Attachment J-3 PREBLE Milestones (INSERT OFFEROR NAME) rev5 20200114.xlsx
XLSX spreadsheet 764 KB Posted
- Solicitation number
- N00024-20-R-4400
About this file
This solicitation seeks proposals for the USS PREBLE (DDG 88) FY20 Depot Modernization Period (DMP) availability. The Naval Sea Systems Command will execute maintenance, modernization, and repair work at a contractor's facility with DDG-51 capabilities. Interested offerors must register in SAM and monitor beta.SAM.gov for release of the solicitation and amendments. Attachments S-5 Enclosure (1), J-1 through J-5, J-8, and CDRLs are available by request. The contractor must complete all work by March 2022. Proposals are due in June 2020 and award is expected around then as well. The availability start is slated for September 2020.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exec Milestones (Contractural)
| USS PREBLE DDG88 DMP | Offerors are not to propose milestones highlighted in Orange. These milestones are calculated or fixed | |||
| Offerors are to propose values highlighted in Blue in accordance with "Notes". Entering values into the blue highlighted cells will allow the milestone spreadsheet to calculated the remaining interim milestones. | ||||
| System | Milestones (Calculated or Proposed) | Work Days Prior to "Proposed Contractor Complete" Milestone | Notes | |
| Avail Start at KTR Facility | Monday, September 14, 2020 | |||
| DOCK | Offeror to Propose Dock Dates IAW Specification 997-11-001 | |||
| Dry Dock Reports Due (No Later Than) | Sunday, December 31, 1899 | Reports due on the date in Column C or, if the date in Column C is on a weekend or Government holiday, due on the next Government business day following the date in Column C | ||
| 2 F/O groups closed & ready | ERROR:#NUM! | 30 | ||
| 2 F/O groups closed & ready | ERROR:#NUM! | 20 | ||
| ALL FO TANKS TURNED OVER | ERROR:#NUM! | 10 | ||
| UNDOCK | Offeror to Propose Undock Dates IAW Specification 997-11-001 | |||
| 20% Open and Inspect CFRs due | Monday, December 28, 2020 | Reports due on the date in Column C or, if the date in Column C is on a weekend or Government holiday, due on the next Government business day following the date in Column C | ||
| 2 | 25% CONFERENCE | Friday, January 29, 2021 | Conference to be held on the next Wednesday following the date in Column C | |
| 40 | 50% CONFERENCE | Monday, June 14, 2021 | Conference to be held on the next Wednesday following the date in Column C | |
| 75% CONFERENCE | Wednesday, October 27, 2021 | Conference to be held on the next Wednesday following the date in Column C |
| 13 | HM&E AIT starts CTM install and connections in SWBDs, SF SWBDs and Load Centers (30 days) | Tuesday, December 01, 2020 | 338 | |
| 13 | HM&E T/O 1 to AIT | Monday, February 01, 2021 | 294 | |
| HM&E AIT work complete Turnover 1- GEDMS MG and Mesh B (includes cabling) all AIT | Monday, February 01, 2021 | 294 | ||
| HM&E T/O 2 to AIT | Monday, February 08, 2021 | 289 | ||
| HM&E AIT work complete Turnover 2 | Monday, March 01, 2021 | 274 | ||
| 39 | HM&E T/O 3 to AIT | Monday, March 01, 2021 | 274 | |
| HM&E AIT work complete Turnover 3 | Monday, March 22, 2021 | 259 | ||
| HM&E T/O 4 to AIT | Monday, March 22, 2021 | 259 | ||
| HM&E AIT work complete Turnover 4 | Monday, April 12, 2021 | 244 | ||
| HM&E T/O 5 to AIT | Monday, April 12, 2021 | 244 | ||
| HM&E AIT work complete Turnover 5 | Monday, May 03, 2021 | 229 | ||
| 42 | HM&E T/O 6 to AIT | Monday, May 03, 2021 | 229 | |
| HM&E AIT work complete Turnover 6 | Monday, May 24, 2021 | 214 | ||
| HM&E T/O 7 to AIT | Monday, May 24, 2021 | 214 | -297 | |
| HM&E AIT work complete Turnover 7 | Wednesday, June 16, 2021 | 197 |
| Complete Shipyard Combat Systems Space Release Turnover #1 | Friday, October 22, 2021 | 105 | |
| Complete Shipyard Combat Systems Space Release Turnover #2 | Friday, October 29, 2021 | 100 | |
| Complete Shipyard Combat Systems Space Release Turnover #3 | Friday, November 05, 2021 | 95 | |
| 21 | Complete Shipyard Combat Systems Space Release Turnover #4 | Friday, November 12, 2021 | 90 |
| 21 | Complete Shipyard Combat Systems Space Release Turnover #5 | Friday, November 19, 2021 | 85 |
| AWS - MMSP/WDRC Cabinets for Radar Room # 3 | Friday, April 09, 2021 | 245 |
| AWS - MMSP/WDRC Cabinets for Radar Room #2 | Friday, April 23, 2021 | 235 |
| AWS - MMSP/WDRC Cabinets for CSER #2 | Friday, May 07, 2021 | 225 |
| DISCONNECT SHIP'S POWER (DEAD ELECTRIC) | Monday, November 30, 2020 | 339 | |||
| RESTORE SHIP'S POWER | Monday, February 22, 2021 | 279 | |||
| START SYSTEM RESTORATION | Tuesday, April 20, 2021 | 238 | |||
| MCS/EC GROUND ISOLATION & SIGNAL VERIFICATION (10 WKS) | Wednesday, July 28, 2021 | 167 | |||
| All Systems Restoration Complete | Friday, August 20, 2021 | 150 | |||
| EOSS VERIFICATION VISIT # 1 | Tuesday, September 28, 2021 | 123 | |||
| START DVSS TESTING | Wednesday, September 29, 2021 | 122 | |||
| SPS -73 SAOP INSTALL (TO AIT) | Monday, October 11, 2021 | 114 | |||
| MCS COMMAND & CONTROL TESTING (6 WKS) | Monday, November 01, 2021 | 99 | |||
| START DC SENSOR TESTING | Wednesday, November 10, 2021 | 92 | |||
| AHSS VENT VELOCITY TESTING Commence (2 WKS) (MSR) | Wednesday, November 10, 2021 | 92 | |||
| CSSE HOT CHECKS ISO/ALO | Tuesday, November 23, 2021 | 83 | |||
| Engineering Plant Production Completion Date (PCD) | Wednesday, November 24, 2021 | 82 | |||
| 42 | Combat Systems AEGIS Light Off (ALO) | Tuesday, November 30, 2021 | 78 | -107 | |
| CANES POWER UP, SOFTWARE LOAD, AND TESTING COMMENCES | Tuesday, November 30, 2021 | 78 | |||
| Fuel ship | Wednesday, December 01, 2021 | 77 | |||
| CANES MIGRATION FROM BARGE TO SHIP COMPLETE | Monday, December 06, 2021 | 74 | |||
| Habitability Work Complete | Tuesday, December 07, 2021 | 73 | |||
| Commence Crew Move Aboard | Tuesday, December 07, 2021 | 73 | |||
| NAVSSI/67/73 RADAR AVAILABLE FOR IBNS TESTING | Wednesday, December 08, 2021 | 72 | |||
| Commence Hot Plant Testing | Monday, December 13, 2021 | 69 | |||
| RUDDER SWING CHECKS | Tuesday, December 14, 2021 | 68 | |||
| DCMA (W/I 30 DAYS OF LOA) | Monday, January 24, 2022 | 39 | |||
| Complete Hot Plant Testing | Friday, January 28, 2022 | 35 | |||
| Begin LOA Prep | Friday, January 28, 2022 | 35 | |||
| CANES POWER UP, SOFTWARE LOAD, AND TESTING COMPLETE | Tuesday, February 08, 2022 | 28 | |||
| LOA Start | Tuesday, February 22, 2022 | 18 | |||
| Dock Trials | Tuesday, March 01, 2022 | 13 | |||
| 51 | Fast Cruise | Thursday, March 03, 2022 | 11 | ||
| HM&E SEA TRIALS (CSST 1) | Friday, March 11, 2022 | 5 | |||
| Proposed Contract Complete | Thursday, March 17, 2022 | - Offeror to Propose "Proposed Contract Complete" milestone date no later than 17 March 2022 or the 'Derived KTR Contract Complete No Later than Date', whichever is earlier. |
- Proposed date must be a Government Work Day
| "Proposed Contract Complete" No Later than Date | Thursday, March 17, 2022 |
| "Days Completed Early" for use in the Value Adjusted Total Evaluated Price Tradeoff (VATEP) Schedule Adjustment | 0 |
CS Turnovers
| USS PREBLE (DDG 88) | SUPPORT SERVICES | ||||||||||
