ePS_RFP_Final_N00039-17-R-0002_07132017.pdf
PDF 3 MB Posted
- Solicitation number
- N00039-17-R-0002
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local t ime 11 Sep 2017
X
A X B X C X D
EX
X
G F 322 - 353
354 - 375 X H 376 - 384
TERRY.COLEY@NAVY.MIL
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 384
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00039 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 6 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Section L-7 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
TERRY COLEY 202-433-0856
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 207
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
208 - 219
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
221 - 235
236 - 286 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 287 - 290 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 291 - 297 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
298 - 320
PART II - CO NTRACT CLAUSES
COMMANDER, SPACE AND NAVAL WARFARE
701 S. COURTHOUSE ROAD, BLDG 12, SUITE 1400
ARLINGTON VA 22204
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
13 Jul 2017
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N00039-17-R-0002
Section A - Solicitation/Contract Form
SOLICITATION INFORMATION
This solicitation will result in the award of a contract for a base period and nine option periods totaling 10 years (if options are exercised).
Section B - Supplies or Services and Prices
Base Period – Limited Deployment (LD) Phase Option Period 1 – Release 1 Option Period 2 – Release 2 Option Year 3 – Transition to Sustainment Option Year 4 – Sustainment Option Year 5 – Sustainment Option Year 6 – Sustainment Option Year 7 – Sustainment Option Year 8 – Sustainment Option Period 9 – Sustainment
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
FFP
COTS Licenses The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
0001AA
FFP
1 Lot
COTS CWS LD
FOB: Destination
0001AB
Reserved
0001AC
FFP
1 Lot
COTS Enterprise Service Bus (ESB)
0001AD
FFP
1 Lot
COTS CWS Gap Closure
0001AE
FFP
1 Lot
COTS CWS User Licenses
0001AF
FFP
1 Lot
COTS CWS Other Software
SW Maintenance The Contractor shall provide software maintenance in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
0002AA
FFP
1 Lot
COTS CWS LD Maintenance
0002AB
0002AC
FFP
1 Lot
COTS ESB Maintenance
0002AD
FFP
1 Lot
COTS CWS Gap Closure Maintenance
0002AE
FFP
1 Lot
COTS CWS User Licenses Maintenance
0002AF
FFP
1 Lot
COTS CWS Other Software Maintenance
FPI
Lot
Limited Deployment: Various Locations Locations: USMC HQ I&L - MARFORRES, NAVSEA - NSWC Carderock, SSP, ONR - NRL (alternate), NAVSUP site (alternate). The Contractor shall provide all personnel, supervision and resources to perform LD in accordance with Sections 4.1.2; 4.1.3; 4.1.5; 4.1.6; 4.1.7; 4.1.8; 4.1.9; 4.1.10; 4.1.11; 4.1.12; 4.3.1; 4.3.2; 4.3.3;
4.3.4; 4.3.5; 4.3.6; 4.3.7; 4.3.8; 4.3.9; 4.3.10; 4.3.11; 4.3.12; 4.3.13; 4.4.1; 4.4.2; 4.4.4; 4.4.5; 4.4.6; 4.4.7; 4.5.1;
4.5.2; 4.5.3; and 4.7 of the PWS.
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
Contract Data Requirements List DD 1423, Contract Data Requirements List (CDRL), Exhibits A-C (Not Separately Priced Line Item).
CPFF
Engineering Support The Contractor shall perform Engineering Support in accordance with Section 4.3.3 of the PWS.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FIXED FEE
0006AA
CPFF
Lot EST
Special Projects
Training The Contractor shall provide training and an updated version of all training materials in accordance with Section
4.4.3 of the PWS.
0007AA
FFP
1 Lot
Vendor Training Per class maximum 20 students
0007AB
FFP
1 Lot
Initial Instructor Led Training
0007AC
0007AD
FFP
1 Lot eLearning/CBT Training Maximum capacity
0007AE
COST
Other Direct Costs Reimbursable travel in accordance with Sections 4.3.11; 4.4.3; 4.7 of the PWS. Other direct costs in support of contract performance must be explicitly authorized by Government prior to being incurred.
0008AA
COST
Lot
Travel
0008AB
COST
Lot
Facilities
FFP
1 Lot
Option: Impact Level 4 The Contractor shall provide Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services and Commercial Cloud Hosting and Services PWS.
FFP
1 Lot
Impact Level 5 The Contractor shall provide Impact Level 5 in accordance with Section 4 of Attachment 27 Commercial Hosting Services PWS.
Option: Licenses The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
0011AA
FFP
1 Lot
10,000 - 20,000 Licenses
0011AB
FFP
1 Lot
20,001 - 30,000 Licenses
0011AC
FFP
1 Lot
30,001 or more Licenses
FFP-LOE
1 Lot
Option: Transition Activities MARFORRES The contractor shall provide Transition Activities for USMC HQ I&L - MARFORRES in accordance with Section
4.5.4 of the PWS.
CEILING PRICE
FFP-LOE
1 Lot
Option: Transition Activities Carderock The contractor shall provide Transition Activities for NAVSEA - NSWC Carderock in accordance with Section
4.5.4 of the PWS.
FFP-LOE
1 Lot
Option: Transition Activities SSP The contractor shall provide Transitiion Activities for SSP in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
Option: ODC SSP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract performance must be explicitly authorized by Government prior to being incurred.
FFP-LOE
1 Lot
Option: Transition Activities ONR - NRL The contractor shall provide Transition Activities for ONR - NRL (alternate) in accordance with Section 4.5.4 of the
PWS.
FFP-LOE
1 Lot
Option: Transition Activities NAVSUP The contractor shall provide Transition Activities for NAVSUP in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
Option: Transition Activities MSC The contractor shall provide Transition Activities for MSC in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
Option: ODC MSC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
Option: Transition Activities NAVAIR The contractor shall provide Transition Activities for NAVAIR in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
Option: ODC NAVAIR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
Option: Transition Activities ONR The contractor shall provide Transition Activities for ONR in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
Option: ODC ONR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
Option: Transition Activities USMC HQ The contractor shall provide Transition Activities for USMC HQ I&L in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
Option: ODC USMC HQ I&L Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
Option: Transition Activities MARCORSYSC The contractor shall provide Transition Activities for MARCORSYSCOM in accordance with Section 4.5.4 of the
COST
Lot NTE
Option: ODC MARCORSYSCOM Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
NET AMT
COST
Lot NTE
Option: ODC NAVSEA Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
Option: Transition Activities SPAWAR The contractor shall provide Transition Activities for SPAWAR in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
Option: ODC SPAWAR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
Option: Transition Activities NAVFAC The contractor shall provide Transition Activities for NAVFAC in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
Option: ODC NAVFAC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
Option: Transition Activities NAVSUP The contractor shall provide Transition Activities for NAVSUP in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
Option: Transition Activities BUMED The contractor shall provide Transition Activities for BUMED in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
Option: ODC BUMED Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP
1 Lot
Service Desk Support Option 1 Provide service desk support in accordance with section 4.5.1; 4.5.2; 4.5.3 of the PWS.
FFP
1 Lot
Service Desk Support Option 2
FFP
1 Lot
Managed Services The contractor shall provide Managed Services in accordance with Section 4 of Attachment 27 ePS Managed Services and Commercial Cloud Hosting and Services PWS.
FFP
1 Lot
Commercial Cloud Hosting and Services The contractor shall provide Commercial Cloud Hosting and Services in accordance with Section 4 of Attachment 27 ePS Managed Services and Commercial Cloud Hosting and Services PWS.
FFP
1 Lot
Option: Impact Level Cloud Migration The contractor shall perform migration services to transition to Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services and Commercial Cloud Hosting and Services PWS.
FFP
1 Lot
Option: Hosting Migration The contractor shall perform Hosting Migration services in accordance with Section 4 of Attachment 27 ePS Managed Services and Commercial Cloud Hosting and Services PWS.
