TOR_Q&A__4_FBO_Posting.xlsx

XLSX spreadsheet 142 KB Posted

Attached to
USS TORTUGA (LSD 46) FY18 Modernization Period (MODPRD) Availability - Award Notice
Solicitation number
N00024-17-R-4403
Issued by

About this file

Responses to Questions for N00024-17-R-4403, Q&A #4.

View the file

Other files

File Type Posted
J-4_Pricing_Spreadsheet_LSD_46_Rev4.xlsx XLSX spreadsheet
N00024-17-R-4403_0007_SPS.pdf PDF
TOR_Q&A__3_FBO_Posting_(Rev_2).xlsx XLSX spreadsheet
N00024-17-R-4403_0006.docx DOCX document
N00024-17-R-4403_0005_RELEASED.docx DOCX document
TOR_Q&A__5_FBO_Posting.xlsx XLSX spreadsheet
N00027-17-R-4403_0004.docx DOCX document
TOR_Q&A__3_FBO_Posting_(Rev_1).xlsx XLSX spreadsheet
TOR_Q&A__3_FBO_Posting.xlsx XLSX spreadsheet
N00024-17-R-4403_0005.docx DOCX document
J-4_Pricing_Spreadsheet_LSD_46_Rev3.xlsx XLSX spreadsheet
N00024-17-R-4403_0004.docx DOCX document
N00024-17-R-4403_0003.pdf PDF
Exhibit_A_Contract_Data_Requirements_List_(CDRL).pdf PDF
Exhibit_C_Contract_Data_Requirements_List_(CDRL).pdf PDF
TOR_Q&A_2_FBO_Posting.xlsx XLSX spreadsheet
Exhibit_B_Contract_Data_Requirements_List_(CDRL).pdf PDF
TOR_Q&A__1_FBO_Posting.xlsx XLSX spreadsheet
N00024-17-R-4403_0002.docx DOCX document
J-4_Pricing_Spreadsheet_LSD_46_Rev2.xlsx XLSX spreadsheet
N00024-17-R-4403_0001.docx DOCX document
J-4_Pricing_Spreadsheet_LSD_46_Rev1.xlsx XLSX spreadsheet
S-5_Eligibility_Criteria_Data_Sheet_v5_(2).docx DOCX document
S-2_Past_Performance_Questionnaire.docx DOCX document
S-1_Technical_Capabilities_Data_Sheet.docx DOCX document
S-3_PPI_Form.docx DOCX document
S-4_PP_Reference_List.docx DOCX document
J-5_QASP_TORTUGA_170601.docx DOCX document
J-4_Pricing_Spreadsheet_LSD_46FINAL.xlsx XLSX spreadsheet
J-7_RTR_Control_Log_and_Form.doc DOC document
N00024-17-R-4403.pdf PDF
Attachment_2_-_PPI_Form.docx DOCX document
Attachment_1_-_TORTUGA_Ship_Check_Instructions.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A Cover Sheet

TORTUGA QUESTION & ANSWERS ROUND #4
USS TORTUGA (LSD 46) Modernization Period (MODPRD) Bidders' Questions
QuestionWork ItemQuestionPM Answer
1120-11-017PARA 3.6.2 requires clad welding in tanks listed in para 1.2.4 thru 1.2.9. There are no tanks listed in these locations. Please provide the tank numbers that associated with these repairs.ERRATA TO BE ISSUED
2120-11-013Item 120-11-013 has para 3.2.1 which requires 6 square feet of clad welding. This seems to be excessive whereas a 6 sq. foot insert would be more economical to accomplish. Is this requirement a mistake or is this the correct quantity of clad welding?ERRATA TO BE ISSUED
3VARIOUSThe numerical index that was provided has 5 less items than the items provided in the “Sneak Peek” adobe file The following items were also received that were not on the excel numerical index list: 150-90-001, 150-90-002, 168-80-002, 551-90-001 & 651-90-001. Also the 120-11-026 item number was on the numerical index but was not provided with a written spec. Will a new index with titles that match the specification attachment be provided in the future?Use the posted solicitation for pricing. A second CD was issued on 5 June which is the solicitation package.
4584-41-003Paragraph 3.11 states to replace 10 SF of plating as identified in 3.6. Paragraph 3.6 does not have an inspection called out. Should the plate replacement be from the inspection called out in 3.3 and reported in 3.3.1?ERRATA TO BE ISSUED
5612-90-001There is not an example of cable tags provided. Will one be provided?Use standard work practices as required by NAVSEA STD ITEMS which also refers to Electric Plant Standard Methods.
6651-80-001The reference drawing 2.3 (Ovhd Sheathing Mod) is the same as reference 2.2 (Door Mods). Contractor requests a copy of reference 2.3 for Overhead Sheathing Modification Galley Upgrade be provided.Reference Drawing 2.3 will be made available. ERRATA TO BE ISSUED
7120-11-017Paragraph 3.1 states to power tool to bare metal the deck and bulkhead surfaces for the locations listed in 1.2.1 thru 1.2.9.

