Attachment_3_Surveillance_Activity_Checklist_(SAC).pdf

PDF 212 KB Posted

Attached to
PMA-281 Systems Lifecyle Support
Solicitation number
N00421-17-R-0014
Issued by

About this file

SAC

View the file

Other files

File Type Posted
N00421-17-R-0014_-_Q&A_Part_2.pdf PDF
N00421-17-R-0014-0001.pdf PDF
Attachment_P4_Past_Performance_Information_Form.docx DOCX document
Attachment_P6_CLIN_Breakout_Spreadsheet.xlsx XLSX spreadsheet
Attachment_P7__Annual_Fully_Burdened_Labor_.xlsx XLSX spreadsheet
N00421-17-R-0014_-_Q&A.pdf PDF
Attachment_P7__Annual_Fully_Burdened_Labor_.xlsx XLSX spreadsheet
Attachment_11_WD_15-5781_(Rev.-3).pdf PDF
Attachment_5_WD_15-4341_(Rev._-6).pdf PDF
Attachment_1_DD_Form_254.pdf PDF
Attachment_7_WD_15-5547_(Rev._-4).pdf PDF
Attachment_6_WD_15-4539_(Rev._-3).pdf PDF
Exhibit_A_A001-A028.pdf PDF
Attachment_10_WD_15-5635_(Rev._-6).pdf PDF
N00421-17-R-0014.pdf PDF
Attachment_P4_Past_Performance_Information_Form.pdf PDF
Attachment_4_JMPS_IGS_Schedule.pdf PDF
Attachment_8_WD_15-5597_(Rev._-4.pdf PDF
Attachment_2_GFP.pdf PDF
Attachment_P5__Contractor_Performance_Assessment_(CPAQ)_.pdf PDF
Attachment_9_WD_15-5611_(Rev._-3).pdf PDF
Attachment_P6_CLIN_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_12_WD_15-5799_(Rev._-4)_.pdf PDF
Draft_RFP_N00421-17-R-001_Q&A_Part_2_of_2.pdf PDF
Draft_RFP_N00421-17-R-0014_-_Q&A_Part_1_of_2.pdf PDF
Attachment_P5__Contractor_Performance_Assessment_Questionnaire_(CPAQ).pdf PDF
Attachment_1_DD_Form_254.pdf PDF
Attachment_P6_CLIN_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_3_Surveillance_Activity_Checklist_(SAC).docx DOCX document
Exhibits_A001_-_A028.xls XLS spreadsheet
Attachment_4_Integrated_Government_Schedule_-_DRAFT.pdf PDF
Attachment_2_Government_Furnished_Equipment.xlsx XLSX spreadsheet
Attachment_P7_Fully_Burdened_Labor_Rates_Spreadsheet.xlsx XLSX spreadsheet
N00421-17-R-0014.pdf PDF
Attachment_P4_Past_Performance_Information_Form.pdf PDF
Attachment_5_JMPS_Master_Schedule_-_DRAFT.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Surveillance Activity Checklist (SAC)

STRIKE PLANNING AND EXECUTION SYSTEMS SUPPORT SERVICES

1.0 INTRODUCTION

1.1. Purpose. In accordance with FAR 46.103 the purpose of the Surveillance Activity Checklist (SAC) is to identify the methods and procedures the Government will use to evaluate contractor performance while concurrently determining the contractor is meeting the mission essential elements of the Statement of Work

(SOW). The SAC is designed to provide an effective surveillance method by monitoring contractor performance for each listed performance objective in the Performance Requirements Summary (See Section 7).

1.1.1 .The SAC provides a systematic method to evaluate the services the Contractor is required to perform as specified in the SOW and the contract proposal.

1.1.2. The SAC is developed by the requiring activity. It is designed to provide direction to personnel performing contractor surveillance activities. Personnel surveying the contract terms and conditions and SOW requirements will periodically review the SAC throughout the life of the contract.

2.0 ROLES AND RESPONSIBILITIES.

2.1. Government. The role of the Government in quality assurance is to ensure the Contractor is performing in accordance with the contract requirements and that contract standards are achieved.

2.2. Contracting Officer. The Contracting Officer (KO) is responsible for safeguarding the interests of the

United States Government in contractual relationships. Only the KO is authorized to bind the Government and then, only to the extent of the authority entrusted to them through the issuance of a warrant.

2.2.1. The KO designates authority for inspection and/or acceptance responsibilities to the Contracting Officer

Representative (COR) – or delegates authority to another certified acquisition professional - in accordance with the FAR/DFARS. This documented authority allows the COR, or other certified acquisition professionals, to act on the KO’s behalf.

2.3. Contracting Officer Representative (COR). The COR when designated:

2.3.1. The COR serves as the eyes and ears for the KO at the Contractor’s site.

2.3.2. The COR monitors contractor performance to ensure contract requirements are met for: Performance, Cost, and Schedule.

2.3.3. The COR ensures that contract quality requirements, provisions, standards, and thresholds are defined, practical, enforceable, necessary, and verifiable.

2.3.4. The COR evaluates and documents contractor performance in accordance with this SAC and the SOW.

2.3.5. The COR notifies the KO of any significant performance deficiencies using a Contractor Discrepancy

Report with supporting documentation.

2.3.6. The COR maintains surveillance documentation.

2.3.7. The COR recommends improvements to the SAC and SOW throughout the life of the contract.

Strike Planning and Execution systems SAC

2.3.8 The COR is not empowered to make any contractual commitments or to authorize any changes on the

Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the PCO for action.

3.0 DESCRIPTION OF SERVICES

3.1. Scope of Work. The scope of this effort is to provide Integrated Logistics Support (ILS) Services in support of PMA-281 Systems. General ILS efforts shall include, but not be limited to, Engineering, Integration and

Installation, Customer Support Services, Maintenance Planning, Supply Support, Design Interface, Computer

Resource Support, Technical Documentation development, and Training.

The scope of this effort will provide ILS such that the supported systems can achieve Key Performance

Parameters (KPPs) as identified in the individual system or Operational Requirements Document (ORDs). The schedule of program activities that the Contractor shall support is delineated in the PMA-281 Integrated

Government Schedule (IGS) and Long Range Schedule (LRS). For shipboard installations the Contractor shall deliver ILS products in accordance with (IAW) Surface Ship and Carrier Entitled Process for Modernization

(SSCEPM) Management and Operations Manual (SL720-AA-MAN-030) (SHIPMAIN / The One Book). For shore installations, the Contractor shall deliver ILS products IAW the Fleet Readiness Control Board (FRCB) approval process. The Contractor shall adhere to the Department of Defense (DOD) Instruction 8500.1

Information Assurance (IA) and DoD Instruction 8500.2 IA Implementation. The NavMPS training program processes are delineated within the NavMPS Navy Training System Plan (NTSP). Technical documentation will be developed IAW current DOD and Department of the Navy (DoN) policies.

4.0 QUALITY REQUIREMENTS

4.1. Quality Control Program. The Contractor, not the Government, is responsible for management and quality control actions to meet the terms of the contract. Details of these controls will be documented in the contractor’s

Quality Control Plan.

4.2. Level of Performance Evaluation. The Contractor will be evaluated in the following five areas: (1) excellent staffing stability and resource planning; (2) consistent delivery of high quality services and deliverables;

(3) timeliness of products and services; (4) positive business relations, customer satisfaction, and timely and open communication / Task Order coordination with supporting vendors; (5) timely, accurate and complete program reporting. Government customers / Integrated Product Team (IPT) Leads supported by contractor personnel will provide an independent performance evaluation monthly, in accordance with the Section 7.3. The monthly PMSs will also be utilized to complete the annual Contractor Performance Assessment Reports (CPAR). Any discrepancies will be brought to the attention of the KO.

4.3. Timely Feedback to Contractor: Timely feedback to the Contractor on unacceptable performance will be provided by the COR and documented in writing. Prompt feedback is essential so that the Contractor can develop and implement a corrective action plan. The Contractor's corrective action must be reported to the Contracting

Officer for tracking purposes.

5.0 SURVEILLANCE

The COR will perform monthly surveillance based on the quality and effectiveness of the Contractor’s data deliverables as well as the services provided. Regardless of the surveillance method, the COR shall always contact the Contractor's quality manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, when designated, shall be responsible for monitoring the

Contractor’s performance in meeting specific performance standards. The COR(s) assigned to perform surveillance of the Contractor’s performance manages a Surveillance Folder for their assigned contract requirements. The folder has the following divisions:

5.0.1. COR appointment letter, KO letter of designation, and Training Record.

5.0.2. SOW and other pertinent parts of the contract.

5.0.3. Surveillance Plan.

5.0.4. Surveillance Reports / Performance Metrics Surveys

5.0.5. Other applicable documentation, such as: (1) Customer and user comments and (2) Data and technical reports.

5.1. Surveillance methods. The COR, with potential input from the Technical Point of Contact

(TPOC)/Alternate Technical Point of Contact (ATPOC)/User, must use at least 1 of the surveillance methods listed below in the administration of this SAC.

a. PLANNED - DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)

b. PERIODIC INSPECTION. (Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)

c. PERIODIC SAMPLING. (Variation of random sampling. However, sample is only taken when a deficiency is suspected. Good follow-up to MIS analysis. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.)

d. RANDOM SAMPLING. (Designed to evaluate the outputs of the award requirement by randomly selecting and inspecting a statistically significant sample. Highly recommended for large quantity repetitive activities with objective and measurable quality attributes.)

e. USER SURVEY. (Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. Appropriate for high quantity activities that have historically been satisfactory. May also generate periodic and 100% inspections.)

f. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.)

g. 100% INSPECTION. (Evaluates all outputs. Most applicable to small quantity, but highly important services. May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security.)

5.2. Unacceptable Performance. If the number of complaints/defects exceeds the performance threshold for any performance objective, the COR will determine the possible cause of this unacceptable performance. Government-caused complaints/defects will not be counted against the Contractor. The same applies to any other requirement of the contract when Government-caused complaints/defects are the cause of unacceptable contractor performance. If the

Contractor’s performance is judged unacceptable for any requirement by the COR, the COR will document the discrepancy as a non-conformance and inform the Contracting Officer (if needed) for resolution. Significant (major non-conformance) performance deficiencies must be submitted to the Contracting Officer using a Contractor

Discrepancy Report and include supporting documentation.

6.0 DOCUMENTATION REQUIREMENTS

6.1. Contract Deliverables. Delivery requirements include:

A001 Program / System Compliance Documentation - Operational Security

(OPSEC) Plan

A002 COOP/DR Documentation

A003 Program Management Documentation – Progress, Status and Management report

A004 Plan of Actions and Milestones – Installation and Fielding Plans

A005 Program Technical / Functional Documentation- Engineering Change Proposal

A006 Engineering Change Proposal – Configuration Management

A007 System Documentation - Warranty Status Report

A008 System Supply Documentation - Monthly Inventory Report

A009 System Documentation – Site Survey Report

A010 System Documentation – Integration Drawings

A011 Advanced Concepts Documentation – Technical Reports – Study/Services

A012 Program Management Documentation – Conference/Trip Reports

A013 System Documentation – Installation Control Drawings (ICDs)

A014 System Documentation – TMPC System Maintenance Manuals

A015 System Documentation – Site Installation Plan

A016 Program Control Documentation – Financial Reports

A017 System Documentation - Semi-annual Sponsor Owned Material/Government

Owned Material

A018 System Documentation- Training Material

A019 System Documentation- Training Plan

A020 Computer Software Product End Items (CSPEI)

A021 Software Requirements Specifications (SRS)

A022 Software Test Plan

A023 Technical Report Study/ Services Requirements Traceability Matrix (RTM)

A024 Software Design Description

A025 Software Version Description

A026 Software Test Description

A027 Software Test Report

A028 Interface Control Document (ICD)

6.2. Contract Manpower Reporting Application. The COR is responsible for validating the Contractor’s input into the Enterprise-Wide Contract Manpower Reporting Application (ECMRA) website at https://doncmra.nmci.navy.mil. The COR is to obtain a user name and password, and validate that the contractor has completely filled in required contractor information at the ECMRA web site by November 30 of the first year of the contract and annually by November 30 thereafter for the duration of the contract, or sooner if the contract is closed out. The COR shall perform this validation during the month of November each year. The COR shall report the CMRA results in the November Monthly COR Report (due in December of each year) to the KO each year. Discrepancy Reports are as required.

