ePS_RFP_Attach_2_SRS_v1_2_s.pdf
PDF 4 MB Posted
- Solicitation number
- N00039-17-R-0002
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00039-17-R-0002
UNCLASSIFIED//FOR OFFICIAL USE ONLY (FOUO)
electronic Procurement System
Request for Proposal
Attachment 2: System Requirements Specification
Acquisition Category (ACAT) I AM
Version 1.2
6 March 2017
Distribution Notice D: Authorized to the Department of Defense (DoD) and DoD Contractors only. This document is for administrative or operational use, as of the date of approval for this document. Refer to the Program Manager (PM), PMW 220 Navy Enterprise Business Solutions (Navy EBS), Program
Executive Office Enterprise Information System (PEO EIS), Washington Navy Yard, 1325 10 th
St. SE, Bldg. 196, Washington, D.C. 20374 for additional document requests.
Handling and Destruction Notice: Comply with distribution statement and destroy by any method that will prevent disclosure of contents or reconstruction of the document.
ePS System Requirements Specification
(SRS)
File name:
ePS_SRS.docx
Page:
2/382 Version:
Version 1.2 Date of Creation
6 Mar 2017
RELEASE AUTHORIZATION
P. J. KASSAL Date
Chief Engineer, PMW 220
Navy Enterprise Business Solutions Program Office
S. E. SEAY Date
Program Manager, PMW 220
Navy Enterprise Business Solutions Program Office
Page:
3/382 Version:
Version 1.2
DOCUMENT HISTORY
DATE VERSION DESCRIPTION AUTHOR
28 Jul 2014 0.1-0.8 Initial draft for internal SE review ePS Requirements Team
30 Oct 2015 0.8R Minor update; distributed for ePS
Request for Information (RFI) to
Industry ePS Requirements Team
9 Nov 2015 0.85-0.9 Minor update; distributed draft to ePS stakeholder (HCA) community for review, and comments adjudicated ePS Requirements Team
9 Feb 2016 1.0 Baseline version includes leadership signature; technical review version for System Requirements Review
(SRR)
ePS Requirements Team
1 July 2016 1.01 Minor update complete; includes all critical HCA adjudicated comments ePS Requirements Team
24 Oct 2016 1.1 Update for requirements refinement for grants and automated ordering functionality, approved for release 6
December 2016 ePS Requirements Team
16 Dec 2016 1.1.1 Minor updates for Navy Peer
Review ePS Requirements Team
6 Jan 2017 1.1.2 Technical update for Request for
Proposal (RFP) Release to Industry ePS Requirements Team
3 Mar 2017 1.2 Added requirements to Infrastructure to reflect new disconnected state requirements.
ePS Requirements Team
Page:
4/382 Version:
Version 1.2
TABLE OF CONTENTS
RELEASE AUTHORIZATION
DOCUMENT HISTORY
TABLE OF CONTENTS
LIST OF FIGURES
LIST OF TABLES
TABLE OF APPENDIX TABLES
TABLE OF APPENDIXES
1 INTRODUCTION
1.1 Document Purpose
1.2 Document Organization
1.3 Associated Requirement Identification Activities
1.4 Governance and Management of Requirements
1.5 Program Summary
1.5.1 Program Background
1.5.2 System Description
1.6 System Capabilities
1.6.1 CWS High-Level Capabilities
1.6.2 ESB High-Level Capabilities
1.7 Requirements Hierarchy
2 FUNCTIONAL REQUIREMENTS
2.1 CWS Requirements
2.1.1 General System Management
2.1.2 Procurement Process Management
2.1.3 Data Management
2.1.4 External Interface Management
2.1.5 Financial Transaction Management
2.2 Enterprise Service Bus (ESB) Requirements
2.2.1 Enable ESB Data Exchanges
2.2.2 Development Framework Management
3 NON-FUNCTIONAL REQUIREMENTS
3.1 Considerations
3.2 Process Flexibility
3.3 Configurable Features
3.4 System Adaptively
3.5 Standards
3.6 Infrastructure
3.6.1 Internet Access
3.6.2 Network
3.6.3 Usage
Page:
5/382 Version:
Version 1.2
3.6.4 Disconnected State
3.7 Cybersecurity
3.8 Operation
3.9 Usability
4 SUPPORT OF FINANCIAL IMPROVEMENT, AND AUDIT READINESS INITIATIVES230
4.1 Federal Managers’ Financial Integrity Act
4.2 Federal Financial Management Improvement Act (FFMIA)
4.3 Federal Information System Controls Audit Manual
4.4 Defense Procurement and Acquisition Policy (DPAP) and Office of the under Secretary of
Defense (Comptroller) OUSD(C) Internal Control Requirements
4.4.1 Separation of Duties
4.4.2 Requirements
4.4.3 Funds Source and Certification
4.4.4 Solicitation and Award
4.4.5 Obligation
4.4.6 Contract Administration
4.4.7 Property Management
4.4.8 Closeout
4.4.9 Authoritative Systems and Data Sources
4.5 DON Enterprise IT Control Standards for the National Institute of Standards and Technology
(NIST) SP 800-53 Rev. 4 Controls
5 SYSTEM ATTRIBUTES
5.1 System Performance Measures
5.1.1 Data Error Rejection
5.1.2 Document Preview Rendering Time
5.1.3 Contract Instrument Generation
5.1.4 Entitlement Data Transmission
5.1.5 Obligation Data Transmission
5.1.6 Contract Data Compliance
5.2 Other System Attributes
5.2.1 System Responsiveness
5.2.2 User and System Support
5.2.3 Cybersecurity
5.2.4 Reliability, Availability, and Maintainability (RAM)
LIST OF FIGURES
Figure 1: ePS High Level Scope
Figure 2: ePS OV-1
Figure 3: ePS Requirements Hierarchy
Page:
6/382 Version:
Version 1.2
Figure 4: CWS Requirements Hierarchy
Figure 5: CWS General System Management Requirements
Figure 6: CWS Procurement Process Management Hierarchy
Figure 7: Traditional Procurement Process
Figure 8: CWS Data Management Requirements Hierarchy
Figure 9: CWS External Interface Management Requirements Hierarchy
Figure 10: ePS SV-1
Figure 11: CWS Interface Concept
Figure 12: ESB Interface Concept
Figure 13: CWS Interface Concept with Enterprise Services and Authoritative Source
Figure 14: CWS Interface Concept for Facilitation of External Processes
Figure 15: ESB Exchange with PR Tools & FMIS Concept
Figure 16: ESB Exchange with ERP Systems
Figure 17: ESB Exchange with GL Systems
Figure 18: CWS Financial Transaction Management Requirements Hierarchy
Figure 19: Primary Financial Scenario
Figure 20: CWS Handshakes
Figure 21: ESB Requirements Hierarchy
Figure 22: ESB Requirements Hierarchy
Figure 23: ESB Development Framework Management Requirements Hierarchy
Figure 24: ePS Authentication Concept
LIST OF TABLES
Table 1-1: ePS Operational Modes
Table 1-2: HCAs – DASN (AP)
Table 1-3: HCAs – MSC
Table 1-4: HCAs – NAVAIR
Table 1-5: HCAs – NAVFAC
Table 1-6: HCAs – NAVSEA
Table 1-7: HCAs – NAVSUP
Table 1-8: HCAs – ONR
Table 1-9: HCAs – SPAWAR
Table 1-10: HCAs – SSP
Page:
7/382 Version:
Version 1.2
Table 1-11: HCAs – USMC, HQMC, I&L
Table 1-12: HCAs – USMC, MCSC (MARCORSYSCOM)
Table 1-13: User Roles
Table 2-1: Business Process Control Requirements
Table 2-2: Workflow Management Requirements
Table 2-3: Workload Management Requirements
Table 2-4: Business Process Automation Requirements
Table 2-5: Document Controls Requirements
Table 2-6: Instrument/Header/Document-Level (Section A) Requirements
Table 2-7: Line Item Information (Section B) Requirements
Table 2-8: Attachments and Specifications (Section C & J) Requirements
Table 2-9: Logistics: Packaging (Section D), Inspection & Acceptance (Section E), and Period of
Performance/Delivery (Section F) Requirements
Table 2-10: Funding (Section G) and Pricing (Section B)
Table 2-11: Clauses, Provisions, and Clause Logic (Sections H, I, K, L, & M)
Table 2-12: Document Management Requirements
Table 2-13: Forms Control Requirements
Table 2-14: Instrument Associations
Table 2-15: System Administration Function
Table 2-16: User Profile and Account Administration
Table 2-17: Audit Trail Requirements
Table 2-18: Configuration Parameter Requirements
Table 2-19: Dashboard, Reporting, and Metric Requirements
Table 2-20: Requiring Activity Engagement
Table 2-21: Purchase Request Package Establishment Requirements
Table 2-22: Milestone Establishment and Tracking
Table 2-23: Acquisition Planning Requirements
Table 2-24: Synopsis Establishment Requirements
Table 2-25: Solicitation Establishment Requirements
Table 2-26: Offeror Screening Requirements
Table 2-27: Complementary Review Requirements
Table 2-28: Offer Evaluation Requirements
Table 2-29: Vendor Engagement Requirements
Table 2-30: Protest, Dispute, and Appeal Tracking Requirements
Page:
8/382 Version:
Version 1.2
Table 2-31: Award Document Preparation Requirements
Table 2-32: Funds Management Requirements
Table 2-33: Award Issuance Requirements
Table 2-34: Post-Award Setup Requirements
Table 2-35: Award Performance Monitoring Requirements
Table 2-36: Post-Award Modification Requirements
Table 2-37: Procurement Instrument Closeout Requirements
Table 2-38: Procurement Instrument Archive Requirements
Table 2-39: Authoritative Data Management Requirements
Table 2-40: CWS Interface Requirements - General
Table 2-41: CWS Interface Requirements - CLS
Table 2-42: CWS Interface Requirements - DoDAAD
Table 2-43: CWS Interface Requirements - FBO
Table 2-44: CWS Interface Requirements - FPDS-NG
Table 2-45: CWS Interface Requirements - GEX
Table 2-46: CWS Interface Requirements - Grants.gov
Table 2-47: CWS Interface Requirements - PSC-OCC Selection Tool
Table 2-48: CWS Interface Requirements - SAM
Table 2-49: CWS Interface Requirements - USASpending.gov
Table 2-50: CWS Web Requirements - CFDA
Table 2-51: CWS Web Requirements - CORT
Table 2-52: CWS Web Requirements - CPARS
Table 2-53: CWS Web Requirements - eSRS
Table 2-54: CWS Web Requirements - PPIRS
Table 2-55: CWS Web Requirements - WDOL
Table 2-56: CWS Web Requirements - SBCR
Table 2-57: CWS Web Requirements – PASS 2.0
Table 2-58: CWS Web Requirements – eBuy
Table 2-59: CWS Interface Requirements – NPAR
Table 2-60: CWS Interface Requirements – SPOT
Table 2-61: ESB Interfaces - 511R AOL
Table 2-62: ESB Interfaces - CFMS
Table 2-63: ESB Interfaces - DMLSS
Table 2-64: ESB Interfaces - FASTDATA
Page:
9/382 Version:
Version 1.2
Table 2-65: ESB Interfaces – NAVFAC–MIS
Table 2-66: ESB Interfaces - PR Builder
Table 2-67: ESB Interfaces - SYMIS/MAT
Table 2-68: ESB Interfaces - DIFMS
Table 2-69: ESB Interfaces - ILSMIS
Table 2-70: ESB Interfaces - IMPS
Table 2-71: ESB Interfaces - NAVY-ERP
Table 2-72: ESB Interfaces - MSC-FMS
Table 2-73: ESB Interfaces - DWAS
Table 2-74: ESB Interfaces - SABRS
Table 2-75: ESB Interfaces - STARS-HCM
Table 2-76: ESB Interfaces - STARS-FL
Table 2-77: CWS Handshakes Requirements
Table 2-78: Enable ESB Data Exchange Requirements
Table 2-79: Development Framework Management Requirements
Table 3-1: Standards
Table 3-2: Internet Access Requirements
Table 3-3: Usage Requirements
Table 3-4: Disconnected State Requirements
Table 3-4: Cybersecurity Requirements
Table 3-5: Operation Requirements
Table 3-6: Usability Requirements
Table 4-1: FMFIA Controls
Table 4-2: FFMIA Controls
Table 4-3: FISCAM Controls
Table 4-4: Internal Controls - Separation of Duties
Table 4-5: Internal Controls - Requirements
Table 4-6: Internal Controls - Funds Source and Certification
Table 4-7: Internal Controls - Solicitation and Award
Table 4-8: Internal Controls - Obligation
Table 4-9: Internal Controls - Contract Administration
Table 4-10: Internal Controls - Property Management
Table 4-11: Internal Controls - Closeout
Table 4-12: Internal Controls - Authoritative Systems and Data Sources
Page:
10/382 Version:
Version 1.2
Table 5-1: SV-7 SPMs List
Table 5-2: Key System Attributes
TABLE OF APPENDIX TABLES
Appendix B - Table 1: Federal Statutes and Presidential Directives
Appendix B - Table 2: Statements of Federal Financial Accounting Standards
Appendix B - Table 3: Office of Management and Budget Guidance
Appendix B - Table 4: Code of Federal Regulations
