N00024-18-R-2400_Amendment_0006.docx

DOCX document 70 KB Posted

Attached to
FY17/FY19 Landing Craft Air Cushion Service Life Extension Program
Solicitation number
N0002418R2400
Issued by

About this file

N00024-18-R-2400 Amendment 0006

View the file

Other files

File Type Posted
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0008.docx DOCX document
N00024-18-R-2400_Amendment_0008.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0008.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0007.docx DOCX document
N00024-18-R-2400_Amendment_0007.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0007.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0006.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0006.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0005.docx DOCX document
Attachment_A_J-1_TDP.docx DOCX document
N00024-18-R-2400_Amendment_0005.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0005.docx DOCX document
N00024-18-R-2400_Amendment_0005.docx DOCX document
Attachment_A_J-1_TDP.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0004.docx DOCX document
N00024-18-R-2400_Amendment_0004.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0004.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_thru_Amendment_0003.docx DOCX document
N00024-18-R-2400_Conformed_thru_Amendment_0003.docx DOCX document
N00024-18-R-2400_Amendment_0003.docx DOCX document
N00024-18-R-2400_Amendment_0002.docx DOCX document
N00024-18-R-2400_Conformed_thru_Amendment_0001.docx DOCX document
18-R-2400_Amend_0001_Att_A_ADDENDUM_Forms_to_Section_L.docx DOCX document
N00024-18-C-2400_Amendment_0001.docx DOCX document
Attachment_J-6_Preservation_and_Lay-Up.doc DOC document
Attachment_J-2b_Exhibit_A_Index.doc DOC document
Attachment_J-7_LCAC_86_Consolidated_GFP_List.xlsx XLSX spreadsheet
Attachment_J-4a_GFP_Performance_1-12.pdf PDF
Attachment_J-3_Perf_Miles_Pay_Sch.xlsx XLSX spreadsheet
Attachment_J-2a_-_CDRL_Information.docx DOCX document
Attachment_J-9_LCAC_77_Consolidated_GFP_List.xlsx XLSX spreadsheet
Attachment_J-2c_CDRLs_Exhibit_A.pdf PDF
Attachment_J-2e_CDRLs_Exhibit_B.pdf PDF
Attachment_J-4c_GFP_Remarks_Index.docx DOCX document
Attachment_J-8_LCAC_87_Consolidated_GFP_List.xlsx XLSX spreadsheet
N0002418R2400.pdf PDF
Attachment_J-2d_Exhibit_B_Index.doc DOC document
Attachment_J-1_TDP.docx DOCX document
Attachment_J-4b_GFP_Performance_13-24.pdf PDF
Attachment_J-10_LCAC_50_Consolidated_GFP_List.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002418R2400

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

REVISED SUMMARY OF CHANGES

The purpose of this amendment to solicitation N00024-18-R-2400 is to:

a) Respond to questions submitted by potential Offerors;

b) Revise SECTION B – SUPPLIES OR SERVICES AND PRICES;

c) Revise SECTION C – DESCRIPTIONS AND SPECIFICATIONS;

d) Revise SECTION E – INSPECTION AND ACCEPTANCE;

e) Revise SECTION F – DELIVERIES OR PERFORMANCE;

f) Revise SECTION I – CONTRACT CLAUSES;

g) Revise SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS; and

h) Revise SECTION M – EVALUATION FACTORS FOR AWARD

1. The following questions were submitted by potential Offerors. The Government’s response follows each question. Questions and Answers 042 through 044 are provided in this Amendment 0006. Questions and Answers 001 to 041 were provided in previous amendments.

Question 042: Paragraph C.1.8 allows for the option to ship the craft from ACU 4 to ACU 5, post-SLEP. With the possibility for damage during transit post-SLEP, would the Government be amenable to allowing transport pre-SLEP and performance of LCAC SLEP at either ACU 5 or Contractor’s facility on the West Coast in the vicinity of ACU 5?

Answer 042: Yes, the Government will modify the RFP to include an option for performance at ACU 5, with Contractor responsible transport occuring prior to induction into the SLEP availabilities. The Contractor shall still bear the risk of any destruction or damage prior to acceptance of the craft at ACU 5. Per the current RFP, Contractors are permitted to propose offsite performance of the SLEP availabilities at their facility in the United States.

The RFP has been modified in multiple locations to account for this change as shown below in paragraph 2.

Question 043: Will the Government consider extending the Proposal due date an additional three weeks to 13 July 2018?

Answer 043: Yes, the Government will extend the Proposal due date an additional three weeks to 13 July 2018.

Question 044: Is the Navy interested in pursuing the addition of an anti-mine defense system on LCAC?

Answer 044: No, there is currently no requirement or funding for the LCAC SLEP program to include anti-mine defense systems.

2. As a result of the questions and answers above, modifications to the subject solicitation are hereby incorporated as follows:

a. SECTION B – SUPPLIES OR SERVICES AND PRICES is hereby modified as follows:

i. ITEM 0020 is hereby deleted in its entirety and replaced with the following:

“ITEM NO
SUPPLIES/SERVICES

CLIN Number 0020

Shipping Orders Shipment by the Contractor of LCAC from ACU 4 to ACU 5 (Post SLEP) Ordering Ceiling for this CLIN is: $3,000,000.00”

ii. ITEM 0022 is hereby added as follows:

“ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0022

Shipment by the Contractor of LCAC from

FFP

ACU 4 to ACU 5 (Pre-SLEP)

NET AMT”

iii. ITEM 0022AA is hereby added as follows:

“ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0022AA

Shipment of LCACs 86 & 87

FFP

1
Set
OPTION
See Notes C, and I.

FOB: Destination

NET AMT”

iv. ITEM 0022AB is hereby added as follows:

“ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0022AB

Shipment of LCACs 77 & 50

FFP

1
Set
OPTION
See Notes C, and I.

NET AMT”

v. ITEM 0022AC is hereby added as follows:

“ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0022AC

Shipment of LCAC 77

FFP

1
Each
OPTION
See Note C, and I.

NET AMT”

vi. ITEM 0200 is hereby deleted in its entirety and replaced with the following:

“ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0200

Data

Data for ITEMS 0001, 0004, 0007, and if exercised OPTION ITEMS 0010, 0014, 0016, and 0017, and 0022, and if ordered, ITEMS 0002, 0003, 0005, 0006, 0008, 0009, 0011, 0012, 0020, 0021. See DD Form 1423 Attachment J-2 Exhibits A and B. Not Separately Priced. See Note H.

