Text version
LCAC SLEP
N00024-18-R-2400
ATTACHMENT J-2c
CONTRACT DATA REQUIREMENTS LIST,
DD FORM 1423 -
EXHIBIT A
DATED 08 JANUARY 2018
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB NO. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-01: GENERAL CRITERIA (SEE BLOCK 16)
17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draft Final
Reg Repro
16. REMARKS
BLOCK 03 – DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-01 WITH THE FOLLOWING EXCEPTIONS:
(A) PARAGRAPH 3.2.4 DRY DOCK INSPECTION REPORTS NOT APPLICABLE.
(B) SUBMIT SECURITY REQUIREMENTS DATA OF PARAGRAPHS 3.11 DIRECTLY TO THE
SUPERVISOR (MARMC). DO NOT POST IN LCAC IDE.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS 377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
OR RECONSTRUCTION OF THE DOCUMENT.
BLOCK 10 AND 11 - AS SPECIFIED SI 009-01.
BLOCK 12 – DATA SUBMISSIONS AS LISTED IN SI 009-01
AS MODIFIED BY ATTACHMENT TO CDRL A001.
BLOCK 13 - AS SPECIFIED SI 009-01.
BLOCK 14 - ALL CDRL DATA SUBMISSION REQUIREMENTS SHALL BE PROVIDED TO
SUPERVISOR (MARMC) and ACU 4. CDRL A001-C SHALL ALSO BE PROVIDED TO PMS377 BY
POSTING TO THE PMS377 IDE:
CDRL DATA STANDARD ITEM 009-01 REFERENCE*
A001-A CONDITION FOUND REPORT PARAGRAPHS 3.2.1**, 3.2.2, 3.2.5***, 3.2.5.3***
A001-B JOB ORDER REPORT LISTING PARAGRAPH 3.2.6
A001-C REQUEST FOR DEVIATION PARAGRAPH 3.9
A001-D MATERIAL SAFETY DATA SHEET PARAGRAPH 3.13
*INCLUDES ASSOCIATED SUBPARAGRAPHS
** CFRs SHALL BE SUBMITTED TO NMD PER SECTION C.
*** LIST OF MATERIAL SHALL INCLUDE NATIONAL STOCK NUMBERS (NSN) WHERE APPLICABLE.
SUBMIT WORK ITEM INSPECTION REPORTS, SI 009-01 PARAGRAPH 3.2.2, THAT INCLUDE REPAIR
RECOMMENDATIONS WITHIN 45 DAYS OF START OF A CRAFT’S SLEP AVAILABILITY, EXCEPT
FOR WORK ITEMS 120-11-001 AND 150-11-001. FOR THOSE WORK ITEMS, INSPECTION REPORTS
WITH REPAIR RECOMMENDATONS SHALL BE SUBMITTED WITHIN 7 DAYS AFTER ENGINE
MODULE REMOVAL FROM CRAFT.
ACU 4 0 1 0
SUPERVISOR
(MARMC)
0 1 0
PMS 377 IDE 0 1 0
15. TOTAL 0 3 0
G. PREPARED BY
PIERCE SCHREIBER
H. DATE
I. APPROVED BY
KAREN BEVENOUR
J. DATE
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A002
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-04: QUALITY MANAGEMENT SYSTEM (SEE
BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.4
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
A
(SEE BLOCK 16)
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 – SUBMIT INITIAL QUALITY MANAGEMENT SYSTEM AND UPDATES PER SI 009-04.
OTHER DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-04.
BLOCK 08 – APPROVAL FOR CONTENT. APPROVAL AUTHORITY - SUPERVISOR (MARMC).
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25. DESTROY THIS
DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR
RECONSTRUCTION OF THE DOCUMENT.
BLOCK 10, 11, 13 - AS SPECIFIED IN SI 009-04.
BLOCK 12 – SUBMIT QUALITY ASSURANCE PROGRAM NO LATER THAN 10 CALENDAR DAYS
AFTER CONTRACT AWARD.
