This document contains a draft statement of work and pricing schedule for a federal contract to provide technical, engineering, operations and maintenance support services for deployed communication and electronic systems overseas. Key details include: the contractor shall provide support for legacy and current deployed systems in Central Command and Africa Command areas of responsibility, including inspection, troubleshooting, maintenance, logistics support and training; composite labor rates and ceilings are provided for five contract years; cost-plus-fixed-fee and cost reimbursement contract line items are included for labor, data, and other direct costs using different appropriation types; and the solicitation number is N00421-16-R-0073 with the Naval Air Warfare Center Aircraft Division as the issuing agency. The incumbent contractor is BAE Systems Technology Solutions & Services.
Section B - Supplies or Services and Prices
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
B-1 COMPOSITE RATES
B-1 COMPOSITE LABOR RATES
This language is designed for use in conjunction with H-2 Issuance of Orders Using Streamlined Procedures NAVAIR 5252.216-9540 (Variation)(May 2017). For purposes of estimating and establishing a labor cost ceiling for each task order, the following composite rates will be used by multiplying the composite rate for labor category by the estimated hours for each labor category. Overtime will be used by multiplying the rate for labor category by the time and a half estimated hours based on the work schedule. These rates are estimates, and invoicing will be based on actual costs incurred. Ceiling for ODCs will be priced in accordance with the Government Estimate. Orders crossing multiple years will be estimated by the Government using the composite rates for each year in proportion to the period of performance of the order.
| Labor Category (* = Key) |
| Composite Fully Burdened Rates |
| Year 1 |
| Year 2 |
| Year 3 |
| Year 4 |
| Year 5 |
| 02/23/2019 – 02/22/2020** |
| 02/23/2020 – 02/22/2021** |
| 02/23/2021 – 02/22/2022** |
| 02/23/2022 – 02/22/2023** |
| 02/23/2023 – 02/22/2024** |
ELECTRONICS TECHNICIAN I, MAINTENANCE
ELECTRONICS TECHNICIAN II, MAINTENANCE
ELECTRONICS TECHNICIAN III MAINTENANCE
ENGINEERING TECHNICIAN I
ENGINEERING TECHNICIAN III*
BUDGET ANALYST, JOURNEYMAN
PROGRAM ANALYST, JOURNEYMAN*
SYSTEMS ANALYST, JOURNEYMAN
*Indicates Key Personnel, see Section C, paragraph 13.4 for more information **Dates to be adjusted at contract award
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
CPFF Labor Ceiling for CLINs 0002-0005
CPFF
Cost Plus Fixed Fee (CPFF) Labor Ceiling for CLINs 0002 - 0005 in accordance with Statement of Work (SOW) Paragraphs 3.1 - 3.3.
FOB: Destination
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| AMOUNT |
| 0002 |
| CPFF Labor to Support CLIN 0001 |
NSP
CPFF Operations & Maintenance (O&M) Funding in support of (SOW) paragraphs 3.1 - 3.3. Not Separately Priced from CLIN 0001
| ITEM NO |
| SUPPLIES/SERVICES |
| AMOUNT |
| 0003 |
| CPFF Labor to Support CLIN 0001 |
NSP
Procurement Funding in support of (SOW) paragraphs 3.1 - 3.3. Not Separately Priced from CLIN 0001.
| ITEM NO |
| SUPPLIES/SERVICES |
| AMOUNT |
| 0004 |
| CPFF Labor to Support CLIN 0001 |
NSP
Working Capital Funding (WCF) in support of (SOW) paragraphs 3.1 - 3.3. Not Separately Priced from CLIN 0001
| ITEM NO |
| SUPPLIES/SERVICES |
| AMOUNT |
| 0005 |
| CPFF Labor to Support CLIN 0001 |
NSP
Non-Department of Defense (DOD) Funding in support of (SOW) Paragraphs 3.1 - 3.3. Not Separately Priced from CLIN 0001.
| ITEM NO |
| SUPPLIES/SERVICES |
| AMOUNT |
| 0006 |
| Data support of CLINs 0001- 0011 |
NSP
Data in Support of CLIN 0001 in accordance with (SOW) Paragraphs 3.1 - 3.3. Not Separately Priced.
| ITEM NO |
| SUPPLIES/SERVICES |
| AMOUNT |
| 0007 |
| COST ODC Ceiling - CLINs 0008 - 0011 |
COST
ODC to support CLIN 0001 in accordance with (SOW) Paragraphs 3.1 - 3.3.
| ITEM NO |
| SUPPLIES/SERVICES |
| AMOUNT |
| 0008 |
| COST O&M ODC to Support CLIN 0007 |
NSP
COST
Operations and Maintenance (O&M) Funding - ODCs. Not Separately Priced from CLIN 0007.
| ITEM NO |
| SUPPLIES/SERVICES |
| AMOUNT |
| 0009 |
| COST Procurement ODC Support CLIN 0007 |
NSP
COST
Procurement - ODC. Non Department of Defense (DOD). Not Separately Priced from CLIN 0007.
| ITEM NO |
| SUPPLIES/SERVICES |
| AMOUNT |
| 0010 |
| COST WCF ODC to Support CLIN 0007 |
NSP
COST
WCF ODCs. Not Separately Priced from CLIN 0007
| ITEM NO |
| SUPPLIES/SERVICES |
| AMOUNT |
| 0011 |
| COST ODC to Support CLIN 0007 |
NSP
COST
ODCs. Non Department of Defense (DOD) Funding.
CLAUSES INCORPORATED BY FULL TEXT
| 5252.211-9503 | LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012) |
| (a) The level of effort estimated to be ordered during the term of this contract is 787,200 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in this basic contract. The estimated composition of the total man-hours of direct labor by classification is as follows: |
| CLIN 0001 |
| TOTAL |
| Labor Hours |
| 787, 200 |
Totals
* denotes Key Personnel labor categories
| (b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22. | |
| (c) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of: | |
| (1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or 52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort; or | |
| (2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort. | |
| (d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations. | |
| (e) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order. |
File details come from the government source that posted it. Updated .