N00421-16-R-0073_Section_B.docx

DOCX document 21 KB Posted

Attached to
Deployed Mission Support (DMS) Federal contract opportunity
Solicitation number
N00421-16-R-0073
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document contains a draft statement of work and pricing schedule for a federal contract to provide technical, engineering, operations and maintenance support services for deployed communication and electronic systems overseas. Key details include: the contractor shall provide support for legacy and current deployed systems in Central Command and Africa Command areas of responsibility, including inspection, troubleshooting, maintenance, logistics support and training; composite labor rates and ceilings are provided for five contract years; cost-plus-fixed-fee and cost reimbursement contract line items are included for labor, data, and other direct costs using different appropriation types; and the solicitation number is N00421-16-R-0073 with the Naval Air Warfare Center Aircraft Division as the issuing agency. The incumbent contractor is BAE Systems Technology Solutions & Services.

Section B - Supplies or Services and Prices

View the file

Other files for this federal contract opportunity

Other files attached to Deployed Mission Support (DMS), newest first.
File Type Posted
N00421-16-R-0073_Amendment_0004m.docx DOCX document
N00421-16-R-0073_Amendment_0003r.docx DOCX document
Attachment_07_-_Reserved.docx DOCX document
N00421-16-R-0073-0002.docx DOCX document
Attachment_P6_Cost_Summary_Spreadsheet.xls XLS spreadsheet
N00421-16-R-0073_DMS_Amendment_0001.docx DOCX document
Attachment_P3_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Attachment_P4_-_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Attachment_14_Close-Out.doc DOC document
Attachment_11_Small_Business_Subcontracting_Plan.docx DOCX document
Attachment_04_Authorized_Subcontractors.docx DOCX document
Attachment_08_Authorized_Key_Personnel.docx DOCX document
Attachment_07_-_Wage_Determinations.docx DOCX document
Exhibit_A_Deployed_Mission_Support_CDRLs_signed.pdf PDF
Attachment_01_BID_DD254_signed.pdf PDF
Attachment_3_-_OCI_List.docx DOCX document
Attachment_P3_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Attachment_13_Elec_Transfer_Instructions.doc DOC document
Attachment_15_RDTE_LAN_SOP_vNov16.docx DOCX document
Attachment_05_COR_Designation_Letter.docx DOCX document
Attachment_P2_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_02_Non-Navy_IT_Compliance_Form.docx DOCX document
Attachment_P6_Cost_Summary_Spreadsheet.xls XLS spreadsheet
Attachment_09_DataItemTransmittalForm.docx DOCX document
Attachment_06_ACOR_Designation_Letter.docx DOCX document
Attachment_P4_-_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Attachment_P5_Reserved_1.docx DOCX document
Attachment_10_CSP.doc DOC document
Attachment_P1_-_Past_Perf_Information_Form.pdf PDF
Attachment_12_FinancialProgressReportFormat.docx DOCX document
N00421-16-R-0073_DMS_Solicitation.docx DOCX document
N00421-16-R-0073_Section_M.docx DOCX document
N00421-16-R-0073_Section_A.docx DOCX document
N00421-16-R-0073_Section_L.docx DOCX document
N00421-16-R-0073_Section_C.docx DOCX document
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

B-1 COMPOSITE RATES

B-1 COMPOSITE LABOR RATES

This language is designed for use in conjunction with H-2 Issuance of Orders Using Streamlined Procedures NAVAIR 5252.216-9540 (Variation)(May 2017). For purposes of estimating and establishing a labor cost ceiling for each task order, the following composite rates will be used by multiplying the composite rate for labor category by the estimated hours for each labor category. Overtime will be used by multiplying the rate for labor category by the time and a half estimated hours based on the work schedule. These rates are estimates, and invoicing will be based on actual costs incurred. Ceiling for ODCs will be priced in accordance with the Government Estimate. Orders crossing multiple years will be estimated by the Government using the composite rates for each year in proportion to the period of performance of the order.

Labor Category (* = Key)
Composite Fully Burdened Rates
Year 1
Year 2
Year 3
Year 4
Year 5
02/23/2019 – 02/22/2020**
02/23/2020 – 02/22/2021**
02/23/2021 – 02/22/2022**
02/23/2022 – 02/22/2023**
02/23/2023 – 02/22/2024**

ELECTRONICS TECHNICIAN I, MAINTENANCE

ELECTRONICS TECHNICIAN II, MAINTENANCE

ELECTRONICS TECHNICIAN III MAINTENANCE

ENGINEERING TECHNICIAN I

ENGINEERING TECHNICIAN III*

BUDGET ANALYST, JOURNEYMAN

PROGRAM ANALYST, JOURNEYMAN*

SYSTEMS ANALYST, JOURNEYMAN

*Indicates Key Personnel, see Section C, paragraph 13.4 for more information **Dates to be adjusted at contract award

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Lot

CPFF Labor Ceiling for CLINs 0002-0005

CPFF

Cost Plus Fixed Fee (CPFF) Labor Ceiling for CLINs 0002 - 0005 in accordance with Statement of Work (SOW) Paragraphs 3.1 - 3.3.

FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
AMOUNT
0002
CPFF Labor to Support CLIN 0001

NSP

CPFF Operations & Maintenance (O&M) Funding in support of (SOW) paragraphs 3.1 - 3.3. Not Separately Priced from CLIN 0001

ITEM NO
SUPPLIES/SERVICES
AMOUNT
0003
CPFF Labor to Support CLIN 0001

NSP

Procurement Funding in support of (SOW) paragraphs 3.1 - 3.3. Not Separately Priced from CLIN 0001.

ITEM NO
SUPPLIES/SERVICES
AMOUNT
0004
CPFF Labor to Support CLIN 0001

NSP

Working Capital Funding (WCF) in support of (SOW) paragraphs 3.1 - 3.3. Not Separately Priced from CLIN 0001

ITEM NO
SUPPLIES/SERVICES
AMOUNT
0005
CPFF Labor to Support CLIN 0001

NSP

Non-Department of Defense (DOD) Funding in support of (SOW) Paragraphs 3.1 - 3.3. Not Separately Priced from CLIN 0001.

ITEM NO
SUPPLIES/SERVICES
AMOUNT
0006
Data support of CLINs 0001- 0011

NSP

Data in Support of CLIN 0001 in accordance with (SOW) Paragraphs 3.1 - 3.3. Not Separately Priced.

ITEM NO
SUPPLIES/SERVICES
AMOUNT
0007
COST ODC Ceiling - CLINs 0008 - 0011

COST

ODC to support CLIN 0001 in accordance with (SOW) Paragraphs 3.1 - 3.3.

ITEM NO
SUPPLIES/SERVICES
AMOUNT
0008
COST O&M ODC to Support CLIN 0007

NSP

COST

Operations and Maintenance (O&M) Funding - ODCs. Not Separately Priced from CLIN 0007.

ITEM NO
SUPPLIES/SERVICES
AMOUNT
0009
COST Procurement ODC Support CLIN 0007

NSP

COST

Procurement - ODC. Non Department of Defense (DOD). Not Separately Priced from CLIN 0007.

ITEM NO
SUPPLIES/SERVICES
AMOUNT
0010
COST WCF ODC to Support CLIN 0007

NSP

COST

WCF ODCs. Not Separately Priced from CLIN 0007

ITEM NO
SUPPLIES/SERVICES
AMOUNT
0011
COST ODC to Support CLIN 0007

NSP

COST

ODCs. Non Department of Defense (DOD) Funding.

CLAUSES INCORPORATED BY FULL TEXT

5252.211-9503LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012)
(a) The level of effort estimated to be ordered during the term of this contract is 787,200 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in this basic contract. The estimated composition of the total man-hours of direct labor by classification is as follows:
CLIN 0001
TOTAL
Labor Hours
787, 200

Totals

* denotes Key Personnel labor categories

(b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.
(c) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of:
(1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or 52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort; or
(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort.
(d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.
(e) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order.

File details come from the government source that posted it. Updated .