About this file

Technical Exhibit 4

View the file

Other files

File Type Posted
N00244-13-R-0039_Amendment_0004.pdf PDF
N00244-13-R-0039_Amendment_0003.pdf PDF
TECH_EXH_1B_REV_8.9.13.docx DOCX document
N00244-13-R-0039_Amendment_0002.pdf PDF
N00244-13-R-0039_Amendment_0001.pdf PDF
TECH_EXH_8.pdf PDF
TECH EXH 5B.docx DOCX document
N00244-13-R-0039_FBO.pdf PDF
TECH EXH 3.pdf PDF
TECH EXH 1B.docx DOCX document
TECH EXH 5A.docx DOCX document
TECH EXH 6A.docx DOCX document
TECH EXH 2A.docx DOCX document
TECH EXH 7.docx DOCX document
TECH EXH 6B.docx DOCX document
MAA INSPECTION SHEET.docx DOCX document
TECH EXH 2B.docx DOCX document
J-2 WD 05-2057 —
J-1 - CONTRACTOR PERFORMANCE DATA SHEET.docx DOCX document
TECH EXH 5D.docx DOCX document
TECH EXH 5C.docx DOCX document
TECH EXH 1C.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECH EXH 4

TE-4

GOVERNMENT FURNISHED SPACES TO BE USED & CLEANED (AS INDICATED)

The Government will furnish the Contractor with the following facilities:

SPACE

AREA (square feet)

TYPE OF FLOOR (material)

Dining Room(s) (includes serving area)

15,537
PVC Tile / Laminate / Carpet

Dining Room Staging Area

408
Tile

Scullery

1,742
Terrazzo Tile

Passageways

2,640
PVC Tile
Pot & Utensil Washing Room
470
Terrazo Tile
Locker Room & Lavatories
1,260
PVC Tile

Rear Platform & Receiving Area

1,392
Concrete
Offices
1,142
Carpet & Tile

Clean Patient Cart Holding Area

397
Terrazzo Tile

Janitorial Closet & Detergent Room

165
Epoxy/cement Tile
Building Approaches
See Tech Exhibit 3
Concrete

*Note that this list is provided for informational purposes only and the quantities listed in TE-4 may vary over the life of the contract. Any such variance is considered to be within the general scope of the contract and the contractor will not be entitled to a claim for additional compensation if the listed quantities change over the life of the contract or prove to be inaccurate. The contractor remains responsible for cleaning all facility spaces used in support of the galley as generally described in the PWS.