This document provides a Quality Assurance Surveillance Plan (QASP) for a Global Positioning System (GPS)-based Positioning, Navigation, and Timing Service (GPNTS) software support contract. The QASP outlines acceptable quality levels for 40 contract deliverables across performance objectives of quality, schedule, and cost. Deliverables include software specifications, plans, reports, source code, manuals, and matrices. Acceptable quality is determined by factors such as completeness, accuracy, and grammatical errors. Performance will be monitored by the Contracting Officer's Representative and contractors must meet specified acceptable quality levels to receive satisfactory ratings. Rework may be required for deliverables that do not meet these levels. The QASP establishes a methodology for assessing contractor performance against defined standards.
View the file
Other files for this federal contract opportunity
Other files attached to Global Positioning System (GPS)-based Positioning, Navigation, and Timing Service (GPNTS) Software Support, newest first.
All software specifications are complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Development Plan
3.5.1.1, 3.5.5.1, 3.5.11
A021
All software related plans are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Quality of Product
System/ Subsystem Specification
3.5.3, 3.5.7, 3.5.11
A023
All software related specifications and descriptions are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
System Security Plan and Associated Plans of Action
3.5.5.2
A025
All software related plas are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
All software related reports are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
GPNTS Source Code
3.5.7, 3.5.10.4, 3.5.10.5, 3.5.11
A029
All software soruce codes are delivered complete.
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Version Description
3.5.7, 3.5.11, 3.5.11.2
A030
All software descriptions are complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Product Specification
3.5.7, 3.5.11. 3.5.11.3
A031
All software specifications are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Design Description
3.5.7, 3.5.11, 3.5.11.4
A032
All software descriptions are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Interface Design Description
3.5.7, 3.5.11, 3.5.11.5
A033
All software descriptions are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Interface Control Document
3.5.7, 3.5.11, 3.5.11.6
A034
All software related control documents are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Installation Plan
3.5.7, 3.5.11, 3.5.11.7
A035
All software related plans are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Test Plan
3.5.7, 3.5.11, 3.5.12, 3.5.12.5
A036
All software related plans are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Quality of Product
Software Test Procedures
3.5.7, 3.5.11, 3.5.12
A037
All software related test procedures are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Interactive Electronic Technical Manual (IETM)
3.5.7, 3.5.17
A038
All technical manuals are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Verification Matrix
3.5.7, 3.5.12.4
A039
All matrices are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Code Quality Report
3.5.7, 3.5.14
A040
All software related reports are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
All software specifications are complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Development Plan
3.5.1.1, 3.5.5.1, 3.5.11
A021
All software related plans are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
System/ Subsystem Specification
3.5.3, 3.5.7, 3.5.11
A023
All software related specifications are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
System Security Plan and Associated Plans of Action
3.5.5.2
A025
All software related plans are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
All software related reports are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Schedule
GPNTS Source Code
3.5.7, 3.5.10.4, 3.5.10.5, 3.5.11
A029
All software soruce codes are delivered complete.
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Version Description
3.5.7, 3.5.11, 3.5.11.2
A030
All software descriptions are complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Product Specification
3.5.7, 3.5.11. 3.5.11.3
A031
All software specifications are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Design Description
3.5.7, 3.5.11, 3.5.11.4
A032
All software descriptions are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Interface Design Description
3.5.7, 3.5.11, 3.5.11.6
A033
All software descriptions are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Interface Control Document
3.5.7, 3.5.11, 3.5.11.6
A034
All software related control documents are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines).
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Installation Plan
3.5.7, 3.5.11, 3.5.11.7
A035
All software related plans are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Test Plan
3.5.7, 3.5.11, 3.5.12, 3.5.12.5
A036
All software related plans are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Schedule
Software Test Procedures
3.5.7, 3.5.11, 3.5.12
A037
All software related test procedures are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Interactive Electronic Technical Manual (IETM)
3.5.7, 3.5.17
A038
All technical manuals are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Software Verification Matrix
3.5.7, 3.5.13.4
A039
All matrices are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Code Quality Report
3.5.7, 3.5.14
A040
All software related reports are delivered complete, accurate and clear; containing few minor grammatical errors (i.e. errors in less than 2% of the lines)
REMEDY: Rework may be required to correct deliverables to meet this AQL at a satisfactory level. Prior to any reperformance, the government will determine whether the benefits of reperformance justify the associated costs. If the government decides there is little to no benefit to reperformance, the less than satisfactory delivery stands.
100% Review by COR
COR will review within 15 working days of receipt and log results of all reviews (i.e. CDRLs accepted and if rejected, reason for rejection)
Less than 85% of the products delivered in the reporting period meet the AQL.
Between 85-88% of the products delivered in the reporting period meet the AQL.
Between 89-92% of the products delivered in the reporting period meet the AQL.
Between 93-96% of the products delivered in the reporting period meet the AQL.
At least 97% of the products delivered in the reporting period meet the AQL.
Cost Control
Cost management is proactive and effective. The contractor accurately forecasts costs, managest task order resources and controls performance costs within both the value of the contract, and the tast order value and funding.
Cost growth greater than 3%
Cost growth of less than 3%
No cost growth
No cost growth and cost savings of up to 2% of task order estimated cost without sacrificing the quality of task performance.
No cost growth and savings to the Government of more than 2% of the task order estimated cost without sacrificing the quality of task performance.