RFP Amendment 0003 15 August 2018.pdf

PDF 170 KB Posted

Attached to
Battle Force Tactical Network (BFTN) Follow On
Solicitation number
N00039-18-R-0058
Issued by

About this file

This document provides information regarding Amendment 0003 to solicitation number N00039-18-R-0058 for the Battle Force Tactical Network (BFTN) Follow On program. The amendment extends the proposal due date from August 20, 2018 to September 4, 2018 in response to questions received. The solicitation is seeking proposals to procure BFTN Variants I and II, as well as engineering and fielding services and ancillary equipment. Offerors are advised to review the updated specification and statement of work. Proposals shall include documentation demonstrating compliance with standards such as STANAG 5066 and MIL-STD-188-110D, as well as past performance information for the prime contractor and major subcontractors. Pricing is required for the production units on a firm-fixed-price basis, while the engineering services are to be proposed as a cost-plus-fixed-fee not-to-exceed amount. The Navy is the contracting agency.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Extend Proposal Due Date from 20 August 2018 to 4 September 2018.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

U 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0003918R0058

X 9B. DATED (SEE ITEM 11)

20-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Aug-2018

CODE

COMMANDER, SPACE AND NAVAL WARFARE

SYSTEMS COMMAND

02 CONTRACTS

4301 PACIFIC HIGHWAY

SAN DIEGO CA 92110-3127

N00039 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

heidi.radaford Typewritten Text Heidi Radaford

N0003918R0058

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 20-Aug-2018 10:00 AM to 04-Sep-2018 10:00 AM.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

L-317 SUBMISSION OF PROPOSALS (COMPLEX) (JUL 1999)

L-317.1 INTRODUCTION

This Request for Proposal is for Build-to-Print Production procurement of Battle Force Tactical Network (BFTN) Systems, Variant I and Variant II.

L-317.2 OFFEROR QUESTIONS REGARDING SOLICITATION

Offerors may submit questions concerning, or request clarification of, any aspect of this RFP. Questions shall only be provided in writing via email to the following email address: heidi.radaford@navy.mil no later than than fifteen

(15) calendar days before the closing date of this RFP. The Government may make available to the general public any offeror questions and requests for clarifications and any Government responses to such questions and requests for clarifications; therefore, offerors are hereby instructed not to submit comments of a proprietary nature. Offerors are also advised that the Government may not respond to questions and requests for clarifications.

L-317.3 TIME & DATE FOR RECEIPT OF PROPOSALS

The deadline for the Government’s receipt of proposals is 10:00AM San Diego, California local time on 4 September 2018 . Submissions are subject to the late proposal provisions of FAR 52.215-1, “Instructions to Offerors-Competitive Acquisition”. All times are local time in San Diego, California.

L-317.4 REQUIREMENTS

L-317.4.1 The offeror shall print or type its name on the Schedule and each continuation sheet of the RFP thereof on which page an entry is made.

L-317.4.2 Proposals submitted in response to this RFP must contain comprehensive information on all pertinent aspects of the effort being offered to enable the Government to evaluate the offeror’s understanding of, and capability to accomplish, all the stated requirements covered in the Battle Force Tactical Network (BFTN) Specification (SPEC) and Statement of Work (SOW). Throughout the proposal, the offeror shall provide sufficient detail to substantiate the validity of all stated claims. Proposals shall be submitted in accordance with the instructions herein. Non-conformance with the RFP requirements may render the proposal unresponsive and removed from further consideration. An offeror’s proposal is presumed to represent their best efforts to respond to the solicitation. The proposal must demonstrate how the offeror proposes to comply with the requirements of the RFP. Clarity, completeness and conciseness are essential, and the overall quality of the proposal will be evaluated in the context of being representative of the offeror’s capabilities. Responses must adequately address all RFP requirements.

