Exhibit_A_Deployed_Mission_Support_CDRLs_signed.pdf

PDF 691 KB Posted

Attached to
Deployed Mission Support (DMS) Federal contract opportunity
Solicitation number
N00421-16-R-0073
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document provides draft solicitation elements for a Deployed Mission Support contract opportunity with the Department of the Navy. The solicitation seeks technical, engineering, operations, and maintenance support services for forward deployed mission communication-electronic equipment and systems supporting overseas military units. Services include inspection, troubleshooting, maintenance, modification, logistics support, configuration management, and training. The contractor must be able to rotate personnel in and out of overseas locations every six months. The final solicitation is expected within 30 days under number N00421-16-R-0073. The NAICS code is 541330 with a small business size standard of $38.5 million. The PSC is J058. This is a follow-on to contract N00421-16-C-0035 for the same Deployed Mission Systems Support, currently held by BAE Systems Technology Solutions & Services. Any award will be posted on FEDBIZOPPS.

Exhibit A - CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to Deployed Mission Support (DMS), newest first.
File Type Posted
N00421-16-R-0073_Amendment_0004m.docx DOCX document
Attachment_07_-_Reserved.docx DOCX document
N00421-16-R-0073_Amendment_0003r.docx DOCX document
N00421-16-R-0073-0002.docx DOCX document
Attachment_P6_Cost_Summary_Spreadsheet.xls XLS spreadsheet
N00421-16-R-0073_DMS_Amendment_0001.docx DOCX document
Attachment_P3_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Attachment_P4_-_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Attachment_14_Close-Out.doc DOC document
Attachment_11_Small_Business_Subcontracting_Plan.docx DOCX document
Attachment_06_ACOR_Designation_Letter.docx DOCX document
Attachment_P4_-_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Attachment_P5_Reserved_1.docx DOCX document
Attachment_10_CSP.doc DOC document
Attachment_P1_-_Past_Perf_Information_Form.pdf PDF
Attachment_12_FinancialProgressReportFormat.docx DOCX document
Attachment_P3_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Attachment_13_Elec_Transfer_Instructions.doc DOC document
Attachment_15_RDTE_LAN_SOP_vNov16.docx DOCX document
Attachment_05_COR_Designation_Letter.docx DOCX document
Attachment_P2_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_02_Non-Navy_IT_Compliance_Form.docx DOCX document
Attachment_P6_Cost_Summary_Spreadsheet.xls XLS spreadsheet
Attachment_09_DataItemTransmittalForm.docx DOCX document
Attachment_04_Authorized_Subcontractors.docx DOCX document
Attachment_08_Authorized_Key_Personnel.docx DOCX document
Attachment_07_-_Wage_Determinations.docx DOCX document
Attachment_01_BID_DD254_signed.pdf PDF
Attachment_3_-_OCI_List.docx DOCX document
N00421-16-R-0073_DMS_Solicitation.docx DOCX document
N00421-16-R-0073_Section_L.docx DOCX document
N00421-16-R-0073_Section_C.docx DOCX document
N00421-16-R-0073_Section_M.docx DOCX document
N00421-16-R-0073_Section_A.docx DOCX document
N00421-16-R-0073_Section_B.docx DOCX document
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTS DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM ___X____Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

NAWCAD 4.11.4.6

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

Blk 16

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

N/A Reg Repro

16. REMARKS NAWCAD 4.11.4 1 0

Blks 10, 12, & 13 - Submit 15 working days before testing event.

Blk 14 Address:

Deliverable Manager Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

15. TOTAL 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 16 1007/183

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to

TBD

BLK 16

TBD

either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

TBD

Final

BLK 16

b. COPIES

DI-NDTI-80603A

5. CONTRACT REFERENCE

SOW Para 3.1

Deployed Mission Support

Test Procedures

11. AS OF DATE

Blks 7- Acceptance will be by the COR via the Data Item Transmittal/ACCeptance/Rejection Form (attachment 6). if this form has not been transmitted within 30 days of submission of CDRL, the CDRL is considered accepted.

