-_Q&A_Part_1_of_2.pdf PDF
Attachment_5_JMPS_Master_Schedule_-_DRAFT.xlsx XLSX spreadsheet
Attachment_4_Integrated_Government_Schedule_-_DRAFT.pdf PDF
Attachment_P5__Contractor_Performance_Assessment_Questionnaire_(CPAQ).pdf PDF
Attachment_P6_CLIN_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_2_Government_Furnished_Equipment.xlsx XLSX spreadsheet
Attachment_P7_Fully_Burdened_Labor_Rates_Spreadsheet.xlsx XLSX spreadsheet
N00421-17-R-0014.pdf PDF
Exhibits_A001_-_A028.xls XLS spreadsheet
Attachment_3_Surveillance_Activity_Checklist_(SAC).docx DOCX document
Attachment_1_DD_Form_254.pdf PDF
Attachment_P4_Past_Performance_Information_Form.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00421-17-R-0014 Questions & Answers (Q&As) – Part 2

# Page # Sections /

Paragraphs

Questions Answers

1 72 of 93

Section L, Part B, Paragraph 1.1

In the original solicitation, Section L, Part B, paragraph 1.1 requested offerors to provide their understanding and approach to SOW sections 3.1.4

(Software Duplication, Product Distribution, and

Materiel Coordination), 3.1.6 (Site Survey and

Preparation), and 3.1.8 (Customer Support). Per

Amendment 0001, these subparagraphs are now renumbered as 3.1.5, 3.1.7, and 3.1.9 in Section C, yet the instructions in Section L still refer to 3.1.4, 3.1.6, and 3.1.8. Are we to address different SOW elements in our response, or should the cross references in

Section L be updated to correspond with the revised numbering in Section C?

The correct numbering for Section L , Part B, Paragraph 1.1 is

3.1.5 - Software Duplication, Product

Distribution, and Materiel Coordination

3.1.7 - Site Survey and Preparation

3.1.9 - Customer Support

Amendment 0002 will be issued to correct the numbering in Section L to align with the revisions made to Section C in Amendment

0001.

2 16 & 72 Section L, Part B, 1.1

Amendment 01 corrected the numbering scheme in

Section C paragraphs 3.1, Enterprise Requirements, however, there was no change in the technical focus areas described in Section L Part B. Is it the government’s intent that the focus areas remain

Software Duplication, Product Distribution, and

Materiel Coordination (3.1.5), Site Survey and

Preparation (3.1.7), and Customer Support (3.1.9)?

revisions made to Section C in Amendment

0001.

3 63 and

Section L, Part A, 3.0, Table L1, Section J

Attachment P4

Amendment 01 provided an updated Attachment P4

(Past Performance Information Form) in MS Word format, however, the attachment footer indicates only

2 pages. Table L1 indicates that there is no page limit for Volume 2 Past Performance. Is it the government’s intent to allow offerors to expand beyond the second page of P4?

Yes, it is the Government’s intent to allow

Offerors to expand the second page to meet the no page limitation set forth in Section L, Part A, Table L1: Page Limitations, Volume 2

Past Performance.

4 It appears while the government renumbered the SOW section headings within 3.1, the changes did not track through to the original SOW paragraphs requested to be addressed within Section L. Did the government intend to change the section L SOW requirements also, or do they desire to keep the original paragraphs to be addressed consistent?

revisions made to Section C in Amendment

0001.

5 On September 20, 2017 the Government released answers to the industry questions. The Government’s response for Question #20 “This question will be addressed via Amendment 001” The question was

“Where is the Government expecting that cost in

Volume 3”. Does the Government intent to release a second amendment or provide clarification?

Depending on the Government answer it will have a significant impact on pricing and has potential of skewing rates and cost build-ups between the offerors.

Request a 1 week extension based upon the

Government’s response or non-response to Question

#20.

Amendment 0001 included CLIN 0021, which allows for pricing of all non-labor costs necessary and incidental to provide the services described at Section C, Paragraph

3.1.4. The Government does not intend to

further amend Section B or grant any further extensions to the proposal due date.

File details come from the government source that posted it. Updated .