| SPACE NO. | SPACE NAME | 60 Hz | 400 Hz | A/C | ECW | Chill Water | FM SWS | Dry Air | HP Air | LP Air | Release Date |
| TURNOVER 1 | |||||||||||
| 4-94-0-C | IC & Gyro Rm #1 | Y | Y | Y | Y | ALO -38 | |||||
| 3-300-0-C | IC & Gyro Rm #2 | Y | Y | Y | Y | ALO -38 | |||||
| 3-126-2-Q | Power Supply/Conversion Room | Y | Y | Y | Y | ALO -38 | |||||
| 3-319-0-Q | Power Conversion Rm | Y | Y | Y | Y | ALO -38 | |||||
| 4-126-0-E | Auxiliary Machinery Rm #1 | Y | Y | Y | Y | SWS | Y | ALO -38 | |||
| 4-42-0-Q | Sonar Cooling Equip Rm | Y | Y | Y | Y | Y | ALO -38 | ||||
| 03-142-2-Q | Electric Load Center #1 | Y | Y | ALO -38 | |||||||
| 01-110-3-Q | Fan Room PZ #1 | Y | Y | ALO -38 | |||||||
| 01-126-3-Q | Fan Room PZ #2 | Y | Y | ALO -38 | |||||||
| 01-158-0-Q | Fan Room | Y | Y | ALO -38 | |||||||
| 01-240-01-Q | Fan Room PZ #3 | Y | Y | ALO -38 | |||||||
| 01-300-2-Q | Fan Room | Y | Y | ALO -38 | |||||||
| 01-338-3-Q | Fan Room | Y | Y | ALO -38 | |||||||
| 01-338-4-Q | Fan Room | Y | Y | ALO -38 | |||||||
| 03-142-3-Q | Fan Room | Y | Y | ALO -38 | |||||||
| 03-142-4-Q | Fan Room | Y | Y | ALO -38 | |||||||
| 1-78-1-Q | Fan Room | Y | Y | ALO -38 | |||||||
| 1-78-2-Q | Fan Room | Y | Y | ALO -38 | |||||||
| 2-42-2-Q | Fan Room (SNR CONT-CSER1) | Y | Y | ALO -38 | |||||||
| 3-164-2-Q | Fan Room | Y | Y | ALO -38 | |||||||
| 3-362-0-Q | Fan Room | Y | Y | ALO -38 | |||||||
| 01-130-0-Q | CSMC | Y | Y | Y | ALO -38 | ||||||
| TURNOVER 2 | |||||||||||
| 05-131-0-Q | Director Equip Rm #1 | Y | Y | Y | Y | Y | ALO -31 | ||||
| 04-272-0-Q | Director Equip Rm #2 | Y | Y | Y | Y | ALO -31 | |||||
| 03-282-0-Q | Director Equip Rm #3 | Y | Y | Y | Y | Y | ALO -31 | ||||
| 06-157-0-T | Mast Access/Wiring Trunk | Y | ALO -31 | ||||||||
| 1-126-0-C | CIC | Y | Y | Y | ALO -31 | ||||||
| 1-268-0-C | CCS (VLS Alarms) | Y | Y | ALO -31 | |||||||
| 2-53-1-C | CSER #1 | Y | Y | Y | Y | ALO -31 | |||||
| 2-126-2-C | CSER #2 | Y | Y | Y | Y | ALO -31 | |||||
| 1-300-0-C | CSER #3 | Y | Y | Y | ALO -31 | ||||||
| 1-314-0-C | CSER 3 Annex | Y | Y | ALO -31 | |||||||
| 03-142-1-C | CSER Rm #4 | Y | Y | Y | Y | ALO -31 | |||||
| TURNOVER 3 | |||||||||||
| 03-128-0-C | Radar Rm #1 | Y | Y | Y | Y | Y | Y | ALO -24 | |||
| 03-142-0-C | Radar Rm #2 | Y | Y | Y | Y | Y | ALO -24 | ||||
| 01-274-1-C | Radar Rm #3 | Y | Y | Y | Y | Y | ALO -24 | ||||
| 03-128-1-Q | Array Rm #1 (Fwd Stbd) | Y | Y | Y | Y | ALO -24 | |||||
| 03-128-2-Q | Array Rm #2 (Fwd Port) | Y | Y | Y | Y | ALO -24 | |||||
| 03-158-3-Q | Array Rm #3/Elect WS #1A | Y | Y | Y | Y | ALO -24 | |||||
| 03-158-2-Q | Array Rm #4/ Elect WS #1B | Y | Y | Y | Y | ALO -24 | |||||
| 2-126-1-C | Communications Center | Y | Y | Y | ALO -24 | ||||||
| 2-157-1-C | Radio Transmitter Room | Y | Y | Y | ALO -24 | ||||||
| 2-220-1-Q | Snap III Computer Room | Y | Y | ALO -24 | |||||||
| 01-130-2-C | Ship Signal Exploitation Space | Y | Y | Y | ALO -24 | ||||||
| 2-153-2-C | Tomahawk Equip Rm | Y | Y | ALO -24 | |||||||
| 04-130-0-C | Pilot House | Y | Y | Y | Y | ALO -24 | |||||
| 04-150-0-C | Chart Room | Y | Y | ALO -24 | |||||||
| TURNOVER 4 | |||||||||||
| 02-299-0-C | CIWS Control Rm #2 | Y | Y | FM | ALO -17 | ||||||
| 01-300-0-Q | CIWS Wep & Avi Ord Eqpt WS | Y | Y | FM | ALO -17 | ||||||
| 02-(300-316) DECK | CIWS MT 22 | ALO -17 | |||||||||
| FWD/AFT 03-05 | AN/SPY Arrays 5-3 A, B, C, D | ALO -17 | |||||||||
| 06 (130-160) DECK | FCS Director #1/Optical Sight | ALO -17 | |||||||||
| 05 (272-285) DECK | FCS Director #2 | ALO -17 | |||||||||
| 04 (285-297) DECK | FCS Director #3 | ALO -31 | |||||||||
| 01-(46-78) DECK | Wthr Deck 5" Gun MNT 51 | ALO -17 | |||||||||
| 1-46-0-M | 5" Cal Ldr Drum & F/ Rm | Y | Y | Y | FM | Y | Y | ALO -17 | |||
| 2-50-2-C | Sonar Control Rm | Y | Y | Y | ALO -17 | ||||||
| 1-18-0-Q | Sonar Equip Rm #1 | Y | Y | Y | Y | Y | ALO -17 | ||||
| 2-18-0-Q | Sonar Equip Rm #2 | Y | Y | Y | ALO -17 | ||||||
| 3-18-0-Q | Sonar Equip Rm #3 | Y | Y | Y | Y | ALO -17 | |||||
| 2-450-1-Q | Nixie Rm | Y | Y | ALO -17 | |||||||
| 2-458-0-Q | Multi Function Towed Array Winch Room | Y | Y | Y | ALO -17 | ||||||
| 01-(78-110) DECK | VLS Deck (FWD) | ALO -17 | |||||||||
| 2.5-78-0-M | VLS Magazine #1(FWD, 32 cell) | Y | Y | Y | FM | ALO -17 | |||||
| 1-97-2-Q | VLS Service Interface Rm (FWD) | Y | Y | FM | Y | Y | ALO -17 | ||||
| 3-97-2-T | VLS Access Trunk | Y | ALO -17 | ||||||||
| 1-100-2-Q | VLS Security Station (FWD) | Y | Y | ALO -17 | |||||||
| 02-(335-370) DECK | VLS Deck (Aft) | ALO -17 | |||||||||
| 2-338-0-M | VLS Magazine #2 (AFT, 64 cell) | Y | Y | Y | FM | ALO -17 | |||||
| 01-330-0-Q | VLS (AFT) Service Interface Rm | Y | Y | FM | Y | Y | ALO -17 | ||||
| 1-335-2-T | VLS Access Trunk | Y | ALO -17 | ||||||||
| 01-330-2-Q | VLS Security Station (Aft) | Y | Y | ALO -17 | |||||||
| TURNOVER 5 | |||||||||||
| 02-(195-220 ) DECK | SRBOC Launcher (PORT) | Y | ALO -10 | ||||||||
| 02-(195-220 ) DECK | SRBOC Launcher (STBD) | Y | ALO -10 | ||||||||
| 03-(142-158) DECK | EW Array SLQ-32 (PORT) | Y | Y | Y | Y | Y | ALO -10 | ||||
| 03-(142-158) DECK | EW Array SLQ-32 (STBD) | Y | Y | Y | Y | Y | ALO -10 | ||||
| 02-(220-237) DECK | NULKA Launchers (PORT) | Y | ALO -10 | ||||||||
| 02-(220-237) DECK | NULKA Launchers (STBD) | Y | ALO -10 | ||||||||
| 01-(240-260) DECK | SVTT (PORT) | Y | Y | Y | ALO -10 | ||||||
| 01-(240-260) DECK | SVTT (STBD) | Y | Y | Y | ALO -10 |
HM&E Turnovers
USS PREBLE DDG88 DMP
Hull/Mechanical and Electrical (HM&E) Turnovers
| Equipment | Date Contractor turnover to AIT | Date AIT turnover to test team | Equipment | |
| Contractor Responsible | 14-Sep-20 | AIT Responsible | ||
| 09-Nov-20 | SA 71726- SPS-73 ISEA Disconnect Stand Alone Operating Panel (SAOP) for relocation and engineering/field changes. ISEA to disconnect prior to Contractor rigging. | |||
| 05-Nov-20 | SA 73091- Remove al FODMS IOUs (29 total) and ship as directed by drawing Ripout 12,13,52,73,81 and 91 foundations. | |||
| SA 71604- Start CTM install and Swbd Connections in Swbds, SF Swbds, Load Centers (SA71604) (30 days) | ||||
| MSR Fuel Bank Turnover | AIT Fuel Bank Turnover | |||
| 2 Fuel banks closed & ready to test (any two from groups 1 through 6). Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs | ERROR:#NUM! | ERROR:#NUM! | Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs, cabling, connections) | |
| 2 Fuel banks closed & ready to test (any two from groups 1 through 6). Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs | ERROR:#NUM! | ERROR:#NUM! | Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs, cabling, connections) | |
| 2 Fuel banks closed & ready to test (any two from groups 1 through 6). Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs | ERROR:#NUM! | 20-Apr-21 | Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs, cabling, connections) | |
| MSR HM&E T/O 1 | 01-Feb-21 | 01-Feb-21 | AIT T/O 1 GEDMS Mesh B and MG | |
| SA 70403- Ripout Fuel Storage & Receiver Tanks Monitor Panel from Oil Lab | 01-Feb-21 | SA 73091K- All Power Sources and Terminal Boxes for Equipment in TO 1, TO 2 and TO 3 to also include new and upgraded sources.* | ||
