N00024-18-C-2400_Amendment_0001.docx

DOCX document 38 KB Posted

Attached to
FY17/FY19 Landing Craft Air Cushion Service Life Extension Program
Solicitation number
N0002418R2400
Issued by

About this file

N00024-18-R-2400 Amendment 0001

View the file

Other files

File Type Posted
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0008.docx DOCX document
N00024-18-R-2400_Amendment_0008.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0008.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0007.docx DOCX document
N00024-18-R-2400_Amendment_0007.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0007.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0006.docx DOCX document
N00024-18-R-2400_Amendment_0006.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0006.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0005.docx DOCX document
Attachment_A_J-1_TDP.docx DOCX document
N00024-18-R-2400_Amendment_0005.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0005.docx DOCX document
N00024-18-R-2400_Amendment_0005.docx DOCX document
Attachment_A_J-1_TDP.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0004.docx DOCX document
N00024-18-R-2400_Amendment_0004.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0004.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_thru_Amendment_0003.docx DOCX document
N00024-18-R-2400_Conformed_thru_Amendment_0003.docx DOCX document
N00024-18-R-2400_Amendment_0003.docx DOCX document
N00024-18-R-2400_Amendment_0002.docx DOCX document
N00024-18-R-2400_Conformed_thru_Amendment_0001.docx DOCX document
18-R-2400_Amend_0001_Att_A_ADDENDUM_Forms_to_Section_L.docx DOCX document
Attachment_J-6_Preservation_and_Lay-Up.doc DOC document
Attachment_J-2b_Exhibit_A_Index.doc DOC document
Attachment_J-7_LCAC_86_Consolidated_GFP_List.xlsx XLSX spreadsheet
Attachment_J-4a_GFP_Performance_1-12.pdf PDF
Attachment_J-3_Perf_Miles_Pay_Sch.xlsx XLSX spreadsheet
Attachment_J-2a_-_CDRL_Information.docx DOCX document
Attachment_J-9_LCAC_77_Consolidated_GFP_List.xlsx XLSX spreadsheet
Attachment_J-2c_CDRLs_Exhibit_A.pdf PDF
Attachment_J-2e_CDRLs_Exhibit_B.pdf PDF
Attachment_J-4c_GFP_Remarks_Index.docx DOCX document
Attachment_J-8_LCAC_87_Consolidated_GFP_List.xlsx XLSX spreadsheet
N0002418R2400.pdf PDF
Attachment_J-2d_Exhibit_B_Index.doc DOC document
Attachment_J-1_TDP.docx DOCX document
Attachment_J-4b_GFP_Performance_13-24.pdf PDF
Attachment_J-10_LCAC_50_Consolidated_GFP_List.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002418R2400

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

REVISED SUMMARY OF CHANGES

The purpose of this amendment to solicitation N00024-18-R-2400 is to:

a) Respond to questions submitted by potential Offerors;

b) Revise SECTION C – DESCRIPTIONS AND SPECIFICATIONS, C.1, STATEMENT OF WORK;

c) Revise SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS; and

d) Extend the date for Receipt of Proposals.

1. The following questions were submitted by potential Offerors. The Government’s response follows each question. Questions and Answers 001 through 012 are provided in this Amendment 0001.

Question 001: C.1.3.2.1 (a) states: A separately metered electrical service system for contractor use (electrical power consumed in support of SLEP availabilities is paid for by the contractor) is installed in the TFS. Characteristics of the electrical service system are: 60hz (230v and 440v), 400hz (208v), and variable DC power supply. In order to properly estimate the Contractor’s responsibility for the electrical cost, will the Government provide a cost per Kw hour?

Answer 001: Under Section C.1.3.2.1(a), "Note: A separately metered electrical service system for contractor use (electrical power consumed in support of SLEP availabilities is paid for by the contractor) is installed in the TFS. Characteristics of the electrical service system are: 60hz (230v and 440v), 400hz (208v), and variable DC power supply." will be removed from the solicitation. ACU 4 does not have a separately metered electrical service system for Contractor use therefore, this requirement will be removed from the solicitation.

Question 002: If performing the availability at ACU 4, what would the process be for the Contractor to pay for the electrical usage.

Answer 002: See Answer 001 above.

Question 003: In reference to Option Item 0014 and C.1.9, will the Government be providing a US Navy crew during the transit from ACU 4 to the Contractor's facility pre-SLEP induction?

Answer 003: No, the Government will not provide a US Navy crew during transit of the craft from ACU 4 to the Contractor's facility.

Question 004: In reference to Option Item 0015 and C.1.10, will the Government be providing a US Navy crew during the transit from the Contractor's facility to ACU 5 post-SLEP completion?

Answer 004: No, the Government will not provide a US Navy crew during transit of the craft from the Contractor's facility to ACU 5.

Question 005: Please clarify the Chapter and Section numbering under L.3.5.2.1 for the Chapter to be titled "Use of Existing Government Property."

Answer 005: The typographical errors in L.3.5.2.1, Chapter 30, USE OF EXISTING GOVERNMENT PROPERTY are corrected in paragraph 2 of this amendment.

Question 006: L.3.5.2.3.3, Chapter 3.0 (30) does not explain requirements of Sections 4.1, 4.2 (3.1, 3.2) outlined on page 124. This Chapter defines paragraphs a – f only. Please clarify the requirement.

Answer 006: L.3.5.2.3.3 CHAPTER 3.0 - USE OF EXISTING GOVERNMENT PROPERTY, b. states: "Provide a list or description of all additional GFP already in possession of the Offeror and its subcontractors that is intended for use during performance on a rent-free basis." That information, if applicable, shall be designated under "Section 3.1 Offeror/Prime" and Section "3.2 Major Subcontractors."

Question 007: The Addendums to Section L of the RFP can't be found on FedBizOpps. Please clarify and provide.

Answer 007: A single electronic file containing Addendums L-1 through L-4 is hereby provided at Attachment "A" to this amendment and is posted with this amendment on FedBizOpps.

Question 008: Can the Government provide the interested parties who received draft Technical Data Packages (TDPs) with a document that shows what changed from the draft to the final TDP?

Answer 008: No, the Government will not provide a document listing the differences between the Draft TDP and the final version of the TDP. Offerors shall develop proposals using the TDP released with the RFP, unless is it is modified via a solicitation amendment.

Question 009: Regarding LCAC 86, LCAC 87, and LCAC 77, Work Item - 410-85-005 and 410-85-001, Reference – 2.16 - 7285603T, Item 76, "499-5800-001 - CCU- 1 each" is not in the Planning Memorandums (Attachments J-1e, f, g). Will the Government provide Item 76 as Government Furnished Material?

Answer 009: The Planning Memorandum for the referenced Work Item reflects a quantify of 5 per craft. However, the Government will provide a total of six Communication Control Units (CCUs) for each craft. The Planning Memorandums for LCAC 77, LCAC 86 and LCAC 87 (Attachments J-1e, f, and g ) will be revised via an Errata to add Find Number 76 on Drawing 7285603 for the sixth CCU. No change to the Work Item is required.

While reviewing this issue it was discovered that, for LCAC 50, there are a total of nine CCUs called out in error on the Planning Memorandum, Drawing 7646820, Revision E. LCAC 50 Planning Memorandum (Attachment J-1h) will be revised via an Errata to reflect three vice six CCUs being provided under this drawing and General Note for 15 will be deleted. Work Item 433-85-005, for LCAC 50 only, (Attachment J-1d) will also be revised via an Errata to change Reference 2.11, Drawing 7646820 from Revision E to Revision F.

The revisions to LCAC 50, Work Item 433-85-005 (Attachment J-1d), all Planning Memorandums (Attachments J-1-e, f, g, and h) and the associated Drawings enacting these changes will be provided in a future Errata that will be issued prior to receipt of proposals. The Offeror shall take into account the changes identified in this answer in the development of its proposal.

Question 010: Regarding Work Item 423-85-00, can the Government validate if Craft Alteration 506 has been accomplished on LCAC 77, LCAC 86 and LCAC 87? If not accomplished, will Item 5 of Reference 2.7 and Item 15 of Reference 2.9 be provided by the Government?

Answer 010: Yes, Craft Alteration 506 has been accomplished on LCAC 77, LCAC 86, and LCAC 87.

Question 011: Regarding Work Item 513-80-001, Reference 2.2 - Craft Alteration 250D for LCAC 86, can the Government verify that this Craft Alteration is installed on LCAC 86?

Answer 011: No, Craft Alteration 250 is not installed on LCAC 86 and, therefore, Work Item 513-80-001 is required to be accomplished in full.

Question 012: Regarding Work Item 514-85-00, Reference 2.2, Alteration Equivalent to Repair (AER) -362 for LCAC 86, LCAC 87, and LCAC 77, can the Government verify that this AER is applicable to LCAC 77, LCAC 86, and LCAC 87?

Answer 012: Yes, AER 362 is applicable to LCAC 77, LCAC 86, and LCAC 87. AER 362, as originally approved, was not applicable to LCAC 77, LCAC 86, or LCAC 87. During original construction of these craft, it was assumed that AER 362 would be accomplished. However, during the Government's inspection of these craft, it was discovered that AER 362 had not been accomplished. Therefore, Work Item 514-85-001 is required to be accomplished by the Contractor for LCAC 77, LCAC 86 and LCAC 87.

2. As a result of the questions and answers above, modifications to the basic solicitation are hereby incorporated as follows:

a. SECTION C.1, STATEMENT OF WORK, paragraph C.1.3.2.1(a) “Note” is hereby deleted in its entirety.

b. SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS, L.3.5.2.1:

Delete:
“CHAPTER 30USE OF EXISTING GOVERNMENT PROPERTY
Section 4.1Offeror/Prime
Section 4.2Major Subcontractors”

and Insert:

“CHAPTER 3.0 USE OF EXISTING GOVERNMENT PROPERTY

Section 3.1Offeror/Prime
Section 3.2Major Subcontractors”

3. Due to the late delivery of the Technical Data Package to potential Offerors and the omission of the Addendum L file on FedBizOpps, the Receipt of Proposals is hereby extended until 2:00 PM local time 22 June 2018. No further proposal extensions are anticipated.

4. Except as provided herein, all other terms and conditions of solicitation N00024-18-R-2400 remain unchanged.

image1.wmf