Heavy Polar Icebreaker (HPIB) Detail Design and Construction (DD&C)
Solicitation number
N00024-18-R-2210
Issued by

About this file

N00024-18-R-2210 Amendment 0004

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002417MR02574

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to respond to bidder's questions and to update N00024-18-R-2210 HPIB DD&C RFP in response to bidder's questions.

1. CONTRACT ID CODE PAGE OF PAGES

L 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Apr-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002418R2210

X 9B. DATED (SEE ITEM 11)

02-Mar-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Apr-2018

CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2050

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002418R2210

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

Responses to Bidders’ Questions:

14. QUESTION: Attachment J-1 Specification Section 042.5.3.2 references 2 Guidance Drawings (NAEC DWG

626585 Series Visual Landing Aid Installation Lamps Configuration, NAWCAD DWG 52562111 HPIB SWaP tables for C4i) and Section 042.5.3.3 references 2 Project Peculiar Documents (070-1 HPIB Vessel Classification &

Classification Guide, 512-1 HVAC Design Criteria Manual). Can the Government provide these 4 documents?

RESPONSE: Yes. The two PPDs and NAWCAD DWG 5256111 will be provided as Attachments J-1A, J-1B and

J-1C, respectively. The NAEC DWG will be added to Schedule C identifying it as GFI in a future amendment. The appropriate citations in sections 042 and 330 of the HPIB Specification will be updated to reflect provision of the

NAEC DWG after award.

15. QUESTION: As referenced within Attachment J-1 Specification, please provide clarification regarding the term

"ship length" as specified (waterline, forward/aft perpendicular, or LOA).

RESPONSE: For use with SVR Part 3, ship length will be defined as in SVR 3-1-1, using the Aft Perpendicular as the endpoint in place of the rudderstock. The Aft Perpendicular shall be the intersection of the Full Load waterline and the hull aft.

16. QUESTION: As referenced within Attachment J-1 Specification Section 100.2.7.1, please provide specification of strength requirements related to ice ramming.

RESPONSE: Strength requirements for longitudinal bending are established in HPIB Specification 100.4.2.1.2, which includes wave induced, grounding, and ice ramming effects.

17. QUESTION: As referenced within Attachment J-1 Specification Section 100.4.2.1.3, the offeror requests to remove the requirement for design primary stress limits decreasing to zero at the fore and aft perpendicular.

RESPONSE: This requirement remains unchanged. Refer to SVR 3-2-1 Figure 2 and associated text for clarification.

18. QUESTION: As referenced within Attachment J-1 Specification Section 100.5.1, will USCG modify the requirement that "structure contributing to the longitudinal strength of the ship shall be continuous through transverse structure"?

RESPONSE: This requirement remains unchanged.

19. QUESTION: As referenced within Attachment J-1 Specification Section 100.7, the offeror recommends that the wording permitting direct calculation be promoted up to apply to all areas of Section 100.7.

RESPONSE: Direct calculation has been allowed for select elements of the Enhanced requirements and intentionally not allowed for others. Additional elements of the Enhanced requirements are under consideration for direct calculation and will be identified via solicitation amendment once a determination is made.

20. QUESTION: Attachment J-1 Specification Section 100.7.5 Stern and Stern Frames appears to be a placeholder and does not include any new requirements. Does the USCG intend to introduce additional requirements?

RESPONSE: The Government intends to incorporate enhanced requirements for stem and stern frames per SVR Part

6-1-4/15 by updating Attachment J-1 Specification in a future amendment.

21. QUESTION: As referenced in Attachment J-1 Specification Section 070.3.1.12.3, will the Government provide

PPD 070-1 HPIB Vessel Classification & Certification Guide?

RESPONSE: Yes, PPD 070-1 is provided as Section J Attachment J-1A.

22. QUESTION: As referenced in Attachment J-1 Specification Section 512.1.1, will the Government provide HPIB

DCM (PPD 512-01)?

RESPONSE: Yes, PPD 512-01is provided as Section J Attachment J-1B.

23. QUESTION: As referenced in Attachment J-1 Specification Section 079.1, there is no definition provided for the

Aft Perpendicular (AP). Is the AP to be taken as the centerline of the rudder stock (azimuthing drives) as would be appropriate for a non-combatant vessel?

RESPONSE: The Aft Perpendicular shall be the intersection of the Full Load waterline and the hull aft.

24. QUESTION: The Contractor assumes that, within ABS Steel Vessel Rules, After Perpendicular shall be defined as “Intersection of the Full Load waterline and the hull aft, where L equals the distance in meters (feet) on the Full

Load water line from the fore side of the stem to the aft perpendicular. For use with the Rules, L is not to be less than 96% and need not be greater than 97% of the length on the Full Load water line. The forward end of L is to coincide with the fore side of the stem on the waterline on which L is measured.” Can the USCG confirm this assumption?

RESPONSE: The Aft Perpendicular shall be the intersection of the Full Load waterline and the hull aft.

25. QUESTION: Attachment J-1 Specification Section 571.4, Connected Replenishment (CONREP) was added to

System Specification in mid-2017. Please confirm that the definition of the Alongside Delivery Station only includes the delivery to another ship and not receiving from another ship?

RESPONSE: There is no requirement for Connected Replenishment (CONREP). Alongside Replenishment Stations both deliver and receive from another ship, as described in HPIB Specification 571.1.4.

26. QUESTION: N00024-18-R-2210_Heavy_Polar_Icebreaker_Solicitation_030218 Section L.1.2.1.3.1 part i) subpart vii) states the following:

“Perform stability analysis using NAVY Ship Hull Characteristics Program (SHCP) version 4.38.01 dated 38-March

2012 with AreaWin version 6.01.05 dated 37-March 2012, or using General Hydrostatics Software (GHS); and provide the input files used for the stability analyses in digital format.”

The wordage here is specific to suggest that only those versions may be used to perform the stability analysis. The version being provided by the government, for parties under contract, is SHCP 1.40.05 dated 07-Oct-17 and AREA

6.03.04 dated 04-Oct-17. These versions seem to succeed the requirements in the RFP, as they are labelled with a later date. Can USCG confirm that the versions being provided by the U.S. Navy are suitable (given that they are later and likely superior versions) to ensure compliance with the requirements?

RESPONSE: Yes, SHCP version 1.40.05 dated 07-Oct-17 and AREA 6.03.04 dated 04-Oct-17 are suitable and comply with the requirements. Section L will be updated to reference these versions.

27. QUESTION: The HPIB RFP requests "Proposal Technical Data Attachment J-20 (TO BE PROVIDED BY

OFFEROR)." Recommend specifying which data items are to be included in Attachment J-20.

RESPONSE: The Government may include technical elements of the winning proposal into Attachment J-20 at time of award, as deemed appropriate. Offerors are not required to explicitly provide content for this attachment.

28. QUESTION: Section L.1.2.1.3.1 i) requires Tank Data in accordance with Attachment L-6. Attachment L-6 does not specify a requirement specifically for Tank Data.

RESPONSE: Offerors should include tank data on Hydrostatics, Weights & Loadings, and Area-Volumes Details tabs of Attachment L-6.

29. QUESTION: As referenced in Attachment J-1 Specification Section 496.3, please specify the beamwidth configuration for the Kongsberg SBP model listed in the Sonar Mission Systems requirements.

RESPONSE: The Government's requirement is for a 3-degree sub bottom profiling system. Attachment J-1

Specification will be updated in a future amendment.

30. QUESTION: Will the Government add self-propelled model testing with a stock propeller to Section C para

3.079.5.6?

RESPONSE: Government does not require stock propeller test data, but offerors should perform any tests that are necessary to complete their design.

31. QUESTION: As referenced in Attachment J-1 Specification Section 400.1.2, will the Government provide

NAWCAD DWG #52562111?

RESPONSE: Guidance drawing is provided as Section J Attachment J-1C.

32. QUESTION: Attachment J-1 Specification Section 070.3.1.12 states the ABS Statement of Fact shall apply to the cutter in accordance with PPD 070-1 HPIB Classification & Certification Guide. Will the Government provide the PPD 070-1 HPIB Classification & Certification Guide?

RESPONSE: Yes, PPD 070-1 is provided as Section J Attachment J-1A.

33. QUESTION: This Offeror has approached ABS for a proposal for certification and survey services, as required by the RFP and System Specification.

Neither ABS nor Offerors have been provided with the document PPD 070-1 “HPIB Vessel Classification and

Certification Guide” as referenced in Section 070.3.1.12 of the HPIB SS. Offeror has therefore been informed by

ABS that at this time they can only respond to appraisal and survey scope, schedule and cost for standard SVR services.

Please confirm that additional services, as envisaged under PPD 070-1, will either be contracted directly between

USCG and ABS, or that the additional ABS work scope will be subject to a separate contract action with the shipbuilder.

Please note that in the event that Offeror is required to incorporate PPD 070-1 approach and services in its technical and cost proposal, this document must be provided as soon as possible.

RESPONSE: PPD-070-1 is provided as Attachment J-1A. The Offeror is required to procure the services described therein to fulfill the contract requirements.

34. QUESTION: As referenced in Attachment J-1 Specification Section 070.3.6, would the Coast Guard consider a propulsion arrangement of 3 main propulsors, with 1 or less main propulsors being an azimuthing propulsor?

RESPONSE: No, the Government's propulsion plant architecture requirements of Attachment J-1 Section 70.3.6 will remain.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

The following document(s), exhibit(s), and other attachment(s) form a part of this contract:

Exhibits:

A -- Contract Data Requirements List(s) (CDRL)

Attachments:

J-1 Heavy Polar Icebreaker (HPIB) Specification

J-1A PPD-070-1 HPIB Vessel Classification and Certification Guide

J-1B PPD-512-01 HPIB Design Criteria and Calculations

J-1C NAWCAD DWG #52562111

J-2 Design and Readiness Review Requirements and Criteria

J-3 Supplemental Test Statement of Work (SOW)

J-4 Lead Ship Advance Procurement SOW [to be incorporated from Proposal]

J-5 Lead Ship Long Lead Time Material (LLTM) List [to be incorporated from Proposal]

J-6 Schedule A Government Furnished Equipment (GFE) List

J-7 RESERVED [for future addition of Schedule B Government Furnished Property (GFP) List]

J-8 Schedule C Government Furnished Information (GFI) List

J-9 Coordinated Shipboard Allowance List (COSAL)

J-10 Contract Security Classification Specification, DD254

J-11 Government-Provided Technical Support Services

J-12 Program Protection Instruction (PPI)

J-13 Cybersecurity Instruction

J-14 Economic Price Adjustment (EPA) Tables

J-15 Corporate Guaranty [to be incorporated from Proposal]

J-16 Contractor's Subcontracting Plan [to be incorporated from Proposal]

J-17 Contract Burdened Pricing Rates [to be incorporated from Proposal]

J-18 Billing Weighting Factor

J-19 OMB Form LLL – Disclosure of Lobbying Activities [to be incorporated from Proposal]

J-20 Proposal Technical Data [to be incorporated from Proposal]

J-21 Data Rights Assertions, Exceptions and Associated Pricing [to be incorporated from Proposal]

J-22 Critical Equipment List [to be incorporated from Proposal]

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

L.1. INSTRUCTIONS TO OFFERORS

L.1.1. GENERAL INFORMATION

L.1.2.1. Volume I – Technical Proposal

L.1.2.1.3. Factor 1 – Design and Design Maturity

L.1.2.1.3.1. Design

The Offeror shall describe their proposed ship design that meets or exceeds the requirements of this RFP. The

Offeror shall address the following specific design elements:

a) Design Overview

b) Vessel Size & Hull Form

c) Structural Design

d) Propulsion System

e) Integrated Electrical Propulsion System (IEPS)

f) Icebreaking

g) Seakeeping

h) Operations

FROM:

i) Intact and Damaged Stability - Discuss how the proposed design’s intact and damaged stability characteristics meets or exceeds the requirements of the HPIB Specification.

i) Provide calculations of intact stability at Minimum Operating, Half Load and Full Load End of Service

Life conditions as defined in the HPIB Specification with and without topside icing.

ii) Provide a Hydrostatic Table for the proposed design.

iii) Provide complete electronic Tank Data in accordance with (Attachment L-6).

iv) Provide the Floodable Length Curve for Full Load End of Service Life condition.

v) Provided Flooding Water Levels (V-Lines) Analysis.

vi) Provide curves of Maximum Allowable KG versus Displacement, at Minimum Operating, Half Load and Full Load End of Service Life conditions.

i) Perform stability analysis using US Navy Ship Hull Characteristics Program (SHCP) version 1.40.05 dated 07-October 2017 with AreaWin version 6.03.04 dated 04-October 2017, or using General

Hydrostatics Software (GHS); and provide the input files used for the stability analyses in digital format.

TO:

i) Intact and Damaged Stability - Discuss how the proposed design’s intact and damaged stability characteristics meets or exceeds the requirements of the HPIB Specification.

i) Provide calculations of intact stability at Minimum Operating, Half Load and Full Load End of Service

Life conditions as defined in the HPIB Specification with and without topside icing.

ii) Provide a Hydrostatic Table for the proposed design.

iii) Provide complete electronic Tank Data in accordance with (Attachment L-6).

iv) Provide the Floodable Length Curve for Full Load End of Service Life condition.

v) Provided Flooding Water Levels (V-Lines) Analysis.

vi) Provide curves of Maximum Allowable KG versus Displacement, at Minimum Operating, Half Load and Full Load End of Service Life conditions.

ii) Perform stability analysis using US Navy Ship Hull Characteristics Program (SHCP) version 4.40.05 dated 07-Oct 2017 with AREAWin version 6.03.04 dated 04-Oct 2017, or using General

Hydrostatics Software (GHS); and provide the input files used for the stability analyses in digital format.

j) Critical Equipment

k) Advance Procurement

l) Auxiliary Systems and Equipment

m) Reliability.

(End of Summary of Changes)