N00024-20-R-4400-0001 (CONFORMED).pdf
PDF 2 MB Posted
- Solicitation number
- N00024-20-R-4400
About this file
This solicitation seeks proposals for the execution of the FY20 USS PREBLE (DDG 88) Depot Modernization Period (DMP) availability. The Naval Sea Systems Command will issue solicitation N00024-20-R-4400 requiring a combination of maintenance, modernization, and repair services. Offerors must have substantial facilities including a DDG-51 class capable pier and qualified human resources to complete ship maintenance, repair, and modernization.
The availability is competed on a coast-wide basis and will not be set aside for small businesses. Interested parties must register in SAM and monitor beta.SAM.gov for the release of the solicitation and amendments. Attachments with the exception of S-5 Enclosure (1), J-1, J-2, J-3, J-4, J-5, J-8, and CDRLs are available by request. The Navy anticipates a single-award contract by June 2020 for work starting in September 2020 and delivering the USS PREBLE by March 2022. Offerors should submit proposals in accordance with instructions on beta.SAM.gov.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 03:00 PM local time 17 Mar 2020
X
A
X B
X C X D
EX
X
G
F 192 - 201
202 - 222
H 223 - 224
Erica.fetter@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-A3 1 223
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
ERICA E FETTER 202-781-3421
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 112
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
113 - 146
147 - 148
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
149 - 151
152 - 156 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 157 - 169 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror)
X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
170 - 190
PART II - CO NTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N0002419FR62007
5. DATE ISSUED
17 Jan 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0002420R4400
Formatted: Left: 0.25", Right: 0.25"
N0002420R4400N0002420R4400
Section B - Supplies or Services and Prices
NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR
1. The Contractor agrees to provide the level of effort to completion in the performance of growth
CLINs in the execution of the USS PREBLE (DDG 88) FY20 DMP CNO Availability:
a) USS PREBLE (DDG 88) FY20 DMP CNO Availability
i. 88,075 direct labor hours (labor hours) and $5,526,179 materials to complete growth work on the
USS PREBLE (DDG 88) FY20 DMP CNO Availability work package under CLINs (0031-0065)
2. The total level of effort to completion for the performance of the above CLINs shall be labor hours and the associated material required to support that labor and effort. The mix of labor and material may be adjusted, but may not exceed the dollar value of each CLIN listed above.
3. Effort performed in fulfilling the level of effort to completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee’s usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee’s residence or other non-work locations.
4. LOE to Completion labor hours and material are within the general scope of the contract.
5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form
(GMR) calls for effort outside the scope of the contract, the Contractor shall notify the Contracting
Officer in writing within two (2) working days after the receipt of any such direction. The Contractor shall not proceed with the work affected by the GMR unless and until the Contractor is notified by the Contracting Officer that the directed work is within the scope of this contract. Thereafter, any remaining disagreement on the scope issue shall be a dispute under the Disputes clause; however, nothing in this clause shall excuse the Contractor from proceeding with the subject growth work as directed by the Contracting Officer.
6. The labor hours and material requirements listed in Section B, Note A, paragraph 1 above are part of this contract under the original solicitation and award. Prime contractor efforts will be deducted from the allocated labor hours with subcontractor efforts and materials deducted from the allocated materials. The balance of labor hours and materials remaining in the LOE to Completion CLINs are subject to a decrease change order when it is evident no additional growth work will be directed.
7. Only settled production labor hours will be deducted from the LOE to Completion labor hour effort.
While supervision, quality assurance, and other nonproduction labor should be included in the pricing for items in the original bid, they shall not count towards satisfying the Contractor’s obligation to provide LOE to Completion labor hours. The labor hour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically directed by the Government.
8. Material dollars shall be used on settled costs to the Contractor of acquiring the materials provided and total cost of subcontractor efforts proposed. Material dollars may include freight or duties which would be reflected on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the settled cost of materials deducted from the reservation.