Option: LD Mapping to Legacy - HS1 The contractor shall provide LD mapping to legacy financial systems for Handshake 1 in accordance with section 4.3.7(e) of the PWS.
0048AA
FFP
1 Lot
NAVY ERP
0048AB
FFP
1 Lot
IMPS
0048AC
FFP
1 Lot
PRB
Option: LD Mapping to Legacy - HS2/3 The contractor shall provide LD mapping to legacy financial systems for Handshakes 2 and 3 in accordance with section 4.3.7(e) of the PWS.
0049AA
FFP
1 Lot
NAVY ERP
0049AB
FFP
1 Lot
IMPS
0049AC
FFP
1 Lot
SABRS
FFP
1 Lot
Option: Mapping to Standard API - HS1 The contractor shall provide mapping to Standard API for Handshake 1 in accordance with PWS paragraph 4.3.7(f).
FFP
1 Lot
Option: Mapping to Standard API - HS2/3 The contractor shall provide mapping to Standard API for Handshakes 2 and 3 in accordance with PWS paragraph 4.3.7(f).
OPTION COTS Licenses The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
1001AA
FFP
1 Lot
OPTION COTS CWS LD
1001AB
FFP
1 Lot
OPTION COTS CWS Release 1
1001AC
FFP
1 Lot
OPTION COTS Enterprise Service Bus (ESB)
1001AD
FFP
1 Lot
OPTION COTS CWS Gap Closure
1001AE
FFP
1 Lot
OPTION COTS CWS User Licenses
1001AF
FFP
1 Lot
OPTION COTS CWS Other Software
OPTION SW Maintenance The Contractor shall provide software maintenance in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
1002AA
FFP
1 Lot
OPTION COTS CWS LD Maintenance
1002AB
FFP
1 Lot
OPTION COTS CWS Release 1 Maintenance
1002AC
FFP
1 Lot
OPTION COTS ESB Maintenance
1002AD
FFP
1 Lot
OPTION COTS CWS Gap Closure Maintenance
1002AE
FFP
1 Lot
OPTION COTS CWS User Licenses Maintenance
1002AF
FFP
1 Lot
OPTION COTS CWS Other Software Maintenance
FPI
Lot
OPTION Deployment Release 1: Various Locations Locations: MSC, NAVAIR, ONR, SPAWAR, USMC HQ I&L, MARCORSYSCOM, NAVSEA. The Contractor shall provide all personnel, supervision and resources to perform Release 1 in accordance with Sections 4.1.2; 4.1.3;
4.1.5; 4.1.6; 4.1.7; 4.1.8; 4.1.9; 4.1.10; 4.1.11; 4.1.12; 4.3.1; 4.3.2; 4.3.3; 4.3.4; 4.3.5; 4.3.6; 4.3.7; 4.3.8; 4.3.9;
4.3.10; 4.3.11; 4.3.12; 4.3.13; 4.4.1; 4.4.2; 4.4.4; 4.4.5; 4.4.6; 4.4.7; 4.5.1; 4.5.2; 4.5.3; and 4.7 of the PWS.