1. Is it really the intent to have the very large areas listed in 1.2 to be power tooled to bare metal?

2. If the intent is to power tool areas for the NDT called out in 3.2, could the Government narrow the scope to a better defined area? For example paragraphs 1.2.2 thru 1.2.9 are adjacent spaces and therefore do not require all decks and bulkheads to be power tooled to bare metal.

3. After paragraph 3.1 is accomplished the only preservation remaining in this work item is for the newly installed plates. Will the Government allow all the bare decks and bulkheads to be preserved as new and disturbed surfaces?

Paragraphs 3.9 and 3.10 provide a 009-32 Table and Line for the newly installed plates. Will the Government clarify which paragraph applies to what area of the newly installed plates? What paint system does the Government wish to apply to paragraph 3.6 thru 3.6.2.3 for the welding?ERRATA TO BE ISSUED
8120-11-013Paragraph 3.2.1 which requires 6 square feet of clad welding. This seems to be excessive whereas a 6 sq. foot insert would be more economical to accomplish. Does the contractor have the option to insert vice clad weld these areas? How many areas require repairs?ERRATA TO BE ISSUED
9120-11-017Paragraph 3.1 calls for power tool cleaning of the entire deck and bulkhead surfaces in the locations listed in 1.2.1 thru 1.2.9. This seems extreme to power tool clean the entire Well Deck deck and bulkheads. Please clarify by listing the square footage required in each space listed in 1.2.ERRATA TO BE ISSUED
10120-11-017Paragraph 3.6.2 requires clad welding in tanks listed in para 1.2.4 thru 1.2.9. There are no tanks listed in these locations. Please provide the tank numbers that are associated with these repairs.ERRATA TO BE ISSUED
11123-11-003Para 3.8 directs an MT inspection of the “C” links, however paragraph 3.8.1 requires a report of thickness gauging. I shall assume paragraph 3.8.1 is in error and that MT report is requested.ERRATA TO BE ISSUED
12123-16-001Paragraph 3.3 tasks Contractor to accomplish an Ultrasonic test inspection of each tank located in 1.2.3, 1.2.6 through 1.2.10 and 1.2.12, at 1000 locations. Is this a total of 1000 locations for all the tanks or 1000 spots in each tank?A total of 1,000 spots for all tanks listed in 3.3

13 J-3 Execution Milestones The Milestone/Key Event on Line 20 is listed as Undocking and has a date of A+218, 14 AUG 18. There currently is not a Milestone/Key Event for the Docking.

Line 42 includes Milestone/Key Event “Dock” states "Offeror to Propose Dock & Undock Dates IAW Specification 997-11-002".

Does the Government intend to modify the J-3 to add a Docking Milestone/Key Event with “TBD” as the date and change the Undocking Milestone/Key Event to also have a date of “TBD”?Contractor may propose docking date. Undocking will be 14 AUG 18 or sooner.
14RFP Section C – Scope of WorkParagraph 3.4 and the subsequent table of reports contain due dates of "D+30" and "A+74", however, these dates do not conform to the availability and docking period durations identified in attachment J-3 Execution Milestones.
Does the Government intend to change "D+30" to read "NLT 20% of Docking Period" and change "A+74" to read "A+97" (20% of 487 day availability duration) in paragraph 3.4 and the subsequent table of reports?The government is requiring reports noted as A+74 by A+74 and reports required by D+30 as D+30. This is in addition to the NAVSEA STD item requirements.
15RFP Section C – Scope of WorkThirteen work items in the Para 3.4 table do not contain report paragraph numbers: 233-11-037, 233-12-012, 233-13-008, 233-13-026, 233-14-012, 242-13-001, 242-13-002, 262-11-001, 262-12-001, 311-90-002, 524-11-003, 562-11-001, & 631-11-005.
If these work items do not contain Required Reports will the Government please remove them from the Table to preclude questions regarding these work items?233-11-037, 233-12-012, 233-13-026, 233-14-012, 242-13-001, 242-13-002, 262-11-001, 262-12-001, 311-90-002, 524-11-003, 562-11-001, & 631-11-005 will be removed from Sect C para 3.4 table. 233-13-008 Propulsion Diesel Engine (MPDE) Gieslinger Coupling Sect C para 3.4 table will be corrected to reflect report para number 3.4.4.
16RFP Section C – Scope of WorkFour work items in the Para 3.4 table were not received in the Solicitation, nor are they on the Work Item Index or the J-4 Pricing Sheet (311-90-003, 311-90-004, 311-90-005, & 311-90-006).
If these work items do not exist will the Government please remove them from the table to preclude questions regarding these work items?These work items are in addendum one.
17RFP Section C – Scope of WorkSome work items in the Para 3.4 table contain report paragraph numbers that are not open and inspect reports. The type and amount of work required prior to generating some other reports, make them unlikely to be accomplished prior to the due dates (ex. 243-11-002, para 3.11.1 after equipment repairs, completed before D+30).

Work Items (report paragraphs):

123-11-003(3.18.1, 3.20.1, 3.21.1), 123-16-001(3.2.1 and 3.3.1), 123-19-002(3.2.1), 123-22-003(3.2.1), 123-22-004(3.2.1), 130-11-001(3.2.1), 233-11-008(3.4.4), 233-12-008(3.4.4), 233-14-008(3.4.4), 233-14-015(3.3.2), 242-11-001(3.3.1.1), 243-10-001(3.3.1, 3.5.2.1), 243-11-002(3.10.5, 3.11.1.1,3.15.1, 3.18.1), 243-11-003(3.10.5, 3.11.1.1,3.15.1, 3.18.1), 244-10-002(3.2.1.3), 245-11-004(3.7.1), 245-12-001(3.7.1), & 320-22-001(3.1.2.1).

Please remove these reports from the Milestones for Certain Reports table in paragraph 3.4.The following reports will be removed from section C, para 3.4 table: 123-11-003 report 3.18.1 only, 243-10-001 reports 3.3.1 and 3.5.2.1, 243-11-002 reports 3.15.1 and 3.18.1 only, 244-10-002 report 3.2.1.3 only, 245-11-004 report 3.7.1 only, 245-12-001 report 3.7.1 only. Also, 243-11-003 is incorrectly listed and will be corrected to 243-12-003 Port Propulsion Shafting inspect and repair and reports 3.15.1 and 3.18.1 only will be removed.
18120-11-008Bulkhead Stiffener and Plating para 3.1 requires a visual inspection of each bulkhead and stiffener listed in paragraph 1.3 for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion in each location in 1.2. There are fourteen locations identified by paragraph 1.3. There could possibly be thermal insulation on areas in some or all of the fourteen location identified in paragraph 1.3. A quantity of repair work is specified for each location, but it is much less than the area shown in each of the referenced details. If there is thermal insulation in each of the 14 areas identified in paragraph 1.2 for the visual inspection, is it the intention to remove all of the insulation in those locations identified by details to perform the visual inspection and to reinstall the thermal insulation as interference to the work item? Please clarify quantity of insulation to be replaced in para 3.4.NAVSEA STD ITEM 009-11 is included in the work specification. Comply with work specification.
19130-11-007In para 3.7 it is required to accomplish 009-32 line 11, 11A, 12, 13 AND 13A. The contractor is confused as to what line the gov’t actually wants to have accomplished. Also the location of work is not identified for the preservation repairs, para 1.2.1 is the A/C Machinery Room #2 (3-74-1-E). Is the intent to preserve the entire space?The government requires preservation of the deck, newly installed material, and new and disturbed. Use table and line as applicable.
20MilestoneThe 50% conference is scheduled for Saturday September 8, 2018 on the milestone sheet. Are we going to keep that date?Any change will be considered after award. Proposals to move dates to the left will likely be acceptable at no cost to the government.
21MilestoneThe 75% conference is scheduled for Tuesday January 8, 2019 on the milestone sheet. Are we going to keep that date as opposed to Wednesday the 9th?Any change will be considered after award at no cost to the government.
22150-11-009Para 3.1 requires installation of retained lockers. There is no paragraph to remove any lockers. Para 3.4 states to install equipment and lockers retained in 3.1. Please clarify that all lockers listed in para 1.3.1 are to be removed and reused.ERRATA TO BE ISSUED
23167-11-003The subject item reads: 3.1.10 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 25, for each newly installed watertight door listed in 1.3.1 through 1.3.9. This requirement is usually reserved for Powder-coating of Intake Louvers. Please validate the watertight doors listed in 1.3.1 thru 1.3.9 require to be preserved by the Fluidized Bed Method as per 009-32- table 2 line 25 requires.009-32, Table 2, line 25 applies to watertight doors. Comply with work specification, per govt. engineering this method provides prolonged life of equipment.
24150-11-015Para 3.6 of the subject item requires 009-17 for supply fan 2-20-1. There is no description or identification on this electric motor repair. The contractor needs a description of the nameplate nomenclature for the supply fan 2-20-1 in order to estimate repairs.ERRATA TO BE ISSUED
25150-11-028In para 3.1 it is required to replace the materials listed in 1.3. In para 1.3 the identified material is the Work Maintenance Platform itself. Para 3.1.1 goes on to say replace the following with new parts: One each Hose Stowage Rack; 2 each "U" Staples; 8 each Tie Downs (Short); 2 each Tie Downs (Long); and 48 each 3/8-16 UNC 2A Weld Mounting Studs.

These parts are attached to the Work Maintenance platform. Please clarify that it is the intent to replace the entire platform or only the materials listed in para 3.1.1 that are attached to the platform?

Also in para 3.1.3 it is required to replace with new the weld base mounting studs. There is no way to estimate this unless there is a quantity of studs to be replaced or level of effort added to accomplish this task. How many studs are to be replaced?ERRATA TO BE ISSUED
26167-11-003The subject item reads: 3.1.10 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 25, for each newly installed watertight door listed in 1.3.1 through 1.3.9. This requirement is usually reserved for Powder-coating of Intake Louvers. Please validate the watertight doors listed in 1.3.1 thru 1.3.9 require to be preserved by the Fluidized Bed Method as per 009-32- table 2 line 25 requires.009-32, Table 2, line 25 applies to watertight doors. Comply with work specification, per govt. engineering this method provides prolonged life of equipment.
27233-10-009Is the location for Main 2 in paragraph 1.2.2 incorrectly called out for this work item? (Only the heaters for 1A and 1B are identified for work per this specification in paragraph 1.3.)ERRATA TO BE ISSUED
28150-90-001Para 3.1.2 states to Accomplish the requirement of 009-90. Provided the services of qualified Technical Representative. The Representative recommended in 4.1 is a SPAWAR person that works for the Government. Please confirm the Government will provide this representative.ERRATA TO BE ISSUED 009-90 is not required and will be deleted. The Government will provide an on site representative to oversee / assist with removal and relocation of antenna.
29233-11-002233-11-002 MPDE Lube Oil and Jacket Water Thermostatic Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The government has determined 009-09 is not required for this work.
30233-11-002Para. 3.2.2.1 refers to the requirements of para. 3.3.2. Contractor recommends changing it to the correct para. 3.2.2.ERRATA TO BE ISSUED
31233-11-005233-11-005 MPDE Air Start Distributor & Main Air Start Control Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The government has determined 009-09 is not required for this work.
32233-11-0051. Para. 3.2.1.1 refers to the requirements of para. 3.3.1. Contractor recommends changing it to the correct para. 3.2.1.
2. Para. 3.3.1.1 refers to the requirements of para. 3.4.1. Contractor recommends changing it to the correct para. 3.3.1.ERRATA TO BE ISSUED
33233-13-015233-13-015 MPDE Cylinder Head and Component; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task
34233-11-011Para. 3.13 refers to the equipment listed in para. 1.3.1.3. Contractor recommends changing it to the correct para. 1.3.1.2. (Enclosure 9, Section 4 of 2.2 is the Fuel Oil Leak Off System para. 1.3.1.2)ERRATA TO BE ISSUED
35233-12-002233-12-002 MPDE Lube Oil and Jacket Water Thermostatic Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The government has determined 009-09 is not required for this work.
36233-12-005233-12-005 MPDE Air Start Distributor & Main Air Start Control Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The government has determined 009-09 is not required for this work.
37233-12-031233-12-031 MPDE Post Lube Oil Flush; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task
38233-12-037233-12-037 MPDE Crankcase Vacuum System; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task
39233-13-002233-13-002 MPDE Lube Oil and Jacket Water Thermostatic Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The government has determined 009-09 is not required for this work.
40233-13-015233-13-015 MPDE Cylinder Head and Component; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task
41233-13-026233-13-026 MPDE Camshaft Bearings, Lobes and Flex Drive; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task
42233-14-004233-14-004 MPDE Turbocharger Air Intercooler; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task
43233-14-005233-14-005 MPDE Air Start Distributor & Main Air Start Control Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The government has determined 009-09 is not required for this work.
44233-14-012233-14-012 (2B MPDE Overhaul); the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard the 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task
45233-14-016233-14-016 MPDE Jacket Water Cooling Water Elbow; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard the 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task
46241-10-001The subject item calls for para 3.3 to Remove and retain system oil from equipment listed in 1.3.2 and located in 1.2.1. Para 3.8 states to remove and dispose of systems fluids from the equipment listed in 1.3.3 and located in 1.2.1. Para 3.6 requires the stored oil be used to refill the equipment. It is more cost effective to dispose of the residual oil than it is to store the oil. Please verify that we are to store the oil from the Lube Oil Purifier heater for reuse.ERRATA TO BE ISSUED
47241-10-002The subject item calls for para 3.2 to Remove and retain system oil from equipment listed in 1.3.2 and located in 1.2.1. Para 3.5 requires the stored oil be used to refill the equipment. It is more cost effective to dispose of the residual oil than it is to store the oil. Please verify that we are to store the oil from the Lube Oil Purifier heater for reuse.ERRATA TO BE ISSUED
48311-21-030Item 311-21-030 Ship Service Diesel Generator Engine (SSDG) Cylinder Relief Valve; repair; the government has included the requirements of 009-90 in other similar items, however that requirement is not included for this item. Please confirm that 009-90 is not to be included as a requirement for this item. Also the item para 1.3.1.1 calls for 1 Safety Relief Valve vice 12 that are in similar items (i.e. 311-22-032, 311-24-029).The determination was made to exclude 009-90 in this WI. Para 1.3.1.1 calling for 1 Safety Relief Valve vice 12 is a typo and ERRATA will be issued, the correct quantity of the relief valves is 12.
49311-22-032Item 311-22-032 Ship Service Diesel Generator Engine (SSDG) Air Start Piston and Cylinder Safety Relief Valve; repair; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.009-09 will be required since the work is not to be accomplished IAW an approved maintenance standard but IAW various sections of the technical manual. ERRATA TO BE ISSUED.
50311-23-026Item 311-23-026 Ship Service Diesel Generator Engine (SSDG) Cylinder Relief Valve; repair; the government has included the requirements of 009-90 in other similar items, however that requirement is not included for this item. Please confirm that 009-90 is not to be included as a requirement for this item. Also the item para 1.3.1.1 calls for 1 Safety Relief Valve vice 12 that are in similar items (i.e. 311-22-032, 311-24-029).The determination was made to exclude 009-90 in this WI. Para 1.3.1.1 calling for 1 Safety Relief Valve vice 12 is a typo and ERRATA will be issued, the correct quantity of the relief valves is 12.
51311-24-029Item 311-24-029 Ship Service Diesel Generator Engine (SSDG) Air Start Piston and Cylinder Safety Relief Valve; repair; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item.009-09 will be required since the work is not to be accomplished IAW an approved maintenance standard but IAW various sections of the technical manual. ERRATA TO BE ISSUED.
52320-22-001Paragraph 3.1.2.1 states to submit one legible copy, in hard copy or approved transferrable media, of a list of new parts installed, excluding parts specifically listed to be removed in this Work Item or invoked Standard Item, in place of those identified to be missing or defective, with documenting invoices or other substantiating data, to the SUPERVISOR. Is this report referring to Paragraph 3.1, 3.1.1 or 3.1.2?Paragraph 3.1
53512-11-003Para 3.1 requires that each fan assembly in 1.3 be cleaned. Para 3.1.3 states to clean each inlet and outlet duct, however para 3.2 and 3.3 states to clean only 1.3.1 thru 1.3.45. There are 155 vent systems listed in 1.3. It appears that the systems referenced in 3.2 and 3.3 should be 1.3.1 thru 1.3.155. Please clarify and revise specification.ERRATA TO BE ISSUED
54311-23-023Paragraph 3.15 reads, “provide 21% mandays of labor and….” Please clarify that the Contractor is to provide 21 mandays of labor.ERRATA TO BE ISSUED
55321-80-001Paragraph 3.11 calls out 009-32 Table 5, Line 18 for new and disturbed piping. This Table and Line is for a SSPC-SP-10 Blast. Will the Government consider changing this work item to Table 5, Line 1 and review the other SHIPALTs for the same change?This piping is for elevated temperatures, no change will be processed.
56512-11-013Paragraph 3.1.3 provides direction to accomplish the requirements of 009-32 of 2.1, including Table 3, Line 15, for interior surfaces of new equipment in 3.1. This preservation is for steel surfaces using SSPC-SP-10 of vent plenums. Is it the Government’s intent for the Contractor to sandblast to near white metal and apply 30 Mils of paint to the interior only of the NEW steel and aluminum diffusers listed in 3.1? Please clarify.ERRATA TO BE ISSUED
57512-11-020Paragraph 3.4 provides direction to accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, for exterior surfaces of natural supply duct, and Table 3, Line 14 for interior surfaces. This Table and Line is for steel surfaces; the replacement duct VD-03 is 050 aluminum.

