N00024-18-C-2400 Amendment 0003

View the file

Other files

File Type Posted
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0008.docx DOCX document
N00024-18-R-2400_Amendment_0008.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0008.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0007.docx DOCX document
N00024-18-R-2400_Amendment_0007.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0007.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0006.docx DOCX document
N00024-18-R-2400_Amendment_0006.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0006.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0005.docx DOCX document
Attachment_A_J-1_TDP.docx DOCX document
N00024-18-R-2400_Amendment_0005.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0005.docx DOCX document
N00024-18-R-2400_Amendment_0005.docx DOCX document
Attachment_A_J-1_TDP.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0004.docx DOCX document
N00024-18-R-2400_Amendment_0004.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0004.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_thru_Amendment_0003.docx DOCX document
N00024-18-R-2400_Conformed_thru_Amendment_0003.docx DOCX document
N00024-18-R-2400_Amendment_0002.docx DOCX document
N00024-18-R-2400_Conformed_thru_Amendment_0001.docx DOCX document
18-R-2400_Amend_0001_Att_A_ADDENDUM_Forms_to_Section_L.docx DOCX document
N00024-18-C-2400_Amendment_0001.docx DOCX document
Attachment_J-6_Preservation_and_Lay-Up.doc DOC document
Attachment_J-2b_Exhibit_A_Index.doc DOC document
Attachment_J-7_LCAC_86_Consolidated_GFP_List.xlsx XLSX spreadsheet
Attachment_J-4a_GFP_Performance_1-12.pdf PDF
Attachment_J-3_Perf_Miles_Pay_Sch.xlsx XLSX spreadsheet
Attachment_J-2a_-_CDRL_Information.docx DOCX document
Attachment_J-9_LCAC_77_Consolidated_GFP_List.xlsx XLSX spreadsheet
Attachment_J-2c_CDRLs_Exhibit_A.pdf PDF
Attachment_J-2e_CDRLs_Exhibit_B.pdf PDF
Attachment_J-4c_GFP_Remarks_Index.docx DOCX document
Attachment_J-8_LCAC_87_Consolidated_GFP_List.xlsx XLSX spreadsheet
N0002418R2400.pdf PDF
Attachment_J-2d_Exhibit_B_Index.doc DOC document
Attachment_J-1_TDP.docx DOCX document
Attachment_J-4b_GFP_Performance_13-24.pdf PDF
Attachment_J-10_LCAC_50_Consolidated_GFP_List.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002418R2400

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

REVISED SUMMARY OF CHANGES

The purpose of this amendment to solicitation N00024-18-R-2400 is to respond to:

a) Respond to questions submitted by potential Offerors;

b) Revise SECTION C – DESCRIPTIONS AND SPECIFICATIONS, C.1, STATEMENT OF WORK;

and,

c) Revise SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS.

1. The following questions were submitted by potential Offerors. The Government’s response follows each question. Questions and Answers 025 through 036 are provided in this Amendment 0003. Questions and Answers 001 to 024 were provided in previous amendments.

Question 025: Option Items 0014 and 0016 provide the option for either the Contractor or Government, respectively, to ship the pre-SLEP craft from ACU 4 to Contractor’s Facility. Option Items 0015 and 0017 provide the option for either the Contractor or Government, respectively, to ship the post-SLEP craft from Contractor’s Facility to ACU 5. Option Items 0013 provides for only the Contractor to ship the post-SLEP craft from ACU 4 to ACU 5. If the SLEP is performed at ACU 4, will the Government ship the craft from ACU 4 to ACU 5?

Answer 025: If the Government does not exercise Option Item 0013, and the SLEP is performed at ACU 4, the Government will ship the craft once acceptance of the craft has been completed and the craft is accepted by the Government.

Question 026: Paragraph C.1.8.1 requires the Contractor to make all arrangements to ship crafts from ACU 4 to ACU 5. Will the Government provide the travel lifts at ACU-4 for the movement of the LCAC’s from the Tarmac to bottom of the ramp (the water’s edge) and ACU-5 for the movement of the LCAC’s from the bottom of the ramp (the water’s edge) to the Tarmac?

Answer 026: The Travel lifts at ACU 4 and ACU 5 will be available for movement of the craft across the tarmac for fueling and repair actions. However, the travel lift cannot operate on any incline or decline of the ramp to the water's edge. Prior to any craft transportation efforts, the craft will be certified safe for flight and a qualified Navy crew will be provided.