L-317.4.3 The proposal should only contain material that is directly related to the SPEC and SOW or is in response to the RFP. Statements such as “the offeror understands,” and “the offeror shall/can comply,” along with responses that paraphrase the RFP, are considered inadequate. Phrases such as “standard procedures will be employed” or “well known techniques will be used,” without a specific Government or industry reference, will be considered inadequate and unacceptable.

L-317.4.4 Unnecessarily elaborate presentations, elaborate artwork, expensive paper, and expensive visual aids are not desired and may be considered as an indication of the offeror’s lack of cost consciousness.

L-317.4.5 Validity of Proposals. Proposals submitted in response to this solicitation shall be valid for 210 days from the solicitation closing date.

L-317.4.6 The offeror is to identify its cognizant Defense Contract Audit Agency (DCAA) and Defense Contract Management Agency (DCMA) Offices in the Volume II Cost Proposal, providing the following for each cognizant office:

Point of Contact Name, Address, Telephone Number, Email Address, and FAX Number.

The offeror shall submit one (1) identical copy of the cost/price proposal to their DCAA Office, as further explained below.

L-317.5 PROPOSAL ORGANIZATION

The offeror’s proposal submitted in response to this solicitation shall be unclassified and consist of three (3) separate Volumes:

Volume I: Technical Proposal Volume II: Cost Proposal Volume III: Contract Documents

Offerors shall submit an electronic copy as specified below at L-349 “Electronic Submission of Proposal..

L-317.6 SUBMISSION OF ELECTRONIC PROPOSALS

Electronic copies, in accordance with L-349, must contain separate files for Cost and Technical/Management files.

Electronic copies of the proposal shall be submitted as follows:

1. Format: The proposal shall be on 8 1/2" × 11" white bond paper with single-spaced typed lines, including figures, glossaries, table of contents, and cover sheets. Type size shall be Times New Roman and no smaller than 12 point in the text, 10 point in spreadsheets, and 6 point on drawings, figures, and tables. Foldouts may be used, but shall be no larger than 11" × 17", shall be printed on one side only, and shall count as two pages. Standard margins shall be a minimum of one inch, excluding header and footer. The volumes shall contain a glossary of abbreviations and acronyms used and an explanation of each. No pen and ink changes are allowed.

2. Numbering: Pages shall be numbered consecutively within each section, showing volume, section, and page. As an example, page 19 of Volume I, Section 3 would be numbered I-3-19.

L-317.7 PROPOSAL FORMAT

In addition to all other requirements of this solicitation, each offeror shall demonstrate its capability by means of a detailed written proposal in each of the areas indicated under Section M – Evaluation Factors for Award. Proposals submitted for consideration for award must address the full scope of the solicitation. Proposals which address only part of the solicitation will be considered unacceptable.

Offerors’ proposal volumes shall include the following:

Item Limitations

VOLUME I : TECHNICAL PROPOSAL

(with requested documentation) No page limit Factor 1 : Technical Approach No Page limit Factor 2: Past Performance Three (3) pages per reference

VOLUME II : COST PROPOSAL

(with completed Tables B-1 and B-2 from Section B)

Cost/Price information compatible with Microsoft Excel

Factor 3: Cost/Price VOLUME III : Contract Documents

Section A: Letter of Transmittal, Completed Standard Form (SF) 33, and Completed RFP Sections B through K

Three (3) pages maximum, excluding SF 33 and Section B-K of the RFP Section B: Exceptions to the RFP No page limit Section C: Security clearance levels as required by DD Form 254 No page limit Section D: Organizational Conflict of Interest Mitigation Plan(s) No page limit Section E: Small Business Subcontracting Plan No page limit

L-317.8 MINIMUM REQUIREMENT PROPOSAL CONTENT

Each volume of the proposal shall be submitted in accordance with L-317.4 “Requirements”, L-317.5 “Proposal Organization”, and L-349 “Electronic Submission of Proposals” to permit a detailed evaluation. Proposals are to be neat, legible, and orderly. Content is more important than quantity.

Proposals shall correlate directly and sequentially with the following specific proposal preparation instructions.

