Attachment_10_CSP.doc
DOC document 119 KB Posted
- Attached to
- Deployed Mission Support (DMS) Federal contract opportunity
- Solicitation number
- N00421-16-R-0073
About this file
This document outlines a contract surveillance plan (CSP) for a deployed mission support indefinite delivery/indefinite quantity (IDIQ) contract to provide technical and logistics support services for deployed command, control, communications, computers, combat systems, intelligence, surveillance and reconnaissance systems.
The support services include inspection, troubleshooting, maintenance, modification, integrated logistics support, configuration management and training for mobile deployed C5ISR systems. The contract requires personnel to deploy for up to 6 months at a time to locations in the Central and Africa Commands. Performance will be evaluated using the Contractor Performance Assessment Reporting System to assess quality, schedule, cost control, management and other factors on a quarterly and annual basis, with incentives for meeting defined standards.
Attachment 10 - CSP
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Surveillance Plan (CSP) for the Deployed Mission Support IDIQ
1. Purpose
This contract requirement is 100% Level of Effort (LOE); therefore, a Contract Surveillance Plan (CSP) is required.
A CSP is a Government developed and applied document used to make sure the systematic quality assurance assessment methods are used in the administration of the Statement of Work (SOW). The intent is to ensure that the Government receives the quality of services and products for tasks identified in the SOW.
This IDIQ requirement is for Outside the Continental United States (OCONUS) forward deployed mission Command, Control, Communications, Computers, Combat Systems, Intelligence, Surveillance, and Reconnaissance (C5ISR) systems supporting the NAWCAD Patuxent River, Special Communications Mission Solutions (SCMS) Division, AD-4.11.4, St. Inigoes, MD. The contractor shall provide rapid inspection, troubleshooting, verification, scheduled and non-scheduled maintenance and modification, integrated logistics support, configuration management, and training for Mobile Deployable C5ISR systems and subsystems. A properly executed CSP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this CSP is provided under Contract Section E – Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in the contract, which will be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and CSP. The contractor, and not the Government, is responsible for the Quality Control Plan, which defines the management and quality control actions necessary to meet the quality standards set forth by the contract. The CSP, on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely and effective and are delivering the results specified in the contract.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer (KO) - A person duly appointed with the authority to enter into contracts (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determinations and findings on behalf of the Government. The PCO for this contract is Mr. Thomas Conrow, AD-2.5.1.2. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant that sets forth limitations of authority.
Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer’s Representative (ACOR) - An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Government Project Leads (GPLs) - The COR designates an individual Government Project Lead to assist in administering of specific efforts under the contract.
5. Responsibilities
The following Government resources shall have responsibility for the implementation of this CSP:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer who ensures that the contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance
Contracting Officer’s Representative – The COR is responsible for technical administration of the contract and ensures proper Government surveillance of the contractor’s performance. The COR is not empowered to make contractual commitments or authorize changes to the contract on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.
Alternate Contracting Officer’s Representative – The ACOR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance in the absence of the COR. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.
Government Project Leads – The Government Project Lead is responsible for assisting in administering of specific efforts under the contract. A Government Project lead cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance Contractor Performance Assessment Report System (CPARS) – The market place for engineering, technical, and logistics support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of small business, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the SAC.
SAC - The Surveillance Activity Checklist (Enclosure 1) below lists the methods of surveillance that will be used by the COR in the technical administration of the SOW tasks performed by the contractor.
Enclosure (1) provides the checklist and means for the COR to document on a quarterly basis the results of the surveillance of tasks and shall be provided to the Contracting Officer on a quarterly basis.
8. Documentation
In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file within the CORT system. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
9. Enclosures
Enclosure (1) – CSP / Incentives checklist (Annually) Enclosure (2) – Surveillance Activity Checklist (Quarterly)
ENCLOSURE (1) INCENTIVES
The following incentives shall apply to performance under this contract:
Assessment Period Acceptable Performance Definition
How Measured
Incentives
Year I:
None of the measurement areas are rated “Marginal” or below.
See below.
| Midpoint of the assessment period (6 month) evaluation using the CPARS format covering the previous 6 months. |
| (+) Meet the acceptable performance definition as a condition for further issuance of task orders. * |
(-) Does not meet the acceptable performance definition as a condition for further issuance of task orders. *
| Year II |
| 2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below. |
See below.
| Midpoint of the assessment period (Month 18) evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for further issuance of task orders. * |
(-) Does not meet the acceptable performance definition as a condition for further issuance of task orders. *
| Year III: |
| 2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below. |
See below.
| Midpoint of the assessment period (Month 30) evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for further issuance of task orders. * |
(-) Does not meet the acceptable performance definition as a condition for further issuance of task orders. *
| Year IV: |
| 2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below. |
See below.
| Midpoint of the assessment period (Month 42) evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for further issuance of task orders. * |
(-) Does not meet the acceptable performance definition as a condition for further issuance of task orders. *
| Year V: |
| 2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below. |
See below.
| Midpoint of the assessment period (Month 54) evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating. |
(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory Final CPARS rating.
| Annually thereafter until completion |
| 2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below. |
See below.
| Annual evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating. |
(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory Final CPARS rating.
