QA Draft RFP 19 April 2018.pdf

PDF 286 KB Posted

Attached to
Battle Force Tactical Network (BFTN) Follow On
Solicitation number
N00039-18-R-0058
Issued by

About this file

This document contains a draft request for proposal (RFP) for the Battle Force Tactical Network (BFTN) Follow On opportunity along with the related federal contract opportunity posting. The draft RFP includes questions and answers to clarify requirements for the production of BFTN systems. An updated bill of materials and technical data package will be provided with the final RFP. The final proposal due date as extended by Amendment 0003 is 4 September 2018. Interested parties were required to request the specification and technical data packages by signing a non-disclosure agreement. The contract will require compliance with STANAG 5066 Edition 3, STANAG 4691 Edition 1, and MIL-STD-188-110D as demonstrated by test reports or government certification. The Department of the Navy is the issuing agency.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answers

DRAFT RFP N00039-18-R-0058

Date 19 April 2018

Question 1. Assembly drawings for rack and shelf assemblies.

Response 1: Contractor shall create their own assembly procedures using the technical specification, BOM, TDP and Reference Standards in SOW.

Question 2. Drawing USN18-32260 REV A; ASSEMBLY, THERMAL CIRCUIT BOARD.

Response 2: See updated BOM List to be provided with Final RFP.

Question 3. Drawing USN18-WI32999; HARDENING PROCEDURE, MANUFACTURING AID.

Response 3: Contractor shall create their own hardening procedures and manufacturing aids in accordance with technical specification, BOM, TDP and Reference Standards in SOW.

Question 4. Drawing USN18-32800; Assembly, 1RU PDA, 8CK, EMI w/o Cable Tray and Rack MT.

Response: See updated BOM list to be provided with Final RFP.

Question 5. Several drawings were delivered at a revision that conflicts with the BOM description.

Please confirm the delivered drawings are accurate.

Response 5: BOM and drawing package have been updated and correct drawings are listed below.

a. USN18-30119 REV B; TDP drawing is Rev A USN18-30119 REV A

b. USN18-30115 REV A; TDP drawing is Rev USN18-30115

c. USN18-30033 REV D; TDP drawing is Rev B USN18-30033 REV B

d. USN18-30034 REV B; TDP drawing is Rev A USN18-30034 REVA

e. USN18-30033 REV D; TDP drawing is Rev B USN18-30033 REV B

f. USN18-30034 REV B; TDP drawing is Rev A USN18-30034 REV A

g. USN18-30038 REV B; TDP drawing is Rev USN18-30038

h. USN18-30103 REV E; TDP drawing is Rev C USN18-30103 REV E

Question 6. Will an updated TDP be provided at contract award to include in-process rack/system changes including the conversion of gateway controllers and obsolete HF modems?

Response 6: No, an updated copy of the TDP will be released with the final RFP. Furthermore, the updated copy of the TDP will include in process rack/system changes with the conversion of gateway controllers and obsolete HF modems.

Question 7. Will an updated BOM be provided at contract award? Several part numbers are missing such as the LCD keyboard, SNR controller cPci, rack fan, and shock isolators.

Response 7: No, an updated copy of the BOM will be released with the final RFP. Furthermore, the updated copy of the BOM will include missing part numbers for the LCD Keyboard and SNR controller cPci. The BFTN rack does not include a rack fan or shock isolators.

Question 8. To support the production testing estimate, can a copy of the PAT procedure be provided?

Response 8: Yes, the PAT is an Appendix to the SOW and will be released with the final RFP.

Question 9. The following information would help us better understand the system:

Master Drawing List, No. 021-000-1000240 Rev A 021-000-1000240 REV-A.pdf Master Parts List, No. 022-000-1000240 Rev A 022-000-1000240 REV-A.pdf Technical Data Summary, No. 023-000-1000240 Rev A 023-000-1000240 REV-A.pdf Simplified Block Diagram, No. 060-000-1000240 Rev A 060-000-1000240 REV-A.pdf Cable Block Diagram, No. 071-000-1000240 Rev A 071-000-1000240 REV-A.pdf Cable Running Sheets, No. 081-000-1000240 Rev A 081-000-1000240 REV-A.pdf Circuit Diagrams, No. 110-000-1000240 Rev A 110-000-1000240 REV-A.pdf Labeling Details, No. 120-000-1000240 Rev A 120-000-1000240 REV-A.pdf Server Rack (Unit 1) Outline & Installation Drawing, No. 170-001-1000240 Rev A 170-001-1000240 REV- A.pdf

Response 9: The drawings listed above are not included in the TDP and/or BOM because these listed drawings are not required or necessary for proposal submission. However, these drawings are available via Chapter 8 of the “BattleForce Tactical Network (BFTN) Technical Manual (EE679-AX-OMI- 010)” and can be provided upon written request via email to tyler.joworski@navy.mil.