Proposals shall be complete and self-sufficient, relate exactly to what is requested and proposed, and strictly adhere to the requirements of this solicitation. Use of documentation by reference, and not incorporated into the proposal, will not be allowed. Where cross-referencing is used, the volume, attachment, exhibit and paragraph numbers, as appropriate, shall be referenced.

Tables of contents, blank pages, coversheets, requirements compliance matrices, lists of tables, lists of drawings, lists of figures, glossaries, and lists of proprietary data do not count against the page limitations.

General Guidelines for Content

Each offeror shall submit a technical proposal to enable the Government to make a thorough evaluation and arrive at a sound determination as to whether or not the proposed approach/services will meet the requirements of the Government. To this end, each technical proposal shall be so specific, detailed, and complete as to clearly and fully demonstrate that the prospective contractor has a thorough knowledge and understanding of the requirements and has valid and practical solutions for any technical problems. Each proposal must be sufficiently adequate to demonstrate how it is proposed to comply with the requirements of the SPEC and SOW. The contractor’s proposal must include sufficient detail to allow the Government to adequately evaluate the contractor’s ability to accomplish the proposal requirements in accordance with Section M.

Wherever relevant, the offeror is encouraged to use cross-references to the applicable sections of the proposal rather than repeating that information in the several sections of this Volume. No cost/price information shall be included in this technical proposal. Proposals that do not present sufficient information to permit complete technical evaluation by the Government may be rejected.

Offerors shall prepare Volume I in two (2) separate Factors as follows:

Factor 1. Technical Approach Factor 2. Past Performance

Volume I – Technical Proposal

Factor 1 – Technical Approach

The Offeror shall provide a Test Report or Government Certification demonstrating compliance with the following standards on a product/system that correlates to the BFTN Specification (e.g., HF Modems correlate to MIL-STD 188-110D):

STANAG5066 Edition 3 STANAG4691 Edition 1

MIL-STD-188-110D

NSTISSAM TEMPEST/1-93

MIL-STD-167-1

MIL-STD-461G

MIL-STD-1686

MIL-DTL-901E

Test Reports demonstrating failures or noncompliance are not acceptable.

Factor 2 – Past Performance

Using the format provided with Attachment 9, Relevant Experience Form, offerors (prime and/or major subcontractors) are to provide relevant experience information on recent contracts performed by the offeror and/or its proposed major subcontractors for efforts similar and relevant to the requirements of this Request for Proposal. If no CPARs exist for the referenced past performance, the offeror shall submit Attachment 8, Past Performance Questionnaire/Survey to the Government person of contact (POC). The Government POC shall submit the completed Attachment 8 to the PCO via email. This data shall be submitted for (3) three of the most recent and relevant contracts. Major subcontractor is defined as a subcontractor’s cost is greater than 10% of prime contractor’s cost without fee and subcontractor’s cost. Recent is defined as a contract performed within the last five years.

For each relevant experience, the offeror shall list and provide contact information for the Contracting Officer and Program Manager. The offeror shall ensure that the contact information is current, accurate, and complete. The offeror shall define and describe how each reference relates to the production and testing of a system that provides Radio Frequency data over High Frequency and Ultra High Frequency in the maritime operational environment and experience in integrating components to build a system that will be installed onto a ship or submarine as well as any support services to resolve system issues.

If offeror does not have relevant Federal Government contracts experience, then provide data on state and local government or commercial contracts, in that order, to complete this report.

Offerors that have no record of past performance (e.g., new businesses) must submit a signed and dated statement to that effect.

The Government does not assume the duty to search for data to cure the problems it finds in the information provided by the offeror. The burden of providing thorough and complete past performance information remains with the offeror.

The Government reserves the right to use past performance information obtained from sources other than those identified by the offeror. The Government reserves the right to contact references for verification or additional information. This past performance information will be used for the evaluation of past performance.

The submitted Contractor Performance Assessment Reporting System (CPARS) or Past Performance Information Retrieval System (PPIRS) reports shall not count against the page limitations established for this proposal volume.