9. The information received in the consolidated final report required by Section C paragraph 6.6 will be used by the Contracting Officer in the issuance of one contract modification, which will be a final settlement for all LOE to Completion labor hours and material dollars. Once the number of labor hours and materials for a task has been agreed to, neither party shall be entitled to an adjustment should the expended labor hours and materials differ from the settled price. Each task shall receive approval by the SUPERVISOR1 and the Contracting Officer.
NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW
WORK
SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
1. The Contractor’s fully burdened ship repair labor rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of hours included in its price proposal for contract modifications shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:
Abrasive cleaning/blasting
Fire Watch
Welding
Burning
Brazing
Carpentry
Machinists (inside and outside)
Electrical Work
Electronic Work
Engineering
Design Support
Lagging
Ship-fitting
Boiler-making
Painting
Sheet-metal Work
Pipefitting
Rigging
General Labor
Staging/Scaffolding
Diesel Mechanics
2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production functions listed in paragraph 1 above.
Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production hours. Labor hours for the below support functions shall not be separately proposed, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:
Testing
Quality Assurance
Execution Planning
Cleaning (except tank cleaning)
Supervision (all types, including, but not limited to supervision of trades, support personnel and subcontractors)
Security
Surveying
Administration
Transportation
Purchasing
Staff
Lofting
Other indirect support
Handling & Warehousing
Safety/Environmental
Program Management
3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit.
The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.
5. Physical materials are goods that become an integral part of the repaired vessel in the course of the repair, such as equipment, replacement steel, pipes, paint, and fasteners. The material burden rates apply to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.
6. For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs
(ODCs) and will be subject to the contract material burden rate shown in paragraph (7) below. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis
(COPA) in response to Request for Contract Changes (RCCs) and Reservation Task Requests (RTRs) issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs), Government directed subcontractors, and/or
Government authorized vendors. RCCs and RTRs that are subcontracted for material only (no associated labor required within the RCC) shall not be subject to the Material Burden Rate.
7. The contract fixed fully burdened ship repair labor rate and material burden rate are shown below. These fixed rates shall be used for negotiating growth and new work during the availability and up to three (3) months after the Attachment J-3 “Contract Complete” date:
USS PREBLE FY20 CNO Availability
Fully burdened Ship Repair Labor Rate TBD
Material Burden Rate TBD
The rates above shall be used for negotiating all growth and new work during the entire availability up to completion of ‘Contract Complete’ milestone per Attachment J-3.
8. In the event of an extension due to excusable or compensable delay, the Contractor’s fully burdened ship repair labor rate shall be escalated by 0.62 % commencing 3 months after the Attachment J-3 “Contract Complete” date. This rate shall be escalated quarterly through the 24th month, if necessary, following the “Contract
Complete” date and shall be used to negotiate all growth and new work. The material burden rate shall not increase.
NOTE C: Option item to which the option clause FAR 52.217-7 applies and which is to be supplied only if and to the extent said option is exercised.
NOTE D: SCHEDULE OF EXTENSION DAILY RATES FOR PIERSIDE AND DRY DOCKING (FULLY
BURDENED) FOR PURPOSES OF AN EXTENSION DUE TO EXCUSABLE OR COMPENSABLE
DELAY
1. In the event of an extension due to excusable or compensable delay, the Contractor’s fully burdened daily rates as outlined within this Note will be used for negotiating additional dry-dock and/or pierside performance days at the contractor’s facility under this contract.
2. The contractor agrees that the daily rates shall include all costs that run with time associated with additional performance days in accordance with the work package specification requirements of this availability. The daily rates shall include all costs associated with additional performance days (whether charged directly or indirectly by the offeror’s accounting systems) including but not limited to:
Temporary Services, including but not limited to:
o Decking services o Pumping services
Internet Connectivity
Air Conditioning
Support Services for the Navy, its agents and contractors
Facilities, including but not limited to:
o Piers o Office spaces o Trailers o Parking o Flammable Liquid Storage and Hazardous Material Storage o Material Warehousing and Lay-down space
Project Management and other labor costs that run with time including but not limited to:
o Program Management o Supervision o Integration & Scheduling o Cleaning (except tank cleaning) o Quality Assurance o Execution Planning o Security o Administration o Contracts o Purchasing o Other indirect support o Safety/Environmental
Transportation
3. The fully burdened daily rates are fixed rates that include all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit.