PSC CD: 1905

NET AMT”

vii. NOTE I is hereby deleted in its entirety and replaced with the following:

“NOTE I – This solicitation provides for the Offeror to choose between performing the effort at Assault Craft Unit 4, Assault Craft Unit 5 or at a Contractor Owned Facility. The corresponding contractual requirements, clauses and other information not applicable to the successful Offeror’s proposal will be marked as “RESERVED” by the PCO in the awarded contract. If the successful Offeror’s proposal is to be performed at Assault Craft Unit 4, all references to OPTION ITEMS 0014 and 0022, and ITEM 0021will be deleted at contract award. If the successful Offeror’s proposal is to be performed at Assault Craft Unit 5, all references to OPTION ITEMS 0014, 0016, and 0017 and ITEMS 0020, and 0021 will be deleted at contract award. If the successful Offeror’s proposal is to be performed at a Contractor Owned Facility, all references to ITEM 0020 and OPTION ITEM 0022 will be deleted at contract award.”

b. SECTION C – DESCRIPTIONS AND SPECIFICATIONS is hereby modified as follows:

i. C.1.1.4.3 is hereby deleted in its entirety and replaced with the following:

“C.1.1.4.3 Requirements for SLEP availabilities performed at ACU 4/5.”

ii. C.1.1.4.3.2 is hereby deleted in its entirety and replaced with the following:

“C.1.1.4.3.2 After receipt of contract award and prior to starting work on the craft, the Contractor shall submit a list of employees who will work aboard the craft to the authorized representative of the Government and to the ACU 4/5 Commanding Officer. The list shall be on company letterhead, and include each employee’s name, social security number, security clearance, and bear the signature of a company official. The Contractor shall submit updates to list of employees as required.”

iii. C.1.1.7.1 is hereby deleted in its entirety and replaced with the following:

“C.1.1.7.1 For LCAC SLEP Availabilities at ACU 4/5, GFP (Incorporation) items, listed in each craft’s Planning Memorandum, will be available for pick up at the ACU. The Contractor shall make arrangements to pick up GFP (Incorporation) items with the authorized representative of the Government.”

iv. C.1.1.7.2 is hereby deleted in its entirety and replaced with the following:

“C.1.1.7.2 For LCAC SLEP Availabilities at ACU 4/5, GFP (Performance) items, listed in Attachment J-4, will be available for pick up at the ACU. The Contractor shall make arrangements to pick up GFP (Performance) items with the authorized representative of the Government. Upon completion of the use of GFP (Performance) items the Contractor shall return the items, via the authorized representative of the Government, to the ACU. The Contractor shall be held responsible for all lost or damaged GFP (Performance) items while the items are in the possession of the Contractor.”

v. C.1.1.9.2 is hereby deleted in its entirety and replaced with the following:

“C.1.1.9.2 Qualifying certifications for Planner/Scheduler (Onsite if at ACU 4/5) Key Personnel, include, but are not limited to: Project Management Professional (PMP) Certification and Microsoft Certified Technology Specialist (MCTS): Microsoft Project 2010 with Managing Projects.”

vi. C.1.1.10.1is hereby deleted in its entirety and replaced with the following:

“C.1.1.10.1 As addressed in NAVSEA Standard Item 009-04, each test and inspection event requiring Government notification is annotated with a (G) Point symbol. The (G)-Point inserted in a Work Item requires that a representative of the Government be notified by the prime contractor in order to observe a specific test or inspection (I) (V). The Government will be available to observe scheduled tests and inspections (I) (V) during the normal working hours with specific hours delineated in Section C paragraph C.1.3.1.3 for performance at ACU 4/5. Normal Government working hours for place of performance at a Contractor-Owned Facility will be defined during the Post Award Conference.”

vii. C.1.2.1.2.1 is hereby deleted in its entirety and replaced with the following:

“C.1.2.1.2.1 For SLEP Availabilities conducted at ACU 4/5. The Contractor shall conduct the Pre-Induction Survey for each craft after contract award but commence no earlier than 45 days prior to Craft Induction Date. Scheduling of the Pre-Induction Survey shall be coordinated with the authorized representative of the Government.”

viii. C.1.2.7.2 is hereby deleted in its entirety and replaced with the following:

“C.1.2.7.2 The Production Schedule CDRL A009-A shall be a Critical Path Method (CPM) schedule for planning, scheduling, and progress reporting of all work. Individual Production Schedules shall be developed for LCAC 86 LCAC 87, LCAC 77 and LCAC 50 at ACU 4/5 or offsite location, which includes, at a minimum:

a) All Work Items
b) Milestones and Key Events as identified in Table C-2
c) Separate critical paths*

d) Provisions for the incorporation of the Additional Labor Requirements on the schedule critical path

e) Dates of the 50% and 75% work completion points as defined in Section F, paragraph F.4.3

* Critical Paths, as defined in 4.1.7 of Standard Item 009-60, shall be calculated for the defined schedule using the Microsoft Project 2010 software, required by C.1.2.7.5(h).”

ix. C.1.2.13.1 is hereby deleted in its entirety and replaced with the following:

“C.1.2.13.1 The Contractor shall support the Mock INSURV Trial (scheduled by the ACU if at ACU 4/5 and by the Contractor if at a Contractor-Owned Facility) prior to scheduling Runway Trials. As used here, the designation “Mock INSURV Trial” is the same as the “rehearsal INSURV” referenced in Work Item 980-11-001. The Mock INSURV Trial shall be scheduled once all contractor responsible work has been completed and the craft is ready for Runway Trials. All discrepancies identified as contractor production items affecting safety of flight shall be corrected prior to Runway Trials. Designated Contractor personnel that participate in the Mock INSURV Trial shall be the same personnel that support the INSURV Trial. The Mock INSURV Trial will consist of all requirements of the LCAC INSURV Trial Agenda, reference 2.2, of Work Item 980-11-001.”

x. C.1.2.13.3.4 is hereby deleted in its entirety and replaced with the following:

“C.1.2.13.3.4 Contractor Supplemental INSURV Trial Requirements for SLEP Availabilities Conducted at ACU 4/5.”

xi. C.1.3 is hereby deleted in its entirety and replaced with the following:

“UNIQUE ACU REQUIREMENTS, IF PERFORMED AT ACU 4/5”

xii. C.1.3.6 “UNIQUE ACU 5 REQUIREMENTS” is hereby added as follows:

“C.1.3.6 UNIQUE ACU 5 REQUIREMENTS

C.1.3.6.1 BASE ACCESS TO CAMP PENDLETON (APRIL 2010)

C.1.3.6.2 Marine Corps Base Camp Pendleton requires all vendors, contractors, service providers, and their employees, to be properly vetted in order to access the installation. In order to comply with DoD mandates, Base Order 5000.2K, dated 18 Feb 10, incorporates several changes. Camp Pendleton offers two types of access passes for those conducting business activity onboard the installation: Camp Pendleton Business Pass and RAPIDGate Program Pass. The Business Pass is a locally produced credential and will only be issued two times, an initial and one renewal. Extensions beyond the two passes will not be considered, and enrollment in the RAPIDGate program is required for continued access to the installation. The Business Pass is valid at only the following installation access control points: San Luis Rey Gate, Las Pulgas Gate, and the San Onofre Gate. There is no fee for this pass.

The Camp Pendleton RAPIDGate Program is designed to provide a more secure installation while providing streamlined access onto the installation. Personnel who participate in the RAPIDGate Program will be able to access all seven installation access control points: San Luis Rey Gate, Main Gate, Del Mar Gate, Las Pulgas Gate, San Onofre Gate, Christianitos Gate, and the Fallbrook Naval Weapons station Gate. The RAPIDGate Program offers two options, The RAPIDGate-90 Option (a credential valid for 90 days) and the Standard RAPIDGate Program Option (a credential valid for one year). There is a fee to participate in this program.

C.1.3.6.3 For further details regarding base access to Marine Corps Base Camp Pendleton, the Contractor shall refer to Base Order 5000.2K Section 5 (Business Pass or RAPIDGate Pass Issuance) and Section 6 (Background Check Criteria for the Business/Vendor Category and MCCS/NAFI Employees). For more information about the RAPIDGate Program, the Contractor shall call 1-877-RAPIDGate (1-877-727-4342) or the Camp Pendleton Base Access Control Branch at 760-763-7604.”

xiii. C.1.3.7 “GOVERNMENT PROVIDED FACILITIES AND SERVICES AT ACU 5” is hereby added as follows:

“C.1.3.7 GOVERNMENT PROVIDED FACILITIES AND SERVICES AT ACU 5

C.1.3.7.1 The price and delivery schedule set forth in this contract are based on the rent free use of the facilities and equipment identified in paragraphs below. If the Government limits or terminates the Contractor's rent free use of said facilities and equipment, and such action affects the ability of the Contractor to perform this contract in accordance with its terms and conditions, then an equitable adjustment in the price or delivery schedule or both, shall be made pursuant to the clause entitled "CHANGES FIXED PRICE" (FAR 52.243 1); provided, however, that if the limitation or termination is due to failure by the Contractor to perform its obligations under this contract, the Contractor shall be entitled only to such adjustment as the Contracting Officer determines to be appropriate under the circumstances.

C.1.3.7.2 Contractors are advised that in light of the Navy's policy regarding smoke-free facilities, the entire vessel, topside and below decks, is to be considered a "No Smoking Area." The Contractor shall also observe the “No Smoking” policy of ACU 5.

C.1.3.7.3 ACU 5 will provide craft refueling services, fly-over block installation, craft travel lift operation, and testing and trial support including craft operation during normal working hours, 0630 to 1600, Monday through Friday. ACU 5 will not be available to provide the services listed above on weekends, Federal Holidays, the week between Christmas and New Year’s Day, and the week after New Year’s Day unless agreed to by the Commanding Officer, ACU 5. At least 48 hours prior to the need for ACU 5 to provide the services identified herein, the Contractor shall request the specific services, with all necessary details, from the authorized Government representative.

C.1.3.7.4 The Government will provide the following:

a. Access to LCACs 86, 87, 77 and 50 at ACU 5, Marine Corps Base, Camp Pendleton, CA.

b. Work, Storage and Service Areas:

(1) Use of Government-Provided 2-Bay Tension Fabric Shelter (TFS)

(2) Use of one ACU 5 hangar bay

(3) Area for Contractor supplied services for Government-Provided 2-Bay TFS

(4) Area for Contractor administration trailer

(5) Contractor lay down area (5,000 sq. ft)

(6) Contractor material receipt area (2,500 sq. ft)

(7) Area for craft vacated from TFS or ACU 5 hangar bay

c. Employee Parking: 25 passenger-sized vehicle spaces

d. Utility Services:

(1) Within the TFS:

a. Electrical: General Usage (480 VAC 3-Phase 60 Hz) and Lighting (480 VAC 1-Phase 60 Hz)

(2) Within ACU 5 hangar bay:

a. Electrical (110/220/440 VAC, 24 VDC) and craft shore power

b. Lighting, water, heating, and overhead crane

e. Equipment Services:

(1) Mobile Gantry Crane (Travel Lift)

(2) A shipset of blocks installed in each bay of the Government-Provided 2-Bay TFS and the ACU 5 hangar bay

(3) Government Cranes for use with Government Furnished Property. Government Lifting Fixtures shall not be used with Contractor Lifting Equipment.

f. Craft Fuel Services: All craft fuel and refueling services will be provided by ACU 5.

g. Rest Room Facilities: ACU 5 will designate area for Contractor installation of portable restroom facilities. Restroom facilities are not provided by ACU 5.

h. Work Break/Meal Facilities Area: ACU 5 will designate an area for Contractor installation of work break/meal facilities.