INTRODUCTION: This volume shall contain cost/price information only. The guidelines and requirements in this section are provided to (1) aid Offerors in preparing their cost volume, and (2) aid the Government in reviewing and evaluating those proposals as described in Section M. The Government’s intent is to provide instructions that will allow the Offerors to develop clear, concise and comprehensible proposals and to minimize data requests by the Government during the evaluation process.

ORGANIZATION: The cost/price proposal instructions outlined in this section shall be followed in developing the proposed costs and prices for all CLINs listed in Section B – Supplies/Services and Price/Cost of this RFP. Offerors shall complete Section B and provide it in this volume with an additional copy to be provided in the Contractual Document Volume III. Offerors shall complete Section B (including all of its associated tables) by proposing:

(a) FFP BFTN Variants I & II (CLINs 0001 and 0002). The Offeror shall insert individual unit prices for the quantities identified in the Pricing tables provided in Section B of the RFP;

(b) Engineering/Fielding Services (CLIN 0003). The Offeror shall provide an estimated cost and cost plus fixed fee calculated using the Government Not to Exceed amount for this CLIN. In addition, the offeror shall provide an estimate of the labor hours. No deviations will be accepted however, if an offeror reduces the NTE amount, the Government will adjust the proposal upwards to the NTE amount during proposal evaluation

(c) Ancillary Equipment & Spares (CLIN 0004). The Offeror shall provide a firm fixed price calculated using the Government Not to Exceed amount for this CLIN. No deviations will be accepted however, if an offeror reduces the NTE amount, the Government will adjust the proposal upwards to the NTE amount during proposal evaluation

The Offeror’s cost/price proposal shall be divided into two sections: (1) Price, and (2) Cost.

FFP BFTN Variants I & II (Applicable to CLIN 0001 & CLIN 0002): The contractor shall populate the tables below and provide the completed tables in the Price Section of the contractor’s Volume II Cost Proposal. The price in the table below shall match that which the contractor priced in Section B for the corresponding quantities. The current estimate is provided for the contractor’s information and the Government’s use in evaluating proposals.

However, the dollar ceiling for CLINs 0001 and 0002 will be based off the unit price below multiplied by the maximum quantity.

CLIN EST QTY (A) Unit Price (B) Total Evaluated Price (A*B) Maximum

Quantity

0001 10 128

OP 1 2 25*

OP 2 2 25*

OP 3 2 26*

OP 4 2 26*

OP 5 2 26*

0002 5 28

OP 1 1 5*

OP 2 1 5*

OP 3 1 6*

OP 4 1 6*

OP 5 1 6*

*The breakout of quantities per ordering period is for evaluation purposes only, please see Table B.1, Pricing table.

Pricing Information for BFTN system variants The Offeror shall provide information to support evaluation of the unit prices proposed for the BFTN system quantities identified in Section B of the RFP. For evaluation of both BFTN system variants pricing, the Offeror shall provide a narrative description of its pricing approach for the quantities contained in Section B, including the estimating techniques used, learning curve assumptions, and quantity discounts.

The price for each BFTN variant system shall include all material costs, subcontract costs, other direct costs (to include license fees for use of commercial components, if applicable), direct and indirect engineering and manufacturing labor costs, inclusive of, but not limited to, systems engineering, program management, and configuration and data management activities, other indirect costs included in approved Forward Pricing Rate Agreements, and profit. The learning curve may also include escalation.

Cost Breakdown (Engineering/Fielding Services Applicable to CLIN 0003)

The cost breakdown shall indicate the Offeror’s total estimated proposed cost Not-To-Exceed $10,714,000 inclusive of direct and indirect charges, fee, etc. Any information submitted must support the costs proposed. Include sufficient detail or cross references to clearly establish the relationship of the information provided to the cost proposed. Support any information provided by explanations or supporting rationale, as needed, to permit the Contracting Officer and authorized representatives to evaluate the documentation.