TOTAL TARGET PRICE
CEILING PRICE
FFP
1 Lot
OPTION Sustainment The Contractor shall perform Sustainment in accordance with Sections 4.6; 4.6.1; 4.6.1.2; 4.6.2.10; and 4.7 of the
OPTION Contract Data Requirements List
OPTION Engineering Support
1006AA
CPFF
Lot EST
OPTION Special Projects
OPTION Training The Contractor shall provide training and an updated version of all training materials in accordance with Section
1007AA
FFP
1 Lot
OPTION Vendor Training
1007AB
FFP
1 Lot
OPTION Instructor Led Training
1007AC
OPTION Reserved
1007AD
FFP
1 Lot
OPTION eLearning/CBT Training
1007AE
OPTION Other Direct Costs Reimbursable travel in accordance with Sections 4.3.11; 4.4.3; 4.7 of the PWS. Other direct costs in support of
1008AA
COST
Lot
OPTION Travel
1008AB
COST
Lot
OPTION Facilities
FFP
1 Lot
OPTION Option: Impact Level 4 The Contractor shall provide Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services
FFP
1 Lot
OPTION Impact Level 5 The Contractor shall provide Impact Level 5 in accordance with Section 4 of Attachment 27 Commercial Hosting
OPTION Option: Licenses The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
1011AA
FFP
1 Lot
OPTION 10,000 - 20,000 Licenses
1011AB
FFP
1 Lot
OPTION 20,001 - 30,000 Licenses
1011AC
FFP
1 Lot
OPTION 30,001 or more Licenses
FFP-LOE
1 Lot
OPTION Option: Transition Activities SSP The contractor shall provide Transitiion Activities for SSP in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC SSP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities MSC The contractor shall provide Transition Activities for MSC in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC MSC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities NAVAIR The contractor shall provide Transition Activities for NAVAIR in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVAIR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities ONR The contractor shall provide Transition Activities for ONR in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC ONR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities USMC HQ The contractor shall provide Transition Activities for USMC HQ I&L in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC USMC HQ I&L Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities MARCORSYSC The contractor shall provide Transition Activities for MARCORSYSCOM in accordance with Section 4.5.4 of the
COST
Lot NTE
OPTION Option: ODC MARCORSYSCOM Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities NAVSEA The contractor shall provide Transition Activities for NAVSEA in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVSEA Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities SPAWAR The contractor shall provide Transition Activities for SPAWAR in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC SPAWAR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities NAVFAC The contractor shall provide Transition Activities for NAVFAC in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVFAC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities NAVSUP The contractor shall provide Transition Activities for NAVSUP in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities BUMED The contractor shall provide Transition Activities for BUMED in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC BUMED Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP
1 Lot
OPTION Service Desk Support Option 1
FFP
1 Lot
OPTION Service Desk Support Option 2
FFP
1 Lot
OPTION Managed Services The contractor shall provide Managed Services in accordance with Section 4 of Attachment 27 ePS Managed
FFP
1 Lot
OPTION Commercial Cloud Hosting and Services The contractor shall provide Commercial Cloud Hosting and Services in accordance with Section 4 of Attachment
FFP
1 Lot
OPTION Option: Impact Level Cloud Migration The contractor shall perform migration services to transition to Impact Level 4 in accordance with Section 4 of
FFP
1 Lot
OPTION Option: Hosting Migration The contractor shall perform Hosting Migration services in accordance with Section 4 of Attachment 27 ePS
OPTION Option: R1 Mapping to Legacy - HS1 The contractor shall provide R1 mapping to legacy financial systems for Handshake 1 in accordance with section
1048AA
FFP
1 Lot
OPTION MSC-FMS
1048AB
FFP
1 Lot
OPTION ILSMIS
OPTION Option: R1 Mapping to Legacy - HS2/3 The contractor shall provide R1 mapping to legacy financial systems for Handshakes 2 and 3 in accordance with section 4.3.7(e) of the PWS.
1049AA
FFP
1 Lot
OPTION MSC-FMS
1049AB
FFP
1 Lot
OPTION DFIMS
The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
2001AA
FFP
1 Lot
2001AB
FFP
1 Lot
OPTION COTS CWS Release 2
2001AC
FFP
1 Lot
2001AD
FFP
1 Lot
2001AE
FFP
1 Lot
2001AF
FFP
1 Lot
The Contractor shall provide software maintenance in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
2002AA
FFP
1 Lot
2002AB
FFP
1 Lot
OPTION COTS CWS Release 2 Maintenance
2002AC
FFP
1 Lot
2002AD
FFP
1 Lot
2002AE
FFP
1 Lot
2002AF
FFP
1 Lot
FPI
Lot
OPTION Deployment Release 2: Various Locations Locations: MSC, NAVAIR, ONR, SPAWAR, USMC HQ I&L, MARCORSYSCOM, NAVSEA. The Contractor shall provide all personnel, supervision and resources to perform Release 2 in accordance with Sections 4.1.2; 4.1.3;
4.1.5; 4.1.6; 4.1.7; 4.1.8; 4.1.9; 4.1.10; 4.1.11; 4.1.12; 4.3.1; 4.3.2; 4.3.3; 4.3.4; 4.3.5; 4.3.6; 4.3.7; 4.3.8; 4.3.9;
4.3.10; 4.3.11; 4.3.12; 4.3.13; 4.4.1; 4.4.2; 4.4.4; 4.4.5; 4.4.6; 4.4.7; 4.5.1; 4.5.2; 4.5.3; and 4.7 of the PWS.
TOTAL TARGET PRICE
CEILING PRICE
FFP
1 Lot
OPTION Sustainment The Contractor shall perform Sustainment in accordance with Sections 4.6; 4.6.1; 4.6.1.2; 4.6.2.10; and 4.7 of the
2006AA
CPFF
Lot EST
The Contractor shall provide training and an updated version of all training materials in accordance with Section
2007AA
FFP
1 Lot
OPTION Vendor Training
2007AB
FFP
1 Lot
OPTION Instructor Led Training
2007AC
2007AD
FFP
1 Lot
OPTION eLearning/CBT Training
2007AE
Reimbursable travel in accordance with Sections 4.3.11; 4.4.3; 4.7 of the PWS. Other direct costs in support of
2008AA
COST
Lot
2008AB
COST
Lot
FFP
1 Lot
OPTION Option: Impact Level 4 The Contractor shall provide Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services
FFP
1 Lot
OPTION Impact Level 5 The Contractor shall provide Impact Level 5 in accordance with Section 4 of Attachment 27 Commercial Hosting
The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
2011AA
FFP
1 Lot
2011AB
FFP
1 Lot
2011AC
FFP
1 Lot
FFP-LOE
1 Lot
OPTION Option: Transition Activities SSP The contractor shall provide Transitiion Activities for SSP in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC SSP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities MSC The contractor shall provide Transition Activities for MSC in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC MSC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities NAVAIR The contractor shall provide Transition Activities for NAVAIR in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVAIR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities ONR The contractor shall provide Transition Activities for ONR in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC ONR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities USMC HQ The contractor shall provide Transition Activities for USMC HQ I&L in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC USMC HQ I&L Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities MARCORSYSC The contractor shall provide Transition Activities for MARCORSYSCOM in accordance with Section 4.5.4 of the
COST
Lot NTE
OPTION Option: ODC MARCORSYSCOM Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities NAVSEA The contractor shall provide Transition Activities for NAVSEA in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVSEA Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities SPAWAR The contractor shall provide Transition Activities for SPAWAR in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC SPAWAR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities NAVFAC The contractor shall provide Transition Activities for NAVFAC in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVFAC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities NAVSUP The contractor shall provide Transition Activities for NAVSUP in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Transition Activities BUMED The contractor shall provide Transition Activities for BUMED in accordance with Section 4.5.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC BUMED Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract
FFP
1 Lot
OPTION Service Desk Support Option 1
FFP
1 Lot
OPTION Service Desk Support Option 2
FFP
1 Lot
OPTION Managed Services The contractor shall provide Managed Services in accordance with Section 4 of Attachment 27 ePS Managed
FFP
1 Lot
OPTION Commercial Cloud Hosting and Services The contractor shall provide Commercial Cloud Hosting and Services in accordance with Section 4 of Attachment
FFP
1 Lot
OPTION Option: Impact Level Cloud Migration The contractor shall perform migration services to transition to Impact Level 4 in accordance with Section 4 of
FFP
1 Lot
OPTION Option: Hosting Migration The contractor shall perform Hosting Migration services in accordance with Section 4 of Attachment 27 ePS
OPTION Option: R2 Mapping to Legacy for HS1 The contractor shall provide R2 mapping to legacy financial systems for Handshake 1 in accordance with section
2048AA
FFP
1 Lot
OPTION MATmf
2048AB
FFP
1 Lot
OPTION SYMIS MF Cost
2048AC
FFP
1 Lot
OPTION ieFACMAN
2048AD
FFP
1 Lot
OPTION 511R(AOL)
2048AE
FFP
1 Lot
OPTION CFMS
2048AF
FFP
1 Lot
OPTION FASTDATA
2048AG
FFP
1 Lot
OPTION DMLSS
OPTION Option: R2 Mapping to Legacy for HS3 The contractor shall provide R2 mapping to legacy financial systems for Handshake 3 in accordance with section
2050AA
FFP
1 Lot
OPTION DWAS
2050AB
FFP
1 Lot
OPTION STARS-HCM
2050AC
FFP
1 Lot
OPTION STARS-FL
The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
3001AA
FFP
1 Lot
3001AB
FFP
1 Lot
3001AC
FFP
1 Lot
3001AD
FFP
1 Lot
3001AE
FFP
1 Lot
3001AF
FFP
1 Lot
The Contractor shall provide software maintenance in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
3002AA
FFP
1 Lot
3002AB
FFP
1 Lot
3002AC
FFP
1 Lot
3002AD
FFP
1 Lot
3002AE
FFP
1 Lot
3002AF
FFP
1 Lot
TOTAL TARGET PRICE
CEILING PRICE
FFP
1 Lot
OPTION Sustainment The Contractor shall perform Sustainment in accordance with Sections 4.6; 4.6.1; 4.6.1.2; 4.6.2.10; and 4.7 of the
The Contractor shall perform Engineering Support in accordance with Section 4.6.2; 4.6.3 of the PWS.
3006AA
CPFF
Lot EST
The Contractor shall provide training and an updated version of all training materials in accordance with Section
4.6.1.1 of the PWS.
3007AA
FFP
1 Lot
OPTION eLearning/CBT Training (Critical Users) Maximum Capacity
3007AB
FFP
1 Lot
OPTION eLearning/CBT Training (End Users)
Reimbursable travel in accordance with Sections 4.3.11; 4.4.3; 4.7 of the PWS. Other direct costs in support of
3008AA
COST
Lot
3008AB
COST
Lot
FFP
1 Lot
OPTION Option: Impact Level 4 The Contractor shall provide Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services
FFP
1 Lot
OPTION Impact Level 5 The Contractor shall provide Impact Level 5 in accordance with Section 4 of Attachment 27 Commercial Hosting
The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
3011AA
FFP
1 Lot
3011AB
FFP
1 Lot
3011AC
FFP
1 Lot
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities SSP The contractor shall provide Sustainment Activities in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC SSP Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities MSC The contractor shall provide Sustainment Activities for MSC in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC MSC Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities NAVAIR The contractor shall provide Sustainment Activities for NAVAIR in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVAIR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities ONR The contractor shall provide Sustainment Activities for ONR in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC ONR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities USMC HQ The contractor shall provide Sustainment Activities for USMC HQ I&L in accordance with Section 4.6.4 of the
COST
Lot NTE
OPTION Option: ODC USMC HQ I&L Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities MARCORSYS The contractor shall provide Sustainment Activities for MARCORSYSCOM in accordance with Section 4.6.4 of the
COST
Lot NTE
OPTION Option: ODC MARCORSYSCOM Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities NAVSEA The contractor shall provide Sustainment Activities for NAVSEA in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVSEA Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities SPAWAR The contractor shall provide Sustainment Activities for SPAWAR in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC SPAWAR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities NAVFAC The contractor shall provide Sustainment Activities for NAVFAC in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVFAC Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities NAVSUP The contractor shall provide Sustainment Activities for NAVSUP in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities BUMED The contractor shall provide Transition Activities for BUMED in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC BUMED Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP
1 Lot
OPTION Service Desk Support Option 1
FFP
1 Lot
OPTION Service Desk Support Option 2
FFP
1 Lot
OPTION Managed Services The contractor shall provide Managed Services in accordance with Section 4 of Attachment 27 ePS Managed
FFP
1 Lot
OPTION Commercial Cloud Hosting and Services The contractor shall provide Commercial Cloud Hosting and Services in accordance with Section 4 of Attachment
FFP
1 Lot
OPTION Option: Impact Level Cloud Migration The contractor shall perform migration services to transition to Impact Level 4 in accordance with Section 4 of
FFP
1 Lot
OPTION Option: Hosting Migration The contractor shall perform Hosting Migration services in accordance with Section 4 of Attachment 27 ePS
The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
4001AA
FFP
1 Lot
4001AB
FFP
1 Lot
4001AC
FFP
1 Lot
4001AD
FFP
1 Lot
4001AE
FFP
1 Lot
4001AF
FFP
1 Lot
The Contractor shall provide software maintenance in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
4002AA
FFP
1 Lot
4002AB
FFP
1 Lot
4002AC
FFP
1 Lot
4002AD
FFP
1 Lot
4002AE
FFP
1 Lot
4002AF
FFP
1 Lot
TOTAL TARGET PRICE
CEILING PRICE
FFP
1 Lot
OPTION Sustainment The Contractor shall perform Sustainment in accordance with Sections 4.6; 4.6.1; 4.6.1.2; 4.6.2.10; and 4.7 of the
The Contractor shall perform Engineering Support in accordance with Section 4.6.2; 4.6.3 of the PWS.
4006AA
CPFF
Lot EST
FFP
1 Lot
OPTION Training The Contractor shall provide training and an updated version of all training materials in accordance with Section
4.6.1.1 of the PWS.
400701
OPTION eLearning/CBT Training (Critical Users)
400702
OPTION eLearning/CBT Training (End Users)
Reimbursable travel in accordance with Sections 4.3.11; 4.4.3; 4.7 of the PWS. Other direct costs in support of
4008AA
COST
Lot
4008AB
COST
Lot
FFP
1 Lot
OPTION Option: Impact Level 4 The Contractor shall provide Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services
FFP
1 Lot
OPTION Impact Level 5 The Contractor shall provide Impact Level 5 in accordance with Section 4 of Attachment 27 Commercial Hosting
The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.
4011AA
FFP
1 Lot
4011AB
FFP
1 Lot
4011AC
FFP
1 Lot
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities SSP The contractor shall provide Sustainment Activities in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC SSP Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities MSC The contractor shall provide Sustainment Activities for MSC in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC MSC Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities NAVAIR The contractor shall provide Sustainment Activities for NAVAIR in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVAIR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities ONR The contractor shall provide Sustainment Activities for ONR in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC ONR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities USMC HQ The contractor shall provide Sustainment Activities for USMC HQ I&L in accordance with Section 4.6.4 of the
COST
Lot NTE
OPTION Option: ODC USMC HQ I&L Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities MARCORSYS The contractor shall provide Sustainment Activities for MARCORSYSCOM in accordance with Section 4.6.4 of the
COST
Lot NTE
OPTION Option: ODC MARCORSYSCOM Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities NAVSEA The contractor shall provide Sustainment Activities for NAVSEA in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVSEA Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities SPAWAR The contractor shall provide Sustainment Activities for SPAWAR in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC SPAWAR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities NAVFAC The contractor shall provide Sustainment Activities for NAVFAC in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVFAC Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities NAVSUP The contractor shall provide Sustainment Activities for NAVSUP in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
FFP-LOE
1 Lot
OPTION Option: Sustainment Activities BUMED The contractor shall provide Transition Activities for BUMED in accordance with Section 4.6.4 of the PWS.
COST
Lot NTE
OPTION Option: ODC BUMED Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract
IT
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.