Technical Exhibit 5 - RSO Performance Requirements Summary (002).pdf

PDF 95 KB Posted

Attached to
Warehouse Storage Support Services
Solicitation number
N0018926RL002
Issued by

About this file

This is a Performance Work Statement (PWS) for aviation logistics and warehouse management services at Naval Air Station Norfolk and Naval Air Station Oceana. The document establishes performance requirements and Acceptable Quality Levels (AQL) for material receipt, stowage, processing, issuance, and shipment operations.

The PWS covers five primary operational areas: receiving and stowing material (PWS 5.3), processing MTIS material (5.7), receiving DTO material (5.10), processing discrepant material (5.11), issuing material (5.12), shipping material (5.18), and processing outbound and inbound SASS material (5.19). Performance standards mandate completion of partial truckload offloads within 1 hour and full truckloads within 2 hours, with stock material requiring processing and stowage within 1 calendar day for 85% of receipts and 3 days for 95%. DTO material delivery timeframes vary by priority level: aviation IPG-I within 30 minutes, IPG-II within 2 hours, and IPG-III within 22 hours. Issue material timeframes similarly vary by priority, with aviation IPG-I required within 30 minutes of DD 1348 printing and non-aviation materials within 1–3 calendar days depending on priority level. Material must be delivered without damage, classified items processed within designated cages with DD 1907 forms, and HAZMAT properly packaged and certified. The contractor must maintain warehouse refusal rates at or below 1%, complete MSDR/TDR submissions within 4 business days of discrepancy discovery, and conduct monthly reporting to the Designated Government Representative (DGR). Inspection methodologies include planned inspections on weekly, monthly, and quarterly schedules, with 100% inspection required for detention charges, violations, and customer complaints.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Para. Performance Requirement

Performance Standards AQL

5.3 Receive and Stow

Material

Complete offload of material within 1 hour of arrival for partial truckload receipts; within 2 hours of arrival for full truckload receipts. Record receipt date as material is offloaded on receipt documentation (DD 1348-1; DD 1149; DD 250).

Shipments will be offloaded without incurring detention charges. 100

Record all deliveries received in the “Trucks Received Log” and provide copies to the DGR every month.

Ensure material is cosigned to the applicable site (ALSC NORFOLK or ALSC OCEANA).

Contact DGR for material cosigned to other activities

Annotate OSD, exceptions, and received document numbers on Bill of Lading 98 Receipts are documented/annotated in accordance with latest Financial Audit Readiness (FIAR) Directives

Stock material received, processed and stowed within the time frames of 85% within 1 calendar day and 95% within 3 days.

Stow returning RFI repairables within 2 business days of notification in accordance with the P700

Process Change Notices within 3 business days of receipt 98

For Norfolk - turn over stock material with a stow location that begins with location RP to ASD within 1 calendar day of arrival, Turn over stock material with a PUK ID in the Supplementary Address to PUK designated area within 1 calendar day of arrival.

For Oceana - turn over stock material with a stow location that begins with 3 (JETMART) or 5 (ASD) to the material delivery unit within 1 calendar day of arrival

Verify driver signature on DD 1907 prior to accepting protected shipments 99 Prepare a DD 1907 for classified material 100 All classified material processed within Receiving Classified cage 100 Receipts RIP’d via ERP/AIT upon receipt of material 99

Stowage data annotated on outside of material (NSN, Qty, Document Number and Serial Number for repairables, DD 1348-1 and receipts and stows documented in

ERP

PWS Para. Performance Requirement

Performance Standards AQL

Stow returning “W” Purpose RFI material with 1 hour of receipt/ 99

Material matches receipt paperwork 98 Stowage location matches ERP 98 Expiring shelf life items will be identified and processed (extended, disposal, etc.)

30 calendar days prior to expiration.

Stowed items within shelf life areas as applicable 98 Defective material not issued to end-user. 98

Defective material shipped IAW DGR direction 95

Material is properly identified and stowed without damage 98

Ensure Repairable RFI material has RFI tag and is protected for storage or local delivery 98

Receipt discrepancies documented on MSDR 99

5.7 Process MTIS Ensure DD 1348-1 shows condition code of material prior to receipt 98

Material matches receipt paperwork 98

Stowage location matches ERP 95

Provide signed copy of DD 1348-1 to customer upon receipt 95

Record stow data on receipt document (DD 1348-1) 98

MTIS material stowed within 3 business days of arrival 95 MTIS receipts recorded in ERP 95

PWS Para. Performance Requirement

Performance Standards AQL

5.10 Receive DTO

Material

Aviation IPG-I through delivery to MDU within 30 minutes 99

Aviation IPG-II through delivery to MDU within 2 hours 99

Aviation IPG III through delivery to MDU within 22 hours 99

Non-aviation IPG I & IPG II through delivery to customer within 24 hours. 99

Non-aviation IPG III through delivery to customer within 48 hours. 98 Material sorted; matches receipt paperwork and delivered to MDU/customer undamaged 98

Ensure material is cosigned to the applicable site (ALSC NORFOLK or ALSC OCEANA). Contact DGR for material cosigned to other activities.