The cost breakdown shall indicate the Offeror’s total proposed cost (broken down by labor hours, rates, and dollars;

material dollars, Other Direct Cost (ODC) dollars, and subcontract dollars) including applicable overheads, indirect rates and dollars, General and Administrative (G&A), Facilities Capital Cost of Monies (FCCM), and fee. Any information submitted must support the costs proposed. Include sufficient detail or cross references to clearly establish the relationship of the information provided to the cost proposed. Support any information provided by explanations or supporting rationale, as needed, to permit the Contracting Officer and authorized representatives to evaluate the documentation.

Each spreadsheet shall be formatted in Microsoft Excel 2007 and contain cells with working formulas and calculations. Each spreadsheet shall be structured so as to show separate totals per CLIN.

Substantiation. Substantiation is required for all costs included in the cost volume. The requirements outlined in this section shall apply equally to the prime and any expected major subcontractors. As mentioned before, general statements such as “estimates were derived from engineering analysis for judgment” are unacceptable. Statements that simply describe a historical program and the associated labor hours and material costs do not substantiate a cost estimate.

Direct Rates. The Offeror and major subcontractors (subcontractors that are greater than 10% of the total engineering services without fee) shall provide the most current rates, for each cost center, that are in effect at the time of proposal submission. This shall include the current FPRA direct labor rates, the projected direct labor rates assuming contract award, the current company labor categories, and the mix of company labor categories proposed for this contract. The Offeror and major subcontractors shall document the development of composite direct rates, which represent a combination of company labor categories, functional elements, or calendar year accounts. In addition, the Offeror and major subcontractors shall submit detailed definitions for each direct labor category. The Offeror and major subcontractors shall also include the basis for any projected annual increases and any other factors applied to direct rates.

Uncompensated Overtime and Professional Employees. Proposals that include hourly rates for exempt employees which are based on more than a 2,080 hour work-year shall be identified as Uncompensated Overtime as defined in the FAR 52.237-10 “Identification of Uncompensated Overtime” provision in this solicitation and evaluated in accordance with the “Uncompensated Overtime Evaluation” provision in Section M. Offerors are advised that the above plan will be used regardless of the methodology proposed or name given to the compensation plan (i.e., Total Time Accounting, Competitive Time Accounting, Compensated Overtime, or Standard Workweek). If an Offeror decides to include uncompensated effort in their proposal, the following requirements shall be met and reflected in the proposal:

(a) The Offeror must have an established cost accounting system, determined Adequate by Defense Cost Accounting Agency (DCAA) that records all hours worked, including uncompensated hours, for all employees, and regardless of contract type. Failure to meet this requirement may result in the proposal being removed from consideration for contract award.

(b) Uncompensated hours, for all employees and regardless of contract type, shall be included in the Offeror’s base for allocation of indirect costs and meet the requirements of Cost Accounting Standard (CAS) 418 “Allocation of Direct and Indirect Costs.”

(c) The proposed shall clearly identify hours of uncompensated effort proposed by labor category.

(d) The proposal shall clearly identify the amount of uncompensated effort that will be performed without supervision and without support personnel and shall assess the productivity of such effort. Additionally, clearly identify the means by which the Offeror controls or schedules uncompensated overtime for its employees as well as where the uncompensated effort will be accomplished.

(e) The proposal shall describe the extent to which employees are required or encouraged to perform uncompensated effort and the impact the use of uncompensated effort has on work effectiveness.

(f) The proposal shall include a copy on the corporate policy addressing the uncompensated effort.

(g) The proposal shall include a separate, complete, cost breakdown, to the same level of detail as the breakdown supporting the cost proposal. The breakdown shall include direct labor rates for all direct labor categories based on the division by 2,080 of exempt employees actual annual salary, to represent a standard (as deemed by Fair Labor Standards Act) 40-hour week or 2,080 hour standard year. In addition, the breakdown shall include overhead rates and other costs based on employees working a standard 40-hour workweek or a 2,080 hour standard year.

The requirements stated in paragraphs (a) through (g) above shall be met for each subcontract which has uncompensated effort included in the proposal.

Subcontractor Rates. The Offeror and each subcontractor shall provide the rates used in the proposed cost in accordance with the format described in this section. Due to the proprietary nature of company rates, this information may be presented separately for each Offeror and major subcontractor. A trace to the cost reimbursable CLINs shall be included to ensure the proper application of the rates.

Indirect Rates. The Offeror and major subcontractors shall submit the indirect rates used in the proposal. Sample indirect rate accounts are listed below.

Engineering Overhead Manufacturing Overhead General & Administrative (G&A) Material Handling Overhead Facilities Capital Cost of Money (FCCM)

The Offeror and subcontractors shall include a projection of indirect rates that assumes the award and inclusion of the BFTN contract in the business base. Any changes to the current Forward Pricing Rate Agreement (FPRA) indirect rates due to variation of the business base or other factors impacting the rates shall be fully described and justified.

Fee. Subcontractor fee will not be billed as a separate direct cost on any voucher submitted by the contractor to the Government, but will be paid to the subcontractor by the prime contractor from the fee billed from the fee pool.

General Guidelines for Content

Offerors shall prepare Volume III: Contract Documents in five (5) Sections as follows:

Section A Letter of Transmittal, Completed Standard Form (SF) 33, and Completed RFP Sections B through K Section B Exceptions To The RFP Section C Security Clearance Levels as Required by DD Form 254 Section D Organizational Conflict of Interest Mitigation Plan(s) Section E Small Business Subcontracting Plan

VOLUME III - SECTION A: LETTER OF TRANSMITTAL, COMPLETED STANDARD FORM (SF) 33,

AND COMPLETED RFP SECTION B THROUGH K

The offeror’s proposal shall include a cover letter on the offeror’s letterhead stationery and signed by an executive of the company who possesses authority to contractually bind the offeror. The cover letter shall acknowledge receipt of all amendments (if any are issued) to the RFP. The submittal letter shall identify all enclosures being transmitted as part of the response to the RFP. The letter shall reference the RFP number and acknowledge that it transmits an offer in response to the RFP. It shall state: (1) Commercial and Government Entity (CAGE) number, (2) Data Universal Numbering System (DUNS) Number, (3) Taxpayer Identification Number (TIN), (4) address(es) of the location(s) at which the offeror intends to perform the proposed effort, (5) the name, address and telephone number of the cognizant DCAA audit office, (6) the name, address and telephone number of the cognizant DCMA office, and (7) a statement that the proposal is valid for no less than 210 calendar days after the date established for receipt of offers. The above listed information (items 1-7) shall also be provided for proposed major subcontractors. If subcontracting with another company(ies) is proposed, a copy of the subcontractor agreement(s) shall be provided as an enclosure(s) to the cover letter.

The offeror’s proposal shall provide a completed RFP to include completed SF33 and Sections B and K.

VOLUME III - SECTION B: EXCEPTIONS TO THE RFP

The offer shall identify any exceptions to the RFP.

VOLUME III – SECTION C: SECURITY CLEARANCE LEVELS AS REQUIRED BY DD FORM 254

Offerors shall document that all facilities and personnel proposed to perform this contract possess at a minimum the security clearance levels required by the RFP (DD Form 254).

VOLUME III – SECTION D: ORGANIZATIONAL CONFLICT OF INTEREST MITIGATION PLAN(S)

The Offeror shall submit draft versions of any required OCI Mitigation Plans, consistent with the guidance contained in L-339 “Notice of Organizational Conflict of Interest”.

VOLUME III – SECTION E: RESPONSE TO SMALL BUSINESS SUBCONTRACTING PLAN

Offerors shall provide its Small Business Subcontracting Plan.

(End of provision)

(End of Summary of Changes)

2018-08-15T14:15:16-0700
RADAFORD.HEIDI.LYNN.1076270666

File details come from the government source that posted it. Updated .