| 01-Feb-21 | SA 73091K-GEDMS Mesh B (BSE B1-B10) and power cables at least one power source has to be available* | |||
| 01-Feb-21 | SA 73091K- Install GEDMS Maintenance Group. Removed MG will be shipped as directed by drawing. Install while access cut to Aft IC is open | |||
| MSR HM&E T/O 2 (Aft Strng, Repair 3 & #3 GTG) | 08-Feb-21 | 01-Mar-21 | AIT T/O 2 (Aft Strng, Repair 3 & #3 GTG) | |
| SA 71726- Aft Steering Unit (ASU) | 01-Mar-21 | (Power/Network/Shipside Cabling) | ||
| Repair 3 Equipment , Misc Stowages and painted iaw spec 438-90-002 | 01-Mar-21 | SA 71604- RSC Repair 3, C/O SW, Speaker. Hold Keyboard for later installation per SMR direction. | ||
| SA 71726- Local Control Steering Units (LCUs 1 - 4) | 01-Mar-21 | (Power/Network/Shipside Cabling) | ||
| SA 71604- Electric Plant DIU 3 | 01-Mar-21 | (Power/Network/Shipside Cabling) | ||
| 01-Mar-21 | All Power Sources & Terminal Boxes for Equipment in TO 4, TO 5 and TO 6 as per SIDs. | |||
| 01-Mar-21 | FADC #3 (Power/Network/Shipside Cabling) | |||
| 01-Mar-21 | SA 73091- Install IOUs: 21, 22, 23 and 62. IIUs 122, 162. C-DR 122, 141 and 162. USE-162B. All associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| MSR T/O 3 (CCS & Repair 5) | 01-Mar-21 | 22-Mar-21 | AIT T/O 3 (CCS & Repair 5) | |
| SA 71604-UCCs 1 & 2 | 01-Mar-21 | 22-Mar-21 | Complete SA 71604 wiring in CCS, including vent control panels, RSC DCC, C/O SW & Speaker. Hold Keyboard, 40" Monitor & Printer for later installation per SMR direction. | |
| SA 77419 Textile Ducting WI 512-90-002 complete | 01-Mar-21 | |||
| CCS and Repair 5 Equipment and Misc Stowages. Painted and deck complete iaw spec 438-90-002 | 01-Mar-21 | 22-Mar-21 | SA 71604-RSC Repair 5, UPS, C/O SW and Speaker. Hold Keyboard for later installation per SMR direction. | |
| 22-Mar-21 | SA 70403K complete in Oil Lab, includes all cabling, connections for Oil Lab PC | |||
| 22-Mar-21 | SA 71604- TIWS (CCS) LAN Drop & Power Outlet | |||
| 22-Mar-21 | SA 73091- Install IOUs 32, 33, 72. IIUs 132, 172 and 173. C-DRs 132,172 and 172. USE 132B. All associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| MSR T/O 4 (MER 1, AUX 1 & Repair 2) | 22-Mar-21 | 12-Apr-21 | AIT T/O 4 (MER 1, AUX 1 & Repair 2) | |
| SA 71604-Electric Plant DIU 1 AUX 1 | 22-Mar-21 | 12-Apr-21 | (Power/Network/Shipside Cabling) | |
| SA 71604- Propulsion DIU 4 MER 1 | 22-Mar-21 | 12-Apr-21 | (Power/Network/Shipside Cabling) | |
| SA 71604- UCC 3 MER 1 | 22-Mar-21 | 12-Apr-21 | (Power/Network/Shipside Cabling) | |
| SA 71604- ECU 1A and 1B MER 1 | 22-Mar-21 | 12-Apr-21 | (Power/Network/Shipside Cabling) | |
| Repair 2 Equipment, Misc Stowages and painted iaw spec 438-90-002 | 22-Mar-21 | |||
| F/O, L/O & CRP valves associated with SA71604K in MER1. 1A/1B F/O Filt/Sep Outlet, #1MRG Pur Suct/Fill, #1CRP Pur Suct/Fill | 22-Mar-21 | 12-Apr-21 | Electrical hook-up of valves associated with SA 71604K in MER 1 | |
| 31-Dec-99 | FADC #1 (Power/Network/Shipside Cabling) | |||
| SA 71605 Galley foundations, piping and electrical complete that impact MER 1 overhead | 22-Mar-21 | 12-Apr-21 | SA 71604- RSC Repair 2, C/O SW, Speaker. Hold Keyboard for later installation per SMR direction. | |
| 31-Dec-99 | SA 73091- Install IOUs 74, 82, 83 and 84. IIUs 174, 182 and 183. USEs 174B and 183B. C-DRs 174, 182 and 183. All associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| MSR T/O 5 (MER 2) | 12-Apr-21 | 03-May-21 | AIT T/O 5 (MER 2) | 21 |
| SA 71604- Electric Plant DIU 2 MER 2 | 12-Apr-21 | 03-May-21 | AIT (Power/Network/Shipside Cabling) | |
| SA 71604- Propulsion DIU 5 MER 2 | 12-Apr-21 | 03-May-21 | AIT (Power/Network/Shipside Cabling) | |
| SA 71604-UCC 4 MER2 | 12-Apr-21 | 03-May-21 | AIT (Power/Network/Shipside Cabling) | |
| SA 71604- ECU 2A, 2B MER2 | 12-Apr-21 | 03-May-21 | AIT (Power/Network/Shipside Cabling) | |
| F/O, L/O & CRP valves associated with SCD 71604K in MER2. 2A/2B F/O Filt/Sep Outlet, #2MRG Pur Suct/Fill, #2CRP Pur Suct/Fill | 12-Apr-21 | 03-May-21 | AIT (Power/Network/Shipside Cabling) | |
| 03-May-21 | Install IOU 31, IIU 131 and 134, C-DR 131 and 134, USE 131B.All associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| 03-May-21 | FADC # 2 (Power/Network/Shipside Cabling) | |||
| SA 71604- ADACS Foundation MER 2 | 12-Apr-21 | 03-May-21 | ADACS unit in MER2, including power and all hook-ups | |
| MSR T/O 6 (71604 Potable Water) | 3-May-21 | 24-May-21 | AIT T/O 6 | 21 |
| Complete following under SA 71604; Potable Water System, incl Tanks, TBs, MOVs, TLIs & Modified Pump Controllers | 24-May-21 | AIT (Power/Network/Shipside Cabling) | ||
| 24-May-21 | GEDMS Mesh A BSEs (A1-A10) and power cables at least one power source has to be available* | |||
| 24-May-21 | Install IOUs 53, 93 and 94. IIU 194. C-DR 194. All associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| 24-May-21 | SA 77829K, Includes all cabling, C-DR boxes, TBs, etc. from sensor/component to DIU (INCL OW, CRP & MRG due to DIU tie-ins) and associated TBs, JP-5, all electrical work complete | |||
| MSR T/O 7 (70403K, 76253K, 71604 AHSS Vent Mod) | 24-May-21 | 16-Jun-21 | AIT T/O 7 (AHSS, DVSS, Dig Indicators) | |
| LO Filter Separator Purifier (SA 76253K) complete | 24-May-21 | |||
| AHSS Vent Mod SA 71604 dwg 500-8659958 complete | 24-May-21 | 16-Jun-21 | AHSS Install Complete | |
| Digital Fuel Control SA 70403 complete | 24-May-21 | 16-Jun-21 | SA71615 DVSS Complete - ALL VIROEs, CJBs, Cables (*) | |
| 16-Jun-21 | SA 77829K 70403K, Includes all cabling, C-DR boxes, TBs, etc. from sensor/component to DIU (INCL OW, CRP & MRG due to DIU tie-ins) and associated TBs, JP-5, all electrical work complete | |||
| 16-Jun-21 | Digital Indicators SA 77427 complete except CS spaces | |||
| 16-Jun-21 | SA 71615- Install all DVSS Cameras as directed by SMR (week prior to PCD) | |||
| 16-Jun-21 | SA 73091-Install IOUs 14, IIUs 114, C-DRs 114. Complete all associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| HM&E SHIPALT Equipment in Combat Systems MOD Spaces, dates are CS Turnover dates | ||||
| Contractor Complete | Date | Date | AIT Complete | |
| RADAR 1- SA71726 work complete | 05-Nov-21 | 26-Nov-21 | RADAR 1- SA 71726 working complete. IBNS Rack 2 wiring including HS Firewall, UPS & C/O Switches | |
| CIC- SA 71604 work complete | 29-Oct-21 | 19-Nov-21 | RADAR 2- SA71726 Trigger/Video Amp installed and wired | |
| CIC- SA71726 work complete | 29-Oct-21 | 19-Nov-21 | CIC- SA77427 and SA71726 work complete | |
| Array Room #1- SA71726 mods complete | 05-Nov-21 | 26-Nov-21 | Array Room 1- SA71726 work complete | |
| CSMC- SA 71604 work complete | 22-Oct-21 | 12-Nov-21 | CSMC- SA73091K (BSE A5), SA 84226K and SA 71604K work complete. Hold Keyboard for later installation per SMR direction. | |
| Pilot House- all SA 71604 mods complete | 05-Nov-21 | 26-Nov-21 | Pilot House- all SA71604, SA77427 work complete | |
| Pilot House- SA 71726 SPS-73 SAOP install. (ISEA deliver to SY) | 05-Nov-21 | 26-Nov-21 | Pilot House- SA71726, SPS-73 ISEA Connectorize SAOP Ethernet SW, C/O SW & UPS | |
| Pilot House- SA 71726 work complete | 05-Nov-21 | 26-Nov-21 | Pilot House- SA71726 work complete. Hold Keyboard, Training Monitors, Joystick & Cables for later installation per SMR direction. | |
| Pilot House- SA 77419 Textile ducting work complete | 05-Nov-21 | 26-Nov-21 | Pilot House- complete all SA 77427 mods | |
| Pilot House- Painted and deck complete iaw work item 438-90-001 | 17-Dec-21 | |||
| 22-Oct-21 | Aft IC Gyro 3-300-0-C, SA 73091(IOU41, IIU141, CDR 17/141 and MG) and SA77427 complete. | |||
| 22-Oct-21 | Power Supply / Conversion Rm 3-126-2-Q, SA 73091 complete | |||
| 22-Oct-21 | Fwd IC Gyro 4-94-0-C, SA 73091(IOU51, IIU151, CDR1/151) and SA 77427 complete | |||
| 29-Oct-21 | CSER 1 2-53-1-C, SA 73091(IOU93, CDR4) and SA 77427 complete | |||
| 29-Oct-21 | CSER 3 1-300-0-C, SA 73091 complete (IOU42, IIU142, CDR 24/142) | |||
| 29-Oct-21 | CSER 2 2-126-2-C, SA 73091 complete (CDR10) | |||
| 05-Nov-21 | CIC- SA 71604 work complete including RSC, UPS & C/O Switch. Hold Keyboard for later installation per SMR direction. | |||
| 12-Nov-21 | SONAR Control 2-50-2-C, SA 77427 complete | |||
| 12-Nov-21 | SONAR 3 3-18-0-Q, SA 73091 complete (IOU92, CDR2/2A) | |||
| 12-Nov-21 | SONAR 1 1-18-0-Q, SA 73091 complete (BSE A7) | |||
| 05-Nov-21 | Communications Center 2-126-1-C, SA 73091(IOU71, CDR9) and SA 77427 complete | |||
| 29-Oct-21 | CSER 4 03-142-1-C, SA 73091 complete (IOU 11, IIU 111, CDR 29,30, 111) | |||
| 05-Nov-21 | Chart Room- SA 77427 and SA 71726 complete, IBNS NAV 2 computer | |||
| 22-Oct-21 | Electric Load Center 03-142-2-Q, SA73091 complete (CDR28) | |||
| 12-Nov-21 | XO Cabin- SA 77427 complete | |||
| 12-Nov-21 | CO Cabin- SA 77427, 71726 complete; IBNS NAV 4 computer (CO's Laptop), install prior to HAB Turnover |
PERL
USS PREBLE (DDG 88) FY 20 DMP
Planning - Event Readiness List Legend: "I" = Open & Inspect (CFR), "P" = Production Complete, "T" = Testing Complete, "C" = Certification Complete.
Work Item No. / Title GOV EST START OF AVAIL MOVE TO KTR/DOCK DOCK +30 REPORTS AVAIL 20% (O&I) 25% CONFERENCE 50% CONFERENCE UNDOCK SYSTEM RESTORATION COMP PCD ALO/STO/REFUEL 75 % CONFERENCE COMMENCE HOT PLANT TESTING HAB COMPLETE COMPLETE HOT PLANT TEST SHIP PREP LOA LOA DOCK TRAILS/FAST CRUISE HM&E and TYCOM SEA TRIALS CONTRACTOR CONTRACT COMPLETE COMBAT SYSTEM SEA TRIAL #1 COMBAT SYSTEM SEA TRIAL #2 AVAIL COMPLETE Kongdara, Tick CIV SWRMC, 321: Kongdara, Tick CIV SWRMC, 321:
| Annotate Critical Path WI, Controlling WI, PCP, RTR… | |||||||||||||||
| WORK ITEM NO. | WORK ITEM TITLE | Comments | |||||||||||||
| 042-11-001 | Accountability of Manhour and Material Reservation; accomplish | C | |||||||||||||
| 042-11-002 | Work Package Execution Review (WPER); accomplish | C | |||||||||||||
| 042-11-003 | Conditions Found Report (CFR); provide and manage | C | |||||||||||||
| 077-11-001 | Fire Drill Service; provide | ORVIS, JAMES | C | ||||||||||||
| 110-11-001 | Underwater Hull; inspect and repair | I | P/C | ||||||||||||
| 110-11-003 | Padeye Remnant; remove | I | P/C | ||||||||||||
| 110-11-004 | Damage Control Dewatering Overboard Discharge Connection; replace | LOPEZ, CHRISTOPHER | I | P/C | |||||||||||
| 110-21-002 | Freeboard Plating and Appendage; inspect | I | P/C | ||||||||||||
| 113-11-001 | Machinery Space Bilge Drain Well; repair and preserve | I | P/C | ||||||||||||
| 115-90-001 | ShipAlt DDG51-82746K, Stanchion Cracking Foundation; accomplish | I | P/C | ||||||||||||
| 120-11-001 | Machinery Room Structural Repair; accomplish | I | P/C | ||||||||||||
| 120-11-007 | Structural Repair; accomplish (CANCELED) | I | P/C | ||||||||||||
| 122-20-001 | Bulkhead Vertical Stiffener; repair | I | P/C | ||||||||||||
| 122-21-001 | Auxiliary Machinery Room Number One Transverse Bulkhead; inspect and repair | I | P/C | ||||||||||||
| 123-10-001 | Tank and Void Cleaning and Pumping; accomplish | I | P/C | PCP | |||||||||||
| 123-11-001 | Compensated Fuel Tank Group One; preserve (touch up) | I | P/C | Access cut | |||||||||||
| 123-11-002 | Compensated Fuel Tank Group 2; preserve (touch up) | I | P/C | Access cut | |||||||||||
| 123-11-003 | Compensated Fuel Tank Group 6; repair | I | P/C | ||||||||||||
| 123-11-004 | Compensated Fuel Tank Group 5; preserve | I | P/C | Access cut | |||||||||||
| 123-11-005 | Compensated Fuel Tank Group 6; preserve (touch up) | I | P/C | Access cut | |||||||||||
| 123-11-006 | Fuel Oil Service Tank; preserve | I | P/C | Access cut | |||||||||||
| 123-11-007 | Compensated Fuel Tank Group 2; preserve | I | P/C | Access cut | |||||||||||
| 123-11-008 | Compensated Fuel Tank Group 5; repair | I | P/C | ||||||||||||
| 123-11-009 | Compensated Fuel Tank Group 4; preserve | I | P/C | Access cut | |||||||||||
| 123-11-010 | Compensated Fuel Tank Group 4; repair | I | P/C | ||||||||||||
| 123-11-011 | Compensated Fuel Tank Group 5; preserve (touch up) | I | P/C | Access cut | |||||||||||
| 123-11-012 | Compensated Fuel Tank Group One; preserve | I | P/C | Access cut | |||||||||||
| 123-11-013 | Compensated Fuel Tank Group 3; preserve | I | P/C | Access Cut | |||||||||||
| 123-11-014 | Compensated Fuel Tank Group One; repair | I | P/C | ||||||||||||
| 123-11-015 | Compensated Fuel Tank Group 2; repair | I | P/C | ||||||||||||
| 123-11-016 | Compensated Fuel Tank Group 3; repair | ROBERTS, JAMES | I | P/C | |||||||||||
| 123-11-017 | Fuel Expansion Seawater Overflow Tank Group 6; preserve | I | P/C | Access Cut | |||||||||||
| 123-11-018 | Tank Top Plating; preserve | I | P/C | ||||||||||||
| 123-11-019 | Fuel Oil Service and Gravity Head Tank; repair | I | P/C | PCP | |||||||||||
| 123-11-020 | Fuel Oil Gravity Head Tank; preserve | I | P/C | ||||||||||||
| 123-11-021 | Manhole Cover; preserve | I | P/C | ||||||||||||
| 123-12-001 | JP-5 Tank; preserve | I | P/C | Access Cut | |||||||||||
| 123-12-002 | JP-5 Tank; repair | I | P/C | ||||||||||||
| 123-14-001 | Potable Water Tank; preserve | I | P/C | Access Cut | |||||||||||
| 123-14-002 | Potable Water Tank; repair | I | P/C | ||||||||||||
| 123-15-001 | Lube Oil Tank and Sump; repair | ROBERTS, JAMES | I | P/C | PCP | ||||||||||
| 123-17-001 | Contaminated Oil Tank; repair | I | P/C | ||||||||||||
| 123-17-002 | Contaminated Oil Tank; preserve (touch up) | I | P/C | Access Cut | |||||||||||
| 123-17-003 | Contaminated Oil Tank; preserve | I | P/C | Access Cut | |||||||||||
| 123-19-001 | Waste Water Tank; preserve | I | P/C | Access Cut | |||||||||||
| 123-19-003 | Waste Water Tank; repair | I | P/C | ||||||||||||
| 123-19-004 | Vacuum, Collection, Holding and Transfer (VCHT) Tank; preserve | ROBERTS, JAMES | I | P/C | PCP, Access Cut | ||||||||||
| 123-19-005 | Vacuum, Collection, Holding and Transfer (VCHT) Tank; repair | ROBERTS, JAMES | I | P/C | PCP | ||||||||||
| 123-21-001 | Accessible Void; repair | SAMPAN, RYAN | I | P/C | |||||||||||
| 123-21-002 | Accessible Void; preserve | I | P/C | Access Cut | |||||||||||
| 123-22-001 | Chain Locker and Chain Locker Sump; repair | I | P/C | ||||||||||||
| 123-22-002 | Chain Locker and Chain Locker Sump; preserve | I | P/C | Access Cut | |||||||||||
| 123-22-003 | Exhaust Trunk; repair (CANCELED) | I | P/C | ||||||||||||
| 123-22-004 | Deck Plating; repair and preserve | I | P/C | ||||||||||||
| 123-43-001 | Overhead Longitudinal; repair | I | P/C | ||||||||||||
| 130-11-001 | Aircraft Securing Fitting; replace | I | P/C | ||||||||||||
| 130-11-003 | Weapons Magazine Structure Repair; accomplish | I | P/C | ||||||||||||
| 131-11-001 | Overhead Structural; repair | I | P/C | ||||||||||||
| 131-11-003 | Deck Plating; replace | I | P/C | ||||||||||||
| 132-11-001 | Deck Plating; repair and preserve | I | P/C | ||||||||||||
| 137-11-001 | 02 Level Weather Deck; preserve | I | P/C | ||||||||||||
| 139-11-001 | 05 Level Deck Edge Coaming; repair | I | P/C | ||||||||||||
| 142-11-001 | Second Platform Deck Plate; repair | I | P/C | ||||||||||||
| 150-11-001 | 06 Level Deck Edge Plating and Mast Platform; repair | I | P/C | ||||||||||||
| 150-11-002 | 05 Level Bliss Cap Foundation and Deck; repair | I | P/C | ||||||||||||
| 150-11-003 | Deck Repair; accomplish | I | P/C | ||||||||||||
| 150-11-004 | Weather Deck Edge Drain Trough; repair | I | P/C | ||||||||||||
| 150-11-005 | Auto Tilt Antenna Platform; repair and preserve | I | P/C | ||||||||||||
| 150-11-006 | Forward Stack 03 Level Structural Bulkhead; repair | I | P/C | ||||||||||||
| 150-11-007 | Helicopter Control Station Window Washer Pipe and Bulkhead; repair (OPTION ITEM) | I | P/C | ||||||||||||
| 150-11-008 | Deck and Bulkhead Plate; replace | P/C | |||||||||||||
| 150-11-009 | 02 Level Deck; repair | I | P/C | ||||||||||||
| 150-11-010 | Lighting Fixture; repair | I | P/C | ||||||||||||
| 150-11-011 | Antenna Foundation; remove | P/C | |||||||||||||
| 150-80-001 | AER DDG51-83007D, Increase Deck Plate Thickness; accomplish (partial) | I | P/C | ||||||||||||
| 152-11-001 | Pallet Truck Stowage/Battery Charging Room; repair | P/C | |||||||||||||
| 153-11-002 | Super Rapid Blooming Off-Board Chaff (SRBOC) Launcher Deck Plate; repair | I | P/C | ||||||||||||
| 157-11-002 | 06 Level Platform Structure and Grating; repair | I | P/C | ||||||||||||
| 161-11-001 | Strut; repair | I | P/C | ||||||||||||
| 161-11-002 | Strut; repair | I | P/C | ||||||||||||
| 163-11-001 | Sea Chest; inspect and repair | I | P/C | ||||||||||||
| 163-11-002 | Waster Sleeve; replace | I | P/C | ||||||||||||
| 165-11-001 | Sonar Dome Rubber Window (SDRW); inspect and repair (OPTION ITEM) | I | P/C | ||||||||||||
| 165-11-002 | Sonar Dome Pressurization System Valve; replace | I | P/C | ||||||||||||
| 167-11-001 | Watertight Scuttle; repair | P/C | |||||||||||||
| 167-11-002 | Bolted Equipment Removal Plate (BERP); repair | I | P/C | ||||||||||||
| 167-11-004 | Structural Closure; repair | I | P/C | ||||||||||||
| 167-11-005 | Scuttle Lower Sonar Dome; repair | FLETES, CARLOS | I | P/C | |||||||||||
| 167-11-006 | Hatch; replace | P/C | |||||||||||||
| 167-11-007 | Watertight Closure; replace | P/C | |||||||||||||
| 167-11-008 | Cross Flooding Duct Cover Stud; install | I | P/C | Access Cut | |||||||||||
| 167-11-009 | Hatch; repair | I | P/C | ||||||||||||
| 167-11-010 | Watertight Scuttle; replace | P/C | |||||||||||||
| 167-11-012 | Blowout Hatch; overhaul and preserve | I | P/C | ||||||||||||
| 167-80-001 | ShipAlt DDG51-72424D, MAFO-Holtkamp Door Installation; accomplish (partial) | P/C | |||||||||||||
| 168-11-002 | Cargo Door; inspect and repair | I | P/C | ||||||||||||
| 168-11-003 | Structural Door; replace | P/C | |||||||||||||
| 168-11-004 | Door, Watertight, Individually Dogged; replace | P/C | |||||||||||||
| 168-11-005 | Hatch, Watertight, Raised, Quick-Acting; replace | P/C | |||||||||||||
| 168-12-002 | Pallet Truck Stowage/Battery Door; inspect and repair | I | P/C | ||||||||||||
| 171-11-001 | Tactical Air Navigation (TACAN) Antenna Foundation; repair | I | P/C | ||||||||||||
| 180-11-001 | Force Protection .50 Caliber Gun Mount and Kevlar Shield Mounting Pad; replace | P/C | |||||||||||||
| 234-14-001 | Gas Turbine Module 2B Base Enclosure; repair | I | P/C | ||||||||||||
| 234-80-001 | DDG-51 Class AER 66051D, Main Gas Turbine (MGT) and Gas Turbine Generator (GTG) Louver Foreign Object Damage (FOD) Screen Removal; accomplish | P/C | PCP | ||||||||||||
| 241-11-001 | Main Reduction Gear (MRG) Resistance Temperature Detector (RTD); replace | P/C | PCP | ||||||||||||
| 242-11-001 | 1A and 1B Gas Turbine Main (GTM) Synchro Self-Shifting (SSS) Turbine Clutch Assembly; replace | I | P/C | PCP | |||||||||||
| 242-12-001 | 2A and 2B Gas Turbine Main (GTM) Synchro Self-Shifting (SSS) Turbine Clutch Assembly; replace | I | P/C | PCP | |||||||||||
| 243-11-001 | Bulkhead Shaft Seal Emergency Clamp Ring; repair (CANCELED) | I | P/C | ||||||||||||
| 243-11-002 | Starboard Waterborne Propulsion Shafting; install (OPTION ITEM) | I | P/C | Access Cut | |||||||||||
| 243-11-003 | Starboard Propulsion Shafting; inspect and repair | I | P/C | Access Cut | |||||||||||
| 243-11-004 | Starboard Stern Tube Shaft Seal; overhaul | I | P/C | ||||||||||||
| 243-12-001 | Port Propulsion Shafting; inspect and repair | I | P/C | Access Cut | |||||||||||
| 243-12-002 | Port Stern Tube Shaft Seal; overhaul | I | P/C | ||||||||||||
| 243-12-003 | Port Waterborne Propulsion Shafting; install (OPTION ITEM) | I | P/C | Access Cut | |||||||||||
| 244-11-001 | Starboard Outboard Propulsion Shafting Bearing Clearance Measurement; accomplish | I | P/C | PCP | |||||||||||
| 244-12-001 | Port Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplish | I | P/C | ||||||||||||
| 245-11-001 | Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair | I | P/C | RTR, PCP | |||||||||||
| 245-11-002 | Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box; replace | P/C | RTR | ||||||||||||
| 245-11-003 | Controllable Pitch Propeller (CPP) Starboard Hub; replace | I | P/C | PCP | |||||||||||
| 245-11-004 | Controllable Pitch Propeller (CPP) Propeller Blade (Starboard); assess and repair | I | P/C | PCP | |||||||||||
| 245-11-005 | Number One Controllable Pitch Propeller (CPP) Standby Hydraulic Pump and Motor; overhaul | I | P/C | ||||||||||||
| 245-11-006 | Controllable Reversible Pitch (CRP) Flexible Hose Assembly; replace | P/C | |||||||||||||
| 245-12-001 | Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Port; repair | I | P/C | PCP | |||||||||||
| 245-12-002 | Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box; replace | P/C | |||||||||||||
| 245-12-003 | Controllable Pitch Propeller (CPP) Port Hub; replace | I | P/C | PCP | |||||||||||
| 245-12-004 | Controllable Pitch Propeller (CPP) System Propeller Blade (Port); assess and repair | I | P/C | PCP | |||||||||||
| 245-12-005 | Controllable Pitch Propeller (CPP) Sump Tank; repair | I | P/C | ||||||||||||
| 251-30-001 | Propulsion Gas Turbine (GTRB) Air Intake Number One; repair and preserve | I | P/C | ||||||||||||
| 251-30-002 | Number 2A and 2B Gas Turbine Module (GTM) Clean Air Intake; inspect and repair | I | P/C | PCP | |||||||||||
| 251-31-001 | Air Intake and Exhaust Louver; clean and preserve | I | P/C | ||||||||||||
| 251-32-001 | Propulsion Gas Turbine (GTRB) Intake Number 2 and Ships Service Gas Turbine Generator (SSGTG) Intake Trunk Number 2 and 3; repair and preserve | I | P/C | ||||||||||||
| 251-32-002 | Gas Turbine Intake Number One; repair | I | P/C | ||||||||||||
| 256-11-001 | Seawater Service Butterfly Valve; replace | P/C | |||||||||||||
| 256-11-002 | Sea Water Cooling Gage Line; replace | P/C | |||||||||||||
| 256-61-001 | Number 2 Main Reduction Gear Lube Oil Cooler Drain Piping; replace | P/C | |||||||||||||
| 256-72-001 | Seawater Service Pump Resilient Mount; replace | P/C | |||||||||||||
| 256-80-001 | ShipAlt DDG51-64250D, Ship Service Gas Turbine Generator (SSGTG) Emergency Seawater Cooling System Modification; accomplish | P/C | |||||||||||||
| 259-10-001 | Number 2 Gas Turbine Mixing Room, Uptake; repair and preserve | I | P/C | ||||||||||||
| 259-10-002 | Number One Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap; repair and preserve | I | P/C | ||||||||||||
| 259-11-001 | Gas Turbine (GTRB) Exhaust Duct Collector; repair and preserve | P/C | |||||||||||||
| 259-11-002 | Uptake Engine Room and Number 3 Ship Service Gas Turbine Generator (SSGTG) Exhaust Flange Fastener; replace | I | P/C | ||||||||||||
| 259-13-001 | Gas Turbine Exhaust Duct Lagging and Insulation; replace | I | P/C | ||||||||||||
| 259-80-001 | ShipAlt DDG51-76087D, Gas Turbine (GTRB) and Ship Service Gas Turbine Generator (SSGTG) Boundary Layer Infrared Suppression System (BLISS) Cap Modification; accomplish | I | P/C | ||||||||||||
| 262-10-002 | Main Reduction Gear (MRG) Lube Oil Flexible Hose Assembly; replace | P/C | |||||||||||||
| 262-11-002 | Lube Oil Pump Hose; replace | P/C | |||||||||||||
| 262-11-003 | Lubricating Oil System Flexible Hose; replace | P/C | |||||||||||||
| 262-11-005 | Lube Oil Temperature Regulating Valve; repair | I | P/C | ||||||||||||
| 262-12-001 | Lube Oil Temperature Regulating Valve; repair | I | P/C | ||||||||||||
| 262-41-001 | Number One Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect | I | P/C | PCP | |||||||||||
| 262-42-001 | Number 2 Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect | I | P/C | PCP | |||||||||||
| 262-80-001 | ShipAlt DDG-51-76501D Replace Engine Room Number One Reduction Gear Lube Oil Flexible Hose; accomplish | P/C | |||||||||||||
| 262-90-001 | ShipAlt DDG51-76253K, Install Lube Oil Coalescing Filter; accomplish | P/C | PCP, RTR | ||||||||||||
| 264-10-001 | Lube Oil Purifier Flexible Hose; replace | P/C | |||||||||||||
| 264-31-001 | Lube Oil Purifier Heater Number One; clean and inspect | I | P/C | ||||||||||||
| 264-32-001 | Lube Oil Purifier Heater Number 2; clean and inspect | I | P/C | ||||||||||||
| 311-32-001 | Number 2 Ships Service Gas Turbine Generator (SSGTG) Air Inlet Duct Flexible Seal; replace | P/C | |||||||||||||
| 313-80-001 | ShipAlt DDG51-86517D, Material Handling Equipment (MHE) Battery Charger Replacement; accomplish | P/C | |||||||||||||
| 314-31-001 | 400 Hertz Remote Control Panel Gauge; calibrate | P/C | RTR | ||||||||||||
| 321-11-001 | Cableway Hanger; replace | I | P/C | ||||||||||||
| 321-11-002 | Chafing Ring; reseal | ||||||||||||||
| 321-23-001 | Flexible Conduit; replace | P/C | |||||||||||||
| 331-11-001 | Waterline Security Light Bracket; replace | ||||||||||||||
| 331-11-002 | Lighting Distribution Box Cable; replace | P/C | |||||||||||||
| 343-13-001 | Foreign Object Damage (FOD) Screen; replace | P/C | |||||||||||||
| 411-11-001 | Cable; replace (OPTION ITEM) | P/C | |||||||||||||
| 411-90-001 | ShipAlt DDG51-89804K, ACB16/TI16 OA Computing Plant; accomplish | P/C | Critical Path, PCP, Access Cut | ||||||||||||
| 411-90-002 | ShipAlt DDG51-89925K, AWS ACB16/TI16 CIC Display Upgrade; accomplish | P/C | Critical Path, PCP, Access Cut | ||||||||||||
| 432-11-001 | Sound Powered Telephone System Cable; replace | P/C | |||||||||||||
| 432-11-002 | Integrated Voice Communication System (IVCS) Cable; replace | P/C | |||||||||||||
| 432-14-001 | Integrated Voice Communication System (IVCS) Cable; replace | P/C | |||||||||||||
| 433-11-001 | General Announcing System Circuit 1MC; repair | P/C | |||||||||||||
| 437-21-001 | Fuel Oil Storage Tank Level Indicating (TLI) Systems Transmitter; replace | P/C | |||||||||||||
| 437-21-002 | Tank Level Indicating (TLI) Stuffing Tube; repair | P/C | |||||||||||||
| 437-90-001 | ShipAlt DDG51-77829K, Installation of Radar and Time Domain Reflectometer (TDR) Tank Level Indicator (TLI) for Diesel Fuel Marine (DFM), Jet Propellant-5 (JP-5) and Potable Water Tank; accomplish (partial) | P/C | RTR | ||||||||||||
| 438-90-001 | ShipAlt DDG51-71604K, DDG Mod MCS/DCS Upgrades, Single Central Control Station (CCS) Watchstander; accomplish | P/C | Controlling Work Item, PCP, RTR, Access Cut | ||||||||||||
| 438-90-002 | ShipAlt DDG51-71726K, DDG Mod Full IBS Upgrade, Single Bridge Watchstander; accomplish | P/C | Controlling Work Item, PCP, Access Cut | ||||||||||||
| 438-90-003 | ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish | P/C | |||||||||||||
| 441-11-001 | Antenna Coupler Bolt; replace | P/C | |||||||||||||
| 456-90-001 | ShipAlt DDG51-91754K, AWS ACB16/TI16 MMSP Upgrade; accomplish | P/C | Critical Path, PCP, Access Cut | ||||||||||||
| 456-90-002 | ShipAlt DDG51-89769K, ACB16/TI16 Kill Assessment System (KAS) Warhead Data Receiver Cabinet (WDRC) Upgrade; accomplish | P/C | Critical Path, RTR, Access Cut | ||||||||||||
| 462-08-001 | DT-513/BQA-8 Hydrophone and Cable Assembly; replace | I | P/C | ||||||||||||
| 463-89-001 | AN/SQQ-89 Sonar Transducer and Stave Cable Connectorized; replace | I | P/C | ||||||||||||
| 472-90-001 | ShipAlt DDG51-80156K, AN/SLQ-32 (V)6 Surface Electronic Warfare Improvement Program (SEWIP) Block 2 Upgrade; accomplish | P/C | PCP, Access Cut | ||||||||||||
| 482-00-001 | OrdAlt 80831, BMD-MK99 KAS DDG Illuminator RAM Material; accomplish | P/C | |||||||||||||
| 482-11-001 | MK 82 Mod 0, Director; replace | P/C | |||||||||||||
| 482-90-001 | ShipAlt DDG-51-81961K and DDG-51-85114K, Tactical Tomahawk Weapons Control System (TTWCS) V5.4.0.2 and TMPC 5.0.1 Upgrade; accomplish | P/C | Access Cut | ||||||||||||
| 484-90-001 | ShipAlt DDG51-92831K, SNLWS Increment 1 (HELIOS); accomplish | P/C | PCP, Access Cut | ||||||||||||
| 492-60-001 | Visual Landing Aids Line-up Light Fixture; replace | I | P/C | ||||||||||||
| 508-11-001 | Lagging and Insulation; replace | I | P/C | ||||||||||||
| 508-11-002 | Auxiliary Machinery Room Number One Lagging and Insulation; replace | P/C | |||||||||||||
| 508-11-003 | Lagging and Insulation; replace | P/C | |||||||||||||
| 508-11-004 | Lagging and Insulation; replace | P/C | |||||||||||||
| 508-11-005 | Gas Turbine Exhaust Trunk Insulation and Lagging; replace | I | P/C | ||||||||||||
| 508-11-006 | Insulation and Lagging Outside Machinery Space; replace | I | P/C | RTR | |||||||||||
| 508-11-007 | Lagging and Insulation, Outside Machinery Space; replace | I | P/C | RTR | |||||||||||
| 508-11-008 | Lagging and Insulation, Inside Machinery Space; replace | P/C | RTR | ||||||||||||
| 508-11-009 | Redundant Independent Mechanical Start System (RIMSS) Exhaust Assembly Insulation and Lagging; replace | P/C | |||||||||||||
| 508-11-010 | Lagging and Insulation; replace | P/C | |||||||||||||
| 512-11-001 | Cooling Coil Unit; replace (OPTION ITEM) | P/C | |||||||||||||
| 512-11-003 | Cooling Coil Unit; replace | P/C | |||||||||||||