Shipments will be offloaded without incurring detention charges 100

Verify driver signature on DD 1907 prior to accepting protected shipments 100 Classified material processed within Receiving Classified Cage 100 Obtain a signature from an authorized individual when turning classified material over to customer

HAZMAT and Class C explosives processed within assigned space 100 Record all deliveries received in the Trucks Received Log and provide copies to DGR every month

As applicable, annotate OSD, exceptions, and seal number on Bill of Lading 90 For deployed units, contact DGR to create a temporary stow location for customer DTO material 99

Record date on receipt document (DD 1348-1, DD 1149, DD 250) 98

Prepare a DD 1907 for classified material 100

Receipt discrepancies documented on MSDR 98

Record date, time, and signature from MDU/customer on receipt document upon delivery 98

File source documents IAW latest FIAR directives (DD1149/1348-1/250) 98

PWS Para. Performance Requirement

Performance Standards AQL

Create manifest of temporary storage items with time/date of customer delivery request 99

Receipts forwarded to DGR for non-NALCOMIS generated DTOs IAW latest FIAR directives. 99

5.11 Process Discrepant

Material

Create and submit MSDR’s/TDR’s within 4 business days of discovery 99

Provide legible source documents 98

TDR is routed to DGR with supporting documentation. 98

5.12 Issue Material Provide aviation IPG-I material to MDU for on station delivery within 30 minutes of DD 1348 printing

Provide aviation IPG-II material to MDU for on station delivery within 1.5 hours of DD-1348-1 printing

Provide aviation IPG-III material to MDU for on station delivery within 22 hours of DD-1348-1 printing

Non-aviation IPG I, IPG II & III – Material provided to MDU within 1/2/3 calendar days respectively from 1348 printed.

Off-station IPG I; IPG II & IPG III Material provided to carrier for shipment within 1/2/3 calendar days respectively from 1348-1 printing

Bearer Pick-up - available to MDU within 20 minutes of 1348 printed 98

Forward warehouse refusals: notify MDU/DGR within 90 minutes of realization material cannot be located

Correct material issued to MDU undamaged 99 Warehouse refusal rate less than or equal to 1% and DGR/customer notified 98 Non-computer prepared issue documents are checked for authorized signature using the Authorized Signature List provided by the DGR

Repairables issued with RFI tags 100 PWS Para. Performance

Requirement Performance Standards AQL

Classified material maintained under proper control at all times 100 Classified issues delivered to authorized personnel 100

Classified items packed IAW SECNAVINST 5510 100

DD1907 completed for all classified material 100

HAZMAT properly packaged, certified, and shipped 100

HAZMAT shipping certifications completed and maintained 100

Provide excess material for credit to a carrier within 3 calendar days from 1348-1 printing 98

Provide excess material without credit to a carrier within 4 calendar days from 1348-1 printing

Excess material to disposal within 13 calendars days from 1348-1 printing until carrier accepts 98

POS/POD recorded in ERP within one day 99 Return legible signed & dated 1348s from deliveries IAW latest FIAR directives. 99

5.18 Ship Material Process shipments of customer owned organic equipment within 1 business day of customer request or to meet RDD

Arrange for shipment of Deployment Movement Material within 5 business days of squadron request

Complete and maintain DD 1907 and Rep-ship for classified shipments 100

No detention, storage, or equipment ordered, not used charges, or other unnecessary charges to the Government

Shipping Documents prepared correctly 99 Respond to customer inquiry within 4 hours 99

Complete loading of material within 1 hour of arrival for partial truckloads 100

Complete loading of material within 3 hours of arrival for full truckloads 100

PWS Para. Performance Requirement

Performance Standards AQL

Small package requests received by 1330 on a business day are processed same day 99

Ship IPG I material within 1 business days from customer walk-in or in time to meet RDD 999. 98

Ship IPG II material within 2 business days from customer walk-in or in time to meet RDD 777. 98

Ship IPG III material within 3 business days from customer walk-in or in time to meet RDD. 98

Shipments are not delayed unnecessarily or misdirected 100 Shipment and packaging of material is in accordance with the P-700 100 Deliver material destined for AMC Air Terminal, Building LP-25 at 1500 each business day, if required

HAZMAT properly packaged, certified, and shipped 100

No detention, storage, or equipment ordered, not used charges, or other unnecessary charges to the Government

Wood Packaging Material (WPM) website is updated and maintained 100

Wood packing material is DOD compliant 100

5.19.1 Local Pick Up and

Deliver at Base Post Office

Norfolk - Fleet Post Office, Building U-132 and US Post Office pick up/deliver mail no later than 1300 each business day 98

5.19.2 Process Outbound

SASS

Prepare pack-up kits for DGR release within 3 business days from receipt of pull list from DGR 99

