Attachment L-1 - Bidders Questions 7-31-2020.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Elevator Support Unit (ESU)
Solicitation number
N0002419R4303
Issued by

About this file

This document contains questions and answers related to solicitation N0002419R4303 for elevator support unit engineering services. The Naval Sea Systems Command seeks proposals for shipboard elevator maintenance, repair, and operator training support worldwide including Norfolk, Newport News, Portsmouth, San Diego, Bremerton, Everett, and Yokosuka, Japan. The acquisition is a cost-plus-fixed-fee indefinite delivery/indefinite quantity contract with a five-year ordering period. Proposers must submit responses by September 4th, 2020 at 4:00 PM Eastern Time as the due date was extended one week via an amendment. Subcontractors are not required to have a DCAA-approved accounting system to participate.

View the file

Other files

File Type Posted
Attachment L-1-Bidders Questions 8-25-20.xlsx XLSX spreadsheet
Attachment L-1-Bidders Questions 8-12-2020.xlsx XLSX spreadsheet
N0002419R4303 Amendment 0001.pdf PDF
Attachment L-1-Bidders Questions 7-22-2020.xlsx XLSX spreadsheet
N00024-19-R-4303 ESU REQUEST FOR PROPOSAL.pdf PDF
J-3 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-02NW.pdf PDF
J-2 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-01NW.pdf PDF
J-1 Task Action Memorandum (TAM).pdf PDF
J-20 Contractor Badging and Access Requirements Solicitation (HL).pdf PDF
J-16 042-007 Security Requirements for Work Within Norfolk Naval Shipyard- accomplish.pdf PDF
Section J Exhibit B DD FORM 1423 GLOSSARY.doc DOC document
J-9 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-08NW.pdf PDF
J-13 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-12NW.pdf PDF
J-17 042-010 Nuclear Powered Ships-Nuclear Support Ships- special requirements.pdf PDF
J-18 042-037 General Requirements for Work Within Naval Station Norfolk- accomplish.pdf PDF
J-11 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-10NW.pdf PDF
J-15 042-006 General Occupational Safety Health and Environment (OSHE) Requirements for Work Within Norfolk Naval Shipyard- accomplish (PCP.pdf PDF
Attachment L-2 RIS_Past Performance Questionnaire (PPQ).docx DOCX document
J-7 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-06NW.pdf PDF
J-22 Attachment - Key Personnel List.pdf PDF
J-12 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-11NW.pdf PDF
Attachment L-1- Bidders Question Submittal Form.xlsx XLSX spreadsheet
Attachment L-3 Cost Proposal Format.xlsx XLSX spreadsheet
J-10 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-09NW.pdf PDF
J-14 042-005 NNSY Work Authorization Form(WAF) Requirements.pdf PDF
J-5 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-04NW.pdf PDF
J-19 077-001 Hazardous Waste Produced on Naval Vessels- control.pdf PDF
J-6 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-05NW.pdf PDF
J-8 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-07NW.pdf PDF
J-4 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-03NW.pdf PDF
Exhibit A_ ESU CDRLs 2019_5.22 v2 signed.pdf PDF
J-21 DDForm254 for N00024-19-R-4303 - Signed.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question Number:Question Source: (RFP, Attachment #, etc.)Page Number and Paragraph Header from Source:Question:Answer:
4Section L 4.2Page 132RFP Section 4.3 (page 132) states “Offerors shall provide a list and Individual RIS Attachment L-2…” and also states “CPARS information may be utilized in lieu of the RIS.” Is a list still required? If so, is the list considered to be in the table format contained on page 1 of Attachment L-2, or simply a list by Contract Number?If utilizing CPARS information, a list is not required. The offeror may provide CPARS reports of three (3) different relevant contracts. Adobe compatible PDF format is preferred.
5Section L 4.3Page 131RFP Section 4.3 (page 131) states “A minimum of one major subcontractor past performance should be included in the submission”. If the Prime Offeror meets the requirements for Past Performance information, is there still a requirement to submit past performance information for a major subcontractor?Although an offeror is encouraged to submit information for a major subcontractor, it is not required. If the offeror does not have any major subcontractors for which to provide information, the offeror shall state this in the proposal and will still be considered to have met the minimum past performance reference requirements of the RFP if 3 submissions presented.
6Section L 2.0Page 116RFP Section 2.0 (page 116) states that resumes are limited to 2 pages each. Can the Offeror assume that the resumes are excluded from the 30 page allocation for the Management Approach?Each resume is limited to 2 pages per Resume and limited to a number of 14 total resumes. This 14 pages does not count towards the 30 page limit for overall management approach/management plan.
7Section L 2.0Page 117RFP Section 2.0 (page 117) states that all paragraphs shall be numbered. Would the government allow some flexibility in the numbering of paragraphs given the page limitations. Would it be acceptable for major paragraphs and major sub-paragraphs be numbered, leaving smaller sub-paragraphs unnumbered?The paragraph numbering shall remain as instructed in the RFP Section 2.0 page 117.
8Section L Factor 2, #5Page 128-129On page 5, 1st complete sentence states: " The Government will assess the availability of key personnel, as well as the offeror’s plan to provide experienced manpower, and the resources, which would be committed to this work effort. The Government will assess plans to recruit, train, or otherwise obtain adequately trained personnel, including plans to meet staffing phase-in requirements. The Government will assess specific information in terms of manning to perform emergent requirements. The contractor’s ability to man and support tasks outside the continental United States will be evaluated." Q: This requirement seems to belong in Section 3.0 Resource Capabilities. As defined in the 1st sentence: "Offeror should demonstrate PRIOR TECHNICAL EXPERIENCE, meaning specific instances, problem resolution, on specific projects that meet the SOW requirements." Availability of key personnel and plans to recruit, train, or otherwise obtain adequately trained personnel, including plans to meet staffing phase-in requirement are not related to "specific instances, problem resolution, on specific projects that meet the SOW requirements." Recommend that this portion of #5 be moved to Section 3.0 which deals with resources and manning.The Government revises para 2.0 as follows and will be included in amendment to RFP:

FROM:

The Government will assess the availability of key personnel, as well as the offeror’s plan to provide experienced manpower, and the resources, which would be committed to this work effort. The Government will assess plans to recruit, train, or otherwise obtain adequately trained personnel, including plans meet staffing phase-in requirements. The Government will assess specific information in terms of manning to perform emergent requirements. The contractor’s ability to man and support tasks outside the continental United States will be evaluated.

TO:

The Offeror shall provide detailed descriptions of their prior experience handling the availability of key personnel, experienced manpower, and resources that would correlate to this effort. Also provide examples of the Offeror’s prior experience and/or methods of recruiting, training, or otherwise hiring personnel to meet similarly scoped staff requirements. The Offeror shall also provide specific examples of how they manned operations to accomplish emergent technical requirements. Lastly, the Offeror shall demonstrate their prior experience/ability to man and support similarly scoped technical tasks outside of the continental United States.

9RFP Closing Date and TimeRequest to extend the closing date by one weekThe closing date and time is hereby extended to 04 September 2020, 4:00 PM EST. Questions due date also modified to 24 August. Amendment to the RFP is forthcoming.
10Section G and Section LPage 55 (G) Page 133 #2The RFP states the Contractor shall provide and maintain an accounting system, determined adequate by the ACO. Can a subcontractor who does not have a DCAA approved accounting system, submit supporting documentation as part of their Cost Proposal to be considered part of the level of effort for labor as a Subcontract type of FFP-LOE?The subcontractor is not required to provide documentation of a DCAA approved accounting system. Only the prime needs to have an approved accounting system.The sub may submit supporting documentation.

&"Times New Roman,Regular"&10ELEVATOR SUPPORT UNIT (ESU)

SOLICITATION NO. N00024-19-R-4303&"Times New Roman,Regular"&10Bidder's Question Submittal Form
&"Times New Roman,Regular"&10Attachment L-1

&"Times New Roman,Regular"&10 28 May 20 Source Selection Information- See FAR 2.101 and 3.104 &"Times New Roman,Regular"&10&P of &N

File details come from the government source that posted it. Updated .