N00024-18-R-2400_Amendment_0004.docx

DOCX document 38 KB Posted

Attached to
FY17/FY19 Landing Craft Air Cushion Service Life Extension Program
Solicitation number
N0002418R2400
Issued by

About this file

N00024-18-R-2400 Amendment 0004

View the file

Other files

File Type Posted
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0008.docx DOCX document
N00024-18-R-2400_Amendment_0008.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0008.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0007.docx DOCX document
N00024-18-R-2400_Amendment_0007.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0007.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0006.docx DOCX document
N00024-18-R-2400_Amendment_0006.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0006.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0005.docx DOCX document
Attachment_A_J-1_TDP.docx DOCX document
N00024-18-R-2400_Amendment_0005.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0005.docx DOCX document
N00024-18-R-2400_Amendment_0005.docx DOCX document
Attachment_A_J-1_TDP.docx DOCX document
N00024-18-R-2400_Conformed_through_Amendment_0004.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_through_Amendment_0004.docx DOCX document
18-R-2400_ADDENDUM_Forms_to_Section_L_Conformed_thru_Amendment_0003.docx DOCX document
N00024-18-R-2400_Conformed_thru_Amendment_0003.docx DOCX document
N00024-18-R-2400_Amendment_0003.docx DOCX document
N00024-18-R-2400_Amendment_0002.docx DOCX document
N00024-18-R-2400_Conformed_thru_Amendment_0001.docx DOCX document
18-R-2400_Amend_0001_Att_A_ADDENDUM_Forms_to_Section_L.docx DOCX document
N00024-18-C-2400_Amendment_0001.docx DOCX document
Attachment_J-6_Preservation_and_Lay-Up.doc DOC document
Attachment_J-2b_Exhibit_A_Index.doc DOC document
Attachment_J-7_LCAC_86_Consolidated_GFP_List.xlsx XLSX spreadsheet
Attachment_J-4a_GFP_Performance_1-12.pdf PDF
Attachment_J-3_Perf_Miles_Pay_Sch.xlsx XLSX spreadsheet
Attachment_J-2a_-_CDRL_Information.docx DOCX document
Attachment_J-9_LCAC_77_Consolidated_GFP_List.xlsx XLSX spreadsheet
Attachment_J-2c_CDRLs_Exhibit_A.pdf PDF
Attachment_J-2e_CDRLs_Exhibit_B.pdf PDF
Attachment_J-4c_GFP_Remarks_Index.docx DOCX document
Attachment_J-8_LCAC_87_Consolidated_GFP_List.xlsx XLSX spreadsheet
N0002418R2400.pdf PDF
Attachment_J-2d_Exhibit_B_Index.doc DOC document
Attachment_J-1_TDP.docx DOCX document
Attachment_J-4b_GFP_Performance_13-24.pdf PDF
Attachment_J-10_LCAC_50_Consolidated_GFP_List.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002418R2400

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

REVISED SUMMARY OF CHANGES

The purpose of this amendment to solicitation N00024-18-R-2400 is to:

a) Respond to questions submitted by potential Offerors;

b) Revise SECTION C – DESCRIPTIONS AND SPECIFICATIONS, C.1, STATEMENT OF WORK; and,

c) Revise SECTION F – DELIVERIES OR PERFORMANCE

1. The following questions were submitted by potential Offerors. The Government’s response follows each question. Questions and Answers 037 through 038 are provided in this Amendment 0004. Questions and Answers 001 to 036 were provided in previous amendments.

Question 037: For tranportation of the LCAC by the Contractor, will the LCAC remain in a fully operational condition with fuel and oil onboard the LCAC during transit?

Answer 037: Yes, the LCAC will remain in a fully operational condition with a minimum of 4000 lbs of fuel on board for the transit.

Question 038: Based on the size of the installation packages for the structural and cable work for LCAC 50, would the Government consider modifying the length of the LCAC 50 SLEP availability from 18 to 19 months?

Answer 038: Yes, LCAC 50's availability length will be changed from 18 months to 19 months. Changes to the basic solicitation are found below in paragraph 2.

2. As a result of the questions and answers above, modifications to the basic solicitation are hereby incorporated as follows:

a. SECTION C – DESCRIPTIONS AND SPECIFICATIONS, C.1, STATEMENT OF WORK, paragraph C.1.3.4.1 is hereby deleted in its entirety and replaced with the following:

“At a maximum of 10 months after craft induction for LCAC 77, 86, and 87, the craft will be removed, if not already removed, by the Government from the TFS bay and placed on the tarmac at a location designated by ACU 4. For LCAC 50, this will occur after 14 months."

b. SECTION F – DELIVERIES OR PERFORMANCE, paragraph F.1.1, TABLE F-1 is hereby deleted in its entirety and replaced with the following:

TABLE F-1

ITEM
Craft
MILESTONES DATES

Craft Induction (Note 1)

Fuel On Load
Production Work Complete
Craft Delivery
LCAC 86
4 Dec 2018
*
*
28 Feb 2020
LCAC 87
7 May 2019
*
*
31 Jul 2020
LCAC 77
1 Oct 2019
*
*
24 Dec 2020

0010 (Option)

LCAC 50
3 Mar 2020
*
*
24 Sep 2021

c. SECTION F – DELIVERIES OR PERFORMANCE, paragraph F.2.1, TABLE F-3 is hereby deleted in its entirety and replaced with the following:

TABLE F-3

ITEM
Craft
MILESTONES DATES

Craft Induction

Fuel On Load
Production Work Complete
Craft Delivery
LCAC 86
22 Jan 2019
*
*
24 Apr 2020
LCAC 87
25 Jun 2019
*
*
25 Sep 2020
LCAC 77
26 Nov 2019
*
*
26 Feb 2021

0010 (Option)

LCAC 50
21 Apr 2020
*
*
19 Nov 2021

3. The date and time for receipt of proposals is not extended.

4. Except as provided herein, all other terms and conditions of solicitation N00024-18-R-2400 remain unchanged.