Deliver pack-up kits for local customers within 1 business day of DGR release 99

Ship SASS material within 2 business day from DGR release 98

Respond to DGR requests for SASS stock checks within 30 min per line item 97

Temporary loan Issues of “L” Purpose material within 30 minutes of receipt of paperwork 98

PWS Para. Performance Requirement

Performance Standards AQL

Pack-up kits are accurate for repairables IAW ERP pack-up list 98

Pack-up kits are accurate for consumables IAW NALCOMIS pack-up list 98

Delivered to the correct customer 98

Proper control of classified material maintained 100

Inspect kit cabinets and containers, perform minor maintenance and notify DGR if unsatisfactory 98

Stock checks completed accurately 99 Packed & Shipped undamaged 99 Annotate pack-up list with material condition 98

Maintain documentation on the disposition of all L purpose repairables and provide to DGR upon request

Document stock checks on NALCOMIS form 90 Prepare DD 1907 for classified material 100

5.19.2 Process Inbound SASS Inventory material in inbound pack-up kits at the rate of 300 line items per business day. 98

Stow returning material and replenish pack-up items within 4 business days of DGR request

Stow returning RFI repairables from FRC within 1 business day of receipt 99

Returning items condition is accurately recorded on ERP pack-up list 98

Annotate pack-up list with material condition 95

Sampling Frequency

Method of Sampling

Each Detention Charge

100% Inspection

Each Detention Charge

100% Inspection

Monthly Planned Inspection

Monthly Planned Inspection

Monthly Planned Inspection Monthly Planned Inspection

Weekly Planned Inspection

Monthly

Each Change Notice

Planned Inspection

Monthly Planned Inspection

Weekly Planned Inspection Weekly Planned Inspection Weekly Planned Inspection Weekly Planned Inspection

Weekly Planned Inspection

Sampling Frequency

Method of Sampling

Weekly Planned Inspection

Monthly Planned Inspectin

Weekly Planned Inspection Each Complaint Valid Customer Complaint

Monthly Planned Inspection

Weekly Planned Inspection

Weekly Planned Inspection

Weekly Planned Inspection

Weekly Planned Inspection

Weekly Planned Inspection

Monthly Planned Inspection

Each Compliant Customer Complaint

Monthly Planned Inspection

Weekly Planned Inspection Monthly Planned Inspection

Sampling Frequency

Method of Sampling

Weekly Planned Inspection

Weekly Planned Inspection

Monthly Planned Inspection

Each charge incurred

100% Inspection

Monthly Planned Inspection Monthly Planned Inspection Monthly Planned Inspection

Notice of Violation 100% Inspection Monthly Planned Inspection

Monthly Planned Inspection Each complaint Customer Complaints

Monthly Planned Inspection

Weekly Planned Inspection

Weekly Planned Inspection

Monthly Planned Inspection

Monthly Planned Inspection

Sampling Frequency

Method of Sampling

Monthly Planned Inspection

Monthly Planned Inspection

Weekly Planned Inspection

Weekly Planned Inspection

Weekly Planned Inspection

Weekly Planned Inspection

Weekly Planned Inspection

Each complaint Customer Complaints

Weekly Planned Inspection

Each complaint Customer Complaints Daily Planned Inspection

Monthly Planned

Each complaint Customer Complaints Sampling Frequency

Method of Sampling

Monthly Planned Inspection Weekly Planned Inspection

Each complaint or violation

100% Inspection

Monthly Planned Inspection

Notice of Violation 100% Inspection

Monthly Planned Inspection

Monthly Planned Inspection Monthly Planned Inspection

Weekly Planned Inspection

Monthly Planned Inspection

Monthly Planned Inspection

Each Detention Charge

100% Inspection

Monthly Planned Inspection Each Complaint Customer Complaints

Each Detention Charge

100% Inspection

Each Detention Charge

100% Inspection

Sampling Frequency

Method of Sampling

Weekly Planned Inspection

Weekly Planned Inspection

Weekly Planned Inspection

Weekly Planned Inspection

Monthly Planned Inspection

Each notice of Violation

100% Inspection

Monthly Planned Inspection

Monthly Planned Inspection

Monthly Planned Inspection

Monthly Planned Inspection

Weekly Planned Inspection

Monthly Planned Inspection

Monthly Planned Inspection

Each complaint Customer Complaints

Quarterly Planned Inspection

Sampling Frequency

Method of Sampling

Each pack-up kit completed

100% Inspection

Each pack-up kit completed

Planned Inspection

Each complaint Customer Complaints

Each notice of Violation

100% Inspection

Monthly Planned Inspection

Each complaint Customer Complaints Each complaint Customer Complaints

Each list is inspected

100% Inspection

Monthly Planned Inspection Monthly Planned Inspection

Monthly Planned Inspection

Monthly Planned Inspection

File details come from the government source that posted it. Updated .