Please clarify:

1) Does the Government want the exterior of the duct preserved using the system for the exterior surfaces above the boot-top per Table 2, Line one or the same system for interior surfaces because the duct is in a fan room? If the later, what Aluminum Table and Line should the Contractor use?

2) Does the Government want the interior of the duct preserved using the vent plenum system called out in Table 3, Line 14? If so what Aluminum Table and Line should the Contractor use?ERRATA TO BE ISSUED
58130-11-002Paragraph 3.4 calls out Table 3, Line 22 which is preservation for under AFFF stations. Is this the preservation system the Government wishes to use or should the paragraph be changed to Table 3, Line 20 which is for Fan Rooms per 009-32 FY-17 (CH-1)? Please advise.ERRATA TO BE ISSUED
59130-11-006Paragraph 3.4 calls out Table 3, Line 22 which is preservation for under AFFF stations. Is this the preservation system the Government wishes to use or should the paragraph be changed to systems for Interior Surfaces for 2.1 and another table and line for the critical coated tanks on the adjacent sides of the repairs? Please advise.ERRATA TO BE ISSUED
60150-11-009Paragraph 3.1 states to install retained lockers using new fasteners, paragraph 3.1.1 removes the mounting bracket and paragraph 3.4 installs the equipment and lockers retained in 3.1. Contractor requests paragraph 3.1 be re-worded to remove and retain vice install retained.ERRATA TO BE ISSUED
61167-11-003The watertight doors listed in paragraphs 3.1.10, 3.2.2.16 and 3.3.4 have Table 2, Line 25 as the preservation paragraphs. This system is the fluidized bed method. Will the Government consider Table 5, Line 26 or 27 for standard powder coat as the coating method? The standard powder coat method can be done locally and will result in cost savings to the Government.009-32, Table 2, line 25 applies to watertight doors. Comply with work specification, per govt. engineering this method provides prolonged life of equipment.
62150-90-001The specification shows reference 2.4 533-8621580 Power System Signal Shelter Removal. After looking at the drawing, the title is COLD POTABLE WATER MODS SIGNAL SHELTER REMOVAL 06 & 07 LEVEL, FRAM 34-38. The Power System Drawing is listed under 2.10. Recommend 2.4 be changed to Cold Potable Water Signal Shelter.ERRATA TO BE ISSUED
63233-11-023NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item.

Does this note apply to item 233-11-023?

64 233-12-014 NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item.

Does this note apply to item 233-12-014?

65 233-13-035 NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item.

Does this note apply to item 233-13-035?

66 233-14-035 NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item.

Does this note apply to item 233-14-035?