Appendix B - Table 5: Other Relevant Guidance/Direction
TABLE OF APPENDIXES
Appendix A: Reference Links
Appendix B: Reference Documents
Appendix C: List of Attachments
Appendix D: Acronym List
Page:
11/382 Version:
Version 1.2
1 INTRODUCTION
1.1 Document Purpose
The System Requirements Specification (SRS) is the structured collection of information that embodies the requirements of Electronic Procurement System (ePS), a Department of Navy (DON) Defense
Business System (DBS). Each requirement contained within the SRS defines a functional need, technical consideration for the unique DON environment, or system control to ensure compliance with Department initiatives. The SRS defines the ePS and serves as a baseline for system requirements. The SRS may also serve as an aiding component to identify capability gaps, perform requirements validation, and facilitate implementation planning. Throughout the SRS, specific wording is used to identify statements of expectations. Requirements are identified in the tables by statements using the word “shall”. All requirements using “shall” are contractually binding, must be implemented, and must be verified via
Inspection, Demonstration, Analysis or Testing. Statements using the term “will” are considered statements of fact but are not subject to verification. Statements using the term “should” are considered goals which should be considered and addressed by the design team but are not formally verified. Finally, the term “may” refers to statements that could be optional based on circumstances. The SRS is a living document and changes will occur as additional information becomes available.
Page:
12/382 Version:
Version 1.2
1.2 Document Organization
The SRS consists of five primary sections:
Section 1 – Introduction
The introduction provides the purpose of the document and provides the general organization of the SRS document. This section captures relevant background information, summarizes the ePS program, defines the DON environment, and defines the high-level capabilities of the system.
Section 2 – Functional Requirements
The functional requirements are detailed statements of the outcomes that a user or system is required to achieve, without any direction for performance of operation. In simple terms, this section identifies what is required of the system in order to meet business objectives.
Section 3 – Non-Functional Requirements
Non-functional requirements identify environmental considerations and constraints inherited by the ePS that drive the architecture, infrastructure, security, operations, and usability of the system.
Section 4 – Support of Financial Improvement and Audit Readiness (FIAR) Initiatives
The ePS will support current Financial Improvement and Audit Readiness (FIAR) initiatives through inclusion of internal controls (i.e., process constraints) derived from the various statutes, regulations, and policies that govern DON processes.
Section 5 – System Attributes
A system attribute is a system capability considered significant for achieving a balanced solution or approach deemed necessary by the sponsor. Attribute values support the desired outcome of projected levels for both the users and owners of the system. The ePS Capability Requirements Document (CRD)
– a high-level document that defines the ePS capabilities, performance measures, and system characteristics, reiterates the system attributes.
1.3 Associated Requirement Identification Activities
The DON performed five years of requirements identification activities. Beginning in Fiscal Year (FY)
2011, the DON conducted a yearlong effort designed to generate a requirements baseline for a future contract writing system (CWS). This effort included: gathering requirements from available sources
(including currently deployed systems); ensuring that the requirements aligned with emerging DON initiatives; verifying the requirements through a Requirements Working Group (RWG) composed of
Heads of Contracting Activity (HCAs) and electronic business (eBusiness) officials; validating the requirements through onsite visits; and publishing the results.
In FY 2012, the effort continued by identifying current capability gaps (i.e., determining why “paper” contracting processes were still being executed) and performing business process re-engineering, for the future business process through onsite interviews. The result of this effort was a refined requirement set and a DON enterprise procurement process captured within a standard Business Process Modeling
Page:
13/382 Version:
Version 1.2
Notation (BPMN) format. The results use a system-agnostic perspective and conform to current DoD
Application Framework (DoDAF) modeling guidance.
In FY 2013, the Functional Sponsor traveled to Echelon IV commands to define the requirement set further. The information gathered included first-hand user inputs regarding the complexity of environments Outside the Contiguous United States (OCONUS), Marine Corps direct mission support, and Supervisor of Shipbuilding (SUPSHIP) construction and administration. While these areas were addressed at a high level in FY 2011 and FY 2012 efforts, the specialists involved within these regions were unable to coordinate with or support the requirement definition efforts sufficiently due to the level of complexity involved and technical limitations. This resulted in twenty-three (23) new requirements labeled as the FY 2013 Addendum to the requirement set. The ePS Requirements Set is a culmination of those efforts, used to calculate the measure of quality for each alternative within the ePS Analysis of
Alternatives (AoA).
From FY 2014 to FY 2015, the ePS Requirement Set evolved into the contents of this document. Some requirements remain verbatim from the ePS AoA, while others are decomposed to provide clarity and specificity. There are new requirements that emerged from large Information Technology (IT) compliance initiatives. Attachment 1: ePS Requirements Traceability Matrix (RTM) captures the evolution of the ePS Requirements Set This document contains a consolidated list of all current ePS requirements and their origin.
Ultimately, the system requirements are complete as demonstrated through multiple years of requirement definition and refinement, extensive market research (including multiple Requests for Information (RFIs) to industry), and business process re-engineering activities. The efforts also leveraged the near twenty-year history of the DON’s current primary CWS, the Standard Procurement System (SPS), as well as multiple federal CWS procurements over the past decade.
1.4 Governance and Management of Requirements
A memorandum from the Deputy Under Secretary of the Navy, dated 5 September 2014, established the
Governance Board for the DON ePS Program. The Governance Board ensures proper establishment, development, and tracking of ePS Program requirements, through sustainment and to final disposition.
The Governance Board governs the execution of the Program by making trade off decisions where requirement satisfaction, program cost, and schedule considerations come into conflict. Additionally, the
Board will hold the ePS Program accountable for progress in meeting requirements. The Deputy
Assistant Secretary of the Navy (DASN (AP)) and Principal Deputy Assistant Secretary of the Navy;
Financial Management and Comptroller (PDASN (FM&C)) co-chair the Governance Board. Additional board members include representatives from each of the ePS stakeholder communities. As the representatives for the end users, DASN (AP) and PDASN (FM&C) will define requirements and advocate for resources.
The ePS Program Office elicits, analyzes, manages, and documents the ePS requirements. The ePS
Requirements Management Plan (RMP) documents the processes, workflows, roles/responsibilities, metrics, change management, reporting, and traceability associated with the initiation, planning, Page:
14/382 Version:
Version 1.2 development, baselining, control, and validation of requirements. The RMP is the foundation for all management policies and procedures regarding program requirements. It identifies the methodology for managing the Program, and utilized to perform activities related to requirements management. The RMP, together with the Program Management Plan (PMP), Configuration Management Plan (CMP), and Risk
Management Plan (RMP) provide a framework for managing all the activities of the program related to requirement management. The Program Library contains the collection of these documents.
1.5 Program Summary
In May of 2014, the Naval Capabilities Board (NCB) and Resources and Requirements Review Board
(R3B) reviewed the ePS AoA, concurred with its conclusions, and authorized the pursuit of a single DON end-to-end (E2E) contracting capability. The Program Manager, Warfare (PMW) 220, Navy Enterprise
Business Solutions (Navy EBS) is responsible for the acquisition, implementation, and sustainment of the ePS capability. PMW 220 will leverage common industry standards and best practices in order to comply with the Clinger-Cohen Act (CCA) and pursue a Commercial Off-The-Shelf (COTS) solution requiring minimal to no customization.
1.5.1 Program Background
The DoD eBusiness and paperless initiatives began in the mid-1990s with the identification of requirements for an electronic CWS. In April of 1997, American Management Systems was awarded a
$240M, 10-year contract to use their commercially available contract management system, Procurement
Desktop-Defense (PD2), as the foundation for what would become the Department’s mandated enterprise
CWS suite, the SPS.
Throughout the following decade, the SPS served as the primary CWS in the DON for the majority of procurement actions, including major weapon system purchases. By 2007, the SPS was in need of repair;
the Milestone Decision Authority (MDA) issued an Acquisition Decision Memorandum (ADM) stating that the SPS Program would move to sustainment; ending further development of SPS. The DON was unable to address shortfalls as performance began to degrade and capabilities became inoperable. The user community mitigated issues resulting from those shortfalls, with other systems and offline (manual) processes. Those temporary solutions may become unavailable for continued use due to the enactment of
Section 862 Uniform Contract Writing System Requirements of the FY13 National Defense Authorization
Act (NDAA).
In November of 2011, the DoD set the initial goal for the sunset of the SPS across the DoD as 30
September 2017 and all SPS instances should turned off by FY 2018. However, an update in October
2014 reflected delays in budgeting for and procuring replacement systems by the DON and other services.
The current guidance is to cease new contracting actions in the SPS after the start of FY 2018 and remove all active SPS instances by FY 2020.
The plan to sunset SPS is contingent upon the deployment of a replacement system prior to turning off any SPS operations at the respective HCA’s, who currently utilize the SPS for their contracting mission.
The SPS served as the centerpiece for the DON in connecting the E2E data stream for electronic
Page:
15/382 Version:
Version 1.2 commerce for the last 15 years, and cannot sunset until the replacement system is in use at each command.
1.5.2 System Description
The ePS will provide the DON contracting workforce with agile and secure E2E contract writing capabilities, which support the Warfighter and department initiatives. These capabilities will institute an
E2E process perspective, better buying power (BBP), facilitate audit readiness, and reduce infrastructure and sustainment costs. The ePS will support the Procure-to-Pay (P2P) process, which aligns with the
DoD Business Enterprise Architecture (BEA). Multiple systems both internal and external to the DON support the standard P2P process, which encompasses all business functions that are necessary to obtain goods and services. As a result, the ePS will perform only the contracting activities within this process while supporting financial and logistic functions through the alignment and exchange of data.
Figure 1 identifies the primary functions of the P2P process and the scope of the ePS:
Figure 1: ePS High Level Scope
The ePS High-Level Operational Graphic (OV-1) depicts the conceptual operations, strategic goals, and stakeholders of the ePS. The ePS allows end users to satisfy sourcing requirements and share information with industry, federal and other government entities, financial assistance recipients, international partners, and Non-Government Organizations (NGOs). Through those sources, the end users will be able to deliver supplies, services, construction, grants, and other assistance agreements.
This will meet the sourcing capabilities the DON procurement community needs to execute the full range of military operations successfully.
Activities not within the ePS
PROCURE
TO
PAY
Create Purchase
Request (PR)
Develop Procurement
Strategy
Award Procurement Instrument
Administer Procurement Instrument
Perform Receipt, Acceptance, and Return
Manage Procurement Entitlement
Perform Instrument
Closeout
Manage Disbursement
Activities primarily performed within the ePS
Page:
16/382 Version:
Version 1.2
Figure 2: ePS OV-1
The ePS will include two primary components: a Commercial-off-the-Shelf (COTS) CWS and a DON-managed COTS interfacing capability, known within the market as an Enterprise Service Bus (ESB).
The COTS CWS and COTS ESB components, as defined within the ePS AoA, allow for an optimal solution by dividing requirements, maximizing existing market capabilities, and minimizing customization; including the need for unique interfaces.
1.5.2.1 Operational Environment
The ePS design will allow for deployment as a single solution supporting all of the operational modes employed throughout the DON Integrated Contracting Environment (DICE). The solution should provide consistency in appearance, utilization, and business rule implementation.
Page:
17/382 Version:
Version 1.2
Table 1-1 provides high-level information regarding the functional configuration considerations required given the operational modes supported by the ePS:
Table 1-1: ePS Operational Modes
OPERATIONAL MODE DESCRIPTION OF OPERATIONAL MODE
Services Acquisition and management of services by contract, Service Contract Labor
Standards apply:
Maintenance, overhaul, repair, servicing, rehabilitation, salvage, modernization, or modification of supplies, systems, or equipment
Routine recurring maintenance of real property
Housekeeping and base services
Advisory and assistance services
Operation of government-owned equipment, real property, and systems
Communications services
Supplies All property except land or interest in land
Major System Acquiring major systems consistent with DoDI 5000.02 Operation of the
Defense Acquisition System and Research and Development (R&D) integral to acquisition of Major Systems
Construction, Architecture and Engineering
Contracting activities required for procuring construction, construction-related services, and architect and engineering services in support of the physical infrastructure owned and maintained by the DON
R&D Contracted R&D programs advance scientific and technical knowledge and apply it to achieve agency and national goals: when the principal purpose is the acquisition of supplies or services for the direct benefit or use of the Federal government, use contracts; when the principal purpose of the transaction is to stimulate or support R&D for another public purpose, use grants, or cooperative agreements
Information Technology Equipment, or interconnected system(s) or subsystem(s) of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the agency
Expeditionary Contracting Contracting activities required to procure supplies, services, and small-scale construction in support of Operational Contract Support (OCS) military operations where the mission is self-sustaining
Contingency Contracting Connotes a temporary condition; contracting activities to procure supplies, services, and small-scale construction in support of tactical and operational forces engaged in the full spectrum of armed conflict and noncombat contingency operations. It can be performed both OCONUS and Contiguous
United States (CONUS)
Foreign Military Sales Acquisitions for foreign military sales under the Arms Export Control Act
Page:
18/382 Version:
Version 1.2
OPERATIONAL MODE DESCRIPTION OF OPERATIONAL MODE
Section (§) 22, United States Code (U.S.C.) Chapter 39; §22 (22 U.S.C. 2762) authorizes DoD to enter into contracts for resale to foreign countries or international organizations
Grants and Cooperative
Agreements
Department of Defense Grant and Agreement Regulations (DoDGARs)-based activities required to issue and administer grants, Cooperative agreements, Assistance agreements and Technology Investment Agreements in support of
DON operations
Other Transactions (OTs) Generic term that commonly refers to the authority to enter into transactions other than contracts, grants, or cooperative agreements. These are transactions awarded for basic, applied, and advanced R&D research prototype projects directly relevant to weapons or weapon systems proposed for acquisition or development by the DoD. Ots for prototype projects are acquisition instruments that are generally not subject to the federal laws and regulations governing procurement contracts. They are not required to comply with the
Federal Acquisition Regulations (FAR), its supplements, or laws limited in applicability to procurement contracts. OTs are not contracts, grants, or cooperative agreements however, there is no statutory or regulatory definition of "other transaction." Only those agencies provided with OT authority may engage in OTs. Generally, the reason for creating OT authority is that the
Government needs to obtain leading edge R&D products or capabilities
(including prototypes) from commercial sources, and some companies (and other entities) are unable or unwilling to comply with the Government's procurement regulations. The Government's procurement regulations and certain procurement statutes do not apply to OTs and accordingly, OT authority gives agencies the flexibility necessary to develop agreements tailored to a particular transaction. The Competition in Contracting Act, Contract Disputes
Act, and Procurement Integrity Act are examples of three statutes that do not apply to OTs. The basis for the authority is in 10 U.S.C. 2371, Research
Projects: Transactions other than Contracts and Grants. An OT can be either cost reimbursable or fixed priced.
1.5.2.2 Regulatory Environment
The DON contracting domain will utilize the ePS for all contract instrument types including, but not limited to Uniform Contract Format (UCF) contracts and delivery/task orders, Non-FAR-based agreements and OTs. As a result, the ePS is subject to the policies, guidance, instructions, and standardized procedures described in the FAR, Defense Federal Acquisition Regulation Supplement
(DFARS), Navy-Marine Corps Acquisition Regulation Supplement (NMCARS), and the DoD Grant and
Agreement Regulations (DODGARs). As a supporting agency to other DoD and Federal activities, the ePS must also support specific policies, regulations, clauses, etc. as appropriate for the supported agency.
Although the DON’s goal is to reduce the need for local and one-time use clauses, the ePS must support these policies and clauses where appropriate.
Page:
19/382 Version:
Version 1.2
The following doctrines provide guidance for the ePS:
Strategic Plan for Defense Wide Procurement Capabilities (A Functional Strategy) Version 2.1;
18 Feb 2016
Principal Deputy Under Secretary of Defense (PDUSD) Procurement Functional Strategy Memo;
updated Sept 2014
FY13 NDAA Sec. 862 Uniform Contract Writing Systems Requirement; 2 Jan 2013
Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics (USD
(AT&L)), Data Capture in Support of Contingency Planning; 26 Jan 2012
Procurement to-Pay 9.0 Business Enterprise Architecture; 22 Feb 2012
USD (AT&L) Standard Procurement System Sunset Memo; 21 Oct 2011
USD (AT&L) Procurement Functional Strategy; updated 25 Sept 2014
USD (AT&L) DoD Functional Contract Writing and Administration Capabilities; 21 Oct 2011
USD (AT&L) Defense Wide Contract Clause Logic Capability; Feb 2016
USD (AT&L) DoD Compliance Roadmap for Existing and Future Contract Writing and
Administration Capabilities v1.0.1; 15 Jun 2011
DoD Operational Suitability Test Criteria for Contract Writing Systems (CWS) V0.3; 29 Apr
Deputy Under Secretary of the Navy for Acquisitions and Technology (DUSD A&T) Memo, Publication of Procurement Data Standard (Phase I); 21 Jul 2008
DUSD A&T Memo, Publication of Procurement Data Standard (Phase II); 31 Jul 2009
USD Memo, Linking Financial Data to Contract Data; 18 Mar 2009
Financial Data in Procurement Concept of Operations (FDIP CONOPS); 15 Dec 2008
The policies and regulations that the ePS must support continually update in accordance with assessments and findings, shifts in congressional priorities, and other reasons. It is rare to revise the policies and procedures for a maintenance support system such as a CWS based on pre-established business rules, programming logic, or maintenance schedule. Consequently, the ePS architecture must allow for rapid adaptation and persistent maintenance at a reasonable cost.
1.5.2.3 Physical Environment
DON contracting professionals will utilize the ePS to perform the contracting mission within unclassified locations. A commercially available cloud-hosting site will host the ePS in order to support worldwide operations (i.e., CONUS and OCONUS activities). Delivery of the ePS will be via Non-secure Internet
Protocol Router Net (NIPRNET), Navy/Marine Corps Internet (NMCI), OCONUS Navy Enterprise
Network (ONE-Net), or other DON-approved networks. The Cloud Hosting Strategy will provide an additional hosted environment and a disaster recovery capability. Available web browsers (e.g., Internet
Explorer) with secure protocols allow access to the ePS with authentication via a Common Access Card
Page:
20/382 Version:
Version 1.2
(CAC) for all CAC-issued personnel or by login/password for all other entities (e.g., Foreign Nationals and Vendors).
1.5.2.4 Technical Environment
The Technical Environment relates to the overall product and its structure at the highest level. The ePS concept should ensure data standardization, interoperability, secure electronic data transfer, and data visibility within its design. The ePS will be subject to DON network regulations, security accreditations, and the DoD Risk Management Framework (RMF). The DICE refers to the ePS and all its interconnected systems.
The ePS concept should ensure compliance with DON Enterprise Architecture (EA) and depict a modular, highly scalable, and open-systems architecture. The models and viewpoints that compose the ePS architecture will comply with the following policies:
Business Enterprise Architecture (BEA), Deputy Chief Management Officer (DCMO), version
10.0, 14 Feb2013
DoDAF, DoD Deputy Chief Information Officer (CIO), version 2.02, 22 Mar 2010
DON Enterprise Architecture (EA), DON Chief Information Officer (CIO), version 4.0, 26 Sept
Architecture Development Guide (ADG), DON Chief Information Officer (CIO), version 2.0, 29
Jul 2011
Integrated Architecture Process and Viewpoint Guide (United States Marine Corps (USMC)), version 1.01, 21 Sept 2011
The Program Executive Office Enterprise Information Systems (PEO EIS) Enterprise
Architecture Initiative
Business Process Model & Notation (BPMN), Object Management Group (OMG), version 2.0, Jan 2011
Section 1.5.2 System Description identified the two primary components for ePS– the COTS CWS and the COTS ESB. The Vendor Portal capability is separate from the COTS CWS component, which fully illustrates the technical design. This division allows discussion for the unique technical requirements of the Vendor Portal; namely the availability of the Vendor Portal to the public internet.
Three primary user groups will access the ePS:
Primary Users (5,500 estimated): Government procurement professionals that will use the entire set of CWS functionality
Unlimited Non-Primary Users (10,000 estimated): Complementary support functions that require a sub-set of functionality (e.g., document reviews and approvals) for Government and non-
Government users
Unlimited Industry Users (100,000 estimated): Non-Government suppliers of goods and services to the DON (i.e., commercial vendors)
Page:
21/382 Version:
Version 1.2
Primary Users and Non-Primary users will access the ePS using their Government-issued laptop or desktop over a DON approved network (e.g., NMCI). All DON personnel must obtain a CAC, and the
Public Key Infrastructure/Public Key Enabling (PKI/PKE) authentication will secure user access. A system-generated and user-maintained password will ensure access for any users not issued a CAC (e.g., Foreign Nationals and Industry users).
The Vendor Portal is the public-facing element of the ePS and must be accessible from the public internet.
As a result, this capability must be separate from other elements of the ePS to protect the stored information.
1.5.2.5 Organizational Environment
The Program expects to deploy the ePS as a single solution that will support contracting missions and capabilities for each of the eleven HCA commands. The solution should provide consistency in appearance, utilization, and business rule implementation. Each HCA brings with it the potential requirements for unique configurations. The following tables provide high-level information regarding each HCA’s contracting mission, user base, and primary financial systems:
Page:
22/382 Version:
Version 1.2
Table 1-2: HCAs – DASN (AP)
DEPUTY ASSISTANT SECRETARY OF THE NAVY - ACQUISITION AND PROCUREMENT DASN (AP)
Deputy Assistant Secretary of the Navy (DASN) - Acquisition and Procurement (AP)’s mission is to shape acquisition and logistics policies that assure our Sailors and Marines are mission capable and have a technological edge over our adversaries. In support of this mission, DASN (AP) provides advice, staff support to Assistant Secretary of the Navy (ASN)
Research, Development, and Acquisition (RDA) on Acquisition and Logistics issues; serves as the DON Competition Advocate General; establishes acquisition, and logistics policy, facilitates, and improves the acquisition system. DASN (AP) serves as the DON's Functional Area Manager
(FAM) for CWS, providing transition planning, portfolio management oversight and control, and Business
Enterprise Architecture implementation. DASN (AP) applies DoD regulations and guidance to the DON CWSs of record (such as the SPS, Integrated Technical Item Management and Procurement (ITIMP), SeaPort-E, etc.).
Estimated Number of ePS Primary Users 13
Financial Management Information System(s) – Funds Certification/Commitment Dependent on Action
Accounting System(s) – Funds Verification & Obligation Dependent on Action
Table 1-3: HCAs – MSC
MILITARY SEALIFT COMMAND (MSC)
Military Sealift Command (MSC) awards and administers contracts for services of ocean-going ships, crafts, floating dry docks, and other repair facilities, for purposes such as oceanographic research and survey, underwater research, cable lying, and range instrumentation; and contracts for the maintenance, conversion, and modernization of assigned vessels. MSC’s unique contracting responsibilities include contracts for services of ferries and tugs; and exclude contracts for pilot services and ferries and tugs used for husbanding services, including water taxi contracts awarded outside the CONUS under husbanding services contracts. The Defense Transportation
Regulation identifies MSC transportation responsibilities.
Estimated Number of ePS Primary Users 108
Financial Management Information System(s) – Funds
Certification/Commitment
Military Sealift Command Financial
Management System (MSC-FMS)
Accounting System(s) – Funds Verification & Obligation MSC-FMS
Page:
23/382 Version:
Version 1.2
Table 1-4: HCAs – NAVAIR
NAVAL AIR SYSTEMS COMMAND (NAVAIR)
Naval Air Systems Command (NAVAIR) awards and administers contracts for naval aviation programs and efforts supported by the Naval Air Warfare Centers, to include relevant logistics, training and professional, research and engineering services. NAVAIR’s unique contracting responsibilities include designing, developing, procuring, and supporting naval aviation systems used by the DON.
Estimated Number of ePS Primary Users 1,286
Financial Management Information System(s) – Funds
Certification/Commitment Navy-Enterprise Resource Planning (ERP)
Accounting System(s) – Funds Verification & Obligation Navy-ERP
Page:
24/382 Version:
Version 1.2
Table 1-5: HCAs – NAVFAC
NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)
Naval Facilities Engineering Command (NAVFAC) awards and administers contracts for all architect-engineer, construction, utilities, energy, facilities support, and assigned weapon and
IT system programs or components associated with Navy expeditionary forces. NAVFAC’s unique contracting responsibilities include:
Facility engineering and construction, including capital improvements
Utilities, including sales and privatization
Shore Energy, including renewable, conservation, Energy Savings Performance Contracts and Utility
Energy Service Contracts (UESCs), and sales
Environmental remediation, cultural resources (on DoD installations only), historical research, natural resources conservation studies (on and off DoD installations), execution of the Defense Environmental
Restoration Program, delegated caretaker functions at military installations closing under the Defense
Base Closure and Realignment Act of 1990, and any amendments thereto
Public works, including maintenance of buildings, grounds, roads and other infrastructure
Guard services related to the protection and security of U.S. military installations and facilities
Anti-Terrorism Force Protection infrastructure (ashore)
Contingency engineering, expeditionary and construction training systems and equipment
Logistics-over-the-shore, near shore, and ocean facilities infrastructure systems
Navy expeditionary equipment, infrastructure, and IT related systems
Procurement and lease (over 120 days) of Navy civil engineer support equipment (excludes USMC), including railway, construction and weight-handling equipment
Procurement and maintenance of automotive vehicles used by DON
Lease of automotive vehicles used by DON (over 120 days)
Construction, lease, purchase and/or installation of re-locatable buildings, including trailers
DON acquisition of public utility services including, but not limited to: electricity, gas, water, sewerage, drainage, fire and police protection, street lighting and cleaning, and trash and garbage disposal
Administration functions associated with construction work under contracts awarded by other DON contracting activities that contain any construction work
Estimated Number of ePS Primary Users 1,485
Financial Management Information System(s) – Funds
Certification/Commitment
FIS
Accounting System(s) – Funds Verification & Obligation
Standard Accounting and Reporting System/Field
Level (STARS-FL), Standard Accounting and
Reporting/Headquarters Claimant Module
(STARS-HCM), Defense Working-Capital
Accounting System (DWAS)
Page:
25/382 Version:
Version 1.2
Table 1-6: HCAs – NAVSEA
NAVAL SEA SYSTEMS COMMAND (NAVSEA)
Naval Sea Systems Command (NAVSEA) awards and administers contracts for ships and submarines, assigned weapon systems and platforms, and relevant professional, research and engineering services. NAVSEA’s unique contracting responsibilities include awarding and administering contracts for construction, maintenance, and modernization of ships and submarines, nuclear propulsion, watercraft, submersibles, equipage for towing, diving and salvage, and University Affiliated
Research Centers.
Estimated Number of ePS Primary Users 723
Financial Management Information System(s) – Funds
Certification/Commitment
NAVY-ERP
Accounting System(s) – Funds Verification & Obligation NAVY-ERP, STARS-FL, STARS-HCM
Page:
26/382 Version:
Version 1.2
Table 1-7: HCAs – NAVSUP
NAVAL SUPPLY SYSTEMS COMMAND (NAVSUP)
Naval Supply Systems Command (NAVSUP) awards and administers contracts in support of assigned logistics support functions. NAVSUP unique contracting responsibilities include procuring supplies and services for all non-contracting Navy activities, offices or commands for which no other HCA has delegated authority.
Estimated Number of ePS Primary Users 665
Financial Management Information System(s)
– Funds Certification/Commitment
NAVSUP
NAVY-ERP
U.S. Fleet Forces Command (USFFC) and U.S. Pacific
Fleet (PACFLEET)
Funds Administration and Standardized Document Automation
(FASTDATA); Shipyard Management Information
System/Material Access Technology (SYMIS/MAT);
511R Apade Online (AOL); Command Financial Management
System (CFMS)
Reserve Force-Naval Reserve Force (RESFOR)
Reserve Integrated Management System – Financial
Management (RIMS-FM); FASTDATA
U.S. Navy Bureau of Medicine and Surgery (BUMED)
RIMS-FM; FASTDATA; Defense Medical Logistics Standard
Support (DMLSS)
Financial Systems Activity (FSA)
CFMS; FASTDATA
Accounting System(s) – Funds Verification &
Obligation
NAVY-ERP;
STARS-FL
Page:
27/382 Version:
Version 1.2
Table 1-8: HCAs – ONR
OFFICE OF NAVAL RESEARCH (ONR)
Office of Naval Research (ONR) awards and administers contracts and other instruments
(including grants and assistance actions) for assigned DON Science and Technology
(S&T) research. ONR’s unique contracting responsibilities include the award and administration of contracts to the Navy’s Federally Funded Research Development Center (FFRDC).
Estimated Number of ePS Primary Users 130
Financial Management Information System(s) – Funds Certification/Commitment
NAVY-ERP, Integrated
Management Processing
System (IMPS)
Accounting System(s) – Funds Verification & Obligation NAVY-ERP, IMPS
Table 1-9: HCAs – SPAWAR
SPACE AND NAVAL WARFARE SYSTEMS COMMAND (SPAWAR)
Space and Naval Warfare Systems Command (SPAWAR) awards and administers contracts in the information dominance domain, including assigned programs in the areas of R&D, systems engineering and development, and other relevant professional services associated with production, installation and sustainment for Command, Control, Communications, Computers, Intelligence Surveillance, and Reconnaissance Systems (C4ISR); Joint Tactical Radios
Systems (JTRS), Space Systems; Enterprise Information Systems (EIS); and Navy Chief Information Officer
(CIO) supported IT initiatives.
Estimated Number of ePS Primary Users 249
Financial Management Information System(s) – Funds Certification/Commitment NAVY-ERP
Accounting System(s) – Funds Verification & Obligation NAVY-ERP
Page:
28/382 Version:
Version 1.2
Table 1-10: HCAs – SSP
STRATEGIC SYSTEMS PROGRAMS (SSP)
Strategic Systems Programs (SSP) awards and administers contracts in support of the development, production, and life cycle support of the Trident Strategic Weapon System, and other assigned programs under the cognizance of the Director, SSP (DIRSSP).
Estimated Number of ePS Primary Users 25
Financial Management Information System(s) – Funds Certification/Commitment NAVY-ERP
Accounting System(s) – Funds Verification & Obligation NAVY-ERP
Page:
29/382 Version:
Version 1.2 able 1-11: HCAs – USMC, HQMC, I&L
INSTALLATIONS AND LOGISTICS, HEADQUARTERS, U.S. MARINE CORPS (USMC, HQMC, I&L)
Installations and Logistics, Headquarters, U.S. Marine Corps (HQMC, I&L) awards and administers contracts for supplies and services to support installation and logistics requirements of the Marine Corps Operating Forces and supporting establishments.
Estimated Number of ePS Primary Users 394
Financial Management Information System(s) – Funds Certification/Commitment PR Builder
Accounting System(s) – Funds Verification & Obligation
Standard Accounting, Budgeting, and
Reporting System
(SABRS)
Table 1-12: HCAs – USMC, MCSC (MARCORSYSCOM)
MARINE CORPS SYSTEMS COMMAND (MARCORSYSCOM)
Marine Corps Systems Command (MCSC) awards and administers contracts for assigned
Marine Corps programs, assigned IT systems programs or components, and relevant professional, research and engineering services, except for naval aviation programs.
Estimated Number of ePS Primary Users: 154
Financial Management Information System(s) – Funds Certification/Commitment PR Builder
Accounting System(s) – Funds Verification & Obligation SABRS
Page:
30/382 Version:
Version 1.2
1.5.2.6 User Roles
Table 1-13 provides descriptions of the various User Roles associated with the ePS. The solution will provide a set of roles that encompass all functionality of the specific job functions in the existing P2P process, as well as any administrative, technical, and security roles.
Table 1-13: User Roles
USER ROLE DESCRIPTION OF ROLE
User Non-administrative user performing routine tasks
Authorized User
Non-administrative users performing tasks that require specific user profile characteristics. The ePS business rules will define the profile characteristics required to perform a function
Local System Administrator A user performing administrative tasks for other users within their assigned security group and/or contracting office
Enterprise Authorized User A user performing administrative tasks that will be disbursed throughout the entire instance of the application
Contract Specialist (CS) or
Grants Specialist (GS)
The foundational user role assigned to most users in order to perform routine contracting functions
Contracting Officer
(or Grants Officer)
An elevated privilege role that allows the user to sign and approve instruments, documents, and records. In addition to a user designated as a
Contracting Officer (KO), the user profile includes details about the user's warrant including Obligation Amount Limit, Procurement Action Type (e.g., Admin Mods, Grants/Agreements, Terminations, etc.), and Issue/Revocation dates
Contingency Contracting
Officer
An elevated privilege role which includes authorizations found in the KO role and provides authority to exercise business rule exceptions as documented in the Functional Requirements
Supervisor/ Team Lead
An elevated privilege role which allows the user to assign, reassign, and view workload across multiple users, user profile characteristic identify
Supervisor/Supervisee designations
Manager An elevated privilege role which allows the user to assign, reassign, and view workload across multiple Supervisors/Team Leads
Business Intelligence Analyst
A user role that allows an individual to access Business Intelligence reports made available by Business Intelligence Administrators. Users in this role may also create and store reports in a location accessible exclusively to themselves (i.e., a personal folder) and send a stored report to another
Business Intelligence Analyst who may elect to save that report in their personal folder.
Business Intelligence
Administrator
An elevated Business Intelligence Analyst role that includes the functions available to a Business Intelligence Analyst but also allows…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.