NOAA AGOR VARIANT (NAV)
Phase II Data Requirement List
Attachment J-3
Version 1.0
26 April 2018
Solicitation No. N00024-18-R-2201
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
N00024-18-R-2201
PREPARED AND
APPROVED BY: DONNA E. HUDSON, PMS325 DATA MANAGER DATE: TBD
PAGE: i
FOREWORD
The Data Requirements List (DRL) identifies Contractor Data Item requirements in support of the NOAA AGOR
Variant (NAV) program. This Foreword provides general guidance to Contractor personnel and is intended to clarify issues of an administrative and procedural nature that are not otherwise addressed. Emergent issues that are not addressed herein or otherwise provided for in source documents shall be referred to PEO SHIPS PMS325. Data shall be provided for each ship built under this Contract.
Detailed information concerning the content of the data item requirement is provided in the Glossary. A complete listing of addressees for this DRL is provided immediately following the Glossary.
Data required to be delivered under the DRL or this Contract, that would be deemed Technical Data under DFARS
252.227-7013, if it were delivered in written form, shall not lose its status as Technical Data because access by the
Government, or delivery by the Contractor, is by electronic means. The rights of the parties in said Technical Data shall be as specified in DFARS 252.227-7013.
I. CONTENT AND FORMAT OF SUBMITTALS
Submittals shall be prepared in the Contractor’s format unless otherwise specified. Each submittal shall be clear, legible, and electronically developed and formatted (keyed/typed) unless otherwise specified. All submittals shall be prepared in the English language. Calculations and design data shall be provided in metric units unless otherwise specified, or in inch-pound system where existing documentation is in the inch-pound system.
Data Items shall be assigned a sequential one-character alphabet designation in the Revision Block to signify a change from the previous submittal. Revision letter designations shall be in alphabetical order. The first submittal of any data item shall be identified as Revision “-“.
Electronic media and digital files shall be compatible with Windows 7 operating system, or latest available version, unless otherwise specified. The latest available versions of the following software products shall be utilized in the generation of data items, unless otherwise specified: Microsoft Office™ including Microsoft Project™, Adobe
Acrobat™, WinZip™, or IGES™. Electronic files shall not be password protected.
Drawings shall be submitted in the latest version of AutoCAD
TM
and PDF format, unless otherwise specified, and shall not be in “read only” format. Schedules shall be submitted in a Microsoft Project compatible format and PDF format.
All submittals, including drawings, reports and machine-produced listings shall be prepared with the following information:
a. Contractor’s serial number and date.
b. The contract number, data item number, and data item title. When multiple submissions are made under the same data item (such as drawings, purchase orders, or test reports), a subtitle shall be included to further identify the content.
c. A list of all enclosures being submitted in the data package.
d. A revision letter and date shall be included to reflect the revision of any previously submitted document.
The cover sheet shall provide a brief explanation of the reason for the change or a more detailed discussion shall be included in the content of the submittal.
e. Distribution and quantity of copies being sent.
f. Updates and revisions to plans, reports, and procedures shall include a Record of Revisions to annotate what has changed since the previous submittal change bar in the left margin
Each Data Item submittal shall include Distribution Statement C at the bottom of each cover sheet, as follows:
“DISTRIBUTION Statement C: Distribution authorized to the U.S. Government agencies and their Contractors.
Other request for this document shall be referred to PEO Ships PMS325.”
PAGE: ii
Note that the distribution statement for technical manuals (affixed on the individual covers) shall be Distribution
Statement C. Details are included in the data item for technical manuals.
Each file extension shall be the three or four-character default extension automatically assigned by the applicable software in which the document is saved. If the software does not automatically assign the three or four-character extension, the Contractor shall assign a three or four-character extension and specify the file’s applicable software and version in the letter of transmittal.
Each Data Item shall be submitted with a separate letter of transmittal. Multiple documents may be submitted under the same letter of transmittal; subtitles, revision designations, and sheet quantities shall be identified for each document.
Each letter of transmittal shall contain the following:
a. Ship Acronym and applicable Hull Numbers.
b. Contractor’s name, correspondence serial number, and actual date of transmittal.
c. Contract Number.
d. Data Item Number and Data Item Title.
e. Applicable revision letter and revision date.
f. Electronic media or digital file name and respective file date.
g. Each transmittal letter shall provide a brief explanation of the submittal and the reason for the document’s change.
h. Submittals requiring approval shall state: “This document requires Government approval.” If approval of a document is contingent upon incorporation of comments, the document shall be resubmitted. If approval has been granted, the approved version shall state: “The previous version of this document has been reviewed and approved by the Government.” Include identification of the Government approving document serial number and date.
i. Distribution and quantity of copies being sent (not applicable to reproducibles provided at a shared Government and Contractor location).
Where hard copies or electronic media are required, the Contractor shall deliver the Data Item submittals using properly sized envelopes or boxes in accordance with good commercial practice to prevent damage.
II. SUBMISSION SCHEDULE
The Contractor shall develop and maintain scheduling data relating to the submission requirements of all individual data items and shall ensure that actual deliveries are made on or before computed due dates. Submission criteria are usually based on key events. Key events identified herein apply to the lead ship and awarded options. Days After
Contract (DAC) refers to award of lead ship Contract Line Item Number (CLIN). Days After Option Exercised
(DAOE) refers to option exercise of each appropriate CLIN.
It is the responsibility of the Contractor to notify the Government of changes which impact the content and accuracy of a previously submitted document so that the Government may make a determination as to whether the document warrants a revision. If the Government determines that there are significant enough changes which impact the content and accuracy of the document, the document shall be revised appropriately and resubmitted within 30 days or as otherwise agreed to between the Government and the Contractor.
III. QUALITY CONTROL
The Contractor shall maintain internal quality control to ensure submittals are complete, properly integrated, and adequate and shall not rely on Government review comments to ensure the technical accuracy of data. The
Contractor shall review submittals to ensure accuracy of language, flow, overall readability, as well as proofreading for grammar, spelling, and typographical errors.
IV. ACRONYMS
An alphabetical list of acronyms follows. The list includes those acronyms used most frequently in the data requirements list.
PAGE: iii
ABS American Bureau of Shipping
AT Acceptance Trials
BDT Builder’s Dock Trials
BI-WKLY Bi-Weekly
BST Builder’s Sea Trials
BT Builder’s Trials
CAGE Commercial and Government Entity
CDWE Contractor Design Weight Estimate
CFD Computational Fluid Dynamics
CFE Contractor Furnished Equipment
DAC Days After Contract Award
DARC Days After Receipt of Comments
DARP Days After Reporting Period
DAOE Days After Option Exercised
DI Data Item
DPST Dynamic Positioning Sea Trials
DPT Days Prior To
DR Design Review
DRL Data Requirements List
DSAT Deep Sea Acceptance Trial
EMI Electromagnetic Interference
EPLA Electric Power Load Analysis
ET Electronics Technician
FAT Factory Acceptance Test
HAT Harbor Acceptance Test
HVAC Heating, Ventilation, and Air Conditioning
IAW In Accordance With
IBS Integrated Bridge System
IESH Integrated Environmental, Safety, and Health
ILS Integrated Logistics Support
LGC Logistics Guidance Conference
MEL Master Equipment List
MTHLY Monthly
OEM Original Equipment Manufacturer
PAC Post Award Conference
PHMC Pilot House Main Console
PME Program Management Enterprise
PRR Production Readiness Review
QRTLY Quarterly
QWR Quarterly Weight Report
R/ASR Revisions As Required
SAT Sea Acceptance Trial
SCS Scientific Computer System
SD Ship Delivery
SES Scientific Electronic Systems
SOC Start of Construction
SOW Statement of Work
SPPC Ship Production Progress Conference
SSV Single System Vendor
SUPSHIP Supervisor of Shipbuilding
TM Technical Manual
WKLY Weekly
PAGE: iv
V. GLOSSARY
The items listed below are explanations of the headings and blocks on the Data Requirements List (DRL).
PROGRAM NAME: The name of the program.
CONTRACT NO.: The Procurement Instrument Identification Number (PIIN), such as the Contract number, Purchase Request (PR) number, the Request for Proposal (RFP) number, or other appropriate designator.
CLIN: The Contract Line Item Number (CLIN) that is associated with the DRL.
CONTRACTOR: The Contractor's name.
PREPARED AND APPROVED BY: The name and organization responsible for the contractual approval of the DRL.
DATE: The date the Contractual DRL was approved.
BLOCK 1-DATA ITEM NO.: An identification number to support each Data Item identified in the Statement of Work (SOW) or the Contract.
BLOCK 2-DATA ITEM TITLE: The title of the Data Item.
BLOCK 3-REFERENCE: The specific location within the SOW or Contract that contains the tasking that generates a requirement for the data. System Specification, Attachment J-1, Ship Work Breakdown Structure
(SWBS) references, where provided, is shown in parenthesis.
BLOCK 4-DATA DESCRIPTION: Details regarding the Data Item’s content characteristics and format requirements, if applicable.
BLOCK 5-APPROVAL/REVIEW REQ.: The Government will review the Contractor’s submittal as indicated. The time period required for Government review will be as specified. The Government will comment on Data Items that require Government comment and/or approval within the timeframe noted. Non-response to a Government approval Data Item shall be taken as disapproval. The Government reserves the right to comment on all deliverables.
BLOCK 6-SUBMITTAL SCHEDULE: The scheduled date for initial data submission, incremental submittals, and resubmittals, shall be as specified. In addition, details regarding Data Item submittal requirements are included. Submittal dates are often based on Contract events. Days identified are calendar days unless otherwise identified. Where scheduled date for data submission falls on a Saturday, Sunday or
Federal Government holiday, the submission due date shall be the following Federal Government working day.
Revisions and subsequent periodic submissions shall incorporate the resolution of Government comments.
BLOCK 7-DISTRIBUTION: All deliveries shall be in digital format submitted to the PMS325 Project
Management System – Extranet Site (PMS-ES) in accordance with Integrated Digital Environment Site
Access and Public Key Infrastructure/Information Assurance Awareness Attributes, Attachment J-5 unless otherwise specified. The PMS-ES system is the platform used for PMS325’s Integrated Data Environment
(IDE). Specific formats and unique delivery requirements are identified in the individual data items. The numbers specified in Block 7 are the quantities of hard copies and digital copies to be provided to the addressees. Data provided at a shared location shall meet the requirements for digital copies.
ADDRESSEE COMPLETE ADDRESS
PMS325Q 1333 Isaac Hull Ave, S.E.
Washington Navy Yard, DC 20376
Attn: PMS325Q
SUPSHIP To Be Provided at Contract Award
SHIP (via SUPSHIP) To Be Provided at Contract Award
PAGE: v
VI. DRL Data Item Extensions
In the event that the Contractor decides to submit separate items to fulfill a DRL Data Item requirement and to ensure that the PMS-ES accounts for each item individually, the Contractor shall request a Data Item
Extension/Re-designation from the PMS-ES Data Manager via e-mail. The Data Item Extension/Re-designation allows the PME to establish separate sub-tier items within the database allowing the Contractor and
Government to submit, review, and track each item independently. By requesting a DRL Data Item
Extension/Re-designation, the Contractor avoids the need to submit all of the individual items with each submission of the data item, even if only one of the items has been modified since the previous submission.
Examples of when the Contractor shall request DRL Data Item Extension/Re-designation include the Technical
Manual data item. In such an instance, the Contractor shall request DRL Data Item Extension/Re-designation to establish separate items for each individual technical manual, thus allowing individual tracking of review comments, independent resubmissions of single technical manuals, and closure of comments on independent technical manuals. Another example would be for data items that require supporting calculations to be submitted with drawings. In such an instance, the Contractor shall request DRL Data Item Extensions/Re-designation to establish separate sub-tier items for the drawing and for the calculations.
PAGE: vi
NOAA AGOR Variant Table of Contents
Phase II
Data Item
No.
Data Item
Titles And Subtitles Contract Reference Change
Status
DI-001
DI-002
DI-003
DI-004
DI-005
DI-006
DI-007
DI-008
DI-009
DI-010
DI-010-01
DI-010-02
DI-010-03
DI-010-04
DI-010-05
DI-010-06
DI-010-07
DI-010-08
DI-011
DI-012
DI-013
DI-014
DI-015
DI-016
DI-017
DI-018
DI-019
DI-020
DI-021
DI-022
DI-023
DI-024
DI-025
DI-026
DI-027
DI-028
DI-029
DI-030
DI-031
DI-032
DI-033
DI-034
DI-035
DI-036
DI-036-01
DI-036-02
DI-036-03
DI-036-04
POST AWARD CONFERENCE AGENDA, PRESENTATION, AND MINUTES
LOGISTICS GUIDANCE CONFERENCE AGENDA, PRESENTATION, AND
MINUTES
DATA REQUIREMENTS LIST REVIEW AGENDA AND MINUTES
SPECIFICATION CONFERENCE AGENDA AND MINUTES
DESIGN REVIEW AGENDAS, PRESENTATIONS, AND MINUTES
SINGLE SYSTEM VENDORS DESIGN AND PROGRESS REVIEWS AGENDAS,
PRESENTATIONS, AND MINUTES
INTEGRATED LOGISTICS SUPPORT MANAGEMENT TEAM REVIEWS
AGENDAS, PRESENTATIONS, AND MINUTES
SHIPBUILDING PRODUCTION PROGRESS CONFERENCES AGENDAS,
PRESENTATIONS, AND MINUTES
GENERAL MEETING AGENDAS, PRESENTATIONS, AND MINUTES
INTEGRATED MASTER SCHEDULE
DETAIL DESIGN EFFORT SCHEDULE
ERECTION SEQUENCE/ MASTER ERECTION/ ENGINEERING/ WAY SCHEDULE
MATERIAL ORDERING SCHEDULE
SCHEDULE OF MAJOR MILESTONES AND KEY EVENTS
PRODUCTION SCHEDULE
MACHINERY INSTALLATION SCHEDULE
INSTALLATION AND ACCEPTANCE TEST SCHEDULE
VENDOR RECOMMENDED SPARES LISTING SUBMISSION SCHEDULE AND
TECHNICAL MANUAL SUBMISSION SCHEDULE
DRAWING AND DOCUMENTATION SCHEDULE
PURCHASE ORDERS
PURCHASE ORDER INDEX
MASTER EQUIPMENT LIST CHARACTERISTICS
EQUIVALENT EQUIPMENT SUBSTITUTION REQUEST
DOCKING FACILITIES AND SHIPBUILDING WAYS CERTIFICATION
LAUNCHING AND DOCKING INFORMATION
SES PRE-INSTALLATION SURVEY REPORT
SHIP DAMAGE REPORT
REQUIREMENTS VERIFICATION MATRIX
PRODUCTION READINESS REVIEW AGENDA, PRESENTATION, AND
MINUTES
LIFE CYCLE FUEL ESTIMATE AND LIFE CYCLE COST SAVINGS STUDY
REPORT
FIRE AND FLOODING PROTECTION PLAN
CONTRACTOR USE AND MAINTENANCE OF EQUIPMENT LOG
SPEED AND POWER REPORT
SEAKEEPING PERFORMANCE REPORT
MANEUVERING PERFORMANCE REPORT
DYNAMIC POSITIONING SYSTEM PERFORMANCE REPORT
STANDARDIZATION AND SUPPORTABILITY PLAN
STANDARDIZATION AND SUPPORTABILITY STATUS REPORTS
REGULATORY BODY COMMUNICATIONS AND CORRESPONDENCE WITH
ENCLOSURES
REGULATORY BODY COMMUNICATIONS AND CORRESPONDENCE LOG
REGULATORY BODY CERTIFICATES
3-D PRODUCT MODEL DATA
PRODUCTION INFORMATION PACKAGES
NOISE CONTROL DOCUMENTATION
NOISE CONTROL PROGRAM PLAN
AIRBORNE NOISE REPORT
SONAR SELF-NOISE REPORT
UNDERWATER RADIATED NOISE REPORT
SOW C-3.2.042a
SOW C-2.3.042b SOW C-3.2.042b SOW C-3.2.042b SOW C-3.2.042b SOW C-3.2.042b SOW C-3.2.042b SOW C-3.2.042b
SOW C-3.2.042c SOW C-3.2.042d SOW C-3.2.042d SOW C-3.2.042e SOW C-3.2.042f SOW C-3.2.042g SOW C-3.2.042h SOW C-3.2.042i SOW C-3.2.042j SOW C-3.2.042k
SOW C-3.2.042l
SOW C-3.2.042m SOW C-3.2.045e SOW C-3.2.045f SOW C-3.2.070a SOW C-3.2.070a SOW C-3.2.070a SOW C-3.2.070a SOW C-3.2.070b SOW C-3.2.070b
SOW C-3.2.070c SOW C-3.2.070c SOW C-3.2.070c SOW C-3.2.070d SOW C-3.2.070e (See Attachment 1 To
Data Item No. DI-036)
SOW C-3.2.073
SOW C-3.2.073
SOW C-3.2.073
SOW C-3.2.073
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
PAGE: vii
NOAA AGOR Variant Table of Contents
Phase II
Data Item
No.
Data Item
Titles And Subtitles Contract Reference Change
Status
DI-036-05
DI-036-06
DI-037
DI-038
DI-039
DI-039-01
DI-039-02
DI-039-03
DI-040
DI-041
DI-042
DI-043
DI-044
DI-045
DI-045-01
DI-045-02
DI-045-03
DI-045-04
DI-045-05
DI-045-06
DI-045-07
DI-045-08
DI-045-09
DI-045-10
DI-045-11
DI-045-12
DI-045-13
DI-045-14
DI-045-15
DI-045-16
DI-045-17
DI-045-18
DI-045-19
DI-045-20
DI-045-21
DI-045-22
DI-045-23
DI-045-24
DI-045-25
DI-045-26
DI-045-27
DI-045-28
DI-045-29
DI-045-30
DI-045-31
DI-045-32
DI-045-33
DI-045-34
DI-045-35
DI-045-36
DI-045-37
DI-045-38
DI-045-39
DI-045-40
VIBRATION REPORT
RESILIENT MOUNTED EQUIPMENT SYSTEM REPORT
INTEGRATED ENVIRONMENTAL, SAFETY, AND HEALTH REPORT
REQUEST TO USE A GOVERNMENT CONTROLLED SUBSTANCE
STABILITY
INTACT AND DAMAGE STABILITY REPORT
TRIM AND STABILITY BOOKLET
TRIM AND STABILITY COMPUTER PROGRAM
INTEGRATED LOGISTICS SUPPORT MANAGEMENT PLAN
VENDOR RECOMMENDED SPARES LISTINGS, STATISTICS, AND LOCATIONS
CONFIGURATION DATABASE LISTING
OUTFITTING PLAN
OUTFITTING MATERIAL STATUS REPORTS
SHIP CONSTRUCTION DRAWINGS AND DOCUMENTATION
DOCKING PLAN
BOOKLET OF TANK CAPACITY AND SOUNDING TABLES
SHIP DRAWING INDEX
GENERAL ARRANGEMENT DRAWING
MACHINERY ARRANGEMENT
TOPSIDE ARRANGEMENT DRAWING AND REPORT
EQUIPMENT REMOVAL DRAWING
COMPARTMENT LAYOUT DRAWINGS
AREA/VOLUME REPORT
MIDSHIP SECTION DRAWING
SHELL EXPANSION DRAWING
TYPICAL SECTIONS DRAWING
MAST AND FLAGSTAFF DRAWING
DECK AND PLATFORM DRAWING
SUPERSTRUCTURE DRAWING
PROPELLER DRAWING
PROPELLER BLADE GAUGE DRAWING
PROPULSION SHAFTING AND BEARING ALIGNMENT ANALYSIS
PROPULSION SHAFTING ARRANGEMENT DRAWING
ELECTRIC POWER LOAD ANALYSIS
ELECTRICAL POWER ONE-LINE DIAGRAM
VOLTAGE DROP CALCULATIONS
BLOCK WIRING DIAGRAMS
LIGHTING LEVEL CALCULATIONS
LIGHTING SYSTEM ONE-LINE DIAGRAM
RUNNING, SIGNAL AND ANCHOR LIGHTS, AND SEARCHLIGHTS DRAWING
INTERIOR AND EXTERIOR COMMUNICATION SYSTEMS BLOCK WIRING
DIAGRAMS
SHIPBOARD AND SCS NETWORKS DRAWING
DIAL TELEPHONE DIRECTORY
SCIENCE WIREWAYS DIAGRAM
AUXILIARY AND POLLUTION CONTROL SYSTEMS DOCUMENTATION
FLUID SYSTEM CLEANING, FLUSHING, AND MAINTENANCE PROCEDURES
HVAC DIAGRAMMATIC PLAN AND EQUIPMENT LIST
HVAC CALCULATIONS
LIST OF LUBRICANTS
FIRE CONTROL PLAN
APPENDAGE AND CONTROL SURFACE DRAWING
ANCHORING AND MOORING DRAWING
HANDLING SYSTEM AND SCIENTIFIC PACKAGE DEPLOYMENT DRAWING
KEY TAG INDEX
SOW C-3.2.073
SOW C-3.2.085
SOW C-3.2.077
SOW C-3.2.078
(See Attachment 1 to
Data Item No. DI-039)
SOW C-3.2.079
SOW C-3.2.079
SOW C-3.2.079
SOW C-3.2.080a SOW C-3.2.083a SOW C-3.2.083a SOW C-3.2.083b SOW C-3.2.083b (See Attachment 1 to
Data Item No. DI-045)
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
PAGE: viii
NOAA AGOR Variant Table of Contents
Phase II
Data Item
No.
Data Item
Titles And Subtitles Contract Reference Change
Status
DI-045-41
DI-045-42
DI-045-43
DI-045-44
DI-045-45
DI-045-46
DI-045-47
DI-046
DI-047
DI-048
DI-049
DI-050
DI-051
DI-052
DI-053
DI-053-01
DI-053-02
DI-053-03
DI-053-04
DI-054
DI-055
DI-056
DI-057
DI-058
DI-058-01
DI-058-02
DI-058-03
DI-058-04
DI-058-05
DI-058-06
DI-058-07
DI-058-08
DI-058-09
DI-058-10
DI-058-11
DI-058-12
DI-059
DI-059-01
DI-059-02
DI-059-03
DI-059-04
DI-059-05
DI-059-06
DI-059-07
DI-060
DI-061
DI-061-01
DI-061-02
DI-061-03
DI-061-04
JOINER SCHEDULE (INCLUDING ACOUSTIC TREATMENTS)
PAINT SCHEDULE
IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM BLOCK WIRING
DIAGRAM
DECK COVERING SCHEDULE
ACOUSTIC TREATMENT AND INSULATION SCHEDULE
DAMAGE CONTROL DISPLAY PLAN
COMPARTMENT AND ACCESS DRAWING SHOWING DOORS, HATCHES,
SCUTTLES, MANHOLES, WINDOWS AND PORTLIGHTS
SHIP EQUIPMENT DRAWINGS
COMMERCIAL TECHNICAL MANUALS AND SUPPLEMENTAL DATA
TECHNICAL MANUAL STATUS REPORT AND TECHNICAL MANUAL INDEX
CREW FAMILIARIZATION PLAN
INSTRUCTOR GUIDES
STUDENT GUIDES
TRIAL READINESS REVIEW AGENDAS, PRESENTATIONS, AND MINUTES
SURVEY REPORTS
AIRBORNE NOISE SURVEY REPORT
UNDERWAY VIBRATION AND STRUCTUREBORNENOISE SURVEY REPORT
PROPULSION SHAFT VIBRATION SURVEY REPORT
UNDERWATER RADIATED NOISE SURVEY REPORT
TRIALS INDEX
TRIALS SCHEDULE OF EVENTS (SOE)
TRIALS AGENDA
TRIALS REPORT
TEST DOCUMENTATION
ACCEPTANCE TEST PLAN
TEST INDEX
TEST PROCEDURES
TEST REPORTS
ILLUMINATION SURVEY REPORT
BENCHMARK SURVEY REPORT
NAVIGATION SYSTEM AND SES ALIGNMENT SURVEY REPORTS
SYSTEM ISOLATION AND CLEARANCE SURVEY REPORT
ACOUSTIC TREATMENT SURVEY REPORT
HULL INSPECTION SURVEY REPORT
COATINGS SURVEY REPORT
NAVIGATION SYSTEM AND SES ALIGNMENT SURVEYOR CREDENTIALS
WEIGHT DOCUMENTATION
WEIGHT CONTROL PLAN
ACCEPTED WEIGHT ESTIMATE
QUARTERLY WEIGHT REPORT
INCLINING EXPERIMENT PROCEDURES
INCLINING EXPERIMENT REPORT
ACCEPTED SHIP REPORT
FINAL WEIGHT REPORT
ENDURANCE FUEL CALCULATIONS
PROPULSION SINGLE SYSTEM VENDOR TECHNICAL DOCUMENTATION
PROPULSION SSV SYSTEM ENGINEERING INTEGRATION PLAN
PROPULSION SSV SYSTEM DESIGN/ PRODUCTION/ INSTALLATION/ TESTING
SCHEDULE
PROPULSION SSV AND VENDOR EQUIPMENT DRAWINGS AND STATUS
PROPULSION SSV REGULATORY BODY CORRESPOND-ENCE WITH
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.085
SOW C-3.2.086
SOW C-3.2.086
SOW C-3.2.088
SOW C-3.2.088
SOW C-3.2.088
SOW C-3.2.094a (See Attachment 1 To
Data Item No. DI-053) SOW C-3.2.094b SOW C-3.2.094b SOW C-3.2.094b SOW C-3.2.094b SOW C-3.2.094b SOW C-3.2.094b SOW C-3.2.094b SOW C-3.2.094b (See Attachment 1 to
Data Item No. DI-058) SOW C-3.2.095a SOW C-3.2.095b SOW C-3.2.095b SOW C-3.2.095b SOW C-3.2.095b SOW C-3.2.095b SOW C-3.2.095b SOW C-3.2.095b SOW C-3.2.095b SOW C-3.2.095b SOW C-3.2.095b SOW C-3.2.095b (See Attachment 1 to
Data Item No. DI-059)
SOW C-3.2.096
SOW C-3.2.096
SOW C-3.2.096
SOW C-3.2.096
SOW C-3.2.096
SOW C-3.2.096
SOW C-3.2.096
SOW C-3.2.200
(See Attachment 1 to
Data Item No. DI-061)
SOW C-3.2.202
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
PAGE: ix
NOAA AGOR Variant Table of Contents
Phase II
Data Item
No.
Data Item
Titles And Subtitles Contract Reference Change
Status
DI-061-05
DI-061-06
DI-061-07
DI-061-08
DI-061-09
DI-061-10
DI-061-11
DI-061-12
DI-061-13
DI-061-14
DI-061-15
DI-061-16
DI-061-17
DI-061-18
DI-061-19
DI-061-20
DI-061-21
DI-061-22
DI-061-23
DI-062
DI-063
DI-063-01
DI-063-02
DI-063-03
DI-063-04
DI-063-05
DI-063-06
DI-063-07
DI-063-08
DI-064
DI-064-01
DI-064-02
DI-064-03
DI-064-04
DI-064-05
DI-064-06
DI-064-07
DI-064-08
DI-064-09
DI-064-10
DI-064-11
DI-064-12
DI-064-13
DI-064-14
DI-064-15
DI-064-16
DI-064-17
DI-064-18
ENCLOSURES
POWER MANAGEMENT SYSTEM DESCRIPTION OF OPERATIONS
PROPULSION CONTROL SYSTEM DESCRIPTION OF OPERATIONS
AUXILIARY SYSTEM MONITORING AND CONTROL DESCRIPTION OF
OPERATIONS
ELECTRICAL SYSTEM FAULT CURRENT ANALYSIS
FAILURE MODE EFFECT ANALYSIS AND DESIGN VERIFCATION TEST
PROCEDURE
PERIODIC SAFETY TEST PROCEDURES
SYSTEM HARMONIC ANALYSIS
SUBTRANSIENT REACTANCE CALCULATIONS
MCC, SCC, AND BRIDGE WINGS FACE ARRANGEMENTS
TRANSIENT STABILITY ANALYSIS
MCCS BLOCK WIRING/ SYSTEM ARCHITECTURE DIAGRAM
PRELIMINARY MIMIC SCREENS TO BE USED IN THE MCCS
PROPULSION SSV INPUT/ OUTPUT SIGNAL LIST
PROPULSION SSV FACTORY ACCEPTANCE TEST (FAT) SCHEDULE/ STATUS
PROPULSION SSV FACTORY ACCEPTANCE TEST (FAT) NOTIFICATION
PROPULSION SSV FACTORY ACCEPTANCE TEST (FAT) PROCEDURES
PROPULSION SSV FACTORY ACCEPTANCE TEST (FAT) REPORTS
PROPULSION SSV FIELD CHANGES AND MODIFICATIONS (WARRANTY
PERIOD)
APPLICATION AND COORDINATION OF PROTECTIVE DEVICES ANALYSIS
PROPULSION SHAFT VIBRATION REPORT
CYBERSECURITY INFORMATION FOR CONTROL AND COMMUNICATION
SYSTEMS
INFORMATION SYSTEMS
CONTROL AND COMMUNICATION SYSTEMS MAPPING
UNNECESSARY SERVICES AND PROGRAMS
HOST INTRUSION DETECTION SYSTEM
CONTROL AND COMMUNICATION SYSTEMS CONFIGURATION
PATCH MANAGEMENT AND UPDATE PROCESS
FIREWALL RULE SETS
RESTORATION PROCEDURES
SCIENTIFIC ELECTRONIC SYSTEMS SINGLE SYSTEM VENDOR TECHNICAL
DOCUMENTATION
SES SSV SYSTEM ENGINEERING INTEGRATION PLAN
SES SSV SYSTEM DESIGN/ PRODUCTION/ INSTALLATION/ TESTING
SCHEDULE
SES ARRANGEMENT DRAWING
SES SEACHEST INTEGRATION WITH HULL STRUCTURE
SES SSV AND VENDOR EQUIPMENT DRAWINGS AND STATUS
SES SSV REGULATORY BODY CORRESPOND-ENCE WITH ENCLOSURES
SES SYSTEMS AND EQUIPMENT DESCRIPTION OF OPERATIONS
SES SYSTEMS WIRING DIAGRAM
SES SEACHEST VENTS AND FRESHWATER AND SEAWATER PIPING
SERVICES
SES EMI ANALYSIS
SES ARRANGEMENTS WITHIN THE MAIN LABORATORY INCLUDING RACK
ARRANGEMENT RECOMMENDAT-IONS
SES ARRANGEMENTS WITHIN A TRANSDUCER SPACE, TRANSCEIVER
ROOM, AND ET SHOP/COMPUTER LAB
CONFIGURATION AND SIZING OF DEDICATED CONDUITS
SES OPERATOR CONTROLS AND DISPLAYS (FOR EACH SYSTEM)
SES SSV INPUT/ OUTPUT SIGNAL LIST
SES DOCKING PLAN
SES ALIGNMENT SURVEY
SOW C-3.2.202
SOW C-3.2.202
SOW C-3.2.202
SOW C-3.2.202
SOW C-3.2.202
SOW C-3.2.202
SOW C-3.2.202
SOW C-3.2.202
SOW C-3.2.202
SOW C-3.2.243
SOW C-3.2.402
SOW C-3.2.402
SOW C-3.2.402
SOW C-3.2.402
SOW C-3.2.402
SOW C-3.2.402
SOW C-3.2.402
SOW C-3.2.402
SOW C-3.2.402
(See Attachment 1 to
Data Item No. DI-064)
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
PAGE: x
NOAA AGOR Variant Table of Contents
Phase II
Data Item
No.
Data Item
Titles And Subtitles Contract Reference Change
Status
DI-064-19
DI-064-20
DI-064-21
DI-064-22
DI-064-23
DI-064-24
DI-064-25
DI-064-26
DI-064-27
DI-064-28
DI-064-29
DI-064-30
DI-064-31
DI-064-32
DI-064-33
DI-064-34
DI-065
DI-065-01
DI-065-02
DI-065-03
DI-065-04
DI-065-05
DI-065-06
DI-065-07
DI-065-08
DI-065-09
DI-065-10
DI-066
DI-067
DI-068
DI-069
DI-070
DI-071
DI-072
DI-073
DI-074
DI-075
DI-076
DI-077
SES SSV FACTORY ACCEPTANCE TEST (FAT) SCHEDULE/ STATUS
SES SSV FACTORY ACCEPTANCE TEST (FAT) NOTIFICATION
SES SSV FACTORY ACCEPTANCE TEST (FAT) PLANS AND PROCEDURES
SES SSV FACTORY ACCEPTANCE TEST (FAT) REPORTS
SES SSV HARBOR ACCEPTANCE TEST (HAT) SCHEDULE/ STATUS
SES SSV HARBOR ACCEPTANCE TEST (HAT) NOTIFICATION
SES SSV HARBOR ACCEPTANCE TEST (HAT) PLANS AND PROCEDURES
SES SSV HARBOR ACCEPTANCE TEST (HAT) REPORT
SES SSV SEA ACCEPTANCE TRIALS (SAT) SCHEDULE/ STATUS
SES SSV SEA ACCEPTANCE TRIALS (SAT) NOTIFICATION
SES SSV SEA ACCEPTANCE TRIALS (SAT) PLANS AND PROCEDURES
SES SSV SEA ACCEPTANCE TRIALS (SAT) REPORTS
SES DEEP SEA ACCEPTANCE TRIALS (DSAT) SCHEDULE/ STATUS
SES DEEP SEA ACCEPTANCE TRIALS (DSAT) NOTIFICATION
SES DEEP SEA ACCEPTANCE TRIALS (DSAT) PLANS AND PROCEDURES
SES DEEP SEA ACCEPTANCE TRIALS (DSAT) REPORT
SES SSV FIELD CHANGES AND MODIFICATIONS (WARRANTY PERIOD)
INTEGRATED BRIDGE SYSTEM TECHNICAL DOCUMENTATION
PHMC SECTIONS AND FACE ARRANGEMENTS
IBS VENDOR EQUIPMENT DRAWINGS AND STATUS
IBS VENDOR REGULATORY BODY CORRESPOND-ENCE WITH ENCLOSURES
IBS BLOCK WIRING/ SYSTEM ARCHITECTURE DIAGRAM
PHMC INPUT/ OUTPUT SIGNAL LIST
PHMC FACTORY ACCEPTANCE TEST (FAT) SCHEDULE/ STATUS
PHMC FACTORY ACCEPTANCE TEST (FAT) NOTIFICATION
PHMC FACTORY ACCEPTANCE TEST (FAT) PROCEDURES
PHMC FACTORY ACCEPTANCE TEST (FAT) REPORTS
PHMC FIELD CHANGES AND MODIFICATIONS (WARRANTY PERIOD)
CORROSION PREVENTION AND CONTROL PLAN
CORROSION PREVENTION AND CONTROL REPORT
ACCESS CONTROL PLAN
CONFIGURATION MANAGEMENT PLAN
ENGINEERING CHANGE PROPOSALS
NON-ENGINEERING CHANGE PROPOSALS
REQUEST FOR DEVIATION/WAIVER
CONTRACT PROBLEM IDENTIFICATION REPORTS
ADVERSE ENVIRONMENTAL CONDITIONS PLAN
PLANT PROTECTION PLAN
SOFTWARE DATA SET
SOFTWARE CONFIGURATION MATRIX
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
SOW C-3.2.426
(See Attachment 1 to
Data Item No. DI-065)
SOW C-3.2.438
SOW C-3.2.438
SOW C-3.2.438
SOW C-3.2.438
SOW C-3.2.438
SOW C-3.2.438
SOW C-3.2.438
SOW C-3.2.438
SOW C-3.2.438
SOW C-3.2.438
SOW C-3.2.633
SOW C-3.2.633
HQ C-2-0005
HQ C-2-0012
HQ C-2-0012
HQ C-2-0012
HQ C-2-0012
HQ C-2-0013
HQ C-2-0043
HQ C-2-0040
SOW C-3.2.083a SOW C-3.2.083a
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
BASIC
PAGE: 1
NOAA AGOR VARIANT
PHASE II DATA REQUIREMENTS
CONTRACT NO.: N00024-18-R-2201 CLIN: 0003 CONTRACTOR: X
BLOCK 1-DATA ITEM NO.: DI-001
BLOCK 2-DATA ITEM TITLE: POST AWARD CONFERENCE AGENDA,
PRESENTATION, AND MINUTES
BLOCK 3-REFERENCE: SOW C-3.2.042a
BLOCK 4-DATA DESCRIPTION:
1. The Post Award Conference (PAC) Agenda shall identify the meeting name, date, time and location of the
PAC. Materials to be presented during the PAC shall be provided with the agenda.
2. The agenda and presentation shall include as a minimum a discussion of the following:
a. Introductions
b. Organizations and Points of Contact
1) All major organizations involved in the Contract, such as PEO SHIPS, NAVSEA, NOAA, On-site
Government Representatives, Contractor, Design Agent (if used), major Subcontractors including all
Single System Vendors, Noise Control Consultant, Dive Air Consultant, Regulatory Body representative, and others.
2) Roles and Responsibilities of Organizations and Points of Contact.
c. Program Overview
1) Schedule (such as the overall plan and duration for the detail design, Production Readiness Review
(PRR), Single System Vendor (SSV) equipment delivery, construction, test and trials, Ship Delivery
(SD), and Fitting Out Availability (FOA).
2) Conferences, Meetings, and Reviews including Bi-Weekly Telephone Conference with ABS.
3) Contractor Facilities Access Control.
4) Government Expectations.
5) Contractor Expectations.
d. Program Administration
1) Management.
2) Contracts Administration.
3) Change Order Process.
4) Equivalent Equipment Substitution Request.
5) Production Control, Inspection Systems and Quality Assurance.
6) Integrated Logistics Support.
7) Test and Trials.
8) Ship Delivery.
9) Fitting Out Availability.
10) Warranty Management.
11) Crosswalk of interrelationships amongst the multiple contract documents
12) Differences in execution between Phase I and Phase II
e. Communications
1) Authorized Government Representatives.
2) Authorized Contractor Representatives.
3) Web-based Project Management System.
4) Email and letter correspondence.
5) Regulatory Body Correspondence.
6) Submission of Data Requirements List.
(Continued on Next Page)
PAGE: 2
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.:
DI-001 (CONTINUED)
BLOCK 2-DATA ITEM TITLE: POST AWARD CONFERENCE AGENDA,
BLOCK 4-DATA DESCRIPTION: (Continued)
f. Action Item Review
g. Conclusion
3. The PAC Minutes shall identify date, time, and location of the PAC and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included. Copies of each presentation or document reviewed shall also be included and identified in the minutes by document name, document revision, document date, and the digital file name and date.
BLOCK 5-REVIEW REQ.:
Allow 5 days for Government review and comment for the agenda and presentation. Allow 7 days for Government review and comment for the minutes.
BLOCK 6-SUBMITTAL SCHEDULE:
10 DPT PAC; R/ASR 5 DARC. Draft of materials to be presented during the PAC shall be provided with the agenda. Minutes and final presentation materials to be submitted 7 days after the PAC; R/ASR 3 DARC.
BLOCK 7-DISTRIBUTION: Addressee QTY
PMS325Q IDE 1*
* Hard copy presentation materials shall be provided for each attendee at the meeting.
PAGE: 3
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.: DI-002
BLOCK 2-DATA ITEM TITLE: LOGISTICS GUIDANCE CONFERENCE AGENDA,
The Logistics Guidance Conference (LGC) Agenda, Presentation, and Minutes shall include:
1. The Contractor’s presentation shall include the following topics:
a. Personnel Introductions.
b. Organization.
c. Planned Logistics Approach, as outlined in the Integrated Logistics Support Management Plan (ILSMP), including how the Contractor plans to integrate Propulsion and Scientific Electronics System (SES) Single
System Vendor (SSV) logistics data.
2. The Government intends to discuss the following topics:
a. Personnel Introductions.
b. Organization.
c. Life Cycle Management Plan Overview.
d. Contract Logistics Requirements including Data Requirements and Logistics Schedules.
3. The LGC Minutes shall identify date, time, and location of the LGC and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included. Copies of each presentation or document reviewed shall also be included and identified in the minutes by document name, document revision, Allow 7 days for Government review and comment.
Agendas 14 DPT LGC; R/ASR-3-DARC and presentation 3 DPT LGC. Minutes 7 days after LGC; R/ASR 7
DARC.
PAGE: 4
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.: DI-003
BLOCK 2-DATA ITEM TITLE: DATA REQUIREMENTS LIST REVIEW AGENDA
AND MINUTES
1. The Data Requirements List (DRL) Review Agenda shall include the following:
a. A DRL reading schedule.
b. Discussion of those areas of the Contract which contain errors, omissions, or inconsistencies which may result in non-compliance with the contract requirements.
c. Proposed changes to the DRL.
2. The DRL Review Minutes shall include the following:
a. Date, time, and location of the DRL Review meeting and a chronological listing of each topic discussed.
b. Applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed.
c. A list of attendees shall be included.
d. Copies of each presentation or document reviewed shall also be included and identified in the minutes by document name, document revision, document date, and the digital file name and date.
e. Proposed changes to the DRL and Contract.
Allow 7 days for Government review of the agenda. Allow 30 days for Government review and approval of the minutes.
Agenda 14 DPT the DRL Review; R/ASR 3 DARC. Minutes 7 days after the DRL Review; R/ASR 7 DARC.
PMS325Q IDE 1
PAGE: 5
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.: DI-004
BLOCK 2-DATA ITEM TITLE: SPECIFICATION CONFERENCE AGENDA AND
MINUTES
1. The Specification Conference Agenda shall include the following:
a. Purpose, date, location and duration.
b. A Specification reading schedule.
c. Potential impacts of Scientific Mission Systems Specification, Attachment J-6, and Applicable Sections of the Contractor’s Proposal, Attachment J-7.
d. Additional proposed recommendations to the System Specification, Attachment J-1 and Scientific Mission
Systems Specification, Attachment J-6, not identified during the Phase I effort.
e. List of available supporting documentation and other pertinent information.
2. The Specification Conference Minutes shall include the following:
a. Date, time, and location of the meeting and a chronological listing of each topic discussed.
b. Applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed.
c. A list of attendees shall be included.
d. Discussion of those areas of the Contractor’s Proposal, J-7 Attachments, and other documents which contain errors, omissions, or inconsistencies which may result in non-compliance with the System
Specification, J-1, Scientific Mission Systems Specification, J-6,the Specification and other contract requirements..
e. Update/status of proposed recommendations.
f. Update/status of proposed expanded detail.
Allow 7 days for Government review of the agenda. Allow 30 days for Government review and approval of the minutes.
Agenda 14 DPT the Specification Conference; R/ASR 3 DARC. Minutes 7 days after the Specification Conference;
R/ASR 7 DARC.
PAGE: 6
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.: DI-005
BLOCK 2-DATA ITEM TITLE: DESIGN REVIEW AGENDAS, PRESENTATIONS,
1. Design Review (DR) Agendas shall identify the meeting name, date, time and location of each DR. Agendas shall provide information regarding potential issues and decisions. Information regarding ship design and construction status and results shall also be discussed. Items that will be updated prior to the next DR shall also be discussed.
2. The DR Presentations shall include discussion on the following topics, as applicable.
a. Scope of effort required to accomplish Phase II and updated schedules.
b. Detailed status of the evolving detail design.
c. 3-D Model/Design Product completion criteria for the PRR and status.
d. Status of noise control program.
e. Risk review including mitigation plans for all moderate and high risks.
f. Requirements verification status.
g. Efforts accomplished by major subcontractors including the design agent (if used), each Single System
Vendor (SSV), Dive Air Consultant, and the Noise Control Consultant.
h. Primary design drivers, constraints and other issues that are influencing the ship design.
i. Assumptions and/or interpretations related to omissions, inconsistencies, errors, and conflicts, if any, in the requirements.
j. Status of regulatory body comments and issues related to design approval and certification, including ABS status.
k. Summary of technical analyses and tradeoffs with supporting calculations and resulting derived design details.
l. Status of Mock Ups
m. Status of data required by the Phase II DRL, Attachment J-3 and discussion of major unresolved
Government comments.
n. Status of Working Groups.
o. Review of Action Items.
p. ECP, NECP, RFD/RFW Status.
q. Equipment, receipt, warehousing and installation.
3. Minutes shall identify date, time, and location of the applicable review and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included. Copies of each presentation or document reviewed shall also be included and identified in the minutes by document name, document revision, document date, and the digital file name and date. The DR Minutes shall reflect items in the sequence covered at DR Meetings and shall include the following:
a. Documentation of technical information and data required recording joint Contractor and Government decisions and agreements reached during DR Meetings.
b. List documentation reviewed or distributed at meeting, including applicable dates, revisions and source.
c. Identify and include presentation documentation, handouts reviewed or distributed at meeting, including applicable dates, revisions and source of each.
PAGE: 7
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.: DI-005 (CONTINUED)
BLOCK 2-DATA ITEM TITLE: DESIGN REVIEW AGENDAS, PRESENTATIONS,
BLOCK 4-DATA DESCRIPTION: (Continued)
d. Summary of the Integrated Environmental, Safety, and Health (IESH) Working Group discussions.
e. Summary of the Weight Control Working Group discussions.
f. Summary of Deck Handling Equipment Working Group discussions.
Working Groups shall be permitted ample opportunity to convene during each of the design reviews.
Allow 5 days for Government review and comment for the agenda and presentation. Allow 7 days for Government
Agendas 10 DPT each DR; R/ASR 5 DARC. Draft of materials to be presented during each DR shall be provided with each agenda. Minutes and final presentation material to be submitted 7 days after each DR; R/ASR 3 DARC.
PAGE: 8
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.: DI-006
BLOCK 2-DATA ITEM TITLE: SINGLE SYSTEM VENDORS DESIGN AND
PROGRESS REVIEWS AGENDAS,
PRESENTATIONS, AND MINUTES
1. Agendas shall identify the date, time, and location of each Propulsion Single System Vendor (SSV) and
Scientific Electronic Systems (SES) SSV Design and Progress Reviews. Materials to be presented during each
SSV DR meeting shall be provided with the agenda.
2. SSV Design and Progress Reviews - Presentations shall include a discussion on each of the following, as applicable.
a. Integration of SSV responsible areas into the Contractor’s schedules.
b. Detailed progress data.
c. Engineering, fabrication, and test status.
d. Regulatory body approval status, including correspondence.
e. Material ordering status.
f. ILS Status.
g. ECP, NECP, RFD/RFW Status.
h. Requirements verification status.
i. Each DRL delivery status.
j. Constraints and other issues that are influencing the ship design.
k. SSV recommendations to the Contractor and Contractor responses.
l. Review of action items.
3. Minutes shall identify date, time, and location of each SSV DR and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included. Copies of each presentation or document reviewed shall also be included and identified in the minutes by document name, document revision, Allow 5 days for Government review and comment for the agenda and presentation. Allow 7 days for Government
Agendas 10 DPT each SSV DR; R/ASR 5 DARC. Draft of materials to be presented during each SSV DR shall be provided with each agenda. Minutes and final presentation material to be submitted 7 days after each SSV DR;
R/ASR 3 DARC.
PAGE: 9
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.: DI-007
BLOCK 2-DATA ITEM TITLE: INTEGRATED LOGISTICS SUPPORT
MANAGEMENT TEAM REVIEWS AGENDAS,
1. Agendas shall identify the meeting name, date, time and location of Integrated Logistics Support (ILS)
Meetings and ILS Management Team meetings.
2. ILS Meeting agendas and presentations shall include the following:
a. ILS Program Status
1) Proposed time schedule for discussion topics.
2) Overall plan and progress of the ILS program.
3) Vendor Recommended Spares Status (to include graphic depictions of summary, schedule, submissions to date, and late status).
4) Technical Manual (TM) Status (to include graphic depictions of summary, schedule, submissions to date, and late status).
5) Outfitting statistics.
6) Crew Familiarization.
7) Other items as required.
b. Issues, Open Actions, and Decisions Pending from the following:
1) Previous ILS Meetings and other ILS related customer meetings.
2) The Government’s Project Management System as appropriate.
3) DRL comments.
4) Review/recap of action items generated since last ILS Meeting.
5) Other items as required.
3. Minutes shall identify date, time, and location of the ILS meetings and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included. Copies of each presentation or document reviewed shall also be included and identified in the minutes by document name, document revision, Allow 4 days for Government review and comment.
Agendas and presentations 7 DPT each ILS Meeting; R/ASR 3 DARC. Minutes and final presentation material to be submitted 7 days after each ILS Meeting; R/ASR 7 DARC.
PAGE: 10
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.: DI-008
BLOCK 2-DATA ITEM TITLE: SHIPBUILDING PRODUCTION PROGRESS
CONFERENCES AGENDAS, PRESENTATIONS,
1. Each Shipbuilding Production Progress Conference (SPPC) Agenda shall identify the meeting name, date, time and location of each SPPC. Materials to be presented during each SPPC shall be provided with the agenda.
2. The SPPC agendas and presentations shall include the following as a minimum:
a. Program Status.
b. Review of proposed time schedule for major topics (and splinter sessions as required).
c. Overall plan and progress (to include planned/actual events, manpower, other resource constraints, pending issues, and status of DRL submissions).
d. Major Milestone review and readiness assessment.
e. Status of engineering, ILS, material procurement, production, and testing.
f. PRR Status.
g. Integration and installation of the Scientific Electronic Systems (SES).
h. Cost/Schedule Performance (man-hours and material costs, to include planned vs. actual and Estimate at
Completion (EAC)).
i. Graphic depictions of manpower curves showing manpower usage and projections for the NOAA AGOR
Variant as well as all other ship types currently under construction or planned to be under construction in the Contractor's facility during the NOAA AGOR Variant construction period. Manpower curves shall address the following categories: engineering, structural steel, outfit, and total production including any backlogs plus mitigation plans.
j. Cable installation status including total cable required, total cable pulled, total cable terminated, and total cable tested. The status shall be identified by cable type.
k. Constraints and other issues that are influencing ship production.
l. ECP, NECP, RFD/RFW Status.
m. Status of ABS Engineering and Surveyor Comments.
n. Status of questions submitted to the Government.
o. Review of Working Group Recommendations/Implementation.
p. Risk Management Program.
1) Item by item risk assessment and mitigation plan review/status.
2) Splinter session to assess potential for additional risk items.
q. Review of Action Items.
r. Management and Business Splinter
3. SPPC Minutes shall identify date, time, and location of the SPPC and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included. Copies of each presentation or document reviewed shall also be included and identified in the minutes by document name, document revision, PAGE: 11
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.: DI-008 (CONTINUED)
BLOCK 2-DATA ITEM TITLE: SHIPBUILDING PRODUCTION PROGRESS
CONFERENCES AGENDAS, PRESENTATIONS,
Allow 5 days for Government review and comment for the agenda and presentation. Allow 7 days for Government
Agendas 10 DPT each SPPC; R/ASR 5 DARC. Draft of materials to be presented during each SPPC shall be provided with each agenda. Minutes and final presentation material to be submitted 7 days after each SPPC; R/ASR
3 DARC.
PAGE: 12
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.: DI-009
BLOCK 2-DATA ITEM TITLE: GENERAL MEETING AGENDAS,
1. Agendas shall provide information concerning purpose, location, and schedule of joint Contractor and
Government conferences and meetings.
2. Presentations shall include the following for each forthcoming meeting: purpose and objective; location, date, and duration; a daily chronological list of each major topic for discussion and a time schedule; brief description of progress on action items and problems identified at previous meetings; a complete list of all documentation to be available for review; pertinent information, open items, status of items relative to critical items and logistics requirements.
3. Minutes shall identify date, time, and location of the applicable review and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included. Copies of each presentation or document reviewed shall also be included and identified in the minutes by document name, document revision, Allow 4 days for Government review and comment.
Agendas and presentations 7 DPT each meeting; R/ASR 3 DARC. Minutes to be submitted 7 days after each meeting; R/ASR 7 DARC.
PAGE: 13
NOAA AGOR VARIANT
BLOCK 1-DATA ITEM NO.: DI-010
BLOCK 2-DATA ITEM TITLE: INTEGRATED MASTER SCHEDULE
(See Attachment 1 to Data Item No. DI-010)
BLOCK 3-REFERENCE: SOW C-2.3.042b
1. The Integrated Master Schedule (IMS) shall present the overall plan for the design, construction, verification, testing, outfitting and delivery of the ship. The information will be used to verify attainability of program objectives and evaluate progress. The IMS shall depict all activities required for the performance of this
Contract. The IMS shall present key events, milestones, and the critical path. The IMS shall be capable of depicting and producing summary and detailed schedules. The IMS shall incorporate summary, intermediate and detailed schedules. Summary schedules shall present key events and milestones. The IMS shall identify interdependencies and relationships between scheduled events. The IMS shall be highlighted to show changes from the previous submittal.
2. The IMS produced detailed schedules are identified and described in Attachment 1. Detailed schedules shall include all efforts required to complete milestones. Each schedule shall portray in chronological sequence, the actions, events, and requirements with corresponding planned start and completion dates and the actual start and completion dates, which shall be retained on each issue of that schedule. Each schedule shall be kept current with schedule modifications and completed tasks. Human resources shall be expressed in man-hours. As appropriate, a column, line or space shall be provided for comments, explanation of problems encountered, and any remarks providing clarification shall also be identified.
Allow 14 days for Government review and comment.
Preliminary IMS 14 DPT PAC;…