J-1 Task Action Memorandum (TAM).pdf

PDF 288 KB Posted

Attached to
Elevator Support Unit (ESU)
Solicitation number
N0002419R4303
Issued by

About this file

This Task Action Memorandum (TAM) outlines technical evaluation requirements for shipboard elevator modernization and repair services. The Naval Sea Systems Command seeks engineering support, maintenance, training, and repair services for elevators, cargo handling equipment, and associated systems aboard U.S. Navy aircraft carriers located around the world, including Norfolk, Newport News, Portsmouth, San Diego, Bremerton, Everett, and Yokosuka. Contractors must submit deliverables for review and approval according to the TAM's quality and timeliness standards. The Naval Sea Systems Command will evaluate submissions and either accept them as submitted, return with requested changes for resubmission by a given date, or request no further action.

View the file

Other files

File Type Posted
Attachment L-1-Bidders Questions 8-25-20.xlsx XLSX spreadsheet
Attachment L-1-Bidders Questions 8-12-2020.xlsx XLSX spreadsheet
N0002419R4303 Amendment 0001.pdf PDF
Attachment L-1 - Bidders Questions 7-31-2020.xlsx XLSX spreadsheet
Attachment L-1-Bidders Questions 7-22-2020.xlsx XLSX spreadsheet
Section J Exhibit B DD FORM 1423 GLOSSARY.doc DOC document
J-18 042-037 General Requirements for Work Within Naval Station Norfolk- accomplish.pdf PDF
J-12 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-11NW.pdf PDF
J-11 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-10NW.pdf PDF
J-2 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-01NW.pdf PDF
J-14 042-005 NNSY Work Authorization Form(WAF) Requirements.pdf PDF
J-5 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-04NW.pdf PDF
J-4 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-03NW.pdf PDF
Exhibit A_ ESU CDRLs 2019_5.22 v2 signed.pdf PDF
J-6 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-05NW.pdf PDF
J-21 DDForm254 for N00024-19-R-4303 - Signed.pdf PDF
J-8 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-07NW.pdf PDF
J-19 077-001 Hazardous Waste Produced on Naval Vessels- control.pdf PDF
J-3 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-02NW.pdf PDF
N00024-19-R-4303 ESU REQUEST FOR PROPOSAL.pdf PDF
J-7 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-06NW.pdf PDF
J-15 042-006 General Occupational Safety Health and Environment (OSHE) Requirements for Work Within Norfolk Naval Shipyard- accomplish (PCP.pdf PDF
J-22 Attachment - Key Personnel List.pdf PDF
Attachment L-3 Cost Proposal Format.xlsx XLSX spreadsheet
Attachment L-2 RIS_Past Performance Questionnaire (PPQ).docx DOCX document
J-20 Contractor Badging and Access Requirements Solicitation (HL).pdf PDF
J-10 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-09NW.pdf PDF
J-13 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-12NW.pdf PDF
J-17 042-010 Nuclear Powered Ships-Nuclear Support Ships- special requirements.pdf PDF
J-9 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-08NW.pdf PDF
Attachment L-1- Bidders Question Submittal Form.xlsx XLSX spreadsheet
J-16 042-007 Security Requirements for Work Within Norfolk Naval Shipyard- accomplish.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ACTION MEMORANDUM (TAM)

TASK NO.: CONTRACT NO.:

TASK TITLE: HULL NO.:

CODE INITIALS

BY DATE

CONTRACTOR:

The Product/Deliverable Described Below is Submitted For Review And Approval

Product No. Product Brief (Exactly as Described in Para. 8 of Task)

ORIG

Contractor Signature/ Date: Serial No.

TECHNICAL CODE ________ EVALUATION:

Production Evaluation: 1 2 3 4 5 6 7 8 9 0 Provide Comments Quality Below (Required if

Timeliness 5 Or Below)

PR MARG GOOD EX

CODE

Product Accepted as Submitted.

Marked-up product is Returned. Request changes be made. Resubmit by (Date) together with marked-up copy.

ATTN: Remarks/ Special Instructions:

TA Signature/Date:

CODE COR:

COR Signature/ Date:

CODE SSNN CONTRACT SECTION:

For Code File, Distribution And Database Update.

CONTRACTOR:

ORIG Please Respond To Technical Code Evaluation.

No Further Action Required.

BrownSt9 Typewritten Text besonde Typewritten Text besonde Typewritten Text

CNAL Fuels TAM

Check Box5: Off
Check Box3: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Text17:
Text19:
Text22:
Text23:
Text24:
Text25:
Text26:
Check Box27: Off
Check Box28: Off
Check Box29: Off
Text30:
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box42: Off
Check Box43: Off
Check Box44: Off
Text45:
Text46:
Text48:
Text1:
Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Text8: NOTES:
Text9:
Text10:
Text11:

File details come from the government source that posted it. Updated .