7.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS)

7.1. Overview. The PRS details and identifies the contractor requirements by performance objectives that relate directly to mission essential elements from the SOW. The performance threshold describes the minimum acceptable levels of service required for each contractor requirement. These thresholds define minimum acceptance standards critical to mission success. Various methods of surveillance exist to monitor performance;

see Section 5.1.

7.2. Performance Evaluation. Performance of a service will be evaluated to determine whether or not it meets the performance threshold. Revising and resubmitting the documentation at no cost to the Government is the preferred method for correcting unacceptable performance. The Contractor shall provide the Government a written response as to why the performance threshold was not met, how performance will be returned to acceptable levels, and how recurrence of the cause will be prevented in the future.

7.3. Performance Objectives, Indicators, Thresholds, and Surveillance Methods. The services required by the

Contractor are summarized into performance objectives and indicators, along with the minimum standards that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of quality or service required for each requirement. These thresholds are critical to mission success.

https://doncmra.nmci.navy.mil/

Performance

Objective

Performance Threshold

(Satisfactory Performance)

Method of

Surveillance Monthly Payment

PRS #1 (SOW 3.1 -

3.6)

Excellent staffing stability and resource planning across the effort defined in this

Task Order.

1. Management of personnel (retention, replacements, etc.) does not negatively impact quality or timeliness of products and services across the program

1. 100% Inspection of Monthly Progress, Status, and Management Report by COR/ACOR (with TPOC input).

2. Customer Feedback

1) No more than one (1) valid complaint during the contract performance period.

2) Government approval of additional per personnel obtained 100% of the time.

PRS #2 (SOW 3.1 -

3.6) Consistent delivery of high quality technical and logistics documentation

1. Deliverables will be completed with 98% accuracy.

2. Any errors / omissions identified by the

Government are corrected within 10 business days.

1. 100% Inspection of CDRLS by COR /ACOR (with TPOC input).

instance where adjustments to deliverables is required by the Government.

2) All errors / omissions identified by the

Government were corrected within five (5) business days.

PRS #3 (SOW 3.1 -

3.6) Required deliverables and services were provided on schedule.

1. Services and deliverables were submitted on time 98% of the time. Exceptions were due to circumstances outside of the Contractor’s control.

1. 100% Inspection of CDRLS by COR /ACOR (with TPOC input).

1) No more than two (2) instances where deliverables were submitted late.

Performance

Objective

Performance Threshold

(Satisfactory Performance)

Method of

Surveillance Monthly Payment

PRS #4 (SOW 3.1 -

3.6) Positive Business Relations, Customer Satisfaction and Timely and Open Communication.

1. The Contractor was responsive to Government concerns and promptly applied corrective action to performance issues.

2. The Contractor provided timely notification of issues and/or items requiring Government actions.

3. Initial Support for

Mission critical calls will be within 12 hours of first contact

4. For all trouble calls, the

Contractor shall reply with a preliminary

Action Plan within twelve (12) hours of receipt

5. All customers will receive an electronic survey to complete allowing the customer to provide level of satisfaction

1. Customer Feedback

2. 100% Inspection of

Monthly Progress, Status, and

Management Report and eCMR requirement by

COR/ACOR (with

TPOC input).

valid complaint during the contract performance

2) No more than one (1) untimely corrective action or untimely notifications within the contract performance period.

PRS #5 (SOW 3.7)

Timely, Accurate and

Complete Program

Reporting

1. Monthly Progress, Status, and Management

Report and eCMR are delivered on time and meet all PWS content requirements.

1. 100% Inspection of

Monthly Progress, Status, and

Management Report and eCMR requirement by

COR/ACOR (with

TPOC input).

1) 100% accuracy during the contract performance

2) 100% timely delivery of

CDRLs.