BFTN Industry Day 3.6.18_FINAL_PO.pdf
PDF 2 MB Posted
- Attached to
- Battle Force Tactical Network (BFTN) Follow On
- Solicitation number
- N00039-18-R-0058
About this file
This document provides details for the Battle Force Tactical Network (BFTN) Follow On federal contract opportunity with solicitation number N00039-18-R-0058. The Navy is seeking proposals for the production of BFTN systems, including AN/USQ-195(v)1 systems for ships and AN/USQ-195(v)2 systems for submarines, as well as engineering support services and ancillary equipment. Proposals were due by 20 August 2018 according to Amendment 0001, though other amendments have extended the due date further. The contract type will be a single-award IDIQ for a five-year ordering period from FY2019 to FY2023, with firm-fixed-price CLINs for hardware and cost-plus-fixed-fee CLINs for engineering services. The incumbent contractor will be provided GFP systems to use for testing and integration.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Integrated Information Warfare for the
21st Century
PEOC4I.NAVY.MIL
Program Executive Office Command, Control, Communications, Computers and Intelligence (PEO C4I)
PMW/A 170
Battle Force Tactical Network (BFTN) Industry Day 7 March 18
Heidi Radaford, Contracting Officer, (2.2) heidi.radaford@navy.mil
LT. Sade Jurgensen, BFTN APM, (PMW/A 170) sade.jurgensen@navy.mil
DISTRIBUTION STATEMENT A: Approved for public release, distribution is unlimited (6 MARCH 2018)
BFTN Industry Day Schedule
• Contractor Sign-in:
• Opening Remarks:
• Program Overview:
• RFP Overview:
• Technical Overview:
• Rack Viewing:
• Question Submittal:
• Government Caucus:
• Government Responses:
• Conclusion:
1100 - 1130 1130 - 1145 1145 - 1200 1200 - 1215 1215 - 1300 1300 - 1330 1330 - 1400 1400 - 1430 1430 - 1500 1500 - 1515
Opening Remarks
•Opening Remarks
BFTN
Program Overview
•Mission Description BFTN provides secure LOS and BLOS network connectivity for ships and submarines to digitally communicate in a C2D2E using networking protocols over the HF and UHF radio spectrum.
•Program Status ACAT III, Post Milestone C Variants
– AN/USQ-195 (v)1 (ship)
– AN/USQ-195 (v)2 (submarine)
FRP-DR scheduled Q3FY18
LOS: Line-of-Sight BLOS: Beyond Line-of-Sight Maritime Interdiction Operations HF: High Frequency C2D2E: Command & Control Degraded/Denied Environment UHF: Ultra High Frequency
• Mission Areas
MDA
MIO
ASW
EWO
• Operational Outcome:
Tactical data can be distributed across the at-sea AOR without dependencies on NOC intercession
– Concurrently providing immediate bridging of tactical data into any platform's SATCOM circuits to shore
– The BFTN operational contribution is best demonstrated in the operational needs vignette that follows
Capability Production Document Statement
MDA: Maritime Domain Awareness MIO: Maritime Interdiction Operations ASW: Anti-Submarine Warfare EWO: Expeditionary Warfare Operations
AOR: Area of Responsibility NOC: Network Operating Center SATCOM: Satellite Communications
BFTN
Operational View
BFTN Industry Day
• Ground Rules:
A Government escort is required at all times Submit all solicitation related questions in writing during the question submittal period Anonymously written questions and comments will be accepted All questions, answers, brief and any other information presented or submitted will be posted on the SPAWAR E-Commerce website
No sidebar discussions with Government Representatives or BFTN program staff are permitted
Nothing in this brief supersedes the RFP
BFTN Industry Day
• Please note:
E-Commerce website e-commerce.sscno.nmci.navy.mil.
N00039-18-R-0058 Please request Specification and Technical Data Package
(Bill of Materials and Drawings) from the Contract Specialist, Tyler Joworski (Tyler.Joworski@navy.mil)
– NDA required
– Joint Certification Program mailto:Tyler.Joworski@navy.mil
BFTN Contract
• Competition type Full and open competition Lowest Priced Technically Acceptable
• Contract Length Five (5) year ordering period
FY19-FY23
• Contract type Single Award IDIQ for production of BFTN AN/USQ-195(v)1 (ship) and AN/USQ-195(v)2 (submarine) FFP CLINs for hardware procurement and Ancillary
Equipment/Spares CPFF CLINs for engineering support services
FFP: Firm Fixed Price CLIN: Contract Line Item Number CPFF: Cost Plus Fixed Fee
Section B
• CLIN 0001: AN/USQ-195(v)1 (ships) FFP – Max Qty 43 systems
• CLIN 0002: AN/USQ-195(v)2 (submarines) FFP – Max Qty 22 systems
• CLIN 0003: Engineering Support Services/ODCs
CPFF – NTE $475K
• CLIN 0004: Ancillary Equipment/Spares
FFP – NTE $436K
• CLIN 0005: CDRLs
NSP
FFP: Firm Fixed Price CLIN: Contract Line Item Number CPFF: Cost Plus Fixed Fee NSP: Not Separately Priced
GFP
• Upon contract award Item 1 and 2 will be provided to the Contractor for the life of the contract. Refer to Section 9 of the BFTN SOW for additional information.
• *Note: Contractor shall not change the configuration of the image
Item # Description Qty 1 BFTN AN/USQ 195 (v)1 system 1 2 BFTN v.4.2 Software Suite (*image and native) 2
BFTN Evaluation Factors
• Source Selection Type: LPTA
• Factor 1:
Sub-factor 1: Contractor shall provide a test report or Government certification of offered product correlating to the Specification for the BFTN showing testable compliance to the following:
12 LPTA: Lowest Price Technically Acceptable
Sub-factor 2: Small Business (Acceptable/Unacceptable) Large Businesses only
• Factor 2: Past Performance (Acceptable/Unacceptable)
• Factor 3: Price & Costly
STANAG5066 Edition 3
STANAG4691 Edition 1
MIL-STD-188-110D
NSTISSAM TEMPEST/1-93
MIL-STD-167-1
MIL-STD-461G
MIL-STD-464
MIL-STD-331
MIL-STD-901E
Technical Summary Operations
• BFTN system is a wireless gateway for platforms to reach each other in a COMSEC secure HF & UHF radio based multicast ad-hoc network Balances traffic over HF and/or UHF based on best-path/best-link margin configuration settings noted in the BFTN Specification
– Proxies Ethernet to serial transitions into the RF Network
– GFI software provided for Gateway Controllers, GUI and Firewall
• BFTN is fielded in multiple mission environments As of Industry day - 74 ships, 8 subs, 28 aircraft, 2 shore stations in the US Navy; 36 ships, 2 aircraft 2 shore stations in NATO partner nation navies have compatible systems
– Systems must be ad-hoc interoperable to assure mission operations between US-Only platforms and Allied/Coalition partner platforms
– Quality levels, settings and configuration defined in the BFTN
Specification assure interoperability
HF: High Frequency RF: Radio Frequency UHF: Ultra High Frequency NATO: North Atlantic Treaty Organization
Variant Differences
• AN/USQ-195(v)1 is the most commonly order system used in ship and shore platform environments
• AN/USQ-195(v)2 is a kitted BFTN system for dispersed installation in Submarine Radio Room racks (may or may not be ordered with Allied/Coalition capability shown)
Production
• In-process rack/system change initiatives include:
Improved load balancing and application protocol administration
(settings within the GFI software delivered upon award) Shift replacement hardware in rack
– Conversion of Gateway Controllers to common cPCI form factor to address memory management, GUI controls, obsolescence and attain reduced power and HVAC demands (shift hardware in rack)
– Obsolete Rockwell-Collins HF Modems replace Modems
• Production parts acquisition and Build-to-Print is key part of assuring interoperation and installation Parts supply can be from company procurement sources
– Contractor shall follow the BOM (also refer to SOW Section 3.4 and 5) ISO 9002* assembly best practices for build, assembly, connectorization, grounding and cable routing are required (Refer to SOW Section 5.3.2)
15 * International Organization for Standardization (ISO) 9002: Model for quality assurance in production, installation and servicing
TDP: Technical Data Package BOM: Bill of Materials
Rack Assembly Stages (Visual Aid)
Day 1 Day 2 Day 3 Day 4
Day 5 Day 6 Day 7 Day 8
Ruggedization
• Ruggedization of many major and minor components within the BFTN systems assure certification to MIL-DTL- 901E Grade B.
• Refer to SOW and Specification for further details on ruggedization requirements.
Ruggedization Visual cPCI Components:
RTV108 adhesive stabilize front interface connectors
HF & UHF Modems: Tie wraps stop wire movement;
RTV108 at interface connectors
Ruggedization Visual
HSTB: Re-route wires stop wire wear; RTV108 surface mount components. To prevent EMI “noise” per MIL-STD-461E; we seal the chassis with EMI gaskets/tape and close unused rear connectors with metal covers.
Production Acceptance Testing
• Pre-installation “burn-In” test of some components is recommended upon warehouse receipt to reduce warranty risk HSTB pairing to a Garmin 19HXS GPS receiver antenna (15 minutes) SNR Modems operate prior to integration – test for full boot-up and visually assess satisfactory video quality to HMI (15 minutes)
• A BFTN system is provided as GFP
Cable Run Sheets (wiring drawings) are provided to build “back-to-back” test cables between the Production Unit and the GFP system
– Energize each rack and transmit RF Chat back and forth
– Visually verify video quality
– Verify keyboard/mouse responsiveness at each KVM position selection
• Cable run sheets are provided to build intra-system loopback cables for troubleshooting using a single rack 20
BFTN is an Integral Part of C4I
During a Command & Control in a Denied/Degraded Environment (C2D2E), the ADNS autonomously shifts IP transport to BFTN for continuous comms in the worst at-sea warfighting conditions - this rack must be ready
POCs
•PCO: Heidi Radaford Heidi.Radaford@navy.mil
(619) 524-7386
•Contract Specialist: Tyler Joworski Tyler.joworski@navy.mil
(619) 524-7145 mailto:Heidi.Radaford@navy.mil mailto:Tyler.joworski@navy.mil
Visit us at www.peoc4i.navy.mil
We Deliver Information Warfare Capabilities to the
Fleet.
| Slide Number 1 |
| BFTN Industry Day Schedule |
| Opening Remarks |
| BFTN�Program Overview |
| Slide Number 5 |
| BFTN�Operational View |
| BFTN Industry Day |
| BFTN Industry Day |
| BFTN Contract |
| BFTN Contract�Section B |
| BFTN Contract�GFP |
| BFTN Contract�BFTN Evaluation Factors |
| Technical Summary �Operations |
| Technical Summary �Variant Differences |
| Technical Summary �Production |
| Rack Assembly Stages�(Visual Aid) |
| Technical Summary �Ruggedization |
| Technical Summary �Ruggedization Visual |
| Technical Summary �Ruggedization Visual |
| Technical Summary�Production Acceptance Testing |
| Slide Number 21 |
| POCs |
| Slide Number 23 |
File details come from the government source that posted it. Updated .