| 512-11-004 | Supply Ventilation; replace | P/C | |||||||||||||
| 512-11-007 | Ventilation Cleaning; accomplish | P/C | |||||||||||||
| 512-11-008 | Cooling Coil Unit; replace | P/C | |||||||||||||
| 512-11-010 | Exhaust Ventilation Ducting; replace | ||||||||||||||
| 512-11-011 | Fan Coil Unit Differential Pressure Gauge; install | P/C | |||||||||||||
| 512-11-012 | Ventilation Closure Teleflex Remote Operator; replace | P/C | |||||||||||||
| 512-11-014 | Cooling Coil Unit; replace | P/C | |||||||||||||
| 512-11-016 | Ventilation; replace | P/C | |||||||||||||
| 512-11-018 | Ventilation Watertight Closure; repair | P/C | |||||||||||||
| 512-11-019 | Remote Valve Operator Teleflex Cable; replace | P/C | |||||||||||||
| 512-90-001 | ShipAlt DDG51-74012K, VLS Magazine Ventilation Upgrade; accomplish | P/C | RTR, Access Cut | ||||||||||||
| 512-90-002 | ShipAlt DDG51-77419K, Textile Duct Installation; accomplish | P/C | RTR | ||||||||||||
| 512-90-003 | ShipAlt DDG51-71655K, Ventilation System Zone 4 Intake Modification; accomplish | P/C | |||||||||||||
| 514-11-001 | Resilient Mount; replace | P/C | |||||||||||||
| 514-11-002 | Cooling Coil Air Flow Differential Pressure Gage; install | P/C | |||||||||||||
| 514-20-001 | Air Conditioning Plant Condenser Water Control Valve (CWCV); replace | P/C | |||||||||||||
| 514-21-001 | Air Conditioning (AC) Plant Condenser; mechanically clean | I | P/C | ||||||||||||
| 514-22-001 | Number 2 Air Conditioning (A/C) Plant Compressor; overhaul | I | P/C | ||||||||||||
| 516-10-001 | Refrigeration Compressor; overhaul | I | P/C | ||||||||||||
| 520-11-001 | Sea Valve; repair and replace | I | P/C | ||||||||||||
| 521-11-001 | Firemain Pressure Control Valve (PCV); replace | P/C | |||||||||||||
| 521-11-002 | Firemain Piping; replace | P/C | |||||||||||||
| 521-11-003 | Seawater Fuel Oil Compensating Piping; replace | P/C | |||||||||||||
| 521-11-004 | Decontamination Station Number One Firemain Valve; replace | P/C | |||||||||||||
| 521-11-005 | Firemain Piping; replace | P/C | |||||||||||||
| 521-11-006 | Firemain Piping; repair | P/C | |||||||||||||
| 522-11-001 | Magazine Sprinkling System Transmission Tubing; replace | P/C | |||||||||||||
| 522-11-002 | Magazine Sprinkling System Transmission Tubing; replace | P/C | |||||||||||||
| 522-11-003 | Magazine Sprinkling System Transmission Tubing; replace | P/C | |||||||||||||
| 523-11-001 | Countermeasure Washdown (CMWD) Valve; replace | P/C | |||||||||||||
| 526-10-001 | T-Wrench Stowage Bracket, Deck Drain; install | P/C | |||||||||||||
| 526-11-001 | Deck Drain; replace | P/C | |||||||||||||
| 526-80-001 | ShipAlt DDG51-64270D, 02 Level Aft Weather Deck Drain Modification; accomplish | P/C | |||||||||||||
| 528-11-001 | Plumbing Valve Remote Operator Welded Deck Box; replace | P/C | |||||||||||||
| 528-11-002 | Deck Box; replace | P/C | |||||||||||||
| 528-11-004 | Plumbing Drain Piping; replace | P/C | |||||||||||||
| 529-11-001 | Main Drainage Valve Teleflex Cable; replace | P/C | |||||||||||||
| 529-11-002 | Valve Teleflex Cable; replace | P/C | |||||||||||||
| 529-11-003 | Secondary Drainage Eductor Valve Remote Operator Teleflex; replace | P/C | |||||||||||||
| 533-11-001 | Potable Water Valve; replace | P/C | |||||||||||||
| 534-11-001 | Machinery Drain Piping; replace | P/C | |||||||||||||
| 541-11-001 | MORPAC Valve and Actuator Overhaul; accomplish | I | P/C | ||||||||||||
| 541-12-001 | Fuel Oil Compensating System Pressure Switch Gauge Valve and Tubing; replace | P/C | |||||||||||||
| 541-90-001 | ShipAlt DDG51-70403K, Digital Fuel Control System Installation; accomplish | P/C | RTR | ||||||||||||
| 551-21-001 | 01 Level Weatherdeck Low Pressure Air Piping; repair | P/C | |||||||||||||
| 551-53-001 | Low Pressure Air Compressor (LPAC) Class B Overhaul; accomplish (OPTION ITEM) | I | P/C | ||||||||||||
| 551-60-001 | Bleed Air Regulating Valve; repair | P/C | |||||||||||||
| 551-64-001 | Anti-Icing Pipe Hanger; replace | P/C | |||||||||||||
| 561-11-001 | Main Steering Hydraulic Power Unit (HPU) Resilient Mount; replace | P/C | |||||||||||||
| 561-11-002 | Fill and Drain Pump Assembly Isolator Mount; replace | P/C | |||||||||||||
| 562-11-001 | Starboard Rudder Bearing Seal and Rudderstock Seal; overhaul | I | P/C | ||||||||||||
| 562-11-002 | Port Rudder Bearing Seal and Rudderstock Seal; overhaul | I | P/C | ||||||||||||
| 562-11-003 | Rudder Stock Bearing; install (OPTION ITEM) | I | P/C | ||||||||||||
| 562-11-004 | Port Rudder; inspect and repair | I | P/C | ||||||||||||
| 562-11-005 | Starboard Rudder; inspect and repair | I | P/C | ||||||||||||
| 581-11-001 | Anchor and Anchor Chain; inspect and preserve | I | P/C | ||||||||||||
| 582-11-001 | Retractable Chock and Bitt; preserve | I | P/C | ||||||||||||
| 583-11-002 | Boat Handling System; repair (OPTION ITEM) | P/C | |||||||||||||
| 583-11-003 | Liferaft Cradle; repair and preserve | P/C | |||||||||||||
| 583-90-001 | ShipAlt DDG51-83894K, Navy Standard Slewing Arm Davit (SLAD) Installation; accomplish | P/C | PCP, RTR | ||||||||||||
| 588-21-001 | Flight Deck and Recovery Assist, Securing and Traversing (RAST) System Track and Plate; clean and preserve | I | P/C | ||||||||||||
| 588-21-003 | Naval Air Warfare Center, Aviation Facility Assist Visit Discrepancy; correct | P/C | RTR | ||||||||||||
| 588-90-001 | ShipAlt DDG51-73212K, Helo Hanger Door Control System Upgrade; accomplish | P/C | RTR | ||||||||||||
| 593-11-002 | Vacuum, Collection, Holding and Transfer (VCHT) Piping System; chemically clean | P/C | PCP | ||||||||||||
| 593-11-003 | Remote Mechanical Valve Actuator; repair | P/C | |||||||||||||
| 593-11-004 | Vacuum, Collection, Holding and Transfer (VCHT) Ejector Pump and Motor; replace | P/C | PCP | ||||||||||||
| 593-25-001 | Oily Water Separator; repair | P/C | |||||||||||||
| 593-31-001 | Metal and Solid Waste Shredder Catch Tray; replace | I | P/C | ||||||||||||
| 593-90-001 | ShipAlt DDG51-73622K, VCHT Room H2S Detector Install; accomplish | P/C | |||||||||||||
| 611-11-001 | J-Bar Davit Stowage Strap Assembly; replace | ||||||||||||||
| 612-11-001 | Reversible Deck Bolt and Deck Socket; repair | P/C | |||||||||||||
| 612-11-002 | Stanchion; repair | P/C | |||||||||||||
| 612-11-003 | Kevlar Lifeline Assembly; install | P/C | |||||||||||||
| 612-21-002 | Helo Safety Net and Frame; repair (OPTION ITEM) | I | P/C | ||||||||||||
| 621-11-001 | Joiner Bulkhead and Coaming; repair | P/C | |||||||||||||
| 622-12-001 | Nomex Deck Panel; replace | P/C | |||||||||||||
| 622-12-003 | Nomex Deck Panel; replace | P/C | |||||||||||||
| 622-12-004 | Nomex Deck Panel; replace | P/C | |||||||||||||
| 623-11-001 | Boatswain Storeroom Ladder; repair | P/C | |||||||||||||
| 624-11-001 | Balanced Joiner Door; replace | P/C | |||||||||||||
| 631-10-001 | Main Mast Interior; preserve | P/C | |||||||||||||
| 631-10-002 | Boatswain Storeroom Number 2; preserve | P/C | |||||||||||||
| 631-10-003 | CBR and DC Storeroom; preserve | P/C | |||||||||||||
| 631-10-015 | Shore Power Station Deck and Bulkhead; preserve | P/C | |||||||||||||
| 631-11-002 | Machinery Space Bilge; preserve | I | P/C | ||||||||||||