BLOCK 14 - ALL CDRL DATA SUBMISSION REQUIREMENTS SHALL BE PROVIDED TO
SUPERVISOR (MARMC) and ACU 4. CDRL A002-A and A002-B SHALL ALSO BE PROVIDED TO
PMS377 BY POSTING TO THE IDE:
CDRL DATA STANDARD ITEM 009-04 REFERENCE*
A002-A QUALITY MANAGEMENT SYSTEM MANUAL
AND PROCEDURES PARAGRAPH 3.1
A002-B CORRECTIVE ACTION RESPONSES PARAGRAPH 3.5
(MARMC)
PMS377 IDE 0 1 0
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
8 JAN 2018
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A003
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-09: PROCESS CONTROL PROCEDURE (PCP) –
DOCUMENTATION (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.4
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
A
(SEE BLOCK 16)
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-09.
BLOCK 08 – APPROVAL FOR CONTENT. THE CONTRACTOR SHALL ALLOW SEVEN (7) WORKING
DAYS FOR REVIEW AND COMMENT BY THE GOVERNMENT. APPROVAL AUTHORITY -
SUPERVISOR (MARMC).
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE., SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
OR RECONSTRUCTION OF THE DOCUMENT.
BLOCK 10, 11, 12, 13 - AS SPECIFIED IN SI 009-09.
(MARMC)
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A004
2. TITLE OF DATA ITEM
CERTIFICATION/DATA REPORT
3. SUBTITLE
SI 009-12: WELDING, FABRICATION, AND INSPECTION
REQUIREMENTS – PERSONNEL QUALIFICATIONS
(SEE BLOCK 16)
DI-MISC-80678
5. CONTRACT REFERENCE
C.1.2.11.4
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-12.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS 377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
BLOCK 10, 11, 12, 13 - AS SPECIFIED IN SI 009-12.
(MARMC)
15. TOTAL 0 2 0
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A005
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-22: SHIPBOARD ELECTRIC CABLE – TEST
REPORT (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-22.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
BLOCK 10, 11, 12, 13 - AS SPECIFIED IN SI 009-22.
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A006
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-23: INTERFERENCES (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-23.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
OR RECONSTRUCTION OF THE DOCUMENT.
BLOCK 10, 11, 12, 13 - AS SPECIFIED IN SI 009-23.
CDRL DATA STANDARD ITEM 009-23 REFERENCE*
A006-A REPORT OF ADDITIONAL INTERFERENCES
TO BE REMOVED PARAGRAPH 3.2
A006-B REPORT OF PREVIOUSLY DAMAGED OR
DETERIORATED INTERFERENCES PARAGRAPH 3.4
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A007
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-32: CLEANING AND PAINTING REQUIREMENTS
– INSPECTION REPORT (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-32.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
BLOCK 10, 11, 12, 13 - AS SPECIFIED IN SI 009-32.
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A008
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-40: REQUIREMENTS FOR CONTRACTOR
CRANES, MULTI-PURPOSE MACHINES AND MATERIAL
HANDLING EQUIPMENT AT NAVAL FACILITIES –
ACCIDENT REPORT (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSIONS AS LISTED IN SI 009-40.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE., SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
BLOCK 10, 11, 12, 13 - AS SPECIFIED IN SI 009-40.
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A009
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-60: SCHEDULE AND ASSOCIATED REPORTS
FOR AVAILABILITIES OVER 9 WEEKS IN DURATION
(SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.2.7
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draft Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-60 AND AS MODIFIED BY SECTION C REQUIREMENTS.
BLOCK 03, 10, 11, 12, 13 – SEE BELOW.
CDRL DATA SI 009-60 PARAGRAPH*
A009-A
BLK03 SUBTITLE PRODUCTION SCHEDULE 3.2**
BLK10 FREQUENCY WEEKLY AFTER START OF WEEKLY PRODUCTION MEETINGS
BLK11 AS OF DATE NA
BLK 12 DATE OF 1ST SUBM 15 DAYS PRIOR TO THE INDUCTION DATE OF THE FIRST CRAFT
BLK 13 DATE OF SUBS SUBM ONE DAY PRIOR TO WEEKLY PRODUCTION METINGS
A009-B
BLK03 SUBTITLE LIST OF TESTS BY WORK ITEM 3.2**
BLK10 FREQUENCY ASREQ
BLK11 AS OF DATE NA
BLK12 DATE OF 1ST SUBM AT START OF A CRAFT’S SLEP AVAILABILITY
BLK13 DATE OF SUBS SUBM AS REQUIRED TO SUPPORT INTEGRATED TOTAL SHIP TEST
PLAN AS REQUIRED BY SI 009-67
A009-C: Reserved
BLK03
BLK10
BLK11
BLK 12
BLK 13
A009-D
BLK03 SUBTITLE MILESTONE AND KEY EVENT LISTING 3.5
BLK10 FREQUENCY WEEKLY AFTER START OF WEEKLY PRODUCTION MEETINGS
BLK11 AS OF DATE NA
BLK12 DATE OF 1ST SUBM 15 DAYS PRIOR TO A CRAFT’S SLEP INDUCTION DATE
BLK13 DATE OF SUBS SUBM ONE DAY PRIOR TO WEEKLY PRODUCTION MEETINGS
ATTACHMENT TO CDRL A009 CONTINUED
A009-E
BLK03 SUBTITLE TOTAL MANPOWER LOADING CURVE 3.6**
BLK10 FREQUENCY WEEKLY AFTER START OF WEEKLY PRODUCTION MEETINGS
BLK11 AS OF DATE NA
BLK12 DATE OF 1ST SUBM AT START OF A CRAFT’S SLEP AVAILABILITY
BLK13 DATE OF SUBS SUBM ONE DAY PRIOR TO WEEKLY PRODUCTION MEETINGS
A009-F
BLK03 SUBTITLE KEY TRADE MANPOWER CURVES 3.6**
BLK10 FREQUENCY WEEKLY AFTER START OF WEEKLY PRODUCTION MEETINGS
BLK11 AS OF DATE NA
BLK12 DATE OF 1ST SUBM AT FIRST WEEKLY PRODUCTION MEETING
BLK13 DATE OF SUBS SUBM ONE DAY PRIOR TO SUBSEQUENT WEEKLY
PRODUCTION MEETINGS
(MARMC)
(CONTINUATION OF CDRL A009, SCIENTIFIC AND TECHNICAL REPORTS)
A009-G
BLK03 SUBTITLE MANPOWER UTILIZATION REPORT 3.6**
BLK10 FREQUENCY WEEKLY AFTER START OF WEEKLY PRODUCTION MEETINGS
BLK11 AS OF DATE NA
BLK12 DATE OF 1ST SUBM AT FIRST WEEKLY PRODUCTION MEETING
BLK13 DATE OF SUBS SUBM ONE DAY PRIOR TO SUBSEQUENT WEEKLY
PRODUCTION MEETINGS
A009-H
BLK03 SUBTITLE LIST OF SUBCONTRACTORS BY
WORK ITEMS 3.7
BLK10 FREQUENCY ASREQ
BLK11 AS OF DATE NA
BLK12 DATE OF 1ST SUBM AT START OF A CRAFT’S SLEP AVAILABILITY
BLK13 DATE OF SUBS SUBM REPORT CHANGES AS OCCURING ONE DAY PRIOR TO
WEEKLY PRODUCTION MEETING
A009-I
BLK03 SUBTITLE LIST OF PLANNED WORK DAYS AND
HOLIDAYS **
BLK10 FREQUENCY ANNUALLY
BLK11 AS OF DATE NA
BLK12 DATE OF 1ST SUBM 45 DAYS AFTER CONTRACT AWARD
BLK13 DATE OF SUBS SUBM 10 TH WORK DAY OF DECEMBER FOR FOLLOWING
CALENDAR YEAR DATA
A009-J
BLK03 SUBTITLE PRODUCTION SCHEDULE CHANGE CONTROL
DOCUMENT **
BLK10 FREQUENCY WEEKLY AFTER START OF WEEKLY PRODUCTION MEETINGS
BLK11 AS OF DATE NA
BLK12 DATE OF 1ST SUBM ONE DAY PRIOR TO FIRST WEEKLY PRODUCTION MEETING
BLK13 DATE OF SUBS SUBM ONE DAY PRIOR TO SUBSEQUENT WEEKLY PRODUCTION
MEETINGS
*INCLUDES ASSOCIATED SUBPARAGRAPHS
**ALSO SEE SECTION C, SUPPLEMENTAL PRODUCTION SCHEDULE REQUIREMENTS
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE., SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A010
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-63: LUBRICATING OILS AND HYDRAULIC
FLUIDS – ANALYSIS REPORT (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-63.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
BLOCK 10, 11, 12, 13 - AS SPECIFIED IN SI 009-63
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A011
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-67: INTEGRATED TOTAL SHIP TESTING (SEE
BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-67.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE., SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
OR RECONSTRUCTION OF THE DOCUMENT.
BLOCK 10, 11, 12, 13 - AS SPECIFIED IN SI 009-67.
CDRL DATA STANDARD ITEM 009-67 REFERENCE*
A011-A COMPREHENSIVE TEST PLAN PARAGRAPH 3.1
A011-B INTEGRATED TOTAL SHIP TEST PLAN PARAGRAPH 3.2
A011-C TEST STATUS REPORT PARAGRAPH 3.4
(MARMC)
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A012
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-69: HEAVY WEATHER PLAN (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSIONS AS LISTED IN SI 009-69.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
BLOCK 10, 11, 12, 13 - AS SPECIFIED IN SI 009-69.
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A013
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-73: SHIPBOARD
ELECTRICAL/ELECTRONIC/FIBER OPTIC CABLE –
TEST REPORT (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-73.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25. DESTROY THIS
DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR
RECONSTRUCTION OF THE DOCUMENT.
BLOCK 10, 11, 12, 13 - AS SPECIFIED IN SI 009-73
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A014
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-74: OCCUPATIONAL, SAFETY AND HEALTH
REQUIREMENTS – SAFETY PLAN (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 – DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-74.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
BLOCK 10, 11, 12, 13 - AS SPECIFIED IN SI 009-74.
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A015
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-81: COMPARTMENT CLOSEOUT SCHEDULE -
COMPARTMENT CLOSEOUT INSPECTION REPORT
(SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-81.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
BLOCK 10, 11, 12, 13 – AS SPECIFIED IN SI 009-81.
(MARMC)
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden f or this collection of inf ormation is estimated to av erage 110 hours per response, including the time f or rev iewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and rev iewing the collection of inf ormation. Send comments regarding this burden estimate or any other aspect of this collection of inf ormation, including suggestions f or reducing this burden, to the Department of Def ense, Executiv e Serv ices Directorate (0704-0188). Respondents should be aware that notwithstanding any other prov ision of law, no person shall be subject to any penalty f or f ailing to comply with a collection of inf ormation if it does not display a currently v alid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A016
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-82: DATA REQUIREMENTS WHEN INSTALLING
AN EQUAL COMPONENT VICE SPECIFIED
COMPONENT – COMPONENT REPLACEMENT
REPORT DATA (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draf t Final
Reg Repro
16. REMARKS
BLOCK 03 - DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. DATA
SUBMISSIONS AS LISTED IN SI 009-82.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP. 2401 ET. SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS
BLOCK 10, 11, 12, 13 – AS SPECIFIED IN SI 009-82.
(MARMC)
PIERCE SCHREIBER
H. DATE
11 DEC 2017
I. APPROVED BY
KAREN BEVENOUR
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 200
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/SLEP
E. CONTRACT/PR NO.
A017
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-99: SHIP DEPARTURE REPORT (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.1.1
6. REQUIRING OFFICE
SUPERVISOR (MARMC)
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
ONE TIME PER CRAFT
12. DATE OF FIRST
SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
A
(SEE BLOCK 16)
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT
SUBMISSION
(SEE BLOCK 16)
Draft Final
Reg Repro
16. REMARKS
BLOCK 03 – DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH SLEP CRAFT. ONE
REPORT IN MS EXCEL AND PDF FORMAT FOR EACH SLEP CRAFT. DATA FORMAT AND CONTENT
AS LISTED BELOW AND IN ATTACHMENT.
A. THE SHIP DEPARTURE REPORT SHALL CONTAIN INFORMATION IN GENERAL ACCORDANCE
WITH ATTACHMENT B OF NAVSEA STANDARD ITEM 009-99, SHIP DEPARTURE REPORT, AS
MODIFIED HEREIN AND SHOWN IN THE ATTACHED “SAMPLE SHIP DEPARTURE REPORT.”
B. SHIP DEPARTURE REPORT GENERAL REQUIREMENTS:
(1) EACH WORK ITEM SHALL BE LISTED AS A SEPARATE LINE ITEM.
(2) THE DATA PRESENTED IN THE REPORT SHALL BE BID PRICE AND ACTUAL EXPENSES
INCURRED.
(3) THE MULTI-COLUMN HEADING “CLASS “C” ESTIMATES” OF ATTACHMENT B OF NAVSEA
STANDARD ITEM 009-99 SHALL BE REPLACED WITH “BID PRICE.” BID PRICE TOTAL $ SHALL BE
THE SUM OF CONTRACTOR AND, IF APPLICABLE, SUBCONTRACTOR DATA UNDER THE COLUMN
HEADINGS LABOR $ AND CFM $’S.
(4) THE MULTI-COLUMN HEADING “ACTUAL EXPENSES” OF ATTACHMENT B OF NAVSEA
STANDARD ITEM 009-99 SHALL BE REPLACED WITH “ACTUAL EXPENSES (INCLUDING GROWTH
WORK) INCURRED.” BREAKOUTS OF SUBCONTRACTOR LABOR COSTS AND MATERIAL COSTS
ARE REQUIRED. SEPARATE CONTRACTOR AND SUBCONTRACTOR DATA SHALL BE PROVIDED
UNDER THE APPROPRIATE COLUMN HEADINGS HOURS, M/D, LABOR COST $, CFM COST $, AND
TOTAL $. DATA ENTRIES UNDER THE COLUMN HEADING “PRIME + SUB TOTAL $” SHALL BE THE
SUM OF THE “TOTAL $” OF THE CONTRACTOR AND THE SUBCONTRACTOR.
(5) ACTUAL EXPENSES (INCLUDING GROWTH WORK) INCURRED FOR EACH WORK ITEM
SHALL INCLUDE THAT OF THE ORIGINAL WORK ITEM AND, IF APPLICABLE, SEPARATE ENTRIES
FOR EACH GROWTH ITEM APPROVED AS A CONTRACT CHANGE TO THE WORK ITEM. GROWTH
ITEMS SHALL BE IDENTIFIED WITH SPECIFIC CONTRACT MODIFICATION NUMBER AND RCC
DESIGNATION.
(6) DATA UNDER THE COLUMN HEADING “% TO BID PRICE” SHALL BE THE RATIO OF THE
“PRIME + SUB TOTAL $” UNDER ACTUAL EXPENSES (INCLUDING GROWTH WORK) INCURRED
DIVIDED BY THE “TOTAL $” OF THE BID PRICE EXPRESSED IN PERCENT.
(7) SUBCONTRACTOR DATA SHALL INDICATE THE TOTAL OF ALL SUBCONTRACTOR DATA
UNDER THE APPROPRIATE COLUMN HEADING IF MORE THAN ONE SUBCONTRACTOR
SUPPORTS A WORK ITEM, AND IF APPLICABLE, A GROWTH WORK ITEM.
(8) THE SHIP DEPARTURE REPORT SHALL ALSO INCLUDE DATA DEFINED IN
SUBPARAGRAPHS B. (1) THROUGH B. (7) ABOVE FOR ANY NEW WORK ITEMS ADDED TO A
CRAFT’S SPECIFICATION FOR WORK TO BE ACCOMPLISHED.
C. THE FORMAT OF THE SHIP DEPARTURE REPORT IS SHOWN IN THE ATTACHED “SAMPLE SHIP
DEPARTURE REPORT”.
BLOCK 08 - APPROVAL FOR CONTENT. APPROVAL AUTHORITY – PMS 377.
BLOCK 09 - DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377),
WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.