UPDATED Attachment 06 - CLIN Pricing Structure.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- IX527 and IX528 BARGE PRESERVATION, INSPECTION, REPAIR, AND MAINTENANCE (PIRM) SUPPORT SERVICES
- Solicitation number
- N0016725R1001
About this file
This file is a CLIN (Contract Line Item Number) Pricing Structure Excel spreadsheet for a Naval Surface Warfare Center Carderock Division contract for Barge Preservation, Inspection, Repair, and Maintenance (PIRM) Support Services at the Southeast Alaska Acoustic Measurement Facility (SEAFAC). The document details 18 specific work items for service craft IX527, including tasks such as tug delivery services, electrical and safety system upgrades, structural modifications, and various repair activities. Each work item is priced at 1 EA (each) with a performance period date of 9/1/2026, indicating a structured approach to comprehensive maritime vessel maintenance and improvement services for critical acoustic research infrastructure.
The contract opportunity involves maintaining two service craft (IX527 and IX528) permanently moored at the SEAFAC static site in Western Behm Canal near Back Island, Alaska. These vessels are specially modified with a moon pool and large deckhouse structure, and are critical to the Navy's submarine acoustic research and development capabilities. The work items cover a range of technical services including personnel safety modifications, power distribution upgrades, deck improvements, structural repairs, and system enhancements, demonstrating a holistic approach to vessel preservation and operational readiness for this specialized naval research facility.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN Structure
| CLIN | Option CLIN | Description | Period of Performance | Unit Price | Quantity | Unit of Measure | Total Price |
| 1 | N | IX527 Barge Preservation Inspection, Repair, and Maintenance (PIRM) Support Services. Payment in accordance with Milestones set forth in Attachment 01. Inclusive of Post Award Conference, Project Planning Report, and Work Items 5, 6, 28, 30, 10, 17, 22, 12, 15, 9, 24, 25, 31 and 6. The Work Items are in order of events found within Attachment 01. Please note this CLIN also includes Work Items 1, 2, 4, 7, and 8 which are not included as events under the payment schedule (Attachment 01). | DOA – 9/1/2026 | $ | 1 | EA | $ |
| 2 | Y | Tug Delivery Services, Line Handling, and Mooring to Contractor Site (Work Item 3) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 3 | Y | Tank Sounding Tube Install. (Work Item 11) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 4 | Y | Electric Power Distribution Upgrades. (Work Item 13) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 5 | Y | Alarm System Upgrades (Work Item 14) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 6 | Y | Convert Void 6 and Bilge Piping Modifications. (Work Item 16) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 7 | Y | Rake Room Personnel Safety Modifications (Work Item 18) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 8 | Y | New Deck Cleat Installation (Work Item 19) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 9 | Y | Deck Drain System Installation (Work Item 20) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 10 | Y | Deckhouse Structural Modifications (Work Item 21) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 11 | Y | Suspension Winches and Winch Foundations (Work Item 23) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 12 | Y | Cable Way Improvements (Work Item 26) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 13 | Y | Butler Building Exterior Replacement and Vent Closure (Work Item 27) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 14 | Y | Exterior Watertight Door Replacement (Work Item 29) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 15 | Y | Plate Repair (Work Item 32) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 16 | Y | Pit Repair (Work Item 33) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 17 | Y | Weld Replacement (Work Item 34) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |
| 18 | Y | Tug Delivery Services, Line Handling, and Mooring to SEAFAC (Work Item 3) | Date Exercised – 9/1/2026 | $ | 1 | EA | $ |