4. The contract’s fixed fully burdened daily rates for pierside and dry-docking are shown below. These rates are to be used during the availability’s extension period, up to 24 months after the attachment J-3 “Contract
Complete” date. These fixed rates shall be used for additional docking and pierside days:
USS PREBLE FY20 DMP Additional Day requiring
Availability Extension
Additional Day does not require
Availability Extension
Additional Dry-Docking Day TBD TBD
Additional Pierside Day TBD
5. The Contractor bears the burden of proving the requested extension is the result of a delay that is excusable or compensable. The Contractor agrees that, in the event of such an extension, a bilateral modification will be executed with the price of the extension calculated as follows:
Total Price of Extension = D(e) * (P/D)
D(e) = Agreed Extension Days to the Delivery Date
(P/D) = Price/Day entered in “Daily Extension Rate” tab of Attachment J-4
The Price/Day will be utilized to execute any modifications to extend the contract, regardless of the number of modifications or the number of days required to meet the Schedule Milestone “Contract Complete” within 24 months of the “Contract Complete” date. All terms and conditions under the contract apply to all modifications to extend the delivery date. If the Contracting Officer determines a delay in meeting the “Schedule Milestone” is not excusable or compensable, no modification will be executed and the contractor will be directed to continue work until certified ‘Contract Complete’ by the RMC. Additionally, if the Contracting Officer and Contractor are unable to reach an agreement on the number of days required to extend the delivery date, the Government reserves the right to execute a unilateral modification utilizing the equation above. Failure to agree on the cause of de lay or duration of delivery date extension shall be a dispute subject to the requirements of FAR 52.233-1 ‘Disputes.’
NOTE E: SPECIAL AGREEMENT FOR GROWTH WITH A PRICE OF $25,000 OR LESS
1. To make administration of small dollar value growth more efficient and less costly, both parties (Government and Contractor) agree to a pre-priced value for individual growth items with an estimated price of $25,000 or less. The Contract will include a firm fixed price for growth valued at $25,000.00 or less. Zero-dollar changes and administrative contract changes (for example, drawing revision change where no additional work is required) shall not be executed using the Small Dollar Value Growth procedures, but will follow the change process.
2. The amount included in this Contract for the growth described above shall be equal to a maximum quantity of:
• 397 occurrences for growth work computed at a firm fixed price of $7,996 per occurrence, as associated with CLINS 0031-0065 for the USS PREBLE FY20 DMP.
3. A Waterfront Circuit Team comprised of a small group of Contractor and Government representatives shall administer the Special Agreement for Growth with a value of $25,000 or less. The Contractor shall establish a group of empowered representatives who will be located in proximity to the ship during the availability period and who will interact with a similar group of Government representatives (also to be located in close proximity to the ship and to be identified by the NSA). Specific arrangements for the Waterfront Circuit Team shall be mutually agreed between the Contractor and NSA.
4. The Contractor shall report proposed growth work through the normal CFR process in accordance with Contract terms. The Government may also independently identify growth work. No later than 24 hours after the final approval of the CFR, the Waterfront Circuit Team shall use best efforts to determine if the proposed growth is
$25,000 or less, and document the agreed to technical scope of work. The Contracting Officer shall di rect the commencement of all growth work. Directed growth will be followed by documentation to appropriately reflect specification changes.
5. If the Waterfront Circuit Team is not able to reach agreement that the price of the growth work is $25,000, or less, then it will be adjudicated through the LOE to Completion process identified in Section B, Note A.
However, if negotiations reveal the value of growth work is $25,000, or less, the task will be settled in accordance with the Small Dollar Value Growth procedure at the pre-priced value per occurrence identified in
Section B, Note E, Paragraph 2, above.