* The Government reserves the right to not exercise options unless all regulatory requirements are met and the contractor meets the acceptable performance definition.
All SOW/CDRL efforts will be assessed focusing on the following:
Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.
Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contributed to or affected the schedule variance. Also address the significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.
Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under-run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor-provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. Also assess the extent to which the contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort.
Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract, identifies and applies resources required to meet schedule requirements, assigns responsibility for tasks/actions required the by contract, and communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.
Utilization of Small Business – Assess the contractor’s success in utilizing and meeting small business.
Other Areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Evaluation: The Government will evaluate contractor performance based on their ability to complete work specified in the scope and PWS paragraphs 3.1 through 3.3. The contractor shall be evaluated using the following ratings:
Exceptional Performance: Contractor’s performance of virtually all contract requirements consistently exceeds the acceptable standards and in addition provides numerous significant, tangible or intangible, benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). The few areas for improvement are all minor. There are no recurring problems. Contractor’s management initiates effective corrective action whenever needed. .
Very Good Performance: Contractor’s performance of most contract requirements is consistently above acceptable standards and provides significant tangible and intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although some areas require improvement, these areas are minor and are offset by better performance in other areas. Few, if any, recurring problems have been noted, and the contractor takes satisfactory corrective action.
Satisfactory Performance: Contractor’s performance of most contract requirements meets the acceptable standards with some tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although there are some areas of very good or excellent performance, these are more or less offset by unsatisfactory performance in other areas.
Marginal: Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Contractor’s performance of most contract requirements is inconsistent and frequently does not always meet acceptable standards. Quality, responsiveness, and timeliness in many areas require attention and action. Corrective actions have not been taken or are ineffective.
ENCLOSURE (2) SURVEILLANCE ACTIVITY CHECKLIST
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality of Product or Service, Schedule, Cost Control, Business Relations, Management, Utilization of Small Business, and Other Areas utilizing the CPARS evaluation rating definitions listed in Enclosure (1).
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt |
| Util. of Small Bus. |
| Other Areas |
| Provide inspection, troubleshooting and verification & scheduled and non-scheduled maintenance and modification SOW Para 3.1 |
| 100% inspection by COR, ACOR, and/or Government Project Leads Quarterly Input |
| TBD |
| Provide integrated logistics support SOW Para 3.2 |
| 100% inspection by COR, ACOR, and/or Government Project Leads Quarterly Input |
| TBD |
| Provide configuration management, technical documentation & training SOW Para 3.3 |
| 100% inspection by COR, ACOR, and/or Government Project Leads Quarterly Input |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt |
| Util. of Small Bus. |
| Other Areas |
| Test Procedures A001 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Report – Study/Service: Operational Readiness Review Reports A002 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Logistic Support Status Report: Trend Analysis A003 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Report – Study/Service: Maintainability/Reliability/Supportability Status Report A004 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Engineering Change Proposal A005 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Test/Inspection Report A006 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Product Drawings, Models, and Associated Lists A007 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Report – Study/Service: Troubleshoot & Material/Equipment Status Reports A008 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Report/Minutes, Record of Meeting A009 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Contractor's Progress, Status, and Management A010 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Financial Progress Reports A011 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Contractor's Personnel Roster: Workforce Reporting A012 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Task Order Close-Out A013 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt |
| Util. of Small Bus. |
| Other Areas |
| Contracting Officer's Management Report: Segregation of Costs and Invoice Requirements Reporting A014 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Standardized Material Equipment List (MEL) A015 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Operation Security (OPSEC) Plan A016 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
Quarterly Summary of Ratings:
Quality of Product
Schedule
Number of Exceptional
Number of Very Good
Number of Satisfactory
Number of Marginal
Number of Unsatisfactory
Cost Control
Business Relations
Number of Exceptional
Management
Utilization of Small Business
Other Areas annual SURVEILLANCE:
The COR will perform an annual assessment of overall contract performance utilizing the evaluation rating definitions listed in Enclosure (2). This annual assessment will occur at the midpoint of each year following the award of the contract and cover the previous 12 months, except for the first year of the contract which cover only the previous 6 months.
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Summary Rating/Results |
| Quality of Product or Service |
| Review of Quarterly Ratings. |
| TBD |
| Schedule |
| Review of Quarterly Ratings. |
| TBD |
| Cost Control |
| Review of Quarterly Ratings. |
| TBD |
| Business Relations |
| Review of Quarterly Ratings. |
| TBD |
| Management |
| Review of Quarterly Ratings. |
| TBD |
| Utilization of Small Business |
| Review of Quarterly Ratings. |
| TBD |
| Other Areas |
| Review of Quarterly Ratings. |
| TBD |