| 631-11-003 | Fan Room; preserve | P/C | |||||||||||||
| 631-11-004 | Auxiliary Machinery Room Number 2; repair and preserve | I | P/C | ||||||||||||
| 631-11-008 | Generator Room Bilge; repair and preserve | I | P/C | ||||||||||||
| 631-11-009 | Machinery Room Structural Repair; accomplish | I | P/C | ||||||||||||
| 631-11-011 | Engine Room Number 2; repair and preserve | I | P/C | ||||||||||||
| 631-11-012 | Escape Trunk; repair and preserve | I | P/C | ||||||||||||
| 631-11-014 | Fan Room Deck; repair and preserve | I | P/C | ||||||||||||
| 631-11-015 | Engine Room Number One; repair and preserve | I | P/C | ||||||||||||
| 631-11-016 | Auxiliary Machinery Room Number One Repair and Preserve; accomplish | I | P/C | ||||||||||||
| 631-12-001 | Bulkhead; preserve | P/C | |||||||||||||
| 631-12-002 | Corroded Stringer; preserve | I | P/C | ||||||||||||
| 631-12-003 | Engine Room Number 2; preserve | I | P/C | ||||||||||||
| 631-13-001 | Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve | I | P/C | ||||||||||||
| 631-13-002 | Passage; repair and preserve | I | P/C | ||||||||||||
| 631-13-003 | Collective Protection System (CPS) Zone 4 Fan Room; repair and preserve | I | P/C | ||||||||||||
| 631-13-004 | Collective Protection System (CPS) Zone One Fan Room; repair and preserve | I | P/C | ||||||||||||
| 631-13-005 | Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve | I | P/C | ||||||||||||
| 631-13-006 | Supply Storeroom Number 4; preserve | P/C | |||||||||||||
| 631-13-009 | Access Trunk; preserve | P/C | |||||||||||||
| 631-13-011 | Fan Room; repair and preserve | P/C | |||||||||||||
| 631-13-013 | Fan Room Deck; preserve | P/C | |||||||||||||
| 631-13-015 | Exhaust Trunk Deck Plate; preserve | I | P/C | ||||||||||||
| 631-21-001 | Mast Preservation; accomplish | I | P/C | ||||||||||||
| 631-21-002 | 05 Level Antenna Platform; repair and preserve | I | P/C | ||||||||||||
| 631-21-004 | Antenna Platform; inspect and preserve | I | P/C | ||||||||||||
| 631-21-005 | 05 Level Nonskid; replace | P/C | |||||||||||||
| 631-21-006 | Visual Landing Aid (VLA) Protective Shield and Foundation; preserve | P/C | |||||||||||||
| 631-21-007 | Antenna Platform; inspect and preserve | I | P/C | ||||||||||||
| 631-31-001 | Underwater Hull; preserve | I | P/C | PCP | |||||||||||
| 631-41-001 | Freeboard; preserve | I | P/C | ||||||||||||
| 633-21-001 | Impressed Current Cathodic Protection (ICCP) System; repair | I | P/C | ||||||||||||
| 633-21-002 | Shaft Grounding Assembly; repair | I | P/C | ||||||||||||
| 634-11-001 | Chemical - Resistant Floor Covering System; install | ||||||||||||||
| 634-11-002 | Nixie Room Nonskid; replace | P/C | |||||||||||||
| 634-11-003 | Electrical Grade Matting Deck Covering System; replace | P/C | |||||||||||||
| 634-11-004 | Electrical Grade Matting Deck Covering System; install | P/C | |||||||||||||
| 634-11-005 | 02 Level Chemical - Resistant Floor Covering System; install | P/C | |||||||||||||
| 634-11-006 | Chemical Resistant Deck Covering System (Zone One); repair | P/C | |||||||||||||
| 634-11-007 | Chemical - Resistant Floor Covering System (Zone One); install | P/C | |||||||||||||
| 634-11-008 | Chemical - Resistant Floor Covering; resurface | P/C | |||||||||||||
| 634-11-009 | Deck Covering System; install | P/C | |||||||||||||
| 634-11-010 | Chemical - Resistant Floor Covering System; install | P/C | |||||||||||||
| 634-11-011 | 01 Level Deck Covering (Forward); replace | P/C | |||||||||||||
| 634-11-012 | Chemical Resistant Floor Covering System (01 Level Aft); install | P/C | |||||||||||||
| 634-11-015 | Electrical Grade Matting Deck Covering System; replace | P/C | |||||||||||||
| 634-11-016 | Chemical - Resistant Floor Covering System; replace | P/C | |||||||||||||
| 634-11-017 | Chemical - Resistant Floor Covering System; install | P/C | |||||||||||||
| 634-11-018 | Chemical - Resistant Floor Covering; resurface | P/C | |||||||||||||
| 634-11-020 | Porcelain Tile Deck Covering System; replace | P/C | |||||||||||||
| 634-11-021 | Helicopter Control Station Nonskid; replace | P/C | |||||||||||||
| 634-11-022 | Porcelain Tile Deck Covering System; replace | P/C | |||||||||||||
| 634-21-001 | Flight Deck Nonskid; replace | P/C | |||||||||||||
| 634-21-002 | Forecastle Nonskid; replace | P/C | |||||||||||||
| 634-21-004 | 02 Level Nonskid; replace | P/C | |||||||||||||
| 634-21-005 | 01 Level Amidship Nonskid; replace | P/C | |||||||||||||
| 635-11-001 | Hull Insulation; repair | P/C | RTR | ||||||||||||
| 643-11-001 | Berthing Habitability Project Installation; accomplish | P/C | |||||||||||||
| 644-11-002 | Shower Stall; replace | P/C | |||||||||||||
| 644-11-003 | Sanitary Habitability Project Installation; accomplish | P/C | |||||||||||||
| 644-90-001 | ShipAlt DDG51-86821K, Women at Sea Berthing Modification, Crew Living Space Number 2; accomplish | P/C | PCP | ||||||||||||
| 651-90-001 | ShipAlt DDG51-71605K, DDGM Advanced Galley Modification; accomplish | P/C | Controlling Work Item, Access Cut | ||||||||||||
| 652-11-001 | Medical Exam Table; replace | P/C | |||||||||||||
| 654-11-001 | Vending Machine Foundation; replace | P/C | |||||||||||||
| 655-11-001 | Washer-Extractor; replace | P/C | |||||||||||||
| 660-11-001 | Work Desk; replace | P/C | |||||||||||||
| 670-12-001 | Ship Store Storeroom Grating; install | P/C | |||||||||||||
| 712-11-001 | 5 Inch Ammunition Strikedown Elevator System Operability Test (SOT), Level III; accomplish | P/C | |||||||||||||
| 721-31-001 | Vertical Launch System (VLS) Valve Repair and Flush; accomplish | P/C | |||||||||||||
| 721-31-003 | Vertical Launch System (VLS), MK 41 Launcher Top and Uptake Hatch; replace and preserve | P/C | |||||||||||||
| 721-31-004 | MK 41 Vertical Launching System (VLS), Cell Hatch; remove and replace | P/C | |||||||||||||
| 721-90-001 | ShipAlt DDG51-85964K, MK 41 Vertical Launching System Block V; accomplish | P/C | |||||||||||||
| 837-11-001 | Antenna Photographs; provide | P/C | |||||||||||||
| 844-31-001 | Combat Systems Discrepancy Correction; accomplish | P/C | RTR | ||||||||||||
| 857-11-001 | Temporary Duty Section Berthing Off-Ship; provide | P/C | RTR | ||||||||||||
| 857-11-002 | Temporary Galley and Messing Facility; provide (OPTION ITEM) (CANCELED) | P/C | RTR | ||||||||||||
| 863-50-001 | Local Area Network (LAN) Support Service; provide | P/C | |||||||||||||
| 897-10-001 | Availability Program Management AIT Integrator; provide (OPTION ITEM) | P/C | |||||||||||||
| 980-00-001 | OrdAlt DDG51-78778K, 79024K, and 85473K, AWS: MMSP Transmitter Modification, BMD SPY Coherent Combiner for DDG, and SPY-1D Solid State Switch, Alteration Installation Team (AIT) Support Service; provide | P/C | RTR | ||||||||||||
| 980-00-002 | OrdAlt DDG51-85224K, MK41 VLS BL BMD 5.1, OrdAlt DDG51-79353K, Ablative upgrade, and OrdAlt DDG51-83746K, HSD Relocation, Alteration Installation Team (AIT) Support Service; provide | P/C | RTR | ||||||||||||
| 980-00-004 | OrdAlt DDG51-74588K, MK 99 FCS KAS, Alteration Installation Team (AIT) Support Service; provide | P/C |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .