This document provides answers to vendor questions on presolicitation N00024-19-R-2222 for U.S. Navy Force Protection Medium boats. The Navy intends to issue a competitive Request for Proposal in the first quarter of fiscal year 2019 for an estimated 113 Force Protection Medium boats over five years under an indefinite delivery/indefinite quantity contract. The boats will provide anti-terrorism and force protection for naval installations, including patrol, interrogation of waterborne assets, and escorting vessels in and out of port under various conditions. Questions from vendors cover requirements for seating, windows and doors, machine gun mounts, bow design, and alternative items. The Navy provides clarification that only Coxswain and Navigator seats require shock mitigation, overlapping machine gun arcs are permissible, and offerors may propose alternative items meeting specifications.
Responses to questions from industry (10/10/2018)
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANSWERS TO VENDOR QUESTIONS ON PRESOLICITATION
N00024-19-R-2222 US NAVY FP MEDIUM
DATE: 10/10/2018
1. QUESTION: Spec 662-3A, For the CNIC Variant seating, do the additional seats aft of the Cox'sn/Nav seats need to be shock-mitigating?
ANSWER: The additional seating is not required to be shock mitigating. Only the Coxswain and Navigator seats are required to be shock mitigating.
2. QUESTION: Spec 662-3B, Have you considered bench-type seating (with seatbelts) for the Training Variant passenger seating?
ANSWER: The user requires shock mitigating seating for all trainees/passengers due to the aggressive nature of the maneuvers undertaken during the course.
3. QUESTION: Specs 167-1, 625 For windows and doors have you had any feedback about any particular manufacturer(s)?
ANSWER: There are no specific requirements for a particular brand or make of windows and doors, provided they meet the specification requirements and ABYC.
4. QUESTION: Spec 710-1, For the 3 aft machine gun mounts, the spec of 50" working radius can be problematic. Is it permissible for these arcs to slightly overlap?
ANSWER: Yes.
5. QUESTION: Appears FPM boats had bow damage due to heavy wear and blunt blows in this area of the boats. Recommend this be addressed in the published specs and requirements; that FPM boats have bows designed to withstand heavy wear and tear such as that encountered with aggressive boarding/mooring and boat handling.
ANSWER: The feedback is appreciated. Section 166-1 Collar requires that the collar be capable of handling occasional boat shoulder operations.
6. QUESTION: Can vendors (boatbuilders) submit items outside of the items call out in the spec structure with our proposal?
ANSWER: Offerors may propose alternative items that meet the criteria in the Specification Section 042-3.
7. QUESTION: Do you expect a LPTA or Best Value contract?
ANSWER: The Government intends to compete this using a Best Value Tradeoff selection process.
8. QUESTION: We would like to add WIFI and drone and upgrade the phone systems and lights on the side and under water lights.
ANSWER: Wifi is a not required nor approved for use on these boats. We don’t require underwater lights and a phone system for these boats.
9. QUESTION: CLINS 1011, 1012 and 1013 do not match what is written in the description compared to the costing description.
ANSWER: Draft CLINs have been updated to include CLIN 1011 DVR to match the draft SOW.
Please see “REV2 Draft CLINs Draft SOW” on the FBO presolicitation notice for the updated file.
10. QUESTION: CLINS 1006, 1007, and 1008 are engines and spares, the QTY reads 119 however the boat is twin outboard powered.
ANSWER: The quantity for the engines has been updated to QTY 238. Please see “REV2 Draft CLINs Draft SOW” on the FBO presolicitation notice for the updated file.
ANSWERS TO VENDOR QUESTIONS ON PRESOLICITATION
N00024-19-R-2222 US NAVY FP MEDIUM
DATE: 10/10/2018
11. QUESTION: Does the government intend to use a STEP LADDER pricing sheet for this solicitation?
ANSWER: Attachment 8 will allow for pricing by each Ordering Period but step ladder pricing based on quantity is not anticipated at this time.
12. QUESTION: Has consideration been given to a SIMULATOR Variant?
ANSWER: There is no requirement for a Simulator Variant at this time.
13. QUESTION: Please note there was no Draft Statement of Work (SOW) attached with the recently advertised presolicitation N00024-19-R-2222 ANSWER: The Draft SOW is attached as a file to the FBO notice which can be downloaded and can be found on the bottom of the right column on the presolicitation notice. Please see “REV2 Draft CLINs Draft SOW” on the FBO presolicitation notice for the latest updated file.
14. QUESTION: We would like to submit a bid on this procurement, when are proposals due?
ANSWER: Proposals are not being requested at this time, the due date for proposals will be posted when the formal Request for Proposal (RFP) is posted.