Blk 16

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM X Other _______________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Technical Report – Study/Service Operational Readiness Review Reports

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

DI-MISC-80508B

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

(See Blk 16) REQUIRED

XX

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

Reg Repro

16. REMARKS NAWCAD 4.11.4 1 0

Blk 7 - XX - Acceptance will be by the COR via the Data Item Tranmittal/Acceptance/Rejection Form (Attachment 6).

If this form has not been transmitted within 30 days of submission of CDRL, the CDRL is considered accepted.

Blks 10, 11, 12 & 13 – Report is due according to project schedule/milestones.

Blk 14 Address:

Deliverable Manager Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423, Aug 96 Previous editions are obsolete Page 2 of 16

Blk 16 Blk 16

11. AS OF DATE

Deployed Mission Support

NAWCAD 4.11.4.6

b. COPIES

Final

Blk 16

Blk 16

5. CONTRACT REFERENCE

SOW Para 3.1

TBD TBD

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

TBD

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM X Other _______________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003 ****RESERVED****

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

8. APP CODE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

Reg Repro

16. REMARKS 0

15. TOTAL 0 0 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423, Aug 96 Previous editions are obsolete Page 3 of 16

b. COPIES

Final

TBD TBD

Deployed Mission Support

NAWCAD 4.11.4.6

11. AS OF DATE

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM X Other _______________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004 Technical Report – Study/Service Maintainability/Reliability/Supportability Status Report

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

DI-MISC-80508B

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

(See Blk 16) REQUIRED

XX

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

Reg Repro

16. REMARKS NAWCAD 4.11.4 1 0

Blk 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 6).

If this form has not been transmitted within 30 days of submission of CDRL, the CDRL is considered accepted.

Blks 10, 11, 12 & 13 – Submit NLT 10 days after maintainability/reliability/supportability study is completed

Blk 14 Address:

Deliverable Manager Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423, Aug 96 Previous editions are obsolete Page 4 of 16 either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

TBD

Blk 16

b. COPIES

TBD TBD

Blk 16 Blk 16

11. AS OF DATE Final

Blk 16

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to

Deployed Mission Support

NAWCAD 4.11.4.6

5. CONTRACT REFERENCE

SOW Para 3.1-3.2

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM X Other _______________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A005 Engineering Change Proposal

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

DI-CMAN-80639C

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

(See Blk 16) REQUIRED

XX

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

Reg Repro

16. REMARKS NAWCAD 4.11.4 1 0

Blk 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 6).

If this form has not been transmitted within 30 days of submission of CDRL, the CDRL is considered accepted.

Blks 10, 11, 12 & 13 – Submit NLT 15 working days after enginnering change requirements receive government approval.

Blk 14 Address:

Deliverable Manager Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423, Aug 96 Previous editions are obsolete Page 5 of 16

Blk 16 Blk 16

11. AS OF DATE

Deployed Mission Support

NAWCAD 4.11.4.6

b. COPIES

Final

Blk 16

Blk 16

5. CONTRACT REFERENCE

SOW Para 3.1-3.3

TBD TBD

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM X Other _______________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A006

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

DI-NDTI-80809B

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION Blk 16

(See Blk 16) REQUIRED

XX

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

Reg Repro

16. REMARKS NAWCAD 4.11.4 1 0

Blk 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 6).

If this form has not been transmitted within 30 days of submission of CDRL, the CDRL is considered accepted.

Blks 10, 11, 12 & 13 – Report is due NLT 10 working days after inspection, troubleshooting, and testing is completed.

Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423, Aug 96 Previous editions are obsolete Page 6 of 16

Deployed Mission Support

Test/Inspection Report

Final

Blk 16

b. COPIES

5. CONTRACT REFERENCE

SOW Para 3.1-3.2

TBD TBD

TBD

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

NAWCAD 4.11.4.6

Blk 16 Blk 16

11. AS OF DATE

Blk 16

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM ___X____Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A007

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

NAWCAD 4.11.4.6

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

Blk 16

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

N/A Reg Repro

16. REMARKS NAWCAD 4.11.4 1 0

Blks 7- Acceptance will be by the COR via the Data Item Transmittal/ACCeptance/Rejection Form (attachment 6).

if this form has not been transmitted within 30 days of submission of CDRL, the CDRL is considered accepted.

