CoverPage N00039-17-R-0002 ePS WBS
| Solicitation Number: N00039-17-R-0002; Attachment Number: 9 |
| ePS Work Breakdown Structure (WBS) |
| --Version dated 24 FEB 2017-- | ||||||
| CLIN | PWS | WBS # | MIL-STD-881C with CAPE's O&S Recommendations | BASE | Option | |
| 1 | Option | |||||
| 2 | Option | |||||
| 3 | Option | |||||
| 4 | Option | |||||
| 5 | Option | |||||
| 6 | Option | |||||
| 7 | Option | |||||
| 8 | Option |
| Rollup | Rollup | 1.0 | Electronic Procurement System (ePS) | X | X | X | |||||||
| Rollup | Rollup | 1.1 | Prime Mission Product | X | X | X | |||||||
| Rollup | Rollup | 1.1.1 | Custom Application Software (Gap Closure) | X | X | X | |||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.1 | Limited Deployment | X | |||||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.1.1 | Custom Application Software Module 1...n (Specify) | X | |||||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.1.1.1 | Business Process Design | X | |||||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.1.1.2 | Configurations | X | |||||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.1.1.3 | Customizations | X | |||||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.1.2 | Custom Application Software Integration, Assembly, Test and Checkout | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.2 | Release 1 | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.2.1 | Custom Application Software Module 1...n (Specify) | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.2.1.1 | Business Process Design | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.2.1.2 | Configurations | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.2.1.3 | Customizations | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.2.2 | Custom Application Software Integration, Assembly, Test and Checkout | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.3 | Release 2 | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.3.1 | Custom Application Software Module 1...n (Specify) | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.3.1.1 | Business Process Design | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.3.1.2 | Configurations | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.3.1.3 | Customizations | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.5 | 1.1.1.3.2 | Custom Application Software Integration, Assembly, Test and Checkout | X | |||||||||
| Rollup | Rollup | 1.1.2 | Enterprise Service Element (Contract Writing System) | X | X | X | |||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.1 | Limited Deployment | X | |||||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.1.1 | Enterprise Service Element Software Module 1...n (Specify) | X | |||||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.1.1.1 | Business Process Design | X | |||||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.1.1.2 | Configurations | X | |||||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.1.1.3 | Customizations | X | |||||||||
| 0003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.1.2 | Enterprise Service Element Integration, Assembly, Test and Checkout | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.2 | Release 1 | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.2.1 | Enterprise Service Element Software Module 1...n (Specify) | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.2.1.1 | Business Process Design | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.2.1.2 | Configurations | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.2.1.3 | Customizations | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.2.1.4 | Cybersecurity (Enterprise SW) | X | |||||||||
| 1003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.2.2 | Enterprise Service Element Integration, Assembly, Test and Checkout | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.3 | Release 2 | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.3.1 | Enterprise Service Element Software Module 1...n (Specify) | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.3.1.1 | Business Process Design | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.3.1.2 | Configurations | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.3.1.3 | Customizations | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.3.1.4 | Cybersecurity (Enterprise SW) | X | |||||||||
| 2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.5/4.1.2 | 1.1.2.3.2 | Enterprise Service Element Integration, Assembly, Test and Checkout | X | |||||||||
| 0003/1003/2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.1.3 | 1.1.3 | Enterprise Information System 1...n (Specify) (Enterprise Service Bus) | X | X | X | |||||||
| Rollup | Rollup | 1.1.4 | External System Interface Development | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.7 | 1.1.4.1 | External System Interface Software Module 1...n (Specify) | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.7 | 1.1.4.1.1 | Business Process Design | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.7 | 1.1.4.1.2 | Configurations | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.7 | 1.1.4.1.3 | Customizations | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.7 | 1.1.4.1.4 | Cybersecurity (Interface SW) | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8/4.1.9/4.1.11/4.1.12/4.3.7 | 1.1.4.2 | External System Interface Integration, Assembly, Test and Checkout | X | X | X | |||||||
| Rollup | Rollup | 1.1.5 | Development Suite Hosting | X | X | X | |||||||
| 0009/1009/2009/0010/1010/2010/0044-0047/1044-1047/2044-2047 | 4.2 | 1.1.5.1 | Compute/Instance Services | X | X | X | |||||||
| 0009/1009/2009/0010/1010/2010/0044-0047/1044-1047/2044-2047 | 4.2 | 1.1.5.2 | Storage Services | X | X | X | |||||||
| 0009/1009/2009/0010/1010/2010/0044-0047/1044-1047/2044-2047 | 4.2 | 1.1.5.3 | Networking Services | X | X | X | |||||||
| 0009/1009/2009/0010/1010/2010/0044-0047/1044-1047/2044-2047 | 4.2 | 1.1.5.4 | Other Managed Services | X | X | X | |||||||
| 0006/1006/2006 | 4.3.3 | 1.1.6 | System Level Integration | X | X | X | |||||||
| 0003/1003/2003 | 4.3.13 | 1.1.7 | Cybersecurity (Application) | X | X | X | |||||||
| Rollup | Rollup | 1.2 | System Engineering | X | X | X | |||||||
| 0003/1003/2003 | 4.3.1/4.3.2 | 1.2.1 | Engineering Planning, Analysis & Tech Reviews | X | X | X | |||||||
| 0003/1003/2003 | 4.3.4 | 1.2.2 | Requirements Mgt | X | X | X | |||||||
| 0003/1003/2003 | 4.3.6 | 1.2.3 | Architecture | X | X | X | |||||||
| 0003/1003/2003 | 4.3.3 | 1.2.4 | Software Engineering | X | X | X | |||||||
| 0003/1003/2003 | 4.3.8/4.3.9/4.3.10 | 1.2.5 | Configuration, Change & Release Mgt processes | X | X | X | |||||||
| 0003/1003/2003 | 4.3.7 | 1.2.6 | Interface Mgt | X | X | X | |||||||
| 0003/1003/2003 | 4.3.13 | 1.2.7 | IA/Cybersecurity Mgt | X | X | X | |||||||
| Rollup | Rollup | 1.3 | Program Management | X | X | X | |||||||
| 0003/1003/2003/0008/1008/2008 | 4.7 | 1.3.1 | Program Management | X | X | X | |||||||
| 0003/1003/2003 | 4.1.10/4.3.12 | 1.3.2 | Audit Readiness | X | X | X | |||||||
| 0003/1003/2003 | 4.4.4 | 1.4 | Change Management (Organizational) | X | X | X | |||||||
| Rollup | Rollup | 1.5 | System Test and Evaluation | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.1 | Development Test and Evaluation | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.1.1 | Cyber Security | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.1.2 | Other DT&E | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.2 | Operational Test and Evaluation | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.2.1 | Cyber Security | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.2.2 | Other OT&E | X | X | X | |||||||
| 0008/1008/2008 | 4.3.11 | 1.5.3 | Mock-ups / System Integration Labs (SILs) | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.4 | Test and Evaluation Support | X | X | X | |||||||
| Rollup | Rollup | 1.6 | Training | X | X | X | |||||||
| 0007/1007/2007 | 4.4.3 | 1.6.2 | Services | X | X | X | |||||||
| 0008/1008/2008 | 4.4.3 | 1.6.3 | Facilities | X | X | X | |||||||
| 0003/1003/2003 | 4.1.7 | 1.6.4 | Training Development | X | X | X | |||||||
| Rollup | Rollup | 1.7 | Data | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8 | 1.7.1 | Technical Publications | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8 | 1.7.2 | Engineering Data | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8 | 1.7.3 | Management Data | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8 | 1.7.4 | Support Data | X | X | X | |||||||
| Rollup | Rollup | 1.10 | Operational/Site Activation | X | X | X | |||||||
| Rollup | Rollup | 1.10.1 | Deployment Hardware and Software | X | X | X | |||||||
| Rollup | Rollup | 1.10.1.2 | Software-COTS Licenses | X | X | X | |||||||
| 0001/1001/2001/0002/1002/2002/0011/1011/2011 | 4.1.1/4.1.3/4.1.4 | 1.10.1.2.1 | Software License | X | X | X | |||||||
| 0001/1001/2001/0002/1002/2002/0011/1011/2011 | 4.1.1/4.1.3/4.1.4 | 1.10.1.2.2 | Custom Software (Cybersecurity) | X | X | X | |||||||
| 0001/1001/2001/0002/1002/2002/0011/1011/2011 | 4.1.1/4.1.3/4.1.4 | 1.10.1.2.3 | Other License-Related Costs (e.g. Configuration Management) | X | X | X | |||||||
| 0003/1003/2003 | 4.1.6/4.4.1/4.4.2 | 1.10.2 | User Documentation | X | X | X | |||||||
| 0003/1003/2003 | 4.4.5 | 1.10.3 | Site Activation | X | X | X | |||||||
| 0007/1007/2007 | 4.4.3 | 1.10.4 | User Training | X | X | X | |||||||
| 0003/1003/2003 | 4.4.6/4.4.7 | 1.10.5 | Data Migration | X | X | X | |||||||
| 0012-0041/1012-1041/2012-2041 | 4.5.4 | 1.10.6 | HCA Specific Support | X | X | X | |||||||
| 0003/1003/2003/0042/0043/1042/1043/2042/2043 | 4.5.1/4.5.2/4.5.3 | 1.10.7 | Interim Logistics Support | X | X | X | |||||||
| Rollup | Rollup | 2.0 | Sustainment Effort | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4 | Sustaining Support (System Level Cost Only) | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4.3 | Sustaining/Systems Engineering | X | X | X | X | X | X | X | |||
| 3006-9006 | 4.6.2/4.6.3 | 2.4.3.2 | Logistics Engineering (Lsa Updates, Logistics Analysis) | X | X | X | X | X | X | X | |||
| 3006-9006 | 4.6.2/4.6.3 | 2.4.3.8 | Product Engineering Support | X | X | X | X | X | X | X | |||
| 3006-9006 | 4.6.2/4.6.3 | 2.4.3.9 | Information Assurance | X | X | X | X | X | X | X | |||
| 3006-9006 | 4.6.2/4.6.3 | 2.4.3.10 | Configuration Management | X | X | X | X | X | X | X | |||
| 3006-9006 | 4.6.2/4.6.3 | 2.4.3.13 | Data Analysis | X | X | X | X | X | X | X | |||
| 3006-9006 | 4.6.2/4.6.3 | 2.4.3.15 | Cyber Security | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.7 | 2.4.4 | Program Management | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4.5 | Information Systems | X | X | X | X | X | X | X | |||
| 3010-9010 | 4.1.1/4.1.3 | 2.4.5.2 | License Fees | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4.5.3 | System Support/Maintenance | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4.5.3.1 | Help Desk | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.1.2 | 2.4.5.3.1.1 | Tier 0 | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.1.2 | 2.4.5.3.1.2 | Tier 1 | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.1.2 | 2.4.5.3.1.3 | Tier 2 | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.1.2 | 2.4.5.3.1.4 | Tier 3 | X | X | X | X | X | X | X | |||
| 3009-9009 | 4.2 | 2.4.5.3.2 | System Database Administration | X | X | X | X | X | X | X | |||
| 3007-9007 | 4.6.1.1 | 2.4.5.3.3 | Follow On User Training | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.2.10 | 2.4.5.3.4 | Independent Verification And Validation (IV&V) | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4.5.4 | Hosting Services | X | X | X | X | X | X | X | |||
| 3044-3047/9044-9047 | 4.2 | 2.4.5.4.1 | Compute/Instance Services | X | X | X | X | X | X | X | |||
| 3044-3047/9044-9047 | 4.2 | 2.4.5.4.2 | Storage Services | X | X | X | X | X | X | X | |||
| 3044-3047/9044-9047 | 4.2 | 2.4.5.4.3 | Networking Services | X | X | X | X | X | X | X | |||
| 3044-3047/9044-9047 | 4.2 | 2.4.5.4.4 | Other Managed Services | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.1 | 2.4.6 | Data And Technical Publications | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6 | 2.4.8 | Other Sustaining Support (Specify In Remarks) | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.5 | Continuing System Improvements | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.5.2 | Software Support | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.5.2.1 | Software Changes | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.5.2.1.1 | Release 1...N (Specify) | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.5.2.1.1.1 | WBS Name 1...N (Specify) | X | X | X | X | X | X | X | |||
| 3002-9002 | 4.1.9/4.6.2.3 | 2.5.2.1.1.1.1 | Correction Of Deficiencies | X | X | X | X | X | X | X | |||
| 3002-9002 | 4.1.9/4.6.2.3 | 2.5.2.1.1.1.2 | Enhancements | X | X | X | X | X | X | X | |||
| 3002-9002 | 4.1.4 | 2.5.2.2 | Software License Management | X | X | X | X | X | X | X | |||
| 3012-3041/9012-9041 | 4.6.4 | 2.5.2.5 | HCA Operational Management | X | X | X | X | X | X | X | |||
| Note: Rollup indicates that the specific WBS is for summary purposes only. It is not expected that any BOE would be bid at the rollup level. |
Microsoft_Word_Document1.docx electronic Procurement System
Request for Proposal
Attachment 9: Work Breakdown Structure
ACAT 1
Dated
17 February 2017
Distribution Notice D: Authorized to the Department of Defense (DoD) and DoD Contractors only. This document is for administrative or operational use, as of the date of approval for this document. Refer to the Program Manager (PM), PMW 220 Navy Enterprise Business Solutions (Navy EBS), Program Executive Office Enterprise Information System (PEO EIS), Washington Navy Yard, 1325 10th St. SE, Bldg. 196, Washington, D.C. 20374 for additional document requests.
Handling and Destruction Notice: Comply with distribution statement and destroy by any method that will prevent disclosure of contents or reconstruction of the document.