N0002417MR02574
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to 1) Respond to Bidders' Questions for the N00024-18-R-2210 HPIB DD&C RFP, and 2) Make an update to
Section C.3.040.4.3.
1. CONTRACT ID CODE PAGE OF PAGES
L 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002418R2210
X 9B. DATED (SEE ITEM 11)
02-Mar-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jul-2018
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2020
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002418R2210
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
233. QUESTION: As referenced in Attachment J-1 System Specification Section 100.4, the Design Criteria for ABS
Q steel is not provided. Please advise what criteria to use for this steel.
RESPONSE: The Attachment J-1 System Specification will be updated to add rows to the Design Criteria tables in
Section 100.4 as follows:
Table 100- 6 Strength Limits
Material Allowable
Strength Fb
(kips/in2)
Nominal Yield
Strength Fy
(kips/in2)
Extra High Strength Steel (Q43) 45 61
Extra High Strength Steel (Q47) 48 67
Extra High Strength Steel (Q51) 52 73
Extra High Strength Steel (Q56) 55 80
Extra High Strength Steel (Q63) 60 90
Extra High Strength Steel (Q70) 66 100
Table 100- 7 Design Primary Stress Limits
Hull Material Design Primary Stress
Limit, F1 tons/in2 kips/in2
Extra High Strength Steel (Q43) 9.8 22.0
Extra High Strength Steel (Q47) 10.0 22.4
Extra High Strength Steel (Q51) 10.2 22.8
Extra High Strength Steel (Q56) 10.5 23.5
Extra High Strength Steel (Q63) 10.5 23.5
Extra High Strength Steel (Q70) 10.5 23.5
Table 100- 9 C-Constant
C Values
Upper
Shell Tank
Boundaries
Lower
Shell Tank
Boundaries
Flooding
Damage
Control
Extra High Strength Steel (Q43) 440 675 830
Extra High Strength Steel (Q47) 460 700 850
Extra High Strength Steel (Q51) 480 725 880
Extra High Strength Steel (Q56) 500 750 900
Extra High Strength Steel (Q63) 525 775 950
Extra High Strength Steel (Q70) 550 800 1000
This change will be incorporated into the solicitation at the time of award.
N0002418R2210
234. QUESTION: Amendment 0011 addresses subparagraphs C.3.040.4.3, C.3.040.4.3.1, C.3.040.4.3.2, C.3.040.4.3.3 and C.3.040.4.3.4. It is clear that C.3.040.4.3, C.3.040.4.3.1 and C.3.040.4.3.2 were changed.
However, it appears that C.3.040.4.3.3 and C.3.040.4.3.4 were removed – please provide confirmation that they have been removed.
RESPONSE: Both C.3.040.4.3.3 and C.3.040.4.3.4 were deleted by Amendment 0011. However, the deletion of
C.3.040.4.3.4 was unintended, subparagraph C.3.040.4.4 was intended to be deleted instead. This Amendment restores the previous subparagraph C.3.040.4.3.4, and deletes C.3.040.4.4. Additionally, you will see below that the amendment renumbers subsequent paragraphs to reflect this deletion. The referenced Section C section is provided below. In accordance with these changes to Section C, the Attachment J-10 DD254 Contract Security Classification
Specification will be updated at award to remove the block 10a requirement for access to COMSEC Information; the block 11d requirement to Fabricate, Modify, or Store Classified Hardware; the block 11h requirement to have a
COMSEC Account; as well as the guidance in block 13 related to these requirements.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
C.3.040.4 Security Program.
FROM:
C.3.040.4.3 Classified work performed under this contract shall be performed at the Contractor’s facility.
C.3.040.4.3.1 Appropriate security clearance action shall be initiated in pursuit of a SECRET facility security clearance for the Contractor’s DESIGN facility within 60 days after Contract Award and that
SECRET facility clearance shall be maintained for the life of the contract.
C.3.040.4.3.2 The Contractor shall maintain a SECRET level of safeguarding for classified information and material.
C.3.040.4.4 The Contractor shall obtain a Communications Security (COMSEC) account in order to store and access COMSEC systems and data as indicated in the DD254.
C.3.040.4.5 The Contractor shall establish and maintain procedures necessary to manage and safeguard
Controlled Unclassified Information (CUI) described in the Exhibit A CDRL.
C.3.040.4.6 Subcontract agreements and purchase orders shall flow down requirements for Program
Protection, Cybersecurity, and other requirements of the National Industrial Security Program to all subcontractors and vendors.
C.3.040.4.7 Any Contractor information system containing classified information shall be accredited in accordance with the National Industrial Security Program Operating Manual (NISPOM).
TO:
C.3.040.4.3 Classified work performed under this contract shall be performed at the Contractor’s facility.
C.3.040.4.3.1 Appropriate security clearance action shall be initiated in pursuit of a SECRET facility security clearance for the Contractor’s DESIGN facility within 60 days after Contract Award and that
SECRET facility clearance shall be maintained for the life of the contract.
C.3.040.4.3.2 The Contractor shall maintain a SECRET level of safeguarding for classified information and documentation.
C.3.040.4.3.3 The Contractor shall establish Classified data transmission facilities or utilize Defense Courier
Service to receive and transmit classified Data Items required by the Exhibit A CDRL.
C.3.040.4.4 The Contractor shall establish and maintain procedures necessary to manage and safeguard
Controlled Unclassified Information (CUI) described in the Exhibit A CDRL.
C.3.040.4.5 Subcontract agreements and purchase orders shall flow down requirements for Program
Protection, Cybersecurity, and other requirements of the National Industrial Security Program to all subcontractors and vendors.
C.3.040.4.6 Any Contractor information system containing classified information shall be accredited in accordance with the National Industrial Security Program Operating Manual (NISPOM).