Attachment S-4 Manpower Performance_clp (reduced).xlsx

XLSX spreadsheet 31 KB Posted

Attached to
N00024-20-R-4400 USS PREBLE (DDG 88) FY20 DEPOT MODERNIZATION PERIOD (DMP)
Solicitation number
N00024-20-R-4400
Issued by

About this file

This document contains details regarding a federal contract solicitation for depot modernization period work on the USS Preble (DDG 88). The solicitation is issued by the Naval Sea Systems Command for execution of the FY20 USS Preble DMP, requiring maintenance, modernization, and repair services. Interested offerors must register in SAM and monitor beta.SAM.gov for release of the solicitation and amendments. The availability start date is anticipated to be September 2020, with delivery of the USS Preble required by March 2022. The place of performance is a contractor facility on the West Coast of the USA. The Government expects to make a single award by June 2020.

View the file

Other files

File Type Posted
CDRL A012 Enclosure (1) MAR20.pdf PDF
N00024-20-R-4400_A0004_Conformed.pdf PDF
CDRL A015 Enclosure 2 (Template) MAR20.xlsx XLSX spreadsheet
CDRL A015 Performance Report MAR20.pdf PDF
N00024-20-R-4400_A0004_SF 30.pdf PDF
CDRL A015 Enclosure 1 (BLK 16) MAR20.pdf PDF
N00024-20-R-4400_A0003_SF 30.pdf PDF
Attachment S-6__VATEP - Rev1.xlsx XLSX spreadsheet
Attachment J-3 PREBLE Milestones (INSERT OFFEROR NAME) rev5 20200114.xlsx XLSX spreadsheet
N00024-20-R-4400 QA3_05MAR20.pdf PDF
Attachment J-4 PREBLE Pricing Workbook Rev 2 (INSERT OFFEROR NAME) 20200210.xlsx XLSX spreadsheet
N00024-20-R-4400-0002 (CONFORMED).pdf PDF
Attachment J-4 PREBLE Pricing Workbook Rev 1 (INSERT OFFEROR NAME) 20200210.xlsx XLSX spreadsheet
N00024-20-R-4400-0002.pdf PDF
N00024-20-R-4400 Q&A#2_20FEB20.pdf PDF
N00024-20-R-4400 Q&A#1_30JAN20.pdf PDF
Attachment S-5_Eligibility_Criteria_Data_Sheet Rev 1.docx DOCX document
N00024-20-R-4400-0001.pdf PDF
N00024-20-R-4400-0001 (CONFORMED).pdf PDF
Attachment S-3_BQ_PPI.xlsx XLSX spreadsheet
Attachment S-6__VATEP.xlsx XLSX spreadsheet
Attachment S-2_PP_CPARS_Reference_List.docx DOCX document
Attachment S-9_Past_Performance_Questionnaire.docx DOCX document
Attachment S-8_Pier_and_Drydock_Graphical_Representation_Template.xlsx XLSX spreadsheet
Attachment S-4 Manpower Performance.xlsx XLSX spreadsheet
Attachment J-7 Schedule Model Review.docx DOCX document
Attachment S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
N00024-20-R-4400.pdf PDF
Attachment S-1_Manpower_Utilization_Data_Sheet.xlsx XLSX spreadsheet
Attachment S-7 Proposal Assessment PRB.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total

Project level data IAW Factor 2 Subfactor A Para (1) (a)Calendar Year 2018
1/51/121/191/262/22/92/162/233/23/93/163/233/304/64/134/204/275/45/115/185/256/16/86/156/226/297/67/137/207/278/38/108/178/248/319/79/149/219/2810/510/1210/1910/2611/211/911/1611/2311/3012/7
Project 1Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 2Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 3Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 4Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 5Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 6Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 7Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 8Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 9Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 10Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 11Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 12Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 13Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 14Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 15Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 16Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 17Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 18Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 19Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 20Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 21Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 22Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 23Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 24Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 25Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 26Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 27Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 28Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 29Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->
Project 30Project Name (Replace)Actual / Forecast Start Date (Corresponding to ACWP & ETC)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Actual / Forecast Completion Date (Corresponding to ACWP & ETC)ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Contract Start Date (Corresponding to BCWS)BCWP from Contract Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
Contract Completion Date (Corresponding to BCWS)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period FTE) ->

Project 1 Remaining Growth Options Project Name (Replace) Actual / Forecast Completion Date BCWS Remaining from 27 Dec 2019 to Actual / Forecast Completion Date (Fill in current Period FTE) ->

Project 2 Remaining Growth Options Project Name (Replace) Actual / Forecast Completion Date BCWS Remaining from 27 Dec 2019 to Actual / Forecast Completion Date (Fill in current Period FTE) ->

Offeror may add or reduce project and/or growth fields, as required.
*Note: The Navy understand that as Growth and New Work Options are inherently not authorized work, this is not technically BCWS.

Trade

Trade level data IAW Factor 2 Subfactor A Para (1) (a)Calendar Year 2018
1/51/121/191/262/22/92/162/233/23/93/163/233/304/64/134/204/275/45/115/185/256/16/86/156/226/297/67/137/207/278/38/108/178/248/319/79/149/219/2810/510/1210/1910/2611/211/911/1611/2311/3012/7
Trade X
(Replace)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >
Trade Y
(Replace)ACWP from Actual / Forecast Start Date to 27 Dec 2019 (Fill in current Period FTE) ->
ETC to Actual / Forecast Completion Date (Fill in current Period FTE) - >

Manpower Conversion The offeror shall provide the calculations and data necessary to convert the FTE information included in the S-4 tables and manpower curves into man hours (i.e Holiday Calendar).

The offeror shall provide the calculations and data necessary to convert the FTE into Actual Employees and Temporary Labor (i.e. assumed absentee rates, overtime, etc). This is not required for subcontract labor.

This is the start of the file's text. The full file is on GovTribe.