N00024-18-R-2400_Conformed_thru_Amendment_0001.docx

DOCX document 301 KB Posted

Attached to
FY17/FY19 Landing Craft Air Cushion Service Life Extension Program
Solicitation number
N0002418R2400
Issued by

About this file

Conformed Copy of N00024-18-R-2400 Sections A to M through Amendment 0001

View the file

Other files

File Type Posted
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0008.docx DOCX document
N00024-18-R-2400_Amendment_0008.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0008.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0007.docx DOCX document
N00024-18-R-2400_Amendment_0007.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0007.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0006.docx DOCX document
N00024-18-R-2400_Amendment_0006.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0006.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0005.docx DOCX document
Attachment_A_J-1_TDP.docx DOCX document
N00024-18-R-2400_Amendment_0005.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0005.docx DOCX document
N00024-18-R-2400_Amendment_0005.docx DOCX document
Attachment_A_J-1_TDP.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0004.docx DOCX document
N00024-18-R-2400_Amendment_0004.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0004.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_thru_Amendment_0003.docx DOCX document
N00024-18-R-2400_Conformed_thru_Amendment_0003.docx DOCX document
N00024-18-R-2400_Amendment_0003.docx DOCX document
N00024-18-R-2400_Amendment_0002.docx DOCX document
18-R-2400_Amend_0001_Att_A_ADDENDUM_Forms_to_Section_L.docx DOCX document
N00024-18-C-2400_Amendment_0001.docx DOCX document
Attachment_J-6_Preservation_and_Lay-Up.doc DOC document
Attachment_J-2b_Exhibit_A_Index.doc DOC document
Attachment_J-7_LCAC_86_Consolidated_GFP_List.xlsx XLSX spreadsheet
Attachment_J-4a_GFP_Performance_1-12.pdf PDF
Attachment_J-3_Perf_Miles_Pay_Sch.xlsx XLSX spreadsheet
Attachment_J-2a_-_CDRL_Information.docx DOCX document
Attachment_J-9_LCAC_77_Consolidated_GFP_List.xlsx XLSX spreadsheet
Attachment_J-2c_CDRLs_Exhibit_A.pdf PDF
Attachment_J-2e_CDRLs_Exhibit_B.pdf PDF
Attachment_J-4c_GFP_Remarks_Index.docx DOCX document
Attachment_J-8_LCAC_87_Consolidated_GFP_List.xlsx XLSX spreadsheet
N0002418R2400.pdf PDF
Attachment_J-2d_Exhibit_B_Index.doc DOC document
Attachment_J-1_TDP.docx DOCX document
Attachment_J-4b_GFP_Performance_13-24.pdf PDF
Attachment_J-10_LCAC_50_Consolidated_GFP_List.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002418R2400

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0001

Landing Craft, Air Cushion (LCAC) 86

FFP

1
Each

Service Life Extension Program (SLEP) Availability. See Notes A , B, and I.

FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0002

LCAC 86 Additional Labor Requirements

FFP

Orders for SLEP Availability. Not to Exceed 26,250 Man-Hours at TBD = $TBD (FY17 SCN) See Notes D, F, G, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0003

LCAC 86 Additional Material Requirements

Orders for SLEP Availability. Not to Exceed $500,000 (FY17 SCN) See Notes E, F, G, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0004

LCAC 87 SLEP Availability

FFP

1
Each

See Notes A, B, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0005

LCAC 87 Additional Labor Requirements

Orders for SLEP Availability. Not to Exceed 26,250 Man-Hours at TBD = $TBD (FY17 SCN) See Notes D, F, G, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0006

LCAC 87 Additional Material Requirements

Orders for SLEP Availability. Not to Exceed $500,000 (FY17 SCN) See Notes E, F, G, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0007

LCAC 77 SLEP Availability

FFP

1
Each

See Notes A, B, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0008

LCAC 77 Additional Labor Requirements

Orders for SLEP Availability. Not to Exceed 26,250 Man-Hours at TBD = $TBD (FY17 SCN) See Notes D, F, G, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0009

LCAC 77 Additional Material Requirements

Orders for SLEP Availability. Not to Exceed $500,000 (FY17 SCN) See Notes E,F, G, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0010

LCAC 50 SLEP Availability

FFP

1
Each
OPTION
See Notes A, B, C, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0011

LCAC 50 Addtional Labor Requirements

OPTION
Orders for SLEP Availability. Not to Exceed 30,000 Man-Hours at TBD = $TBD (FY17 or FY19 SCN) See Notes D, F, G, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0012

LCAC 50 Additional Material Requirements

OPTION
Orders for SLEP Availability. Not to Exceed $750,000 (FY17 or FY19 SCN) See Notes E, F, G, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0013

Shipment by the Contractor of LCAC from

ACU 4 to ACU 5

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0013AA

Shipment of LCACs 86 & 87

FFP

1
Set
OPTION
See Notes C, and I.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0013AB

Shipment of LCACs 77 & 50

FFP

1
Set
OPTION
See Notes C, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0013AC

Shipment of LCAC 77

FFP

1
Each
OPTION
See Note C, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0014

Shipment by the Contractor of LCAC from

ACU 4 to Contractor-Owned Facility (Pre-SLEP)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0014AA

Shipment of LCACs 86 & 87

FFP

1
Set
OPTION
See Note C, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0014AB

Shipment of LCACs 77 & 50

FFP

1
Set
OPTION
See Notes C, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0014AC

Shipment of LCAC 77

FFP

1
Each
OPTION
See Notes C, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0015

Shipment by the Contractor of LCAC from a Contractor-Owned Facility to ACU 5 (Post-SLEP)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0015AA

Shipment of LCACs 86 & 87

FFP

1
Set
OPTION
See Notes C, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0015AB

Shipment of LCACs 77 & 50

FFP

1
Set
OPTION
See Notes C, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0015AC

Shipment of LCAC 77

FFP

1
Each
OPTION
See Notes C, and I.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0016

Shipment by the Government of Craft for

SLEP Availability From ACU 4 to the Contractor's Facility (Pre-SLEP)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0016AA

Shipment of LCACs 86 & 87

FFP

1
Set
OPTION
FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0016AB

Shipment of LCACs 77 & 50

FFP

1
Set
OPTION
FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0016AC

Shipment of LCAC 77

FFP

1
Each
OPTION
FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0017

Shipment by Government of Craft

Completed SLEP Availability From Contractor's Facility to ACU 5 (Post-SLEP)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0017AA

Shipment of LCAC 86 & 87

FFP

1
Set
OPTION
FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0017AB

Shipment of LCAC 77 & 50

FFP

1
Set
OPTION
FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0017AC

Shipment of LCAC 77

FFP

1
Each
OPTION
FOB: Origin (Shipping Point)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0018

Craft Schedule Incentives

Craft Schedule Incentives for LCACs 86, 87, 77, 50. For Payment Purposes Only.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0019

Craft Quality Incentives

Craft Quality Incentives for LCACs 86, 87, 77, 50. For Payment Purposes Only.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0200

Data

Data for ITEMs 0001, 0004, 0007, and if exercised 0010, 0013, 0014, and 0015, and if ordered 0002, 0003, 0005, 0006, 0008, 0009, 0011, and 0012. See DD Form 1423 Attachment J-2 Exhibits A and B. Not Separately Priced. See Note H.

NET AMT

NOTE A – The Contractor warrants and hereby certifies that its price for ITEMs 0001, 0004, 0007, and 0010 does not include any amount for the "ADDITIONAL LABOR REQUIREMENTS" under ITEMs 0002, 0005, 0008, and 0011, and/or “ADDITIONAL MATERIAL REQUIREMENTS” under ITEMs 0003, 0006, 0009, and 0012.

NOTE B – It is recognized that, should the Government elect to pursue the alternatives outlined in Section C.1.6.6, the presence of the Government or third party contractors may delay, disrupt or otherwise adversely impact upon the performance of this Contract. Consequently, the Contractor's price for ITEMs 0001, 0004, 0007, 0010, will be deemed to include all costs, if any, of supporting Government employees or third party contractors at the work site in performance of "ADDITIONAL LABOR REQUIREMENTS," should the Government elect to pursue such a course. Increased costs that may result from Government or third party Contractor presence as described above, may include, but are not limited to: insurance; physical plant security; utilities used aboard the vessels or in proximity of the vessels in support of the work; and similar requirements. The Government or third party Contractors will only perform the “ADDITIONAL LABOR REQUIREMENTS” or “ADDITIONAL MATERIAL REQUIREMENTS” work if the Contractor and the Government cannot agree upon a fair and reasonable price for efforts under ITEMs 0002, 0003, 0005, 0006, 0008, 0009, 0011, and 0012.

NOTE C - Option Item to which the option clause in SECTION I applies and which is to be supplied only if and to the extent said option is exercised.

NOTE D – The Man-Hours and Labor Dollars listed below are ceiling amounts and do not represent a commitment that the Government will order any or all of these man hours or increase the contract amount. The Man-Hour rate shown is a fully loaded man-hour labor rate (including profit and all indirect costs). This rate shall be the rate used for pricing orders negotiated under C.1.6 entitled “ITEMs 0002, 0005, 0008, and 0011– ADDITIONAL LABOR REQUIREMENTS FOR Landing Craft, Air Cushion (LCAC) 86, LCAC 87, LCAC 77 AND LCAC 50”. Material costs shall not be included in the Fully Loaded Man-Hour Labor Rate. The Contractor agrees that its Fully Loaded Man-hour Labor Rate includes the complete and full compensation to which it is entitled, including, but not limited to, compensation for all the direct labor costs, (e.g. straight time, overtime, premium time, shift differential, holiday time, standby time, etc.) for performing the Additional Labor Requirements, as well as compensation for acceleration, delays and disruptions and other impacts, if any, to the aforementioned work items, to work performed under any other Government contract and to any work in progress for the Government. As these efforts are to be accounted for as part of the overall craft availability schedule, the Contractor agrees that the number of Man-hours included in its price proposal for such. Additional Requirements shall include only direct production (e.g. “trade labor”) and direct production subcontractor Man-hours. Therefore, oversight hours, such as supervision, support functions, etc., which are level of effort estimates in the Contractor’s normal estimating methodology shall not be allowable as additional hours for the pricing of any orders under these Items.

TABLE B-1

ITEM/CRAFT
MAN-HOURS
*FULLY LOADED MAN-HOUR LABOR RATE
*LABOR DOLLARS $
ITEM 0002 (LCAC 86)
26,250
ITEM 0005 (LCAC 87)
26,250
ITEM 0008 (LCAC 77)
26,250
ITEM 0011 (LCAC 50)
30,000

*The Man-hours listed include both prime and subcontractor Man-hours. Labor Dollars ($) equals Man-hours times the Fully Loaded Man-hour Labor Rate. This rate will be used for negotiating Additional Labor Requirements ordered under ITEMS 0002, 0005, 0008, and 0011. The Contractor shall insert the hourly rate provided in the column titled “Fully Loaded Man-hour Labor Rate” to concomitant ITEMS 0002, 0005, 0008, and 0011 in Section B, “Unit Price”.

NOTE E – The Material amounts listed below are only ceiling amounts and do not represent a commitment that the Government will order any or all of that material value.

TABLE B-2

ITEM/CRAFT
MATERIAL $**
ITEM 0003 (LCAC 86 )
$500,000
ITEM 0006 (LCAC 87)
$500,000
ITEM 0009 (LCAC 77)
$500,000
ITEM 0012 (LCAC 50)
$750,000

** The total amount for each craft represents the ceiling amount for material costs that may be added to the contract through the issuance of orders under C.1.6 entitled “ITEMS 0003, 0006, 0009, AND 0012- ADDITIONAL MATERIAL REQUIREMENTS FOR LCAC 86, LCAC 87, LCAC 77 AND LCAC 50”.

NOTE F – Any adjustments in the overall contract price resulting from placing orders under ITEMs 0002, 0003, 0005, 0006, 0008, 0009, 0011, and 0012 shall not include any amount of cost for delay or disruption of work performed under this contract, any other Government contract or any other work in process for the Government.

NOTE G - For informational purposes only, the total contractual ordering of additional requirements under ITEMs 0002, 0003, 0005, 0006, 0008, 0009, 0011, and 0012 shall be summarized in each resulting modification using the following Tables:

TABLE B-3

LCAC 86

ITEM 0002 AND ITEM 0003

AMOD

Request for Contract Change (RCC)
Work Item Number
Man-Hours
Man-Hour Rate
Labor $

Total Material $ Total Total Order $

TOTAL

TABLE B-4

LCAC 87

ITEM 0005 AND ITEM 0006

AMOD

Request for Contract Change (RCC)
Work Item Number
Man-Hours
Man-Hour Rate
Labor $

Total Material $ Total Total

TOTAL

TABLE B-5

LCAC 77

ITEM 0008 AND ITEM 0009

AMOD

Request for Contract Change (RCC)
Work Item Number
Man-Hours
Man-Hour Rate
Labor $

Total Material $ Total Total

TOTAL

TABLE B-6

LCAC 50

ITEM 0011 AND ITEM 0012

AMOD

Request for Contract Change (RCC)
Work Item Number
Man-Hours
Man-Hour Rate
Labor $

Total Material $ Total Total

TOTAL

NOTE H – Offeror shall complete the “Price Group” and “Estimated Total Price” blocks of each data item on the Contract Data Requirements List(s), attached hereto.

NOTE I – This solicitation provides for the Offeror to choose between performing the effort at Assault Craft Unit 4 or at a Contractor Owned Facility. The corresponding contractual requirements, clauses and other information not applicable to the successful Offeror’s proposal will be marked as “RESERVED” by the PCO in the awarded contract. Additionally, if the successful Offeror’s proposal is to be performed at Assault Craft Unit 4, all references to OPTION ITEMS 0014 and 0015 will be deleted at contract award. If the successful Offeror’s proposal is to be performed at a Contractor Owned Facility, all references to OPTION ITEM 0013 will be deleted at contract award.

CLAUSES INCORPORATED BY FULL TEXT

B.2 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)

This entire contract is fixed price.

B.3 CRAFT SCHEDULE INCENTIVE (Applicable to ITEMS 0001, 0004, 0007, AND OPTION ITEM 0010 if exercised)

B.3.1 GENERAL

The successful delivery of craft is of paramount importance to the Government. The Government’s purpose in granting a Craft Schedule Incentive is to encourage and reward superior performance. Accordingly, in addition to any profit or other compensation which may be paid to the Contractor, pursuant to other clause(s) of this contract, the Contractor may earn a Craft Schedule Incentive, as determined by the Incentive Determining Official (IDO), PMS377J, pursuant to the procedures set forth in this clause.

B.3.2 AVAILABLE CRAFT SCHEDULE INCENTIVE

The amount of any incentive available to the Contractor, pursuant to this clause, shall be determined using the evaluation criteria set forth in paragraph B.3.3 and the determination procedures set forth in paragraph B.3.4. The total Craft Schedule Incentive available pursuant to this clause is $150,000 per craft as listed in Table B-7 below.

TABLE B-7

Craft Schedule Incentive
Amount Available
LCAC 86 (ITEM 0001)
$150,000
LCAC 87 (ITEM 0004)
$150,000
LCAC 77 (ITEM 0007)
$150,000
LCAC 50 (ITEM 0010)
$150,000

B.3.3 INCENTIVE EVALUATION CRITERIA

The Craft Schedule Incentive for each craft shall be computed as follows:

Craft Schedule Incentive = $150,000*[(P1*T1)+(P2*T2)+(P3*T3)]

Where:

Phase, (P): P1, P2, and P3 equals the values listed in the following table:

TABLE B-8

P Value Criteria
P Value
P1: All Key Events between Milestones 1. CRAFT INDUCTION to 2. FUEL ON LOAD listed in Table C-2 are complete
0.50
P2: All Key Events between Milestones 2. FUEL ON LOAD to 3. PRODUCTION WORK COMPLETE listed in Table C-2 are complete
0.25
P3: All Key Events between Milestones 3. PRODUCTION WORK COMPLETE to 4. CRAFT DELIVERY listed in Table C-2 are complete
0.25

Time, (T): T1 (Fuel on Load Date), T2 (Production Work Complete Date), and T3 (Craft Delivery Date) equals values from the following table:

TABLE B-9

T Value Criteria
T Value
Earlier than the respective Milestone date listed in Section F, Table F-1
1.0
On-time or later than the respective Milestone date listed in Section F, Table F-1
0.0

B.3.4 INCENTIVE DETERMINATION PROCEDURES

B.3.4.1 Within 14 days after Craft Delivery, the Contractor shall furnish to the IDO, a self-evaluation assessment report and such other information as may be reasonably required to assist the IDO in evaluation of the Contractor’s performance for the incentive. If the Craft Schedule Incentive is not addressed by the Contractor in the required time frame, the IDO will consider the Contractor non-responsive.

B.3.4.2 Within 14 days after the Contractor provides its self-evaluation assessment report, the IDO shall review and provide a Craft Schedule Incentive award recommendation to the Procurement Contracting Officer (PCO), including substantiating documentation. The IDO will also notify the Contractor, in writing, of the incentive award determination. The PCO will issue a unilateral contract modification to provide the incentive. Any payment will be made under ITEM 0016 for LCACs 86, 87, 77, and 50.

B.4 CRAFT QUALITY INCENTIVE (Applicable to ITEMs 0001, 0004, 0007, 0010)

B.4.1 GENERAL

The successful delivery of craft is of paramount importance to the Government. The Government’s purpose in granting a Craft Quality Incentive is to encourage and reward superior performance. Accordingly, in addition to any profit or other compensation which may be paid to the Contractor, pursuant to other clause(s) of this contract, the Contractor may earn a Craft Quality Incentive, as determined by IDO, PMS377J, pursuant to the procedures set forth in this clause.

B.4.2 AVAILABLE CRAFT QUALITY INCENTIVE

The amount of any Incentive available to the Contractor, pursuant to this clause, shall be determined using evaluation criteria set forth in paragraph B.4.3 and the determination procedures set forth in paragraph B.4.4. The total Craft Quality Incentive available pursuant to this clause is $250,000 per craft as listed in Table B-10 below.

TABLE B-10

Craft Quality Incentive
Amount Available
LCAC 86 (ITEM 0001)
$250,000
LCAC 87 (ITEM 0004)
$250,000
LCAC 77 (ITEM 0007)
$250,000
LCAC 50 (ITEM 0010)
$250,000

B.4.3 INCENTIVE EVALUATION CRITERIA

B.4.3.1 The Craft Quality Incentive for each craft shall be computed as follows:

Craft Quality Incentive = $250,000*(S+K+C)

Where:

Contractor responsible Board of Inspection and Survey (INSURV) Starred Cards, (S):

S equals 0.4 based on no Contractor responsible INSURV Starred cards are identified during INSURV*

S equals 0.0 based on one or more Contractor responsible INSURV Starred cards are identified during INSURV*

*Contractor responsible INSURV Starred cards, as defined in INSURVINST 4730.1G dated 23 APR 13, are those trial cards deemed safety issues (either personnel or equipment), and Repair Before Operate (RBO) issues.

Contractor responsible INSURV Trial Cards, (K):

K equals 0.3 based on no more than 40 Contractor responsible INSURV Trial cards (including Starred cards) identified during INSURV**

K equals 0.0 based on more than 40 Contractor responsible INSURV Trial cards (including Starred cards) identified during INSURV**

**Contractor responsible INSURV Trial cards are those cards assigned to the Contractor during INSURV.

Government issued Major Non-Conformity (Type B or C) Corrective Action Requests (CAR) for areas of Quality or Management (C):

C equals 0.3 based on no more than four Government issued Major Non-Conformity (Type B or C) Corrective Action Requests (CAR) for areas of Quality or Management at Craft Delivery

C equals 0.0 based on more than four Government issued Major Non-Conformity (Type B or C) Corrective Action Requests (CAR) for areas of Quality or Management at Craft Delivery

B.4.3.2 A craft will be considered delivered on that day if it is delivered before 3:00 PM local time; otherwise, it will be counted for the next day. Government personnel will not be available to receive craft from the Contractor on weekends, Federal Holidays, the week between Christmas and New Year’s Day, and the week of New Year’s Day.

B.4.3.3 For the purpose of this Incentive, the ACO will issue a letter stating the actual date of Craft Delivery, the status of Contractor responsible INSURV Trial cards, including Starred Cards, and the status of Government issued Major Non-Conformity (Type B or C) CARs for areas of Quality and Management.

B.4.4 INCENTIVE DETERMINATION PROCEDURES

B.4.4.1 Within 14 days after Delivery, the Contractor shall furnish to the IDO, a self-evaluation assessment report and such other information as may be reasonably required to assist the IDO in evaluation of the Contractor’s performance for the Incentive. If a Craft Quality Incentive is not addressed by the Contractor in the required time frame, the IDO will consider the Contractor non-responsive.

B.4.4.2 Within 14 days after the Contractor provides its self-evaluation assessment report, the IDO shall review and provide an Incentive award recommendation to the PCO, including substantiating documentation. The IDO will also notify the Contractor, in writing, of the Incentive award determination. The PCO will issue a unilateral contract modification to provide the Incentive. Any payment will be made under ITEM 0017 for LCACs 86, 87, 77, and 50.

CLAUSES INCORPORATED BY FULL TEXT

B.5 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)

(a) As part of the negotiated fixed price or total estimated amount of this contact, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term “residual dollar amount” shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

Section C - Descriptions and Specifications

C.1 STATEMENT OF WORK

C.1.1 GENERAL SCOPE OF WORK

C.1.1.1 NAVAL SEA SYSTEMS COMMAND (NAVSEA) STANDARD ITEMS

C.1.1.1.1 NAVSEA Standard Items are available at the following web site:

http://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/

C.1.1.1.2 The current NAVSEA Category I Standard Items applicable to this contract are listed in the Index of each craft's Specification For Work To Be Accomplished, incorporated in Attachment J-1. For LCACs 86, 87, 77, and 50, the applicable FY19 Standard Items are invoked.

C.1.1.1.3 Category II Standard Items are part of each craft’s Specifications For Work To Be Accomplished when invoked and/or referenced in individual Work Items.

C.1.1.1.4 The Contractor shall submit data required by Category I and II Standard Items invoked in this contract in accordance with Attachment J-2, Contract Data Requirements List (CDRL), DD Form 1423.

C.1.1.2 ALUMINUM MATERIAL SPECIFICATION

C.1.1.2.1 High Corrosion Resistant Aluminum material (H116/H321) invoked in any craft drawing or specification to be procured under American Society for Testing and Materials (ASTM) International, Standard Specification B-209, "Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate" is superseded by and shall be procured under ASTM-B928 - 15, "Specification for High Magnesium Aluminum-Alloy Sheet and Plate for Marine Service and Similar Environments".

C.1.1.3 USE OF BLACK OXIDE COATED BRASS THREADED FASTENERS (BOCBTFs)

C.1.1.3.1 Due to safety concerns, use of BOCBTFs is not authorized when installing or replacing threaded fasteners in the accomplishment of any work required by any Work Item in this contract.

C.1.1.4 CONTRACTOR PROVIDED FACILITES AND SERVICES

C.1.1.4.1 The Contractor shall protect the craft from adverse environmental exposure, including that caused by craft operating nearby, Contractor equipment, machinery, or vehicles.

C.1.1.4.2 The Contractor shall store, handle and maintain Government Furnished Property (GFP) (Incorporation) items, GFP (Performance) items, Contractor Furnished Material (CFM), and equipment and components removed from craft that will be reinstalled as part of the craft in a controlled storage facility in a manner that does not degrade the intended use of the item.

C.1.1.4.3 Requirements for SLEP availabilities performed at ACU 4.

C.1.1.4.3.1 Except as specifically described herein, the Contractor shall furnish all necessary material, labor, services, equipment (e.g., air compressors, crane services, test equipment), accessories, facilities, and such other services as are necessary for accomplishing the work specified in the contract.

C.1.1.4.3.2 After receipt of contract award and prior to starting work on the craft, the Contractor shall submit a list of employees who will work aboard the craft to the authorized representative of the Government and to the ACU 4 Commanding Officer. The list shall be on company letterhead, and include each employee’s name, social security number, security clearance, and bear the signature of a company official. The Contractor shall submit updates to list of employees as required.

C.1.1.4.4 Requirements for SLEP availabilities performed at a Contractor-Owned Facility.

C.1.1.4.4.1 Except as specifically described herein, the Contractor shall furnish all necessary material, labor, services, equipment (e.g., air compressors, crane services, test equipment), accessories, facilities, and such other services as are necessary for accomplishing the work specified in the contract. This includes adequate space for storing LCAC until they are shipped from the Contractor’s facility to ACU 5. The Contractor shall conduct preservation in accordance with Attachment J-6 , “Preservation and Lay-up of LCAC Craft at the Contractor’s Facility”.

C.1.1.5 GOVERNMENT-FURNISHED PROPERTY (GFP) (INCORPORATION)

C.1.1.5.1 The Planning Memorandum for each craft, included in the Technical Data Package (TDP) (Attachment J-1), is the consolidated listing of the GFP (Incorporation) and the only items that the Government will provide for incorporation in the equipment to be delivered under ITEMs 0001, 0004, 0007, and OPTION ITEM 0010 notwithstanding any term or condition of this contract to the contrary. The GFP (Incorporation) items listed in the Planning Memorandum take precedence over all other GFP references in the TDP. The availability date of the GFP (Incorporation) items listed in each craft’s Planning Memorandum is the induction date of the respective craft, or as otherwise noted.

C.1.1.5.2 The Contractor shall determine the “Need Date” of GFP (Incorporation) items listed in the Planning Memorandum for each craft. The “Need Date” shall be based upon the Contractor’s Production Schedule, compliance with Government Property clauses of Section I and NAVSEA Standard Item requirements invoked in this contract concerning Government property control and status reporting, and determination of the priority of GFP (Incorporation) item requirements by Work Item. The Government intends to provide all GFP (Incorporation) items to meet the Contractor’s “Need Date,” but may not be able to provide items earlier than the planned availability dates specified herein. The Contractor shall report the “Need Date” of GFP (Incorporation) items for each craft in accordance with Attachment J-2, CDRL B005. At a minimum, the report shall include craft hull number, Work Item number, and “Need Date”.

C.1.1.6 GOVERNMENT-FURNISHED PROPERTY (GFP) (PERFORMANCE)

The Government will furnish only that property set forth in Attachment J-4 for use in the performance of this contract notwithstanding any term or condition of this contract to the contrary.

C.1.1.7 PICK-UP OF GFP BY THE CONTRACTOR

C.1.1.7.1 For LCAC SLEP Availabilities at ACU 4, GFP (Incorporation) items, listed in each craft’s Planning Memorandum, will be available for pick up at the ACU. The Contractor shall make arrangements to pick up GFP (Incorporation) items with the authorized representative of the Government.

C.1.1.7.2 For LCAC SLEP Availabilities at ACU 4, GFP (Performance) items, listed in Attachment J-4, will be available for pick up at the ACU. The Contractor shall make arrangements to pick up GFP (Performance) items with the authorized representative of the Government. Upon completion of the use of GFP (Performance) items the Contractor shall return the items, via the authorized representative of the Government, to the ACU. The Contractor shall be held responsible for all lost or damaged GFP (Performance) items while the items are in the possession of the Contractor.

C.1.1.7.3 For LCAC SLEP Availabilities at a Contractor-Owned Facility, upon notification by Cognizant Contract Administration Office representative, the Contractor will accept delivery of the GFP cited in the solicitation package from any and all locations within a 25-mile radius of Cognizant Contract Administration Office.

C.1.1.7.4 For LCAC SLEP Availabilities at a Contractor-Owned Facility, the Contractor will be required to make an initial pickup of all available GFP at the start of availability. Supervisor of Shipbuilding (SUPSHIP) Material Department will notify the Contractor when additional GFP will be available for pickup, the approximate number of pieces, and the size of the GFP. These requirements do not supersede specific requirements stated in the work specifications.

C.1.1.8 INTEGRATED DATA ENVIRONMENT (IDE)

C.1.1.8.1 The Contractor shall be responsible for the development and management of all documentation generated by the Contractor and its subcontractors under this contract. The Contractor shall enter specified data submissions, identified in CDRL BLK 14-DISTRIBUTION and BLK-16 REMARKS, into the IDE in the appropriate CDRL folder. The IDE will be accessible to the Contractor through the Internet and requires 128-bit encryption software at the Contractor’s access points. For those CDRL deliverables identified in Attachment J-2 to be entered into IDE, all, or any portion of the CDRL submittal shall be developed in a digital format compatible with Microsoft Office 2010 and Adobe Acrobat 9.0 or earlier.

C.1.1.8.2 Department of Defense (DoD) Public Key Infrastructure (PKI) authentication is required for access to the IDE. The Contractor shall obtain DoD PKI certificates from an External Certification Authority (ECA) for their personnel that require access to IDE. Information on DoD PKI certificates and purchase costs can be obtained from the following website:

http://iase.disa.mil/pki/eca/

(Note: DoD PKI certificates obtained for access to another Navy/DoD private web site are applicable to IDE)

C.1.1.8.3 The Contractor shall designate two personnel for access to the IDE. The Government will provide the two Contractor designated personnel with training focusing on the details of the use and functionality of the IDE. The Contractor will be contacted after contract award to establish the training date. Training is desired to occur within 14 days after contract award and will occur via WEBEX. Prior to the training session, the Contractor will be contacted concerning initiation and completion of Contractor access requirements to the IDE. CDRL data submissions required to be posted to the IDE prior to completion of the training session shall be posted no later than five (5) days after completion of IDE training.

C.1.1.8.4 NAVSEA provides a 24/7 Help Desk for the IDE that is accessible through email, helpdesk@netideasinc.com, or call center at 877-742-3725 (toll free in the U.S.) or 856-866-3802. PMS377J maintains an Office Level Systems Administrator (OLSA) for assistance with issues and any problems that may arise during normal working hours.

C.1.1.9 CONTRACTOR KEY PERSONNEL

C.1.1.9.1 The following positions are considered, at a minimum, to be Key Personnel:

a. Program Manager
b. Project Manager
c. Material/Logistics Manager
d. Quality Control Supervisor
e. Test Engineer
f. Planner/Scheduler
g. Subcontractor Manager

No individual shall occupy more than one Key Personnel position listed above. All key personnel shall be located onsite at place of performance or within reasonable driving distance from the facility.

C.1.1.9.2 Qualifying certifications for Planner/Scheduler (Onsite if at ACU 4) Key Personnel, include, but are not limited to: Project Management Professional (PMP) Certification and Microsoft Certified Technology Specialist (MCTS): Microsoft Project 2010 with Managing Projects.

C.1.1.10 (G) – POINT TEST OR INSPECTION NOTIFICATIONS

C.1.1.10.1 As addressed in NAVSEA Standard Item 009-04, each test and inspection event requiring Government notification is annotated with a (G) Point symbol. The (G)-Point inserted in a Work Item requires that a representative of the Government be notified by the prime contractor in order to observe a specific test or inspection (I) (V). The Government will be available to observe scheduled tests and inspections (I) (V) during the normal working hours with specific hours delineated in Section C paragraph C.1.3.1.3 for performance at ACU 4. Normal Government working hours for place of performance at a Contractor-Owned Facility will be defined during the Post Award Conference.

C.1.1.10.2 The Contractor shall schedule any test or inspection event annotated with the (G)-Point during the Government’s normal working hours, where practicable. The Contractor shall adhere to the following notification requirements in lieu of those stated in NAVSEA Standard Item 009-04, paragraph 3.11.2:

(a) The Contractor shall notify the Production Controller, or his designated representative, via FAX, hard copy, or electronic method, as directed by the Production Controller. The Contractor shall document the date, time, method and identity of the Production Controller or the designated representative who was notified.

(b) The Contractor shall notify the Production Controller during normal working hours at least four (4) hours prior to commencing the specific test or inspection event annotated with a (G)-Point.

(c) For (G)-Point events which must be rescheduled to occur after normal working hours, or on a weekend, or on a Federal holiday, the Contractor shall notify the Production Controller as soon as it is known, but no later than two (2) hours prior to the scheduled event.

(e) When (G)-Point events are scheduled after normal working hours, the Contractor shall notify the Production Controller no later than 1200 on the second normal workday prior to the weekend or a Federal holiday.

C.1.1.10.3 On days with multiple (G)-Point events, the Contractor shall coordinate with the Production Controller a prioritized list of (G)-Points.

C.1.2 LCAC SLEP AVAILABILITY

C.1.2.1 PRE-INDUCTION SURVEY

C.1.2.1.1 The Contractor shall conduct, with Government assistance as necessary, a Pre-Induction Survey of each craft. The purpose of the Pre-Induction Survey is to ascertain any changes to the craft material condition requiring growth work to Work Items identified in Attachment J-1. The Contractor shall ensure that the primary focus of the Pre-Induction Survey is the conduct of a comprehensive survey of equipment, systems, and hull structures related to the Work Items.

C.1.2.1.2 The Pre-Induction Survey shall be conducted at the ACU.

C.1.2.1.2.1 For SLEP Availabilities conducted at ACU 4. The Contractor shall conduct the Pre-Induction Survey for each craft after contract award but commence no earlier than 45 days prior to Craft Induction Date. Scheduling of the Pre-Induction Survey shall be coordinated with the authorized representative of the Government.

C.1.2.1.2.2 For SLEP Availabilities conducted at a Contractor-Owned Facility, the Contractor shall conduct a Pre-Induction Survey for each craft after contract award or after Option exercise date, as appropriate, to commence no earlier than 45 days prior to the craft’s Contractor Transport Pickup Date from ACU 4 and be completed prior to date of craft transport to the Contractor’s facility.

C.1.2.1.3 The Contractor shall document and submit a report of candidate growth work, in order of craft Specification Work Item number, based on the results of the Pre-Induction Survey. Each report shall be serialized and shall provide sufficient information to enable the Government to determine a course of action for disposition of candidate growth work. Reports shall, as a minimum, identify the craft hull number, the Work Item number, craft system and sub-system, component, description of discrepancy, recommendations for disposition including requirement for a Condition Found Report (CFR), rough order of magnitude cost, and digital pictures of the items recommended for growth work. Each report shall clearly identify the work which is part of the TDP, also known as “base work”, and the growth work. Each report shall include an affirmative statement that the effort identified as growth is not already accounted for in the base work package. The reports shall also indicate the controlling Work Item on the schedule critical path affected by any candidate growth work and provide impact to the craft schedule.

C.1.2.1.4 The Contractor shall provide the Pre-Induction Survey Report in accordance with Attachment J-2, CDRL A020.

C.1.2.2 CONDITION FOUND REPORTS

C.1.2.2.1 During the contract period of performance, the Contractor shall identify craft deficiencies and recommend corrective action for needed repairs for those deficiencies discovered which are not addressed in a craft’s Attachment J-1: Technical Data Package For LCAC SLEP. Reports of craft deficiencies and recommended corrective action for needed repairs shall be submitted to the Government in the form of a CFR entered into the Navy Maintenance Database (NMD). A representative of the Government will assist the Contractor in accessing the NMD. The Contractor shall track the status of CFRs and the associated RCCs in the Government’s NMD RCC Status Report throughout the contract period of performance.

C.1.2.2.2 The Contractor shall submit CFR's documenting found deficiency during the dis-assembly process to allow for planning and procurement of long lead parts. All CFRs and supporting data shall be submitted via electronic means into NMD within five (5) working days of identification of a craft deficiency. The CFR shall include the following:

a. Contract number and craft hull number

b. CFR serial number (Craft hull number and sequential CFR number)

c. Applicable Work Item number

d. Date craft deficiency was discovered

e. Description of the deficiency

f. Specific location of the deficiency

g. Recommendation for corrective action and needed repair, including identification of drawings or other references and CFM. The Contractor shall include the National Stock Number NSN for all CFM and for all parts/requested Government Furnished Material (GFM)

h. Attach electronic media photo (.jpg) of deficiency to CFR (when additional clarity would be beneficial or when requested by the supervisor)

C.1.2.2.3 Standard Item 009-01, General Criteria; accomplish, requires the Contractor to submit CFRs. The Contractor will be required to provide CFRs as addressed in Attachment J-2, CDRL A001-A.

C.1.2.3 GAS TURBINE ENGINE SERVICE RECORD

C.1.2.3.1 The Contractor shall maintain records of all gas turbine engine (TF40B, ETF40B, and T-62) movement by engine and/or component serial number. The Contractor shall report gas turbine engine service record data in accordance with Attachment J-2, CDRL A021. The Contractor shall forward original documents received with all gas turbine engines to the authorized representative of the Government for each craft in the SLEP availability.

C.1.2.4 UNIQUE ITEM IDENTIFIER (UII)

C.1.2.4.1 The Contractor shall provide unique item identification or a DoD recognized unique identification equivalent, in accordance with DFARS 252.211-7003, “ITEM IDENTIFICATION AND VALUATION, for all new Contractor-Furnished Equipment (CFE) installed in each craft having an acquisition cost of $5,000 or more. The Contractor shall provide UII reports in accordance with Attachment J-2, CDRL B007.

C.1.2.5 GROUP 2 MATERIAL

C.1.2.5.1 Equipment and components removed from craft that will not be reinstalled as part of the SLEP availability are designated Group 2 Material. The Contractor shall segregate, clean and store Group 2 Material in an equivalent manner as listed in paragraph C.1.1.4.2 until turnover to the authorized representative of the Government. When directed, the Contractor shall turn over Group 2 Material to the authorized representative of the Government. Turnover of Group 2 Material may be accomplished incrementally or as a one-time event.

C.1.2.5.2 The following Group 2 Material, listed in the table below, for each craft shall be separately processed and turned over to the authorized representative of the Government in one shipment no later than 30 days after craft induction:

TABLE C-1

Equipment Description
Part Number
Qty
EGI Control Panel
14550-09512001
1
Universal Keyboard (UKB) Processor Unit
426-7621839-2
1
Navigation (NAV) Processor Unit
426-7621811-2
1
CDR Processor Unit
426-7621881-1
1
CDR Shuttle with drive (Spare)
110-2430-098-OC
2
Ethernet Switch Assembly
426-7621838-2
1
Bridgemaster-E Turning Unit
65825LAR/X
1
Bridgemaster-E Electronics Unit
65800RAVC
1
IVT Display (10.4”)
90200022/35
3
IVT Display (17”)
90200023/36
1

C.1.2.5.3 The Contractor shall develop and maintain an inventory database of the Group 2 material for each craft. The inventory database, compatible with Microsoft Office 2010 Excel format, shall contain the following:

Description/nomenclature, Serial Number, and Quantity, and include data fields for date of turn over to the Government, receiving Government activity, and point of contact at receiving Government activity. The Contractor shall provide the report in accordance with Attachment J-2, CDRL B006.

C.1.2.5.4 For SLEP availabilities conducted at a Contractor-Owned Facility, when directed by the Supervisor, the Contractor shall package and ship (by Government Bill of Lading (GBL)) the equipment and components to ACU 4. Craft sets of lift system skirt material, not to be reused, shall be packaged and shipped (by GBL) separately from other equipment and components or may be disposed of locally, as directed by the Supervisor.

C.1.2.6 LCAC SLEP QUARTERLY PROGRESS MEETINGS

C.1.2.6.1 The Contractor shall support Quarterly Progress Meetings (QPMs) to be held primarily at the ACU or at the Contractor’s facility. The QPMs may occasionally be held at the LCAC Program Office in Washington, DC. The first QPM shall be scheduled three (3) months after induction of the first LCAC, and quarterly thereafter, on dates mutually agreeable to the Contractor and PMS377J.

C.1.2.6.2 The purpose of the QPM is for the Contractor to report on progress of SLEP availabilities. In support of the QPMs, the Contractor shall prepare a QPM presentation consisting of topics such as craft SLEP availability progress, anticipated delays, manning, craft production schedules, growth work status, lessons learned, receipt of GFP/CFM, production problems, technical issues, and other related matters. The Contractor’s presentation shall include background information, current status, and anticipated resolution or future action related to the QPM topics. The Contractor shall address all craft in SLEP availabilities under contract at each QPM. The QPM presentation shall be submitted in hard copy and electronic format compatible with Microsoft Office PowerPoint 2010 in accordance with Attachment J-2, CDRL A022.

C.1.2.6.3 The requirement for the Contractor to support the QPMs replaces the requirement of the Contractor to participate in review conferences at the 25, 50, and 75 percent points of each SLEP availability, as listed in paragraph 3.9 of NAVSEA Standard Item 009-60.

C.1.2.7 SUPPLEMENTAL PRODUCTION SCHEDULE REQUIREMENTS

C.1.2.7.1 The Contractor shall be responsible for submitting reports required by Standard Item 009-60, in accordance with Attachment J-2, CDRL A009. Standard Item 009-60 is invoked in its entirety with the modifications as specified below.

C.1.2.7.2 The Production Schedule CDRL A009-A shall be a Critical Path Method (CPM) schedule for planning, scheduling, and progress reporting of all work. Individual Production Schedules shall be developed for LCAC 86 LCAC 87, LCAC 77 and LCAC 50 at ACU 4 or offsite location, which includes, at a minimum:

a) All Work Items
b) Milestones and Key Events as identified in Table C-2
c) Separate critical paths*

d) Provisions for the incorporation of the Additional Labor Requirements on the schedule critical path

e) Dates of the 50% and 75% work completion points as defined in Section F, paragraph F.4.3

* Critical Paths, as defined in 4.1.7 of Standard Item 009-60, shall be calculated for the defined schedule using the Microsoft Project 2010 software, required by C.1.2.7.5(h) .

C.1.2.7.3 The Contractor’s baseline Production Schedule shall remain constant throughout the contract period of performance. In the event the Contractor fails to define any element of work, activity or logic, such omission or error, when discovered by the Contractor or Government, shall be corrected by the Contractor and shall not affect the Craft Delivery Date.

C.1.2.7.4 Milestones as defined in Standard Item 009-60 cannot be standalone events, but must have a logical relationship (predecessor and successor) to the work activities that must be completed to support the Milestone and the work activities that can start once the previous milestone is achieved. Start No Earlier Than (SNET) or Start No Later Than (SNLT) should not be used, except when the milestone has a prescribed date associated with the milestone that cannot be altered. SNET and SNLT milestones, if not properly used, can create artificial critical paths in the CPM schedule. At a minimum, the Contractor’s baseline Production Schedule shall include the Milestones and Key Events as listed in Table C-2 below. Milestones are defined as Production Schedule events and are listed in time order sequence. Key Events are defined as Production Schedule events but are not all inclusive and are not listed in time order sequence. The Contractor shall determine the sequence of the Key Events.

TABLE C-2

MILESTONES AND KEY EVENTS

MILESTONE
KEY EVENT
TITLE

P1*

1. CRAFT INDUCTION

X
1.1 Open and Inspect Reports
X
1.2 Electrical Lite Off
X
1.3 Climate Control System Testing
X
1.4 Control and Monitoring System (CAMS) Lite Off
X
1.5 Fuel System Testing
X
1.6 Halon Testing
X
1.7 Structural Work, Completion and Tightness Testing (exception of 1.12 below)
X
1.8 Powertrain Alignments
X
1.9 Deep Skirt Installation
X
1.10 Internal Communications Testing
X
1.11 Propulsion Systems Work Complete (to include Lube Oil (L/O) and hydraulic systems and the installation of all equipment/interferences removed in Work Item 120-11-001).
X
1.12 Climate Control Systems Testing
X
1.13 Removal from Environmentally Protected Facility
X
1.14 Chock Pull Test

P2*

2. FUEL ON LOAD

X
2.1 Common Data Recorder (CDR) Testing
X
2.2 Propulsion and Auxiliary Systems Testing
X
2.2.1 CAMS Control and Sensors Functional Testing
X
2.2.2 Fuel System Operational Testing
X
2.2.3 Auxiliary Power Unit (APU) Engine Starts
X
2.2.3.1 Generator Start Testing
X
2.2.3.2 Generator Set Control System Functional Testing
X
2.2.4 ETF40B Engine Starts
X
2.2.5 Balance Lift Fans and Props
X
2.2.6 Engine and Transmission Functional Testing (High Power Runs)
X
2.2.7 Bleed Air, Anti-Icing (BAAS) System Testing
X
2.2.8 Cold Weather System Testing
X
2.3 Water Wash System Testing
X
2.4 Ramp System Testing
X
2.5 Exterior Communications Testing
X
2.6 Navigation Systems Testing
X
2.6.1 Radar Functional Testing
X
2.6.2 Embedded Global Positioning System (GPS)/Embedded GPS/Inertial (EGI) Testing
X
2.6.3 Lights and Horn Testing
X
2.7 Lighting System Functional Testing
X
2.8 Painting
X
2.9 Compartment Close Out Inspections
X
2.10 Infrared Survey (Government Test)
X
2.11 Mock INSURV Trial
X
2.12 Runway and Harbor Trials (Work Item 982-31-001)

P3*

3. PRODUCTION WORK COMPLETE

X
3.1 INSURV Trial Preparations
X
3.1.2 Communication Systems Validation (CSV) Testing (Government Test)
X
3.1.3 Craft Crew Preparation Period (if place of performance is the ACU)
X
3.2. INSURV TRIAL
X
3.2.1 INSURV Trial Card Correction Period

4. CRAFT DELIVERY

*Applicable to B.3.3 Craft Schedule Incentive

C.1.2.7.5 The Contractor shall prepare a Production Schedule as follows:

a. The Production Schedule shall show the sequence and interdependence of activities required for complete performance of all work. The Contractor shall be responsible for assuring all work sequences are logical and that the Production Schedule shows a coordinated plan for the work.

b. The Production Schedule shall indicate which days of the week will be planned work days, all scheduled non-work days and holidays, and the time periods for planned shift work by trade, if any.

c. The Production Schedule shall include activities for submission of reports as identified within the applicable Work Items and Standard Items.

d. The Work Items in each Production Schedule shall be listed in increasing order, by Work Item number.

e. The Production Schedule shall include each Work Item to the activity level. At a minimum, the Production Schedule shall include the following for each activity:

(1) ID.

(2) Task Name.

(3) Baseline Duration.

(4) Duration.

(5) Percent (%) Complete.

(6) Percent (%) Work Complete.

(7) Physical Percent (%) Complete.

(8) Start.

(9) Finish.

(10) Early Start.

(11) Early Finish.

(12) Late Start.

(13) Late Finish.

(14) Total Slack.

(15) Predecessors.

(16) Successors.

(17) Planned Labor Hours.

(18) Actual Labor Hours.

(19) Actual Start.

(20) Actual Finish.

(21) Baseline Start.

(22) Baseline Finish.

(23) Activity Codes identifying Work Phase, Work Area, Responsibility, and subcontractor work activities.

(24) Work Activity Description. A clear and concise description of the work represented by the activity. Avoid the use of non-standard abbreviations.

(25) Planned Manpower Loading. The total number of hours by trade and labor category (not total number of crews or personnel) that will be assigned to each activity.

(26) Notes: This field shall be utilized to describe Contractor’s manual changes from the previous month’s schedule and impact to associated activities.

f. The Production Schedule shall include Work Item activities for approved Additional Labor Requirements orders.

g. The Production Schedule shall include all subcontractor work.

h. The Production Schedule shall include computer-produced Production Schedule reports, as required by Standard Item 009-60. The Contractor shall provide the Production Schedule electronic files and reports in Microsoft Office 2010 Project.

i. The Production Schedule shall be revised monthly to include additions, deletions, modifications, progress, and completions.

j. The Contractor shall utilize the following criteria to describe the overall progress of each craft undergoing the SLEP availability. The Contractor shall not report overall progress at or in excess of the percentages below, until the corresponding Key Event or Milestone is…