This document is a set of Questions and Answers (Round Five) for Request for Proposal (RFP) N00167-25-R-1001 for IX-527 & IX-528 Barge Overhaul Services. The Q&A addresses multiple technical details about the barge overhaul project, including work items related to ceramic tile removal and reinstallation, vent louver closures, suspension winches, and barge transportation logistics. Key points include the Government's plans to disconnect and reconnect the barge at the SEAFAC pier, removing and reinstalling deep draft fenders, and modifications to winch-related work items. The document indicates that some specifics, such as precise square footage and detailed drawings, are being provided through RFP amendment 0004 and associated drawing packages, requiring prospective offerors to reference those supplemental materials for complete project understanding.

View the file

Other files

File Type Posted
Solicitation Amendment N0016725R10010006 SF 30.pdf PDF
Answers to Prospective Offeror Questions - Round Six.pdf PDF
Solicitation Amendment SF 1449 - N0016725R10010005.pdf PDF
Solicitation Amendment N0016725R1001 SF30 0005.pdf PDF
Solicitation Amendment N0016725R10010004 SF 30.pdf PDF
Answers to Prospective Offeror Questions - Round Five.pdf PDF
Answers to Prospective Offeror Questions - Round Four.pdf PDF
Solicitation Amendment N0016725R10010003 SF 30.pdf PDF
Attachment 05 - Requirements Specification for Task Order 0001 - Barge IX527 (WI-23 and 1.4.9 update).docx DOCX document
Questions and Answers from Industry Day Two.pdf PDF
Solicitation Amendment N0016725R10010002 SF 30.pdf PDF
Answers to Prospective Offeror Questions - Second and Third Rounds.pdf PDF
UPDATED Attachment 06 - CLIN Pricing Structure.xlsx XLSX spreadsheet
Solicitation Amendment N0016725R10010001 SF 30.pdf PDF
Attachment 09 - IX528 General Specifications.docx DOCX document
Answers to Prospective Offerors Questions.pdf PDF
UPDATED Attachment 01 - CLIN Structure and Milestones.docx DOCX document
Attachment 08 - CFR Price Template.xlsx XLSX spreadsheet
Attachment 02 - Past Performance Reference.docx DOCX document
Exhibit A - CDRLs A001 - A016.pdf PDF
Attachment 01 - CLIN Structure _ Milestones.docx DOCX document
Attachment 04 - IX527 Barge PIRM Support Services GFP Attachment_DRAFT.xlsx XLSX spreadsheet
Attachment 05 - Requirements Specification for Task Order 0001 - Barge IX527.docx DOCX document
Attachment 07 - Property Management Questionnaire.docx DOCX document
Attachment 06 - CLIN Pricing Structure.xlsx XLSX spreadsheet
SF 1449 - N0016725R1001.pdf PDF
Attachment 03 - Past Performance Questionnaire.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Answers to Prospective Offeror Questions – Round Five

RFP N00167-25-R-1001 – IX-527 & IX-528 Barge Overhaul Services

Question 1: Work Item 31 does not state square footage for the scope of work. Can you please provide square footage for each Line Item, 31.3.2 thru 31.3.15.

Answer: Please refer to the latest RFP amendment (0004) that includes updates to Work Item 31 where an estimated percentage of coverage was provided. In addition, please refer to the drawings package in association with the updated requirements specification to determine square footage.

Question 2: Work Item 31 - are the Ceramic tiles (Sound dampening tiles), installed in tanks where coatings will take place, are the tiles to be removed and new tiles installed?

Answer: The ceramic tiles will need to be removed and reinstalled or replaced after preservation efforts. If the tiles are damaged in the removal process they will need to be replaced.

Question 3: Work Item 31 - If the tiles are suppose to be removed and reinstall, please provide material type and quantity.

Answer:

Lord Kinematics

Erie, PA USA

P/N DN-1019-5

Class-1

Question 4: Work Item 27 – PARA 27.3.4 Vent Louver Permanent Clousure, please identify quantity of Vent Louvers, location and dimension of louver. There is no drawing providing this information. During the ship check the vent on the ridge was pointed out to be sealed but how its writing its sound like there are louvers on bhds of the butler house to seal. Please clarify.

Answer: The louvers are ridge vent only and run the length of the ridge. The control mechanism is on one of the bulkheads. The Government does not currently have drawings available for this system.

Question 5: Work Item 3 – Who will disconnect the IX from its achored lines currently shackled to the barge, this includes work boats and line handler to disconnect (unshackle the lines).

Answer: The barge will be made available for tow from the SEAFAC pier. The Government will disconnect the barge from its permanent moor.

Question 6: Work Item 3 – who will reconnect the IX upon return, who will provide work boat and line handlers to reconnect?

Answer: The barge will be returned (towed) to the SEAFAC pier by the Contractor. The

Government will reconnect the barge to its permanent moor.

Question 7: Work Item 31 – Are the Bow and Stern Curtain going to be removed prior to the tow by Government and after return?

Answer: The Government does not currently intend to remove the bow and stern curtains prior to tow. Government does not currently believe this is necessary based on a towing assessment currently in progress and under review.

Question 8: Work Item 31 – Are the Port and Stbd Fenders going to be removed prior the post the tow by the Government?

Answer: The Government will remove the deep draft fenders prior to tow and reinstall upon return.

Question 9: Work Item 023 Suspension Winches and Winch Foundation:

Please provide information in 2 Suspension winches and Omni winches to be removed and inspected.

Answer: This work item was modified with the last update to the SOW. The winches will be removed and refurbished locally. The only action required by the Contractor is to inspect and refurbish the foundations and supporting structure of these winches. Please see the latest RFP amendment (0004) where the Work Item was updated.