Blk 14 Address:

Deliverable Manager Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

15. TOTAL 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 7 of 16 1007/183 either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

TBD

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to

Deployed Mission Support

Product Drawings, Models, and Associated Lists

b. COPIES

Blk 16 BLK 16

5. CONTRACT REFERENCE

SOW Para 3.1 and 3.3

TBD TBD

11. AS OF DATE Final

BLK 16

DI-SESS-81000D

Blks 10, 12, & 13 - Submit NLT 10 working days after project design receives Government approval and after project material requirements are determined/updated

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM X Other _______________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A008 Technical Report – Study/Service Troubleshoot & Material/Equipment Status Reports

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

DI-MISC-80508B

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

(See Blk 16) REQUIRED

XX

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

Reg Repro

16. REMARKS NAWCAD 4.11.4 1 0

Blk 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 6).

If this form has not been transmitted within 30 days of submission of CDRL, the CDRL is considered accepted.

Blks 10, 11, 12 & 13 – Report is due NLT 10 working days after troubleshooting/material equipment status is completed.

Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423, Aug 96 Previous editions are obsolete Page 8 of 16

Blk 16 Blk 16

11. AS OF DATE

Deployed Mission Support

NAWCAD 4.11.4.6

b. COPIES

Final

Blk 16

Blk 16

SOW Para 3.1 and 5.1

TBD TBD

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM ___X____Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A009

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

NAWCAD 4.11.4.6

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

LT

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

N/A Reg Repro

16. REMARKS NAWCAD 4.11.4 1 0

Blk 9: Distribution authorized to U.S. Government agencies only. Other request for this document shall be referred to the Contracting Officer.

Blks 10, 12 & 13 - Submit within 10 days after trip or meeting.

Blk 14 Address:

Deliverable Manager Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

15. TOTAL 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 9 of 16 1007/183

Deployed Mission Support

Report/Minutes, Record of Meeting

11. AS OF DATE

Contractor Format

BLK 16

5. CONTRACT REFERENCE

SOW Para 3.1 - 3.3 and 5.1

Blk 16 Final

Trip/Meeting Report

b. COPIES

TBD

BLK 16

either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

TBD

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM ___X____Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A010

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

DI- MGMT-80227 NAWCAD 4.11.4.6

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

LT

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

N/A Reg Repro

16. REMARKS NAWCAD 4.11.4 1 0

Blk 4 - The contractor shall deliver a monthly technical progress report in accordance with instructions below: The COR may request

Blk 14 Address:

Deliverable Manager Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

15. TOTAL 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 10 of 16 1007/183

Final

TBD

b. COPIES

11. AS OF DATE

either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

5. CONTRACT REFERENCE

SOW Para, 4.1

BLK 16

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to

Deployed Mission Support

TBD

TBD

BLK 16

MTHLY

submission of monthly progress reports via electronic storage media such as CDs.

Blks 12 & 13 - Submit NLT 10th of each month following the first full month of the contract.

The report shall include the following items and data:

a. Cover sheet.

b. Major milestones summary. The contractor shall provide a contract level summary of major accomplishments and associated benefit to the Government during the month.

c. Data Calendar. The contractor shall provide a data calendar showing all overdue data items required under the task order. Provide an explanation of why the deliverables are late and when they will be delivered. The calendar shall be updated monthly and provided with the progress report.

d. Identification of new problem areas.

e. Status of previously identified and open problem areas.

f. Justification for cost increases or schedule slippages, if any, which may differ from previous reports to the original estimate to complete specific efforts.

g. Monthly and cumulative labor hours bid and expended per contract labor category, names of employees charged to each contract labor category, and total labor cost per Contract Line Item Number (CLIN)

Contractor's Progress, Status, and Management

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM ________ Other X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A011

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

NAWCAD 4.11.4.6

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

LT

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

N/A Reg Repro

16. REMARKS NAWCAD 4.11.4 1 0

Blk 12 – Submit 30 days after contract award.

