This document is an amendment to a request for proposal for Force Protection Medium Boats. The Navy seeks approximately 113 boats over five years through an indefinite delivery/indefinite quantity contract. Eligible offerors are small businesses. The amendment extends the response deadline from March 14, 2019 to March 20, 2020 at 2:00 PM EST. It also provides answers to industry questions, updates specifications for stability analysis, electrical systems, materials, and seating arrangements. Offerors must submit proposals electronically and in hard copy in accordance with instructions. The boats will be used for force protection, security, and anti-terrorism patrols for Navy installations worldwide.
Amendment 0003
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002418NR53004
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to 1) respond to questions from industry, 2) update Attachments 1 and 2, and 3) to extend the RFP closing date.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Mar-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002419R2222
X 9B. DATED (SEE ITEM 11)
12-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Mar-2019
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2020
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002419R2222
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES REVISED
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 14-Mar-2019 02:00 PM to 20-Mar-2020 02:00 PM.
The following have been modified:
L.1.1.3. Responses to Questions from Industry
Q&A Amendment 0001:
# Posted Question Posted Answer
1 Reference 433-1. Can offerors specify alternate intercom systems that meet or exceed the specifications of the desired system proposed in the solicitation?
No alternate intercom systems will be accepted. The
Government approved a brand name "Justification and
Approval for Use of Other that Full and Open
Competition" which included the Gentex Light Vehicle
Intercom System (LVIS), which has been posted with the solicitation per FAR 6.302-1(c)(1) and FAR 6.305.
Q&A Amendment 0002:
2 References Section L and Attachment 1
Specification 085-1. Section L includes instructions to have the full stability report included with the proposal, however
Attachment 1 Specification 085-1 states that design calculations shall be submitted no later than 60 days after contract award. Is it the
Government's desire to have the Proof of
Stability including all design calculations and reports including 3D model at the time of proposal, or 60 days after award?
As stated in Section L, a full stability analysis is required with the Offeror's proposal for proposal evaluation. An updated stability analysis is required no later than 60 days after contract award in accordance with Attachment 1
Specification 85-1.
Q&A Amendment 0003:
3 Reference 169-1. Does the longitudinal dimension of the outboard bracket, as a welded appendage, contribute to the nominal hull length (welded structure only) as stated in
Section 042-1 General Requirements?
Yes
4 Reference 252-1. Can instrument package be replaced by 1 OEM display?
A single OEM display would not meet the requirement of
Specification Item 252-1 to provide an instrument package for each engine. A minimum of two (2) gauges/displays is required.
5 Reference 303-1. Cooper-Bussman 187 series does not meet UL489 Branch Circuit Rating.
The only rating that this breaker has is for
Ignition Protection SAE J1171. Please advise if these will still be ok to use for main feeder greater than 100 amps?
Specification Item 303-1 allows Cooper-Bussman 187 series or equal as an exception for using UL-489 breakers on large DC feed circuits above 100A due to the size of molded case circuit breakers and their impact on small boat arrangements. The Cooper-Bussman 187 series are compact breakers and they are designed to be branch circuit protection for marine vessels.
6 Reference 313-4. Can the house battery bank charger be an independent unit with a dedicated
12v converter to supply house loads while on shore?
Attachment 1 Specification Item 313-4 is being amended to allow a combined charger/converter or a separate battery charger and converter for charging the house battery bank and supplying house DC loads while either on shore power or generator power. The Specification
Item 313-4 is also being amended to clarify the requirements for component sizing based on the ELA.
7 Reference 078-1. It has always been common in aluminum boat construction and in USN boats in particular to allow welded handrails, boltrope track etc. to be welded. The extreme number of additional SS dissimilar metals will increase corrosion issues for the Navy in this instance. Will the Navy amend this to allow for welded handrails and collar boltrope 6061 extrusion?
Specification Item 078-1 allows alternatives to the specification as approved by the Navy. The Specification is being amended to clarify that non-structural components utilizing 6061 materials may be welded with Government approval. Handrails in 6061 welded applications will be considered based on final handrail design (e.g. strength requirements). The use of 6061 material for boltrope extrusions is acceptable.
8 Reference 150-1. Is the cuddy to have a lower deck than the main cabin deck, or is it safe to assume the crew would be crawling under the console to access the foredeck?
Specification Item 150-1 is being revised to eliminate the
"lower" requirement for the cuddy. Access to forward portion of the console shall meet the Specification Item
071-1 requirement for accessibility to equipment for maintenance, repair, and operation.
9 Reference 150-1. Is there a minimum headroom requirements such as sitting headroom required for the cuddy?
Specification Item 150-1 is being revised to eliminate the
"lower" requirement for the cuddy. Access to forward portion of the console shall meet the Specification Item
071-1 requirement for accessibility to equipment for maintenance, repair, and operation.
10 Reference 166-1. Some builders use styrafoam for the collar when 2.1 lb ethyfoams is common on most USN boat collars. Will the specification be amended to reflect this requirement for the foam collar?
The Government is amending Attachment 1 Specification
Item 166-1 and Attachment 2 Specification Response
Matrix Item 166-1 to require Offerors to provide a description of collar design and identify foam materials.
11 Reference 236-1 and 070-4. If the builder can provide the required speed of 30 knots with less
HP can the builder quote with lesser HP engines?
No. The specification requires each engine model be 225
HP; the engine HP was specified to maintain commonality with the existing fleet of Force Protection Boats.
12 Reference 662-1 Would the Navy be open to a changer ecommendation to this seating arrangement?
The requirement for a starboard side helm position on the
FP Medium boat is derived from the configuration of the existing FP fleet and was chosen to maintain commonality.
In general, a port side helm in considered non-standard for
US Navy boats.
The requirement for a centerline helm position on the CSF
Training Variant matches the configuration of various CSF training craft and conform to instructor Standard
Operating Procedures SOP). Due to the aggressive nature of maneuvers that are conducted by trainees, the instructor requires immediate access to the throttles in the event of an emergency.
SECTION L
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
L.1. INSTRUCTIONS TO OFFERORS
L.1.1. GENERAL INFORMATION
(a) Terms and conditions
(1) Offerors shall submit the proposal by 1400 Eastern Standard Time (EST) on 20 March 2019 to the point of contact (POC) listed in paragraph (2) below. The quantities of hard and electronic copies of the proposal are identified in paragraph (b) below. The electronic copies shall be submitted on CD-ROM or
DVD disk(s) in Microsoft Office products for PC applications, or Adobe Acrobat .pdf files. When mailing the proposal or proposal amendments, the outside shipping container shall be marked with “RFP N00024-
19-R-2222” and mailed to the address listed in paragraph (2) below.
(End of Summary of Changes)