6. The Contractor and Contracting Officer shall develop a growth tracker to identify and record the number of directed occurrences under this Note. All growth meeting the criteria of paragraph 1 above shall be accepted under this clause without delay and disruption in ship redelivery.
7. When the quantity of occurrences for Small Dollar Growth is depleted, the Small Dollar Growth process shall revert to the LOE to Completion process for remaining growth.
8. Within 30 days after the end of the contract period of performance, the Contractor and Contracting Officer, utilizing the growth work tracker, shall determine the number of pre-priced occurrences not directed under this contract. Accordingly, the Contracting Officer will decrease the contract price by an amount calculated by multiplying the remaining number of occurrences by the pre-established firm fixed price per occurrence.
NOTE F: AVAILABILITY SCHEDULE PERFORMANCE
1. The Contractor shall schedule the performance of all items of the work package, including work items included as both Base and Option items, so as to permit a contract scope increase up to the:
Total contract wide number of labor hours and material dollars to complete growth work as described in NOTE
A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR, paragraph 1.
46,936 hours and $2,766,619 materials to complete new work as evaluated in Attachment J-4.
Total contract wide number of Small Value Dollar Growth occurrences as described in NOTE E: SPECIAL
AGREEMENT FOR GROWTH WITH A PRICE OF $25,000 OR LESS, paragraph 2.
2. The contractor agrees that the growth and new work identified in Section B, Note F, Paragraph 1, above, if tasked, shall be performed concurrently with the work items, without impacting, accelerating, or causing delay or disruption to the work required by the base and option work items, to any other Government contract, or to any other work in progress for the Government.
3. The growth or new work described above, if required, shall be tasked during the contract period of performance, as may be modified, on the following schedule phasing:
No more than 75% of the hours or material following the 25% schedule point of the availability (as measured in days between the “Avail Start” and “Contract Complete” milestones in Attachment J-3).
No more than 50% of the hours or material following the 50% schedule point of the availability (as measured in days between the “Avail Start” and “Contract Complete” milestones in Attachment J-3).
No more than 25% of the hours or material following the 75% schedule point of the availability (as measured in days between the “Avail Start” and “Contract Complete” milestones in Attachment J-3).
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
1 Lot
TYCOM (1B4B)
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS PREBLE (DDG 88) DURING FY20 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the
DEPOT MODERNIZATION PERIOD (DMP) onboard USS Preble (DDG 88) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A and C
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PURCHASE REQUEST NUMBER: N0002419FR62007
PSC CD: J999
NET AMT
PMS 407 Funded OMN
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS PREBLE (DDG 88) DURING FY20 DEPOT
specified in the statement of work provided herein and in accordance with standard
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PMS 407 Funded OPN
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS PREBLE (DDG 88) DURING FY20 DEPOT
specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
Temporary Service; provide
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS PREBLE (DDG 88) DURING FY20 DEPOT
specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
DATA
FFP
CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR THE USS PREBLE
(DDG 88) CLINs, INCLUDING OPTION CLINs, IF EXERCISED.
The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B, and C, attached hereto. The CDRLs form a part of the schedule of this solicitation.