Question 027: A portion of paragraph C.1.1.9.1 states, “The following positions are considered, at a minimum, to be Key Personnel:

a. Program Manager

b. Project Manager

c. Material/Logistics Manager

d. Quality Control Supervisor

e. Test Engineer

f. Planner/Scheduler

g. Subcontractor Manager”

Paragraph C.1.1.9.2 provides “Qualifying certifications for Planner/Scheduler” to include, but not limited to, “Project Management Professional (PMP) Certification and Microsoft Certified Technology Specialist (MCTS): Microsoft Project 2010 with Managing Projects.” The "Planner/Scheduler" is the only contractor Key Personnel Labor Category requiring certifications or minimum qualifications. Does the Government intend to provide minimum labor category requirements for Key Labor Categories other than Planner/Scheduler?

Answer 027: No, the Government does not intend to provide any additional certification requirements or minimum qualifications.

Question 028: In Amendment 0001 - Question 001, the Government removed the Note under Section C.1.3.2.1(a). Can the Government verify that there is an electrical system for use by the Contractor in the TFS?

Answer 028: Yes, electrical power will be provided to the TFS. The electrical system is not separately metered so the Contractor will not be required to pay for the service. Paragraph C.1.3.1.4 (d) will be modified.

Question 029: Paragraph L.3.2.1 page limitation table shows a page limit of 20 pages for Appendix A of the Technical Proposal. Will the Government consider increasing the page limit of Appendix A, Production Schedule to accommodate the anticipated level of detail required for the Schedule as well as the requirement that 11 x 17 paper count as two (2) pages?

Answer 029: Yes, the Government will increase the page limit of Appendix A, Production Schedule by 20 pages from 20 pages to 40 pages. Paragraph L.3.2.1 table will be modified to revise Appendix A from a page limit of 20 pages to a page limit of 40 pages. Per paragraph L.3.2.4, 11" x 17" paper will still count as two (2) pages.

Question 030: Paragraph L.3.5.1.5.1.1 reads, “The Offeror shall describe and provide details to demonstrate its scheduling system for preparing, managing and updating the Production Schedule. The Production Schedule shall be a Critical Path Method (CPM) schedule for planning, scheduling, and progress reporting of all work. The Offeror shall provide an integrated Production Schedule for LCAC 86 that contains, at a minimum:” Does the Government intend for the offeror to provide one Production Schedule for LCAC 86 only; one Production Schedule showing all four crafts (LCAC 86, 87, 77, AND 50) on one schedule; or four individual Production Schedules, one for each of the four (4) crafts?

Answer 030: Paragraph L.3.5.1.5.1.1 requires the Offeror to provide an integrated Production Schedule for LCAC 86 under Appendix A of the Technical Proposal. After award, per paragraph C.1.2.7.2, Individual Production Schedules shall be developed for LCAC 86 LCAC 87, LCAC 77 and LCAC 50.

Question 031: Paragraph L.3.2.1 requires no more than 15 resumes be submitted by the Offeror under Appendix B of the Technical Proposal. Is it the Government’s intent that the 15-resume limit include both the offeror and all major subcontractor key personnel resumes?

Answer 031: Yes, paragraph L.3.5.1.6.1.2.1 states: "...the Offeror shall provide the names, proposed position, and a two (2) page resume for up to a total of 15 Key Personnel (including major subcontractors) (Technical Proposal Appendix B)." The Offeror shall include major subcontractor resumes in its 15 resume limit.

Question 032: L.3.5.1.5.4.1 states, “Any Offeror proposing to accomplish LCAC SLEP availabilities at its Facility must have sufficient facilities in appropriate locations to fully support the work required by the contract.” What does the Government consider to be a “sufficient” facility in an “appropriate” location?

Please define “sufficient facility.” Please define “appropriate location.”

Answer 032: Paragraph L.3.5.1.5.4.1 is a header paragraph for L.3.5.1.5.4.1.1 through L.3.5.1.5.4.1.6 below it. For clarity, paragraph L.3.5.1.5.4.1 will be modified to read, "L.3.5.1.5.4.1 Contractor facility requirements".

Question 033: L.3.5.1.6.1.3.3 states, “For LCAC SLEP availabilities conducted at a Contractor-Owned Facility, the Offeror shall provide the names and certification of Contractor personnel proposed for LCAC craft operator possessing a valid U. S. Coast Guard ocean operator’s license for the appropriate tonnage vessel, LCAC qualified craft engineer, and LCAC radar operator/navigator possessing a valid U. S. Coast Guard radar operator’s license (unlimited) or complete Contractor crew certified as U. S. Navy qualified per LCAC SEAOPS Manual S9LCA-AA-SSM-030 Rev 14 dated 01 MARCH 2017, to operate LCAC craft during trials at sea.” Paragraph L.3.5.1.6.1.3.3 does not mention LCAC SLEP Crews needed to operate Craft during sea trials for availabilities conducted at ACU 4. For LCAC SLEP availabilities conducted at ACU 4, will the Government provide a complete, qualified LCAC Crew per LCAC SEAOPS Manual; or provide a Craft Operator, Craft Engineer and Radar Operator/Navigator to operate the Craft during these trials?