If required submittal date is a holiday, the copy shall be submitted by 1600 the next working day.

Submission of first report is required within 30 days after task order is awarded.

c. A list of travel and per diem charges per trip, for each CLIN including total current and cumulative expenses.

d. Total costs under each CLIN, current and cumulative.

Blk 14 Address:

Deliverable Manager Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

15. TOTAL 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 11 of 16 1007/183

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to

b. COPIES

TBD

TBD TBD

Final

5. CONTRACT REFERENCE

SOW Para 4.2 either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Blks 4, 10, & 13 – Submit per required format and definition in Exhibit A of the contract and SOW Paragraph 4.2. Reports shall be submitted at a minimum of twice a month, within seven (7) working days after the end of every reporting period in conjunction with the contractor’s time/fiscal accounting system. If the required submittal date is a holiday, the reports shall be submitted by 1200, e.s.t. of the next working day. These financial status reports will be transmitted electronically to the COR, at an NMCI email account, via a contractor-furnished work station. Instructions for electronic submission will be provided after task order award. Before implementing a system or schedule for submission, the contractor shall check with the COR to ensure all Code 4.11.4 requirements are met. Additionally, a copy of the financial data transferred shall be submitted the Friday following the electronic transmission by 1600, e.s.t. The contractor shall conduct quality reviews of all data before and after each electronic submission and is responsible for updating and correcting errors and omissions on current and cumulative expense data within 48 hours of submission. Adjustments to the financial report shall be submitted electronically as the adjustments occur. Prior year adjustments shall be made at the lowest level, and shall be available upon request.

The financial progress report shall include costs broken out to the contractor’s lowest WBSN. All costs shall role up to a cumulative amount per CLIN, task order level. The contractor shall include the following items and data.

Blk 16

Deployed Mission Support

Financial Progress Reports

Blk 16

11. AS OF DATE

BLK 16

a. Current and cumulative labor hours bid and expended per contract labor category, names of employees charged to each contract labor category, and total labor cost per CLIN.

BLK 16

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM ________ Other X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A012

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

NAWCAD 4.11.4.6

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

LT

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

N/A Reg Repro

16. REMARKS NAWCAD 4.11.4.2 1 0

Blk 4: The contractor shall electronically deliver a monthly workforce data report. Digital media to be in IBM compatible Microsoft Excel 2010 or later format. Contractor is required to submit in accordance with the embedded 2011 SCMS Workforce Reporting template.

Blk 9 - Distribution authorized to U.S. Government agencies only. Other requests for this document shall be referred to the Contracting Officer.

Blk 11: Workforce reporting is required 10 days after the close of each monthly reporting period.

Blk 12: First report is required (40) days after award of the contract.

Blk 14 Address Deliverables Manager Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Road, B8185 St. Inigoes, MD 20684-4009

15. TOTAL 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 12 of 16 1007/183

MTHLY 40 DAC

11. AS OF DATE Final

20 10 DARP

Deployed Mission Support

Contractor's Personnel Roster Workforce Reporting

5. CONTRACT REFERENCE

SOW Para 4.3

DI- MGMT-81834 (See Block 16_

b. COPIES

TBD TBD

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

TBD

2011 SCR

Workforce

Reporting Template

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM Other _____X__________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A013

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

Blk 16

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION Blk 16

REQUIRED

LT

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

N/A Reg Repro

16. REMARKS NAWCAD 4.11.4.6 1 1

Blk 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 6).

If this form has not been transmitted within 30 days of submission of CDRL, the CDRL is considered accepted.

Blk 9 - Distribution authorized to U.S. Government agencies only. Other requests for this document shall be referred to the Contracting Officer.

