Draft_RFP_N00421-17-R-001_Q&A_Part_2_of_2.pdf

PDF 88 KB Posted

Attached to
PMA-281 Systems Lifecyle Support
Solicitation number
N00421-17-R-0014
Issued by

About this file

Draft RFP N00421-17-R-0014 Q&A Part 2 of 2.

View the file

Other files

File Type Posted
N00421-17-R-0014_-_Q&A_Part_2.pdf PDF
Attachment_P7__Annual_Fully_Burdened_Labor_.xlsx XLSX spreadsheet
N00421-17-R-0014-0001.pdf PDF
Attachment_P4_Past_Performance_Information_Form.docx DOCX document
Attachment_P6_CLIN_Breakout_Spreadsheet.xlsx XLSX spreadsheet
N00421-17-R-0014_-_Q&A.pdf PDF
Attachment_P5__Contractor_Performance_Assessment_(CPAQ)_.pdf PDF
N00421-17-R-0014.pdf PDF
Attachment_P6_CLIN_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_5_WD_15-4341_(Rev._-6).pdf PDF
Attachment_12_WD_15-5799_(Rev._-4)_.pdf PDF
Attachment_P4_Past_Performance_Information_Form.pdf PDF
Attachment_P7__Annual_Fully_Burdened_Labor_.xlsx XLSX spreadsheet
Attachment_1_DD_Form_254.pdf PDF
Attachment_7_WD_15-5547_(Rev._-4).pdf PDF
Attachment_3_Surveillance_Activity_Checklist_(SAC).pdf PDF
Attachment_11_WD_15-5781_(Rev.-3).pdf PDF
Attachment_4_JMPS_IGS_Schedule.pdf PDF
Attachment_8_WD_15-5597_(Rev._-4.pdf PDF
Exhibit_A_A001-A028.pdf PDF
Attachment_6_WD_15-4539_(Rev._-3).pdf PDF
Attachment_10_WD_15-5635_(Rev._-6).pdf PDF
Attachment_2_GFP.pdf PDF
Attachment_9_WD_15-5611_(Rev._-3).pdf PDF
Draft_RFP_N00421-17-R-0014_-_Q&A_Part_1_of_2.pdf PDF
Attachment_5_JMPS_Master_Schedule_-_DRAFT.xlsx XLSX spreadsheet
Attachment_4_Integrated_Government_Schedule_-_DRAFT.pdf PDF
Attachment_P5__Contractor_Performance_Assessment_Questionnaire_(CPAQ).pdf PDF
Attachment_P6_CLIN_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_2_Government_Furnished_Equipment.xlsx XLSX spreadsheet
Attachment_P7_Fully_Burdened_Labor_Rates_Spreadsheet.xlsx XLSX spreadsheet
N00421-17-R-0014.pdf PDF
Exhibits_A001_-_A028.xls XLS spreadsheet
Attachment_3_Surveillance_Activity_Checklist_(SAC).docx DOCX document
Attachment_1_DD_Form_254.pdf PDF
Attachment_P4_Past_Performance_Information_Form.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft RFP N00421-17-R-0014 Question & Response

# Page

Sections /

Paragraphs

Questions Answers

1 21 C.4.0 Section C.4.0 (Security) states that contractor personnel are required to have access to classified material up to the Top Secret (TS) level, later stating to the TS/SCI level. Can the government provide the estimated number of TS/SCI billets required to support the contract?

There will be three (3) TS/ SCI level clearances required. This will be clarified in the final RFP.

2 23 C.5.0 The “Training and Development Specialists, Journeyman” account for 16FTEs each year for FFP support. These positions are critical in the support of PMA281 Systems located at numerous field locations. Recommend a percentage of these positions (4 FTEs, 25%) be considered Key Personnel, and as such, require resume submittals.

20 FTEs are required for the Training and Development Specialist labor category. This will be reflected in the final RFP.

3 24 C.5.0 The BLS SOC No. listed for the “Information

Management and Technology Analyst, Senior” (15-1241) does not appear to be valid.

Request clarification on the correct code

The correct BLS SOC No. for

Information Management and

Technology Analyst, Senior is BLS

SOC No 15-1152.

5 63 Table L1

(3.4)

Request that the page limit for compensation plans be removed. Our corporate plans are quite lengthy.

The page limit for the compensation plan will be updated in the final RFP.

6 PWS 3.1.4,

3.3.2.2 &

3.5.2.4

PWS 3.1.4, 3.3.2.2 and 3.5.2.4 speak of product receipt and distribution, material coordination/tracking and warehouse-type operations. Will the Government provide the specifications/requirements for warehouse-type operations such as total floor space;

storage bin and/or shelving and/or rack requirements and shelf weight specs and

Length/width/depth dimensions; forklift

(weight capacity); overhead crane/lift requirements; and other specific requirements to support PWS 3.1.4, 3.3.2.2 and 3.5.2.4?

While the Government does not have a specific requirement for the warehouse (e.g. square footage, etc.,) the current effort is being fulfilled using a warehouse that is approximately 10,000 sq. feet. All

GFP to be provided, including the items currently being stored in the warehouse, will be included as

Attachment (2) in the final RFP.

7 Will we be able to utilize the Naval Data

Distribution System (NDDS) to deliver software and IA patches? The V-22 SSA currently uses NDDS to distribute software to

MV & CV squadrons.

The requirement is accurate as written.

PMA-281 currently uses AUDT to distribute software, including software and IA patches, and NDDS to distribute JMPS documentation and training.

8 Can we be granted read only access to the Only users designated as system containing existing accreditation / security authorization packages?

Cybersecurity Workforce Compliant can be provided access to Navy eMASS; therefore, this access will be provided to the successful offeror after contract award.

9 What are the specific DoDD 8140.01 / DoD

8570.01.M workforce qualification requirements for The Contractor cyber personnel on this contract?

The Contractor would require

CompTIA Security+ ce as well as any necessary background clearances required for privileged access. A signed privileged access statement is required. The minimum qualifications for the Information Security Manager labor category will be revised in the final RFP.

Update to Part 1 Questions and Answers

16 69

L. Part B.

Cost 3.3 (f)

Wage

Determinatio n, and (g)

SCA Labor

Request these be struck since SCA is not applicable. This solicitation has labor categories and qualifications to adhere to.

Original Response:

SCA labor is not applicable and will be removed from the final RFP.

Update:

Due to the meaningful number of

Service Contract Act (SCA) FTEs, the content in Section L regarding SCA labor and all applicable SCA clauses and attachments will be included in the final RFP.