The Contractor shall not have access to ACU 5 shops, offices, heads, locker rooms, or any other facilities, unless authorized by Commanding Officer, ACU 5.

C.1.3.7.5 Assignment of a craft to a bay in the TFS or in the ACU 5 hangar is dependent on bay availability. The representative to the Government will provide specific bay assignments no later than fourteen (14) days prior to the Craft Induction Date.

C.1.3.7.6 The Contractor shall have full working access to the assigned TFS or hangar bay on the induction date of the craft for setup of Contractor-provided material and equipment in the bay.”

xiv. C.1.3.8 “HANGAR SERVICES AT ACU 5” is hereby added as follows:

“C.1.3.8 HANGAR SERVICES AT ACU 5

C.1.3.8.1 The hangar and the “T” row are equipped with the following: 440VAC for welding machines; 110VAC for hand tools and drop lights; low pressure air for hand tools; fresh water eye station, overhead bridge crane, and ground cable/lugs.

C.1.3.8.2 The hangar has a 15,000 lb Overhead Bridge Crane (CAT three) that is available for use provided the Contractor develop a Crane Safety Course/Training Plan, obtain approval of the plan from the representative of the Government, and then qualify and certify its personnel to their plan. ACU 5 personnel will also provide on the job training to Contractor personnel to familiarize them with crane operation.”

xv. C.1.3.9 “SERVICE AND MAINTENANCE OF TFS AT ACU 5” is hereby added as follows:

“C.1.3.9 SERVICE AND MAINTENANCE OF TFS AT ACU 5

C.1.3.9.1 The Contractor shall provide the services and maintenance described below to support the SLEP availabilities concurrent with the induction date of the first craft until the TFS is vacated by the last craft under this contract. The Contractor shall provide the services listed below in a manner which meets all applicable Federal, State and local laws, regulations and codes. The Contractor shall maintain the TFS in good working order and is responsible for providing a work environment which meets the safety standards of all Federal, State and local laws, regulations and codes.

a. TFS Services:

(1) Interior lighting. The Contractor shall ensure proper operation and maintenance of the lights sufficient to provide a work environment suitable for the performance of this contract.

(2) Electrical equipment as required to support SLEP availabilities;

(3) Low pressure (LP) air;

(4) Lifting equipment necessary for removal and re-installation of craft major assemblies such as propulsors, engines, and machinery modules;

(5) Fire alarms

(a) Install and test at initial installation and monthly thereafter providing notification to the Representative of the Government no later than 24 hours prior to the fire alarm test;

(b) Maintain working fire alarm system at induction of first SLEP craft through the last day of removal of Contractor equipment and material from the TFS; and

(6) Opening and Closing: The Contractor shall be responsible for opening and closing the moveable portion of the TFS in support of the SLEP availabilities.

(7) Any additional services required by the Contractor to perform the SLEP availability.

Note: A separately metered electrical service system for Contractor use (electrical power consumed in support of SLEP availabilities is paid for by the Contractor) is installed in the TFS. Characteristics of the electrical service system are: 60HZ (230V and 440V), 400HZ (208V), and variable DC power supply.

b. TFS Maintenance shall be performed at least every six (6) months in order to keep the TFS in good working order and shall, at a minimum, include the following :

(1) Clean any excessive dirt or grime from exterior fabric surface;
(2) Repair, where needed, holes, tears, scuffs or scrapes in the fabric;
(3) Tighten threaded rod to tension main fabric, if necessary;
(4) Tighten any loose cables;
(5) Tighten any loose lacing;
(6) Repair/replace damaged, deteriorated or torn lacing;

(7) Treat frame/fasteners with a corrosion inhibitor where necessary.

(8) Check all bolts and nuts, including concrete anchor fasteners for TFS frame, for proper Torque and adjust as necessary;

(9) Repair/replace, as necessary, all concrete anchors and bolts on the removable sections of the track of the TFS;

(10) Grease the wheels and door tracks to ensure proper operation;
(11) Replace concrete inserts for rail retainer hardware, as necessary;

(12) Replace any heavily corroded studs and nuts, including installing new fasteners in the concrete, where necessary.

c. TFS repairs, status, progress and any issues encountered shall be presented at the weekly onsite progress meeting and quarterly at the QPM.

C.1.3.9.2 Upon vacating the TFS, the Contractor shall restore the TFS to its original condition and configuration, except for Government approved modifications.”

xvi. C.1.3.10 “LAY DOWN AND MATERIAL RECEIPT AREAS AT ACU 5” is hereby added as follows:

“C.1.3.10 LAY DOWN AND MATERIAL RECEIPT AREAS AT ACU 5

C.1.3.10.1 The Contractor will be assigned space within the lay down and material receipt areas to setup any needed equipment and supplies in the lay down and material receipt areas. The first half (1/2) of the lay down and material receipt area is available seven (7) days prior to induction of the first SLEP craft. The subsequent half (1/2) of the lay down and material receipt areas are available upon induction of subsequent craft.

Similar to entering the lay down and material receipt areas, the Contractor shall reduce the total of lay down and material receipt areas in two (2) increments of the total of the lay down and material receipt areas concurrent with craft TFS or hangar bay craft-specific vacancy dates. The Contractor may utilize approximately half (1/2) of the total area within the lay down and material receipt areas until the delivery of the last SLEP craft.”

xvii. C.1.3.11 “BAY VACANCY FROM TFS OR HANGAR BAY AT ACU 5” is hereby added as follows:

“C.1.3.11 BAY VACANCY FROM TFS OR HANGAR BAY AT ACU 5

C.1.3.11.1 At a maximum of 10 months after craft induction for LCAC 77, 86, and 87, the craft will be removed, if not already removed, by the Government from the TFS or hangar bay and placed on the tarmac at a location designated by ACU 5. For LCAC 50, this will occur after 13 months.

C.1.3.11.2 The Contractor shall remove all Contractor equipment and material in conjunction with vacating each bay of the TFS or hangar with the exception of fire alarms. Fire alarms shall remain in the TFS or hangar until completion of removal of Contractor equipment and material from the final utilized TFS or hangar bay.”

xviii. C.1.3.12 “DEMOBILIZATION FROM ACU 5” is hereby added as follows:

C.1.3.12 DEMOBILIZATION FROM ACU 5

“If, at this end of this contract, the TFS is in use by the Contractor under an additional contractual vehicle, the Contractor shall obtain a signed statement from the on-site program office representative that the TFS is in acceptable condition, that all services are operational, and that the contractual maintenance cycles have been performed satisfactorily. All Contractor-provided services and equipment must be removed from the lay down and material receipt areas concurrent with the delivery of the last SLEP craft. Concurrent with the delivery last SLEP craft, the Contractor shall ensure that all Government Property has been returned to the Government, all Group 2 material have been turned over to the Government, and all Contractor property and services have been removed from the TFS or hangar bay, the lay down and material receipt areas, and all other work, storage, service and parking areas used by the Contractor at ACU 5.”

xix. C.1.3.13 “ELECTRICAL POWER AT CAMP PENDLETON (JUN 2008)” is hereby added as follows:

“C.1.3.13 ELECTRICAL POWER AT CAMP PENDLETON (JUN 2008)

C.1.3.13.1 The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Utility services at ACU 5 will be provided to the Contractor without charge, with the exception of electricity service that is provided from a separately metered system established explicitly for the purpose of tracking electricity usage by the contractor and determining appropriate charges. The amount of electricity service consumed from the separately metered system shall be charged to or paid for by the Contractor at prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

C.1.3.13.2 The prevailing rate for electricity use by a private party at ACU 5 is currently 15 cents per Kilowatt, this rate is subject to change and advance notice will be given to the Contractor prior to any change in the rate. The Contractor will be required to provide advance payment to the Government in order to set up an account for electrical billing purposes. The amount of the advance payment will be based upon an estimate of the Contractor’s electricity usage for a specified period and will be computed by the Government. The Contractor will need to contact the Base Utilities Office manager, Jay Bergamini, (760) 725-3807, jay.bergamini@usmc.mil, before performance begins in order to assist the Government in calculating an appropriate preliminary estimate. The advance payment shall be in the form of a check made payable to the United States Treasury and submitted to the Base Comptroller before work begins. The point of contacts for making the advance payment and setting up an electrical billing account at ACU 5 are: Cynthia Frenzel, 760-763-5194; Marsha Addison, 760-725-6583; and Tina San Nicolas, 760-763-5191. The instructions provided in this section are to be used for guidance only, it is the Contractor’s responsibility to ensure that arrangements to pay for their electricity usage at ACU 5 have been made prior to commencement of the work.

C.1.3.13.3 The meter shall be read on a monthly basis by a representative of the Government and charges will be deducted from the Contractor’s account.”

xx. C.1.3.14 “SUBMISSION OF HAZARDOUS WASTE MANIFEST (APR 2005)” is hereby added as follows:

“C.1.3.14 SUBMISSION OF HAZARDOUS WASTE MANIFEST (APR 2005)

Submission of the completed and signed Hazardous Waste Manifest forms, as required by the applicable Hazardous Waste Handling and Disposal Work Item, shall be submitted directly to the Southwest Regional Maintenance Center, Code 106B, located Naval Station San Diego, Bldg 91. The fax number is (619) 556-7887.”

xxi. C.1.9.2.3 is hereby deleted in its entirety and replaced with the following:

“C.1.9.3 Once at the Contractor’s facility, the Contractor shall conduct preservation in accordance with Attachment J-6 , “Preservation and Lay-up of LCAC Craft at the Contractor’s Facility”.”

xxii. C.1.15 is hereby deleted in its entirety and replaced as follows:

“C.1.15 OPTION ITEM 0022 - SHIPMENT BY THE CONTRACTOR OF LCAC FROM ACU 4 TO ACU 5 (PRE-SLEP)

C.1.15.1 If Option SLINs 0022AA, 0022AB and/or 0022AC are exercised, craft shipment shall be accomplished by the Contractor. The Contractor shall make all arrangements, coordinated through the Program Office, PMS377, to ship the LCACs from ACU 4 to ACU 5. The Contractor shall develop detailed instructions concerning craft preparation for transit, crane lifting details, if applicable, schedule (primary and alternate dates), location for delivery of the craft, and transit vendor requirements for each shipment of LCAC craft from ACU 4 to ACU 5. (CDRL A035)

C.1.15.2 Prior to shipment of the craft, the Contractor shall participate with Government representatives in an inspection of the craft and conduct an inventory of craft equipage to be shipped with the craft. The purpose of the craft inspection is to verify craft readiness for transport and document the pre-transport condition of the craft. Upon completion of documentation of the craft inspection and inventory of craft equipage, the Contractor shall take custody of the craft and craft equipage. Custody of the craft and equipage by the Contractor will be via DD FORM 1149, REQUISITION AND INVOICE/SHIPPING DOCUMENT.

C.1.15.3 Upon arrival of the craft to ACU 5, the Contractor shall participate with Government representatives in an inspection of the craft. The purpose of the craft inspection is to document damage, if any, to craft that occurred during transit. The Contractor shall bear the risk of any destruction or damage prior to acceptance of the craft at ACU 5.”

xxiii. C.1.16 “ITEM 0200 – DATA FOR CONTRACT LINE ITEMS 0001 THROUGH 0017, 0020 AND 0021” is hereby added as follows:

“C.1.16 ITEM 0200 – DATA FOR CONTRACT LINE ITEMS 0001 THROUGH 0017, 0020 AND 0021

C.1.16.1 The Contractor shall prepare and furnish data in accordance with the Contract Data Requirements List, DD Form 1423 – Exhibits A and B, Attachment J-2 attached hereto.”

c. SECTION E – INSPECTION AND ACCEPTANCE is hereby modified as follows:

i. E.1.1 is hereby deleted in its entirety and replaced with the following:

“ITEMS 0001, 0004, 0007, AND IF EXERCISED, ITEM 0010 - SLEP AVAILABILITIES AT ACU 4/5 OR CONTRACTOR-OWNED FACILITY

The craft shall be inspected throughout the SLEP availability, testing, and applicable craft trial requirements. Inspection and acceptance of the craft shall be accomplished by an authorized representative of the Government. NAVSEA Standard Item 009-04, referenced throughout Attachments J-1 and J-2, provides amplifying requirements. Inspection of the craft for purposes of acceptance will be accomplished at the SLEP availability Place of Performance as specified in Section F.”

ii. E.1.4 is hereby deleted in its entirety and replaced with the following:

“OPTION ITEMS 0014, AND 0022 AND ITEMS 0020 AND 0021 - SHIPMENT BY CONTACTOR OF LCAC TO A CONTRACTOR-OWNED FACILITY OR ACU 5

If exercised or ordered, inspection and acceptance shall be made at destination by an authorized representative of the Government.”

d. SECTION F – INSPECTION AND ACCEPTANCE is hereby modified as follows:

i. F.1.2 is hereby deleted in its entirety and replaced with the following:

“ITEM 0020 - This item shall be delivered or performed in accordance with Orders issued pursuant to Section H clauses entitled “ORDERS (FIXED-PRICE)”. TABLE F-2 – RESERVED”

ii. F.2.4 is hereby deleted in its entirety and replaced with the following:

“ITEM 0021 - These items shall be delivered or performed in accordance with Orders issued pursuant to Section H clauses entitled “ORDERS (FIXED-PRICE)”. TABLE F-5 – RESERVED”

iii. F.3 is hereby deleted in its entirety and replaced with the following:

“F.3 ITEMS 0001, 004, 0007, AND IF EXERCISED, ITEMS 0010, AND 0022 – SLEP AVAILABILITIES AT ACU 5

F.3.1 SLEP availabilities performed at ACU 5 shall occur during the time period between the Craft Induction Date and the Craft Delivery Date listed in Table F-6 below.

TABLE F-6

ITEM
Craft
MILESTONES DATES

Craft Induction (Note 1)

Fuel On Load
Production Work Complete
Craft Delivery
LCAC 86
22 Jan 2019
*
*
24 Apr 2020
LCAC 87
25 Jun 2019
*
*
25 Sep 2020
LCAC 77
26 Nov 2019
*
*
26 Feb 2021

0010 (Option)

LCAC 50
21 Apr 2020
*
*
22 Oct 2021

*To be completed by Offeror. The Fuel On Load Date must be a date after Bay Vacancy. The Offeror shall determine the Production Work Complete Date corresponding to the date when work requirements identified in Table C-2, Milestone 2 through Milestone 3 will be complete. The time period between Fuel On Load and Craft Delivery shall be a minimum of four months to accommodate a sufficient period to complete testing requirements.

Note 1 - The Craft Induction Date is the date that Contractor shall initiate SLEP availability. Craft shall not be scheduled for induction on days ACU support is not available as defined in Section C, paragraphs C.1.3.1.3. See EARLY INDUCTION below.

TABLE F-7

ITEM

Craft
MILESTONES DATES
Period of Performance Start Date
Contractor Pickup Date

Craft Arrival at ACU 5

Craft Induction

0022AA

LCAC 86
Option Exercise
*
**
22 Jan 2019

0022AA

LCAC 87
Option Exercise
*
**
25 Jun 2019

0022AB

LCAC 77
Option Exercise
*
**
26 Nov 2019

0022AB

LCAC 50
Option Exercise
*
**
21 Apr 2020
0022AC
LCAC 77
Option Exercise
*
**
26 Nov 2019

F.3.2 Option SLINs 0022AA, 0022AB, and or 0022AC- If exercised, the period of performance shall be from the date of option exercise, through craft departure from ACU 4, to five (5) days after the date of craft arrival at ACU 5 listed in Table F-7 below.

* Offeror shall fill-in a date after the latest date of option exercise that supports craft arrival at ACU 5 prior to date of induction. ITEMs 0022AA, and 0022AB crafts shall be shipped together.

**To be completed by Offeror.”

iv. F.4 is hereby deleted in its entirety and replaced with the following:

“F.4. EARLY INDUCTION

F.4.1 Upon Contractor request and Government approval, craft may be inducted earlier into the SLEP availability. The period of performance for the SLEP availability for any craft inducted early will remain the same duration as that listed in Table F-1 or Table F-3.

F.4.2 For any craft approved by the Government for early induction into the SLEP availability, the Government will issue a unilateral contract modification that specifies the revised Craft Induction Date, Fuel On Load Date, Production Work Complete Date, and Craft Delivery Date.”

v. F.5 is hereby deleted in its entirety and replaced with the following:

“F.5. ITEMS 0002, 0005, 0008, AND 0011- ADDITIONAL LABOR REQUIREMENTS

F.5.1 Any Additional Labor Requirements to be furnished under this contract shall be ordered by issuance of delivery orders by the activities designated in the Schedule. The Contractor agrees that these Additional Labor Requirements, if ordered, shall be performed concurrently with the aforementioned work set forth in ITEMS 0001, 0004, 0007, and 0010, without impacting, or causing delays or disruptions to either Craft Delivery Dates, this contract, or any other Government contract.

F.5.2 The Contractor further agrees that it is not entitled to a time extension to the Craft Delivery Dates or Milestones by reason of, or as a result of, the ordering of Additional Labor Requirements. Therefore, Craft Delivery Dates under this contract shall not be extended by reason of, or as result of, the work performed under these items.

F.5.3 Any man-hours ordered under ITEMS 0002, 0005, 0008, and 0011 shall be ordered according to the following schedule:

a. No more than 75% of the man-hours of the above listed items shall be ordered prior to the 50% work completion point for each craft (each craft considered as one production lot). The 50% work completion point is defined as that point in the Production Schedule where the scheduled man-hours for ITEMS 0001, 0004, 0007, and 0010 equates to 50% of the total scheduled man-hours for each craft.

b. No more than 20% of the man-hours of the above listed items shall be ordered after the 75% work completion point for each craft (each craft considered as one production lot). The 75% work completion point is defined as that point in the Production Schedule where the scheduled man-hours for ITEMS 0001, 0004, 0007, and 0010 equates to 75% of the total scheduled man-hours for each craft.

F.5.4 All delivery orders are subject to the terms and conditions of this contract. In the event of a conflict between any delivery order and this contract, the contract shall control.”

vi. F.6 is hereby deleted in its entirety and replaced with the following:

“F.6 ITEMS 0003, 0006, 0009, AND 0012– ADDITIONAL MATERIAL REQUIREMENTS

F.6.1 Any Additional Material Requirements to be furnished under this contract shall be ordered by issuance of delivery orders by the activities designated in the Schedule.

F.6.2 Material shall be ordered, as required, during the SLEP availability without impacting, or causing delays or disruptions to Craft Delivery Dates.

F.6.3 The Contractor agrees that these Additional Material Requirements, if ordered, shall be performed concurrently with the aforementioned work set forth in ITEMS 0001, 0004, 0007, and 0010, without impacting, or causing delays or disruptions, to either Craft Delivery Dates, this contract, or any other Government contract.

F.6.4 The Contractor further agrees that it is not entitled to a time extension to the Craft Delivery Dates or Milestones by reason of, or as a result of, the ordering of Additional Material Requirements. Therefore, Craft Delivery Dates under this contract shall not be extended by reason of, or as result of, the work performed under these items.”

vii. F.7 is hereby deleted in its entirety and replaced with the following:

“F.7 ITEM 0200 - DATA

F.7.1 All data to be furnished under this contract shall be prepaid to the destination(s) and at the time(s) specified in Attachment J-2.”

viii. F.8 is hereby added as follows:

“F.8 PLACE OF PERFORMANCE

( ) SLEP availabilities for LCACs 86, 87, 77, and 50 if exercised, shall be performed at ACU 4, JEB Little Creek/Fort Story, Little Creek, VA.

OR

( ) SLEP availabilities for LCACs 86, 87, 77, and 50 if exercised, shall be performed at ACU 5, Camp Pendleton, CA.

OR ( ) SLEP availabilities for LCACs 86, 78, 77, and 50 if exercised, shall be performed at the following Contractor Owned Facility location(s) (Contractor fill in name and address of locations(s) for LCAC SLEP to be conducted at the Contractor Owned Facility.):

Note: Offer shall select ONE (1) option above only.”

e. SECTION I - CONTRACT CLAUSES is hereby modified as follows:

i. 52.217-7 “OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989) (NAVSEA VARIATION II) (SEP 2009)” is hereby deleted in its entirety and replaced with the following:

(a) The Government may extend the term of this contract by written notice(s) to the Contractor within the periods specified below. If more than one option exists the Government has the right to unilaterally exercise any such option whether or not it has exercised other options.

ITEM
LATEST OPTION EXERCISE DATE
0010
01 June 2019
0014AA
Contract Award
0014AB
21 Jun 2019
0014AC
21 Jun 2019
0016AA
Contract Award
0016AB
21 Jun 2019
0016AC
21 Jun 2019
0017AA
25 May 2020
0017AB
22 Jun 2021
0017AC
26 Oct 2020
0022AA
Contract Award
0022AB
21 Jun 2019
0022AC
21 Jun 2019

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any option(s) under this clause, shall not exceed five (5) years, however, in accordance with paragraph (g) of the requirement of this contract entitled "LEVEL OF EFFORT" (NAVSEA 5252.216-9122), if the total manhours delineated in paragraph (a) of the LEVEL OF EFFORT requirement, have not been expended within the period specified above, the Government may require the Contractor to continue to perform the work until the total number of manhours specified in paragraph (a) of the aforementioned requirement have been expended.

f. SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS is hereby modified as follows:

i. L.3.1.1.1 is hereby deleted in its entirety and replaced with the following:

“The Government intends that the LCAC SLEP availabilities addressed in this solicitation be performed at either ACU 4, ACU 5 or at a Contractor-Owned Facility. Requirements in the solicitation that apply only when the performance of the LCAC SLEP availabilities are at ACU 4 or 5 are so annotated; similarly, requirements that apply only when the performance of the LCAC SLEP availabilities are at a Contractor-Owned Facility are so annotated. Requirements in the solicitation not expressly annotated for performance of the LCAC SLEP availabilities at either ACU 4/5 or at a Contractor-Owned Facility are applicable for performance of the LCAC SLEP availabilities at both ACU 4/5 and a Contractor’s Facility.”

ii. L.3.1.2 is hereby deleted in its entirety and replaced with the following:

“Multiple proposals are not acceptable. Each Offeror shall submit only one proposal which represents their best approach to meeting the requirements of the solicitation. The proposal shall address the Offeror’s performance of the LCAC SLEP availabilities at either ACU 4, ACU 5, or at a Contractor-Owned Facility. Proposals cannot contain a blending of sites. The Offeror’s submittal of a proposal addressing the LCAC SLEP availabilities at more than one location forms the basis for rejection of the proposal.”

iii. L.3.5.2.3.1 is hereby deleted in its entirety and replaced with the following:

“Price summaries for ITEMS 0001, 0002, 0004, 0005, 0007, 0008, 0010, 0011, 0014, 0016, 0017, 0022 and ITEM 0200:”

iv. L.3.5.2.3.1.1 is hereby deleted in its entirety and replaced with the following:

“L.3.5.2.3.1.1 For proposal pricing evaluation purposes only, Offerors shall assume a contract award date of 07 December 2018. This date shall not be construed as allowing for any adjustment of any kind if the actual award date differs from this date.”

v. L.3.5.2.3.1.2 is hereby deleted in its entirety and replaced with the following:

“Total Estimated Price for ITEMs 0001, 0004, 0007, 0010, 0014, 0016, 0017 and 0022:”

vi. L.3.5.2.3.1.2.1 is hereby deleted in its entirety and replaced with the following:

“Offerors shall list the Items with their associated price. These prices must match the prices offered in Section B. If submitting a proposal for work at a Contractor-Owned Facility, include pricing for Items 0014AA, 0014AB, 0014AC, 0016AA, 0016AB, 0016AC, 0017AA, 0017AB AND 0017AC. If submitting a proposal for work at ACU 5, include pricing for 0022AA, 0022AB and 0022AC.”

g. SECTION M- EVALUATION FACTORS FOR AWARD is hereby modified as follows:

i. Section M.1.17 is hereby deleted in its entirety and replaced with the following:

“M.1.17 Offerors must propose prices for all Items listed in Section B (SUPPLIES OR SERVICES AND PRICES/COSTS) of this solicitation except for ITEMS 0003, 0006, 0009, 0012, 0020, and 0021. If proposing work at a Contractor-Owned Facility, offerors are not required to price ITEM 0022. If proposing work at ACU 4, offerors are not required to price ITEMS 0014, 0016, 0017, and 0022. If proposing work at ACU 5, offerors are not required to price Items 0014, 0016, and 0017. Although ITEM 0200 is not separately priced in Section B and will not be evaluated, “Figure L.3” must be provided.”

ii. Section M.5.1.3 is hereby deleted in its entirety and replaced with the following:

“M.5.1.3 The Offeror’s SLEP availability period of performance of Section F, Table F-1, F-3, or Table F-6, will be evaluated based on a SLEP availability period of performance that is both realistic and substantiated by the Production Schedule and supporting documentation. Unrealistic and unsubstantiated task durations will be rated lowest.”

iii. Section M.6.2 is hereby deleted in its entirety and replaced with the following:

“The Contracting Officer will determine whether the proposed prices are fair and reasonable. In making this determination, the Contracting Officer may compare the proposed price with prices proposed by competitors and with other data and estimates available to the Contracting Officer. The Contracting Officer may determine a proposed price not to be fair and reasonable if it is found to be unrealistically high. The Contracting Officer’s determinations will be factored into the decision of which offer provides the Best Value to the Government.”

iv. M.6.4, TABLE M-4, is hereby deleted in its entirety and replaced with the following:

“TABLE M-4

TGEP CALCULATION FOR LCAC SLEP AVAILABILITY AT ACU 4 OR ACU 5

FIRM FIXED PRICED ITEMS

Step
Input
Result
1
Offeror Proposed Price for ITEM 0001
2
Offeror Proposed Price for ITEM 0004
3
Offeror Proposed Price for ITEM 0007
4
Offeror Proposed Price for ITEM 0010
5
Sum of Results under Steps 1 through 4
Firm Fixed Price Total

ADDITIONAL LABOR REQUIREMENT ORDER ITEMS

Step
Input
Result
6
Offeror Proposed Fully Loaded Man-Hour Labor Rate x 26,250 Man-Hours for ITEM 0002
Additional Labor Requirement Ceiling for ITEM 0002
7
Offeror Proposed Fully Loaded Man-Hour Labor Rate x 26,250 Man-Hours for ITEM 0005
Additional Labor Requirement Ceiling for ITEM 0005
8
Offeror Proposed Fully Loaded Man-Hour Labor Rate x 26,250 Man-Hours for ITEM 0008
Additional Labor Requirement Ceiling for ITEM 0008
9
Offeror Proposed Fully Loaded Man-Hour Labor Rate x 30,000 Man-Hours for ITEM 0011
Additional Labor Requirement Ceiling for ITEM 0011
10
Sum of Results under Steps 6 through 9
Total Additional Labor Requirement Ceiling
11
Normalization for performance at the ACU 4 per FAR 45.301 “USE AND RENTAL” and FAR 52.245-9, “USE AND CHARGES”

For ACU 4 use $1,193,933.

For ACU 5 use $1,234,414.

$1,193,933 or

$1,234,414

12
Sum of Results under Step 5, Step 10, and Step 11
TGEP”

v. M.6.4.5 is hereby deleted in its entirety and replaced with the following:

“M.6.4.5 ITEMS 0014, 0016,0017, and 0022 will be evaluated for price reasonableness and completeness. The Offeror shall provide pricing for all sub-ITEMS thereunder. The burden of proof for price credibility rests with the Offeror.”

vi. M.6.4.6.2 is hereby added as follows:

“M.6.4.6.2 For LCAC SLEP availabilities at ACU 5, the total proposed price will be increased by a normalization amount of $1,234,414 to account for rent free use of Government facilities, equipment, craft crew and craft fuel, craft refueling services and other resources at ACU 5 as specified in C.1.2.13.3, INSURV Trials, C.1.3.7 GOVERNMENT PROVIDED FACILITIES AND SERVICES AT ACU 5, and C.21 TESTS AND TRIALS.”

3. Receipt of Proposals is hereby extended to 13 July 2018, 02:00 PM EST.

4. Except as provided herein, all other terms and conditions of solicitation N00024-18-R-2400 remain unchanged.