Blks 4, 10, 11, 12 & 13 - Within 90 days after completing each task order, the contractor shall provide a close out report. The report shall include financial data, deliverable status, disposition of Government Furnished Equipment/Information and a detailed list of Contractor Furnished Materials. The report shall be signed by the contractor program manager and forwarded to NAWCAD Patuxent River, St. Inigoes, Code 4.11.4.

Blk 14 Address:

Naval Air Warfare Center, Aircraft Division

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423, Aug 96 Previous editions are obsolete Page 13 of 16

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

TBD

Blk 16 Blk 16

Deliverable Manager, Code 4.11.4

17100 Webster Field Road, B8185

Deployed Mission Support TBD

Task Order Close-Out

SOW Paragraph 4.4 and 11.0 NAWCAD 4.11.4.6

St. Inigoes, MD 20684-4009

b. COPIES

Blk 16 Blk 16

11. AS OF DATE Final

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM Other __X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A014

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14 DISTRIBUTION Blk 16

REQUIRED

Blk 16

8. APP CODE D 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

N/A Reg Repro

16. REMARKS COR/NAWCAD 4.11.4 1 0

Blk 9 - Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to the Contracting Officer.

Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 14 of 16 1007/183

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

TBD

Deployed Mission Support TBD

Contracting Officer's Management Report Segregation of Costs and Invoice Requirements Reporting

5. CONTRACT REFERENCE

SOW Para 4.5

DI-MGMT-81864 NAWCAD 4.11.4.6

TBD

b. COPIES

Blk 16 Blk 16

11. AS OF DATE Final

Blk 16 Blk 16

Blocks 10, 11, 12 & 13: Report shall be submitted concurrently with each invoice to the COR and shall be for the exact dollar amount and period of performance as the invoice.

The contractor shall segregate costs incurred under this contract at the lowest level of performance, either by tasks or by subtask, rather than only on a Contract Line Item Number (CLIN) or total contract basis, and shall submit invoices reflecting costs incurred at that level. In addition, the contractor shall submit invoices containing summaries of work charged during the period covered, as well as overall cumulative summaries for all work invoiced to date.

When there is more than one line of accounting, the Government will describe each ACRN preceding the accounting citation in the contract or a particular CLIN. The Government will pay contractor invoices by charging only an ACRN corresponding to the CLIN invoiced. Accordingly, when there are many lines of accounting, the Government will fund each CLIN separately and it will summarize the funding level for each CLIN, The contractor's invoices shall state separate incremental and cumulative amounts for each CLIN with further segregation by task and subtask showing each element of cost.

Invoices shall contain the following cost elements by schedule and include supporting detail. Invoices shall be submitted with two attachments. The first attachment shall contain Schedules A through D, F and G and shall be provided as fully burdened. The second attachment shall contain Schedule E, Invoice Summary, for current billing period and cumulative.

(Schedule A) Direct Labor $ (Schedule B) Material $ (Schedule C) Travel $ (Schedule D) Other Direct Charges $ (Schedule E) Indirect Charges $ (Schedule F) Adjustments $

TOTAL $__________

Schedule G) Outstanding Commitments $

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP_______ TM X Other _____________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A015

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

Blk 16

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION Blk 16

REQUIRED

LT

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

N/A Reg Repro

16. REMARKS NAWCAD 4.11.4.6 1 0

Blk 4: Digital media to be in IBM compatible Microsoft Excel 2000 or later format.

Contractor is required to download the latest template from the government's automated system and electronically upload the' updated Standardized MEL. Access to the government's automated system, and location of the Standardized MEL template and instructions will be provided after contract award. A sample Standardized MEL has been attached (Attachment 15) for reference only. The template must be downloaded from the government' s automated system.

Populate the MEL Template worksheet with all major equipment, components, and material requirements. Use the Directions and Sample Worksheets as a reference. Complete all known information on the template prior to upload. All yellow fields (columns) are mandatory and must be populated (note that assembly headers (record indicator type 1) are an exception and only require "Item No." and “P/N Desc” fields to be populated). The maximum number of characters allowed in a field is indicated in parenthesis in the column header. Select data using drop-down menus where available.