Not Separately Priced (NSP)
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION Messing and Berthing Barge Tow Service
FFP
Messing and Berthing Barge Tow Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS PREBLE (DDG 88) DURING FY20 DEPOT
specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION TYCOM Option Item (1B4B)
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS PREBLE (DDG 88) DURING FY20 DEPOT
specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION SDRW; inspect and repair
Sonar Dome Rubber Window (SDRW); inspect and repair (OPTION ITEM) specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION Starboard Waterborne Propulsion Shafting
Starboard Waterborne Propulsion Shafting; install (OPTION ITEM) specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION Port Waterborne Propulsion Shafting
Port Waterborne Propulsion Shafting; install (OPTION ITEM) specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION LPAC Class B Overhaul; accomplish
FFP
Low Pressure Air Compressor (LPAC) Class B Overhaul; accomplish (OPTION
ITEM)
specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION Rudder Stock Bearing; install
Rudder Stock Bearing; install (OPTION ITEM) specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION TYCOM Option Items (1B4B)
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS PREBLE (DDG 88) DURING FY20 DEPOT
specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION Alt DDG51-80156K, AN/SLQ-32 (V)6 SEWIP
FFP
ShipAlt DDG51-80156K, AN/SLQ-32 (V)6 Surface Electronic Warfare
Improvement Program (SEWIP) Block 2 Upgrade; accomplish specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION Alt DDG51-88260K, Enterprise Remote Moni
FFP
ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation;
accomplish specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION OrdAlt 80831, BMD-MK99 KAS DDG Illuminat
OrdAlt 80831, BMD-MK99 KAS DDG Illuminator RAM Material; accomplish specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION ShipAlt DDG-51-81961K and DDG-51-85114K
FFP
ShipAlt DDG-51-81961K and DDG-51-85114K, Tactical Tomahawk Weapons
Control System (TTWCS) V5.4.0.2 and TMPC 5.0.1 Upgrade; accomplish specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION Change DDG51-90119K, Navy Cash Equipment
FFP
Engineering Change DDG51-90119K, Navy Cash Equipment Refresh 1.0, Alteration Installation Team (AIT) Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION Alt DDG51-75360K, CBSP Tier 3 AIT Suppor
FFP
ShipAlt DDG51-75360K, Commercial Broadband Satellite Program (CBSP) Tier
3, Alteration Installation Team (AIT) Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION OrdAltDDG51-79362K &ShipAlt DDG51-79362K
FFP
OrdAlt DDG51-79362K and ShipAlt DDG51-79362K, AWS Seawater Flow Meter for Spy Water Cooler, Alteration Installation Team (AIT) Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION ShipAlt DDG51-75874K, PEOC4I SSEE Increm
FFP
ShipAlt DDG51-75874K, PEOC4I Ships Signal Exploitation Equipment (SSEE)
Increment F, Alteration Installation Team (AIT) Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION ShipAlt DDG51-86539K, PEOC4I C2P OTH, AI
FFP
ShipAlt DDG51-86539K, PEOC4I C2P Tech Refresh (OTH), Alteration
Installation Team (AIT) Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION ShipAlt DDG51-87785K, AS-4775 Link 16 An
FFP
ShipAlt DDG51-87785K, AS-4775 Link 16 Antenna, Alteration Installation Team
(AIT) Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION ShipAlt DDG51-81322K, PEOC41 ADNS AN/USQ
FFP
ShipAlt DDG51-81322K, PEOC41 ADNS AN/USQ-144K(V)2 with SP1, Alteration Installation Team (AIT) Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION ShipAlt 81798K & 89468K, CANES & HW 1.2
FFP
ShipAlt 81798K and 89468K, Consolidated Afloat Network and Enterprise Service
(CANES) and HW 1.2 and NAVMACS Tech Refresh, Alteration Installation Team
(AIT) Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION ShipAlt DDG51-86752K, AN/USQ-T52 Trainin
FFP
ShipAlt DDG51-86752K, AN/USQ-T52 Training Interface Unit, Alteration
Installation Team (AIT) Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION ShipAlt DDG51-89920K & 86222K, AN/SQQ-89
FFP
ShipAlt DDG51-89920K and 86222K, AN/SQQ-89A(V)15 Tech Refresh with TI-
16 HW and AN/UQN-10 Next Gen Fathometer, Alteration Installation Team (AIT)
Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION ShipAlt DDG51-92831K, SNLWS Increment 1
ShipAlt DDG51-92831K, SNLWS Increment 1 (HELIOS); accomplish specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION ShipAlt DDG51-84646K, PEOC4I SSEE Mods S
FFP
ShipAlt DDG51-84646K, PEOC4I Ship's Signals Exploitation Equipment (SSSE)
Mods SA 555, Alteration Installation Team (AIT) Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION ShipAlt DDG51-85077K, AN/SPQ-9B Producti
FFP
ShipAlt DDG51-85077K, AN/SPQ-9B Production Tech Refresh With PDD On
Surface Ship, Alteration Installation Team (AIT) Support Service; provide specified in the statement of work provided herein and in accordance with standard unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION Growth Reservation
FFP