Answer 033: Yes, per paragraph C.1.3.1.3, the Government will provide a complete, qualified LCAC crew for testing and trial support including craft operation for trials conducted at ACU 4.

Question 034: For LCAC 50, there are no references for the removal of existing cables on the following Work Items: 234-90-001, 234-90-002, 251-85-005, 261-90-005, 262-85-005, 311-85-005, 422-85-005, 426-85-005, 433-85-005, 555-85-005. Can the Government provide references for the removal of the LCAC 50 existing cables?

Answer 034: See below for descriptions of changes that will be incorporated into the respective Work Items in the updated Technical Data Package to account for removal of the existing cables on LCAC 50.

For WI 234-90-001, paragraphs 3.1.5, and 3.1.5.1 address removal of electrical control boxes and associated cables that are to be removed in accordance with reference 2.16, drawing 6582585 LG. No changes will be made to this WI.

For WI 234-90-002, drawing 6582604 Rev E will be added to paragraphs 2 and 3.1 to be used for removals.

For WI 251-85-005, drawing 6572070 Rev D will be added to paragraph 2 and 3.1 to be used for removals.

For WI 261-90-005, drawing 6572058 Rev J will be added to paragraph 2 and 3.1 to be used for removals.

For WI 262-85-005, drawing 6274776 Rev LG will be added to paragraph 2 and 3.1 to be used for removals.

For WI 311-85-005, drawing 6628262 Rev B will be added to paragraph 2 and 3.1 to be used for removals.

For WI 422-85-005, drawing 6642422 Rev - will be added to paragraph 2 and 3.1 to be used for removals.

For WI 426-85-005, drawing 6582588 Rev - to will be added to paragraph 2 and 3.1 to be used for removals.

For WI 433-85-005, the Government will create a cable rip out/removal drawing and will revise the WI by adding the new drawing to Para 2 and 3.1.

For WI 555-85-005, drawing 6572059 Rev LA will be added to paragraph 2 and 3.4 to be used for removals.

Question 035: Regarding Section L.3.1.7, Submission of Bidder’s Questions, will the Government extend the date by which Bidder’s Questions should be submitted to three weeks before solicitation closing and will the Government guarantee responses to questions submitted on or before this date?

Answer 035: Offerors are not prohibited from submitting questions after 14 May 2018. L.3.1.7 states: “Although every effort will be made, the Government makes no guarantee that all questions will be answered." The soliciation will not be amended.

Question 036: Regarding Work Item 500-11-001 for LCAC 50, what are the materials required for Find Numbers -207 and -208 associated with Drawing 5750156?

Answer 036: On Sheet 2 of Drawing 5750156, General Note 24 refers to Drawing 6642426 "Master Tube Fitting List" for all Avondale Gulfport Marine built craft which is also Reference 2.11 of Work Item 500-11-001. Sheet 88 of Drawing 6642426 provides details for materials required for the window wash tube assemblies of Find Numbers -207 and -208.

2. As a result of the questions and answers above, modifications to the basic solicitation are hereby incorporated as follows:

a. SECTION C.1, STATEMENT OF WORK, paragraph C.1.3.1.4 (d) is hereby modified to read:

“d. Utility Services:

(1) Water is provided through two potable water risers (1.5 inch standard navy hose fitting) at the corners of the TFS facing the tarmac for LCAC SLEP related use only.

(2) Electrical. Includes 60hz (230v and 440v), 400hz (208v), and variable DC power supply.”

b. SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS, paragraph L.3.2.1, Table, is hereby revised to read as follows:

TABLE L-1

VOLUME
TITLE
PAGE LIMIT
PAPER COPIES

(ORG/COPY)

ELECTRONIC

COPIES (CD_ROM)

I
Technical Proposal
75
1/5
2 (with appendices)
Appendix A
Production Schedule
40
1/5
Appendix B
Key Personnel Resumes only
2 pages per Resume NTE 15 Resumes
1/5
Appendix C
Schedule Management Certification
10
1/5
Appendix D
Welder/NDT Certification
Unlimited
1/5
Appendix E
Quality Control/Quality Management System Certification
10
1/5
Appendix F
Past Performance Questionnaires
Unlimited
1/5
II
Price Proposal
Unlimited
1/2
2

c. SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS, paragraph L.3.5.1.5.4.1 is hereby deleted in its entirety and replaced with the following:

"L.3.5.1.5.4.1 Contractor Facility Requirements.”

3. The date and time for receipt of proposals is not extended.

4. Except as provided herein, all other terms and conditions of solicitation image1.wmf