NO COMMAS, DOLLAR SIGNS, OR HARD RETURNS ARE ALLOWED IN ANY CELL (use “Find and Replace” feature to replace any commas or dollar signs with a blank space or semicolon)

Blk 9 - Distribution authorized to U.S. Government agencies only. Other requests for this document shall be referred to the Contracting Officer.

Blk 10: All material purchases completed under this contract shall be initiated using the Standarized MEL and completing all fields required for purchase. Frequency of updates dependent upon program requirements and project milestones.

Blks 11 and 12: First report is required (5) days after system design has been approved.

Blk 13: Maintain and update records as necessary to ensure real-time/accurate status of all system procurements. Updates to the first CDRL submission will not require formal submittal to the deliverables manager. Subsequent submission dates dependent upon program requirements and project milestones.

Naval Air Warfare Center, Aircraft Division 17100 Webster Field Road, B8185 St. Inigoes, MD 20684-4009

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423, Aug 96 Previous editions are obsolete Page 15 of 16

Blk 14 Address:

Deliverable Manager, Code 4.11.4

b. COPIES

Blk 16 Blk 16

11. AS OF DATE Final

Blk 16 Blk 16

Deployed Mission Support TBD

NAWCAD 4.11.4.6

Standardized Material Equipment List (MEL)

SOW Paragraph 5.1

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP________ TM ___X____Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A016

4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE

AIR-7.4.4

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

Blk 16

8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft

N/A Reg Repro

16. REMARKS NAWCAD 4.11.4 1 1 0

AIR-7.4.4 1 1 0

Blk 14 – Provide reproducible copy in electronic media format. (see SOW paragraph 9.0)

Blk 14 Address:

Deliverable Manager Code 4.11.4 Naval Air Warfare Center, Aircraft Division 17100 Webster Field Rd, Bldg. 8185 St. Inigoes, MD 20684-4009

NAVAIR Security ATTN Madeline Gantt 47123 Buse Rd Bldg 2272, R074 Patuxent, MD 20670 301-757-2955

Madeline.gantt@navy.

mil

15. TOTAL 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 16 of 16 1007/183 either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

TBD

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to

b. COPIES

Blk 16 BLK 16

Blk 16

Deployed Mission Support

Operation Security (OPSEC) Plan

5. CONTRACT REFERENCE

SOW Para 8.0

TBD TBD

Blk 4 – Contractor Format. Use the definition of sensitive information given in Public Law100-235. Use National Security Decision Directive (NSDD) 298 for the concept of AIR 7.4.4 Operations Security.

Blk 9 – Apply and use distribution statements in accordance with the Distribution Statement Shown in BLK 13 of DD Form 254 and the guidance of

SECNAVINST 5510.36

Blks 10, 12 & 13 – Draft OPSEC Plan due 90 days after Contract award with final draft due 45 days after feedback received. Revisions as required after approval of final plan to comply with Government Data Protection Policy Documents.

11. AS OF DATE Final

BLK 16

Blks 7- Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (attachment 6). if this form has not been transmitted within 30 days of submission of CDRL, the CDRL is considered accepted.

mailto:Madeline.gantt@navy.mil# mailto:Madeline.gantt@navy.mil#

A001
A002
A003
A004
A005
A006
A007
A008
A009
A010
A011
A012
A013
A014
A015
A016
2018-06-05T11:27:37-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:28:10-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:28:35-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:29:02-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:29:25-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:29:45-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:30:04-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:30:26-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:30:45-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:31:03-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:31:23-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:31:40-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:31:56-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:32:25-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:32:49-0400
WALSH.ROBERT.C.JR.1218051436
2018-06-05T11:33:11-0400
WALSH.ROBERT.C.JR.1218051436

File details come from the government source that posted it. Updated .