Growth Reservation associated with CLIN 0001. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0001. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0001. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0002. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0003. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0004. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0006. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0007. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0008. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0009. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0009. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0010. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0010. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0011. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0012. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0013. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0013. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0013. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0014. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0015. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0016. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0017. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0018. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0019. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0020. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0021. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0022. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0023. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0024. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0025. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0026. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0027. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0028. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0029. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
Growth Reservation associated with CLIN 0030. See attachment J-4. See Notes A, B, C, D, E, and F.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR
1. The Contractor agrees to provide the level of effort to completion in the performance of growth
CLINs in the execution of the USS PREBLE (DDG 88) FY20 DMP CNO Availability:
a) USS PREBLE (DDG 88) FY20 DMP CNO Availability
i. 88,075 direct labor hours (labor hours) and $5,526,179 materials to complete growth work on the
USS PREBLE (DDG 88) FY20 DMP CNO Availability work package under CLINs (0031-0065)
2.1. The total level of effort to completion for the performance of the above CLINs shall be labor hours and the associated material required to support that labor and effort. The mix of labor and material may be adjusted, but may not exceed the dollar value of each CLIN listed above.
3.1. Effort performed in fulfilling the level of effort to completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee’s usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee’s residence or other non-work locations.
4.1. LOE to Completion labor hours and material are within the general scope of the contract.
5.1. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form
(GMR) calls for effort outside the scope of the contract, the Contractor shall notify the Contracting
Officer in writing within two (2) working days after the receipt of any such direction. The Contractor shall not proceed with the work affected by the GMR unless and until the Contractor is notified by the Contracting Officer that the directed work is within the scope of this contract. Thereafter, any remaining disagreement on the scope issue shall be a dispute under the Disputes clause; however, nothing in this clause shall excuse the Contractor from proceeding with the subject growth work as directed by the Contracting Officer.
6.1. The labor hours and material requirements listed in Section B, Note A, paragraph 1 above are part of this contract under the original solicitation and award. Prime contractor efforts will be deducted from the allocated labor hours with subcontractor efforts and materials deducted from the allocated materials. The balance of labor hours and materials remaining in the LOE to Completion CLINs are subject to a decrease change order when it is evident no additional growth work will be directed.
7.1. Only settled production labor hours will be deducted from the LOE to Completion labor hour effort.
While supervision, quality assurance, and other nonproduction labor should be included in the pricing for items in the original bid, they shall not count towards satisfying the Contractor’s obligation to provide LOE to Completion labor hours. The labor hour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically directed by the Government.
8.1. Material dollars shall be used on settled costs to the Contractor of acquiring the materials provided and total cost of subcontractor efforts proposed. Material dollars may include freight or duties which would be reflected on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the settled cost of materials deducted from the reservation.
9.1. The information received in the consolidated final report required by Section C paragraph 6.6 will be used by the Contracting Officer in the issuance of one contract modification, which will be a final settlement for all LOE to Completion labor hours and material dollars. Once the number of labor hours and materials for a task has been agreed to, neither party shall be entitled to an adjustment should the expended labor hours and materials differ from the settled price. Each task shall receive approval by the SUPERVISOR1 and the Contracting Officer.
NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW
WORK
SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
1. The Contractor’s fully burdened ship repair labor rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of hours included in its price proposal for contract modifications shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:
Abrasive cleaning/blasting
Fire Watch
Welding
Burning
Brazing
Carpentry
Machinists (inside and outside)
Electrical Work
Electronic Work
Engineering
Design Support
Lagging
Ship-fitting
Boiler-making
Painting
Sheet-metal Work
Pipefitting
Rigging
General Labor
Staging/Scaffolding
Diesel Mechanics
2.1. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .