ePS_RFP_Final_N00039-17-R-0002_07132017.pdf

PDF 3 MB Posted

Attached to
Department of the Navy (DON) electronic Procurement System (ePS)
Solicitation number
N00039-17-R-0002
Issued by

View the file

Other files

File Type Posted
ePS_RFP_Attach_09_ePS_Work_Breakdown_Structure_WBS_20170224.xlsx XLSX spreadsheet
ePS_RFP_Attach_17_Gate Form_Past Performance_20170215.docx DOCX document
ePS_RFP_Attach_2_SRS_Attachment_7_Department_of_Navy_(DoN)_Enterprise_IT_Control_Standards.pdf PDF
ePS_RFP_N00039-17-R-0002_Amendment_0001_2017_07_20.pdf PDF
Amendment_0004_CRM_Response_20170929_Industry_Response.xlsx XLSX spreadsheet
ePS_RFP_Attach_2_SRS_Attachment_5_ePS_COTS_CWS_Data_Validations.pdf PDF
ePS_RFP_Attach_21_Cost_Price_Worksheets_03202017.xlsx XLSX spreadsheet
N00039-17-R-0002_Amend_0004_Attachments (1).zip ZIP file
ePS_RFP_Attach_18_Gate Form_Past Performance Questionnaire_20170217.docx DOCX document
ePS_RFP_Final_N00039-17-R-0002_Amendment_0003_2017_09_21.pdf PDF
ePS_Final_N00039-17-R-0002_Amend_0004_10032017_confcopy.docx DOCX document
ePS_RFP_Attach_13_Consolidated_Government_Furnished_Information_Property_List_20170216.pdf PDF
ATT22EOG.pdf PDF
ePS_RFP_Attach_08_EntArch models for RFP.pdf PDF
ePS_Final_N00039-17-R-0002_Amend_0004_10032017.pdf PDF
ePS_N00039-17-R-0002_Comment_Response_Matrix_07132017.xlsx XLSX spreadsheet
ePS_RFP_Final_N00039-17-R-0002_Conformed_to_Amendment_0003_2017_09_21.docx DOCX document
ePS_RFP_Attach_2_SRS_Attachment_6_ePS_Grants_Reporting_Rules.pdf PDF
N00039-17-R-0002_Amend_0003_Attachments (1).zip ZIP file
ePS_RFP_Attach_05_Systems_Engineering_Plan_20170214.pdf PDF
Amendment_0003_CRM_Response_20170921_Industry_Response.xlsx XLSX spreadsheet
ePS_RFP_Attach_22_PWS_CLIN Mapping_06212017.xlsx XLSX spreadsheet
ePS_RFP_Attach_15_Gate Form_Requirements Self-Certification_20170302.xlsx XLSX spreadsheet
ePS_RFP_Attach_12_DD 254 Signed.pdf PDF
ePS_RFP_Final_N00039-17-R-0002_Conformed_to_Amendment_0001_2017_07_20.pdf PDF
ePS_RFP_Attach_2_SRS_v1_2_s.pdf PDF
N00039-17-R-0002 Amdt 0005.docx DOCX document
ePS_RFP_Attach_07_Test and Evaluation Master Plan (TEMP)_20170214.pdf PDF
ePS_RFP_Attach_03_Capability_Requirements_Document_20170214.pdf PDF
ePS_RFP_Attach_2_SRS_Attachment_2_Operational_Rules_Matrix.pdf PDF
ePS_RFP_Attach_10_CM Plan_20170214.pdf PDF
ePS_RFP_Attach_1_PWS_2017_07_20.pdf PDF
ePS_RFP_Attach_11_Quality_Assurance_Surveillance_Plan_signed.pdf PDF
ePS_RFP_Attach_2_SRS_Attachment_1_RTM.xlsx XLSX spreadsheet
ePS_RFP_Attach_4_ePS_Notional_Schedule_2017_07_20.pdf PDF
ePS_RFP_Attach_14_Gate Form_Small Business Utilization_20170215.docx DOCX document
ePS_RFP_Exhibit_A_B_C_Contract_Data_Requirements_List_20170309_SIGNED.pdf PDF
ePS_RFP_Questions_2017_08_27.pdf PDF
ePS_RFP_Attach_25_Legacy_System_Data_Statisitics.docx DOCX document
ePS_RFP_Attach_2_SRS_Attachment_4_ePS_COTS_CWS_Transactional_Data_Elements.pdf PDF
ePS_RFP_Attach_23_OCI_Declaration_and_Disclosure.pdf PDF
ePS_RFP_N00039-17-R-0002_Amendment_0002_2017_08_17.pdf PDF
ePS_RFP_Attach_27_Managed_Services_and_Commercial_Cloud_Hosting_and_Services_PWS_20170307.docx DOCX document
ePS_RFP_Attach_26_Technical_Direction_Letter.docx DOCX document
ePS_RFP_Attach_2_SRS_Attachment_3_ePS_COTS_CWS_Required_Data_Element.pdf PDF
ePS_RFP_Attach_01_Performance Work Statement (PWS)_20170712.pdf PDF
ePS_RFP_Attach_16_Gate Form_CWS Deployment Compliance_20170215.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local t ime 11 Sep 2017

X

A X B X C X D

EX

X

G F 322 - 353

354 - 375 X H 376 - 384

TERRY.COLEY@NAVY.MIL

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 384

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00039 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 6 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See Section L-7 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

TERRY COLEY 202-433-0856

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 207

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

208 - 219

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

221 - 235

236 - 286 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 287 - 290 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 291 - 297 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

298 - 320

PART II - CO NTRACT CLAUSES

COMMANDER, SPACE AND NAVAL WARFARE

701 S. COURTHOUSE ROAD, BLDG 12, SUITE 1400

ARLINGTON VA 22204

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

13 Jul 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N00039-17-R-0002

Section A - Solicitation/Contract Form

SOLICITATION INFORMATION

This solicitation will result in the award of a contract for a base period and nine option periods totaling 10 years (if options are exercised).

Section B - Supplies or Services and Prices

Base Period – Limited Deployment (LD) Phase Option Period 1 – Release 1 Option Period 2 – Release 2 Option Year 3 – Transition to Sustainment Option Year 4 – Sustainment Option Year 5 – Sustainment Option Year 6 – Sustainment Option Year 7 – Sustainment Option Year 8 – Sustainment Option Period 9 – Sustainment

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

FFP

COTS Licenses The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

0001AA

FFP

1 Lot

COTS CWS LD

FOB: Destination

0001AB

Reserved

0001AC

FFP

1 Lot

COTS Enterprise Service Bus (ESB)

0001AD

FFP

1 Lot

COTS CWS Gap Closure

0001AE

FFP

1 Lot

COTS CWS User Licenses

0001AF

FFP

1 Lot

COTS CWS Other Software

SW Maintenance The Contractor shall provide software maintenance in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

0002AA

FFP

1 Lot

COTS CWS LD Maintenance

0002AB

0002AC

FFP

1 Lot

COTS ESB Maintenance

0002AD

FFP

1 Lot

COTS CWS Gap Closure Maintenance

0002AE

FFP

1 Lot

COTS CWS User Licenses Maintenance

0002AF

FFP

1 Lot

COTS CWS Other Software Maintenance

FPI

Lot

Limited Deployment: Various Locations Locations: USMC HQ I&L - MARFORRES, NAVSEA - NSWC Carderock, SSP, ONR - NRL (alternate), NAVSUP site (alternate). The Contractor shall provide all personnel, supervision and resources to perform LD in accordance with Sections 4.1.2; 4.1.3; 4.1.5; 4.1.6; 4.1.7; 4.1.8; 4.1.9; 4.1.10; 4.1.11; 4.1.12; 4.3.1; 4.3.2; 4.3.3;

4.3.4; 4.3.5; 4.3.6; 4.3.7; 4.3.8; 4.3.9; 4.3.10; 4.3.11; 4.3.12; 4.3.13; 4.4.1; 4.4.2; 4.4.4; 4.4.5; 4.4.6; 4.4.7; 4.5.1;

4.5.2; 4.5.3; and 4.7 of the PWS.

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

Contract Data Requirements List DD 1423, Contract Data Requirements List (CDRL), Exhibits A-C (Not Separately Priced Line Item).

CPFF

Engineering Support The Contractor shall perform Engineering Support in accordance with Section 4.3.3 of the PWS.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FIXED FEE

0006AA

CPFF

Lot EST

Special Projects

Training The Contractor shall provide training and an updated version of all training materials in accordance with Section

4.4.3 of the PWS.

0007AA

FFP

1 Lot

Vendor Training Per class maximum 20 students

0007AB

FFP

1 Lot

Initial Instructor Led Training

0007AC

0007AD

FFP

1 Lot eLearning/CBT Training Maximum capacity

0007AE

COST

Other Direct Costs Reimbursable travel in accordance with Sections 4.3.11; 4.4.3; 4.7 of the PWS. Other direct costs in support of contract performance must be explicitly authorized by Government prior to being incurred.

0008AA

COST

Lot

Travel

0008AB

COST

Lot

Facilities

FFP

1 Lot

Option: Impact Level 4 The Contractor shall provide Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services and Commercial Cloud Hosting and Services PWS.

FFP

1 Lot

Impact Level 5 The Contractor shall provide Impact Level 5 in accordance with Section 4 of Attachment 27 Commercial Hosting Services PWS.

Option: Licenses The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

0011AA

FFP

1 Lot

10,000 - 20,000 Licenses

0011AB

FFP

1 Lot

20,001 - 30,000 Licenses

0011AC

FFP

1 Lot

30,001 or more Licenses

FFP-LOE

1 Lot

Option: Transition Activities MARFORRES The contractor shall provide Transition Activities for USMC HQ I&L - MARFORRES in accordance with Section

4.5.4 of the PWS.

CEILING PRICE

FFP-LOE

1 Lot

Option: Transition Activities Carderock The contractor shall provide Transition Activities for NAVSEA - NSWC Carderock in accordance with Section

4.5.4 of the PWS.

FFP-LOE

1 Lot

Option: Transition Activities SSP The contractor shall provide Transitiion Activities for SSP in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

Option: ODC SSP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract performance must be explicitly authorized by Government prior to being incurred.

FFP-LOE

1 Lot

Option: Transition Activities ONR - NRL The contractor shall provide Transition Activities for ONR - NRL (alternate) in accordance with Section 4.5.4 of the

PWS.

FFP-LOE

1 Lot

Option: Transition Activities NAVSUP The contractor shall provide Transition Activities for NAVSUP in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

Option: Transition Activities MSC The contractor shall provide Transition Activities for MSC in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

Option: ODC MSC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

Option: Transition Activities NAVAIR The contractor shall provide Transition Activities for NAVAIR in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

Option: ODC NAVAIR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

Option: Transition Activities ONR The contractor shall provide Transition Activities for ONR in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

Option: ODC ONR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

Option: Transition Activities USMC HQ The contractor shall provide Transition Activities for USMC HQ I&L in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

Option: ODC USMC HQ I&L Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

Option: Transition Activities MARCORSYSC The contractor shall provide Transition Activities for MARCORSYSCOM in accordance with Section 4.5.4 of the

COST

Lot NTE

Option: ODC MARCORSYSCOM Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

NET AMT

COST

Lot NTE

Option: ODC NAVSEA Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

Option: Transition Activities SPAWAR The contractor shall provide Transition Activities for SPAWAR in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

Option: ODC SPAWAR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

Option: Transition Activities NAVFAC The contractor shall provide Transition Activities for NAVFAC in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

Option: ODC NAVFAC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

Option: Transition Activities NAVSUP The contractor shall provide Transition Activities for NAVSUP in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

Option: Transition Activities BUMED The contractor shall provide Transition Activities for BUMED in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

Option: ODC BUMED Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP

1 Lot

Service Desk Support Option 1 Provide service desk support in accordance with section 4.5.1; 4.5.2; 4.5.3 of the PWS.

FFP

1 Lot

Service Desk Support Option 2

FFP

1 Lot

Managed Services The contractor shall provide Managed Services in accordance with Section 4 of Attachment 27 ePS Managed Services and Commercial Cloud Hosting and Services PWS.

FFP

1 Lot

Commercial Cloud Hosting and Services The contractor shall provide Commercial Cloud Hosting and Services in accordance with Section 4 of Attachment 27 ePS Managed Services and Commercial Cloud Hosting and Services PWS.

FFP

1 Lot

Option: Impact Level Cloud Migration The contractor shall perform migration services to transition to Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services and Commercial Cloud Hosting and Services PWS.

FFP

1 Lot

Option: Hosting Migration The contractor shall perform Hosting Migration services in accordance with Section 4 of Attachment 27 ePS Managed Services and Commercial Cloud Hosting and Services PWS.

Option: LD Mapping to Legacy - HS1 The contractor shall provide LD mapping to legacy financial systems for Handshake 1 in accordance with section 4.3.7(e) of the PWS.

0048AA

FFP

1 Lot

NAVY ERP

0048AB

FFP

1 Lot

IMPS

0048AC

FFP

1 Lot

PRB

Option: LD Mapping to Legacy - HS2/3 The contractor shall provide LD mapping to legacy financial systems for Handshakes 2 and 3 in accordance with section 4.3.7(e) of the PWS.

0049AA

FFP

1 Lot

NAVY ERP

0049AB

FFP

1 Lot

IMPS

0049AC

FFP

1 Lot

SABRS

FFP

1 Lot

Option: Mapping to Standard API - HS1 The contractor shall provide mapping to Standard API for Handshake 1 in accordance with PWS paragraph 4.3.7(f).

FFP

1 Lot

Option: Mapping to Standard API - HS2/3 The contractor shall provide mapping to Standard API for Handshakes 2 and 3 in accordance with PWS paragraph 4.3.7(f).

OPTION COTS Licenses The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

1001AA

FFP

1 Lot

OPTION COTS CWS LD

1001AB

FFP

1 Lot

OPTION COTS CWS Release 1

1001AC

FFP

1 Lot

OPTION COTS Enterprise Service Bus (ESB)

1001AD

FFP

1 Lot

OPTION COTS CWS Gap Closure

1001AE

FFP

1 Lot

OPTION COTS CWS User Licenses

1001AF

FFP

1 Lot

OPTION COTS CWS Other Software

OPTION SW Maintenance The Contractor shall provide software maintenance in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

1002AA

FFP

1 Lot

OPTION COTS CWS LD Maintenance

1002AB

FFP

1 Lot

OPTION COTS CWS Release 1 Maintenance

1002AC

FFP

1 Lot

OPTION COTS ESB Maintenance

1002AD

FFP

1 Lot

OPTION COTS CWS Gap Closure Maintenance

1002AE

FFP

1 Lot

OPTION COTS CWS User Licenses Maintenance

1002AF

FFP

1 Lot

OPTION COTS CWS Other Software Maintenance

FPI

Lot

OPTION Deployment Release 1: Various Locations Locations: MSC, NAVAIR, ONR, SPAWAR, USMC HQ I&L, MARCORSYSCOM, NAVSEA. The Contractor shall provide all personnel, supervision and resources to perform Release 1 in accordance with Sections 4.1.2; 4.1.3;

4.1.5; 4.1.6; 4.1.7; 4.1.8; 4.1.9; 4.1.10; 4.1.11; 4.1.12; 4.3.1; 4.3.2; 4.3.3; 4.3.4; 4.3.5; 4.3.6; 4.3.7; 4.3.8; 4.3.9;

4.3.10; 4.3.11; 4.3.12; 4.3.13; 4.4.1; 4.4.2; 4.4.4; 4.4.5; 4.4.6; 4.4.7; 4.5.1; 4.5.2; 4.5.3; and 4.7 of the PWS.

TOTAL TARGET PRICE

CEILING PRICE

FFP

1 Lot

OPTION Sustainment The Contractor shall perform Sustainment in accordance with Sections 4.6; 4.6.1; 4.6.1.2; 4.6.2.10; and 4.7 of the

OPTION Contract Data Requirements List

OPTION Engineering Support

1006AA

CPFF

Lot EST

OPTION Special Projects

OPTION Training The Contractor shall provide training and an updated version of all training materials in accordance with Section

1007AA

FFP

1 Lot

OPTION Vendor Training

1007AB

FFP

1 Lot

OPTION Instructor Led Training

1007AC

OPTION Reserved

1007AD

FFP

1 Lot

OPTION eLearning/CBT Training

1007AE

OPTION Other Direct Costs Reimbursable travel in accordance with Sections 4.3.11; 4.4.3; 4.7 of the PWS. Other direct costs in support of

1008AA

COST

Lot

OPTION Travel

1008AB

COST

Lot

OPTION Facilities

FFP

1 Lot

OPTION Option: Impact Level 4 The Contractor shall provide Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services

FFP

1 Lot

OPTION Impact Level 5 The Contractor shall provide Impact Level 5 in accordance with Section 4 of Attachment 27 Commercial Hosting

OPTION Option: Licenses The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

1011AA

FFP

1 Lot

OPTION 10,000 - 20,000 Licenses

1011AB

FFP

1 Lot

OPTION 20,001 - 30,000 Licenses

1011AC

FFP

1 Lot

OPTION 30,001 or more Licenses

FFP-LOE

1 Lot

OPTION Option: Transition Activities SSP The contractor shall provide Transitiion Activities for SSP in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC SSP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities MSC The contractor shall provide Transition Activities for MSC in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC MSC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities NAVAIR The contractor shall provide Transition Activities for NAVAIR in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVAIR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities ONR The contractor shall provide Transition Activities for ONR in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC ONR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities USMC HQ The contractor shall provide Transition Activities for USMC HQ I&L in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC USMC HQ I&L Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities MARCORSYSC The contractor shall provide Transition Activities for MARCORSYSCOM in accordance with Section 4.5.4 of the

COST

Lot NTE

OPTION Option: ODC MARCORSYSCOM Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities NAVSEA The contractor shall provide Transition Activities for NAVSEA in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVSEA Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities SPAWAR The contractor shall provide Transition Activities for SPAWAR in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC SPAWAR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities NAVFAC The contractor shall provide Transition Activities for NAVFAC in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVFAC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities NAVSUP The contractor shall provide Transition Activities for NAVSUP in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities BUMED The contractor shall provide Transition Activities for BUMED in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC BUMED Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP

1 Lot

OPTION Service Desk Support Option 1

FFP

1 Lot

OPTION Service Desk Support Option 2

FFP

1 Lot

OPTION Managed Services The contractor shall provide Managed Services in accordance with Section 4 of Attachment 27 ePS Managed

FFP

1 Lot

OPTION Commercial Cloud Hosting and Services The contractor shall provide Commercial Cloud Hosting and Services in accordance with Section 4 of Attachment

FFP

1 Lot

OPTION Option: Impact Level Cloud Migration The contractor shall perform migration services to transition to Impact Level 4 in accordance with Section 4 of

FFP

1 Lot

OPTION Option: Hosting Migration The contractor shall perform Hosting Migration services in accordance with Section 4 of Attachment 27 ePS

OPTION Option: R1 Mapping to Legacy - HS1 The contractor shall provide R1 mapping to legacy financial systems for Handshake 1 in accordance with section

1048AA

FFP

1 Lot

OPTION MSC-FMS

1048AB

FFP

1 Lot

OPTION ILSMIS

OPTION Option: R1 Mapping to Legacy - HS2/3 The contractor shall provide R1 mapping to legacy financial systems for Handshakes 2 and 3 in accordance with section 4.3.7(e) of the PWS.

1049AA

FFP

1 Lot

OPTION MSC-FMS

1049AB

FFP

1 Lot

OPTION DFIMS

The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

2001AA

FFP

1 Lot

2001AB

FFP

1 Lot

OPTION COTS CWS Release 2

2001AC

FFP

1 Lot

2001AD

FFP

1 Lot

2001AE

FFP

1 Lot

2001AF

FFP

1 Lot

The Contractor shall provide software maintenance in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

2002AA

FFP

1 Lot

2002AB

FFP

1 Lot

OPTION COTS CWS Release 2 Maintenance

2002AC

FFP

1 Lot

2002AD

FFP

1 Lot

2002AE

FFP

1 Lot

2002AF

FFP

1 Lot

FPI

Lot

OPTION Deployment Release 2: Various Locations Locations: MSC, NAVAIR, ONR, SPAWAR, USMC HQ I&L, MARCORSYSCOM, NAVSEA. The Contractor shall provide all personnel, supervision and resources to perform Release 2 in accordance with Sections 4.1.2; 4.1.3;

4.1.5; 4.1.6; 4.1.7; 4.1.8; 4.1.9; 4.1.10; 4.1.11; 4.1.12; 4.3.1; 4.3.2; 4.3.3; 4.3.4; 4.3.5; 4.3.6; 4.3.7; 4.3.8; 4.3.9;

4.3.10; 4.3.11; 4.3.12; 4.3.13; 4.4.1; 4.4.2; 4.4.4; 4.4.5; 4.4.6; 4.4.7; 4.5.1; 4.5.2; 4.5.3; and 4.7 of the PWS.

TOTAL TARGET PRICE

CEILING PRICE

FFP

1 Lot

OPTION Sustainment The Contractor shall perform Sustainment in accordance with Sections 4.6; 4.6.1; 4.6.1.2; 4.6.2.10; and 4.7 of the

2006AA

CPFF

Lot EST

The Contractor shall provide training and an updated version of all training materials in accordance with Section

2007AA

FFP

1 Lot

OPTION Vendor Training

2007AB

FFP

1 Lot

OPTION Instructor Led Training

2007AC

2007AD

FFP

1 Lot

OPTION eLearning/CBT Training

2007AE

Reimbursable travel in accordance with Sections 4.3.11; 4.4.3; 4.7 of the PWS. Other direct costs in support of

2008AA

COST

Lot

2008AB

COST

Lot

FFP

1 Lot

OPTION Option: Impact Level 4 The Contractor shall provide Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services

FFP

1 Lot

OPTION Impact Level 5 The Contractor shall provide Impact Level 5 in accordance with Section 4 of Attachment 27 Commercial Hosting

The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

2011AA

FFP

1 Lot

2011AB

FFP

1 Lot

2011AC

FFP

1 Lot

FFP-LOE

1 Lot

OPTION Option: Transition Activities SSP The contractor shall provide Transitiion Activities for SSP in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC SSP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities MSC The contractor shall provide Transition Activities for MSC in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC MSC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities NAVAIR The contractor shall provide Transition Activities for NAVAIR in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVAIR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities ONR The contractor shall provide Transition Activities for ONR in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC ONR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities USMC HQ The contractor shall provide Transition Activities for USMC HQ I&L in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC USMC HQ I&L Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities MARCORSYSC The contractor shall provide Transition Activities for MARCORSYSCOM in accordance with Section 4.5.4 of the

COST

Lot NTE

OPTION Option: ODC MARCORSYSCOM Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities NAVSEA The contractor shall provide Transition Activities for NAVSEA in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVSEA Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities SPAWAR The contractor shall provide Transition Activities for SPAWAR in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC SPAWAR Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities NAVFAC The contractor shall provide Transition Activities for NAVFAC in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVFAC Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities NAVSUP The contractor shall provide Transition Activities for NAVSUP in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Transition Activities BUMED The contractor shall provide Transition Activities for BUMED in accordance with Section 4.5.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC BUMED Reimbursable travel in accordance with Section 4.5.4; 4.7 of the PWS. Other direct costs in support of contract

FFP

1 Lot

OPTION Service Desk Support Option 1

FFP

1 Lot

OPTION Service Desk Support Option 2

FFP

1 Lot

OPTION Managed Services The contractor shall provide Managed Services in accordance with Section 4 of Attachment 27 ePS Managed

FFP

1 Lot

OPTION Commercial Cloud Hosting and Services The contractor shall provide Commercial Cloud Hosting and Services in accordance with Section 4 of Attachment

FFP

1 Lot

OPTION Option: Impact Level Cloud Migration The contractor shall perform migration services to transition to Impact Level 4 in accordance with Section 4 of

FFP

1 Lot

OPTION Option: Hosting Migration The contractor shall perform Hosting Migration services in accordance with Section 4 of Attachment 27 ePS

OPTION Option: R2 Mapping to Legacy for HS1 The contractor shall provide R2 mapping to legacy financial systems for Handshake 1 in accordance with section

2048AA

FFP

1 Lot

OPTION MATmf

2048AB

FFP

1 Lot

OPTION SYMIS MF Cost

2048AC

FFP

1 Lot

OPTION ieFACMAN

2048AD

FFP

1 Lot

OPTION 511R(AOL)

2048AE

FFP

1 Lot

OPTION CFMS

2048AF

FFP

1 Lot

OPTION FASTDATA

2048AG

FFP

1 Lot

OPTION DMLSS

OPTION Option: R2 Mapping to Legacy for HS3 The contractor shall provide R2 mapping to legacy financial systems for Handshake 3 in accordance with section

2050AA

FFP

1 Lot

OPTION DWAS

2050AB

FFP

1 Lot

OPTION STARS-HCM

2050AC

FFP

1 Lot

OPTION STARS-FL

The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

3001AA

FFP

1 Lot

3001AB

FFP

1 Lot

3001AC

FFP

1 Lot

3001AD

FFP

1 Lot

3001AE

FFP

1 Lot

3001AF

FFP

1 Lot

The Contractor shall provide software maintenance in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

3002AA

FFP

1 Lot

3002AB

FFP

1 Lot

3002AC

FFP

1 Lot

3002AD

FFP

1 Lot

3002AE

FFP

1 Lot

3002AF

FFP

1 Lot

TOTAL TARGET PRICE

CEILING PRICE

FFP

1 Lot

OPTION Sustainment The Contractor shall perform Sustainment in accordance with Sections 4.6; 4.6.1; 4.6.1.2; 4.6.2.10; and 4.7 of the

The Contractor shall perform Engineering Support in accordance with Section 4.6.2; 4.6.3 of the PWS.

3006AA

CPFF

Lot EST

The Contractor shall provide training and an updated version of all training materials in accordance with Section

4.6.1.1 of the PWS.

3007AA

FFP

1 Lot

OPTION eLearning/CBT Training (Critical Users) Maximum Capacity

3007AB

FFP

1 Lot

OPTION eLearning/CBT Training (End Users)

Reimbursable travel in accordance with Sections 4.3.11; 4.4.3; 4.7 of the PWS. Other direct costs in support of

3008AA

COST

Lot

3008AB

COST

Lot

FFP

1 Lot

OPTION Option: Impact Level 4 The Contractor shall provide Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services

FFP

1 Lot

OPTION Impact Level 5 The Contractor shall provide Impact Level 5 in accordance with Section 4 of Attachment 27 Commercial Hosting

The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

3011AA

FFP

1 Lot

3011AB

FFP

1 Lot

3011AC

FFP

1 Lot

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities SSP The contractor shall provide Sustainment Activities in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC SSP Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities MSC The contractor shall provide Sustainment Activities for MSC in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC MSC Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities NAVAIR The contractor shall provide Sustainment Activities for NAVAIR in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVAIR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities ONR The contractor shall provide Sustainment Activities for ONR in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC ONR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities USMC HQ The contractor shall provide Sustainment Activities for USMC HQ I&L in accordance with Section 4.6.4 of the

COST

Lot NTE

OPTION Option: ODC USMC HQ I&L Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities MARCORSYS The contractor shall provide Sustainment Activities for MARCORSYSCOM in accordance with Section 4.6.4 of the

COST

Lot NTE

OPTION Option: ODC MARCORSYSCOM Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities NAVSEA The contractor shall provide Sustainment Activities for NAVSEA in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVSEA Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities SPAWAR The contractor shall provide Sustainment Activities for SPAWAR in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC SPAWAR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities NAVFAC The contractor shall provide Sustainment Activities for NAVFAC in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVFAC Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities NAVSUP The contractor shall provide Sustainment Activities for NAVSUP in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities BUMED The contractor shall provide Transition Activities for BUMED in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC BUMED Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP

1 Lot

OPTION Service Desk Support Option 1

FFP

1 Lot

OPTION Service Desk Support Option 2

FFP

1 Lot

OPTION Managed Services The contractor shall provide Managed Services in accordance with Section 4 of Attachment 27 ePS Managed

FFP

1 Lot

OPTION Commercial Cloud Hosting and Services The contractor shall provide Commercial Cloud Hosting and Services in accordance with Section 4 of Attachment

FFP

1 Lot

OPTION Option: Impact Level Cloud Migration The contractor shall perform migration services to transition to Impact Level 4 in accordance with Section 4 of

FFP

1 Lot

OPTION Option: Hosting Migration The contractor shall perform Hosting Migration services in accordance with Section 4 of Attachment 27 ePS

The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

4001AA

FFP

1 Lot

4001AB

FFP

1 Lot

4001AC

FFP

1 Lot

4001AD

FFP

1 Lot

4001AE

FFP

1 Lot

4001AF

FFP

1 Lot

The Contractor shall provide software maintenance in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

4002AA

FFP

1 Lot

4002AB

FFP

1 Lot

4002AC

FFP

1 Lot

4002AD

FFP

1 Lot

4002AE

FFP

1 Lot

4002AF

FFP

1 Lot

TOTAL TARGET PRICE

CEILING PRICE

FFP

1 Lot

OPTION Sustainment The Contractor shall perform Sustainment in accordance with Sections 4.6; 4.6.1; 4.6.1.2; 4.6.2.10; and 4.7 of the

The Contractor shall perform Engineering Support in accordance with Section 4.6.2; 4.6.3 of the PWS.

4006AA

CPFF

Lot EST

FFP

1 Lot

OPTION Training The Contractor shall provide training and an updated version of all training materials in accordance with Section

4.6.1.1 of the PWS.

400701

OPTION eLearning/CBT Training (Critical Users)

400702

OPTION eLearning/CBT Training (End Users)

Reimbursable travel in accordance with Sections 4.3.11; 4.4.3; 4.7 of the PWS. Other direct costs in support of

4008AA

COST

Lot

4008AB

COST

Lot

FFP

1 Lot

OPTION Option: Impact Level 4 The Contractor shall provide Impact Level 4 in accordance with Section 4 of Attachment 27 ePS Managed Services

FFP

1 Lot

OPTION Impact Level 5 The Contractor shall provide Impact Level 5 in accordance with Section 4 of Attachment 27 Commercial Hosting

The Contractor shall provide software licenses in accordance with Sections 4.1.1; 4.1.3; and 4.1.4 of the PWS.

4011AA

FFP

1 Lot

4011AB

FFP

1 Lot

4011AC

FFP

1 Lot

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities SSP The contractor shall provide Sustainment Activities in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC SSP Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities MSC The contractor shall provide Sustainment Activities for MSC in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC MSC Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities NAVAIR The contractor shall provide Sustainment Activities for NAVAIR in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVAIR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities ONR The contractor shall provide Sustainment Activities for ONR in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC ONR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities USMC HQ The contractor shall provide Sustainment Activities for USMC HQ I&L in accordance with Section 4.6.4 of the

COST

Lot NTE

OPTION Option: ODC USMC HQ I&L Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities MARCORSYS The contractor shall provide Sustainment Activities for MARCORSYSCOM in accordance with Section 4.6.4 of the

COST

Lot NTE

OPTION Option: ODC MARCORSYSCOM Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities NAVSEA The contractor shall provide Sustainment Activities for NAVSEA in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVSEA Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities SPAWAR The contractor shall provide Sustainment Activities for SPAWAR in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC SPAWAR Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities NAVFAC The contractor shall provide Sustainment Activities for NAVFAC in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVFAC Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities NAVSUP The contractor shall provide Sustainment Activities for NAVSUP in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC NAVSUP Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

FFP-LOE

1 Lot

OPTION Option: Sustainment Activities BUMED The contractor shall provide Transition Activities for BUMED in accordance with Section 4.6.4 of the PWS.

COST

Lot NTE

OPTION Option: ODC BUMED Reimbursable travel in accordance with Section 4.6.4; 4.7 of the PWS. Other direct costs in support of contract

IT

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.