67233-80-001In para 3.3 it is required to accomplish testing IAW reference 2.5. The reference 2.5 (S6438-AA-DDT-010) has not been issued to the contractor.
68243-10-004Based on the specification paragraph 3.3 and the reference document paragraph 243-1.5.3; when should the contractor schedule the Main Propulsion Shaft Alignment to be accomplished?
69244-10-002Contractor is questioning the intent of paragraph 3.1.2.2. It appears to be a duplicate of 3.1.2.1.
70245-11-004Contractor suggests using clean, new oil conforming to MIL-PRF-17331 (2190 TEP) ILO water in the CPP hydraulic system.

"3.18.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 1135 PSIG, for new and disturbed CPP piping systems."

71 245-90-001 Paragraph 1.2 Location of Work does not include the Underwater Hull and Drydock; where the propeller blades are located. Propeller Blades are removed in paragraph 3.3 and installed in 3.4.

72311-21-028Para 3.1 requires 009-90 tech rep services for equipment listed in 1.3.1.1. There is no para 1.3.1.1. Please identify the correct paragraph and OEM required.
73311-24-007It has been found that SSDG engines #1, #2, & #3 require that the Engine Blowers be uncrated, cleaned, inspected and reinstalled. SSDG Engine #4 has only the Blower Air Bypass being repaired. Please confirm that there will be no work required or reinstallation of the #4 SSDG Blower.
74311-90-003This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item:

1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.

2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.

3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.

4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.

5) Para. 3.19.2 is formatted incorrectly and makes no sense.

Please review and advise soonest so offerors have time to secure pricing.

75 311-90-004 This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item:

1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.

2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.

3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.

4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.

5) Para. 3.19.2 is formatted incorrectly and makes no sense.

Please review and advise soonest so offerors have time to secure pricing.

76 311-90-005 This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item:

1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.

2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.

3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.

4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.

5) Para. 3.19.2 is formatted incorrectly and makes no sense.

Please review and advise soonest so offerors have time to secure pricing.

77 311-90-006 This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item:

1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.

2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.

3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.

4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.

5) Para. 3.19.2 is formatted incorrectly and makes no sense.

Please review and advise soonest so offerors have time to secure pricing.

78443-11-002Reference 2.2 (331-8680335) needs to be issued to the contractor for planning and estimating.
79512-11-006Missing all References below:

2.3 139-6102525 Rev E, Unit 441 04 DK Frs 42-53 S/S

2.5 S9512-B6-MMA-010, Duct Cooling Coils, Unit Coolers and Gravity Coils

2.6 S6230-CR-MMM-010/87103, Gravity Coils Sizes 1 GW, 3 GW, and 5 GW

2.7 S6230-CF-MMA-010/38450, Navy Standard Unit Coolers Models 51UW Through 55UW

2.8 S9514-DS-MMA-010, Fan Coil Assemblies (Type III), Models DDG, FCA-21 Through -25

2.9 S6230-A8-MMA-010, Fan Coil Assemblies (Type II) Models FCA-22 and FCA-24, Part Number 81H2573 and (Type III) Models FCA-21, FCA-25

2.10 805-1311397, Air Cooling Coils Duct - Classes DW and DF for Shipboard Mechanical Cooling

80 512-11-039 Missing all References below:

2.2 S9512-B6-MMA-010, Duct Cooling Coils, Unit Coolers and Gravity Coils

2.3 S6230-BB-MMO-010, Fan Coil Unit FCA Sizes 21-25 Types 1 & 2

2.5 514-6101609 Rev B, Diagram of Chill Water System

81 521-11-004 3.1 Accomplish a hydrostatic test of each pump in accordance with Paragraph 4-6.1.1 of 2.2, using 2.3 as guidance. Allowable leakage through the casing and the seal: None.

3.2 Install each fire pump and motor assembly listed in 1.3 and located in 1.2, using 2.2 through 2.4 for guidance.

There is no requirement to remove the old pumps. Are there any old pumps in spaces to remove?

The reference’s doesn’t include a fire main system DWG.

82529-11-005It was found that the valves in para 1.3.3 and 1.3.4 have the same valve identification numbers. Please verify correct valve numbers or delete duplicate paragraph.
83529-11-007Para 3.5 states to install new material listed but it does not identify what equipment that the parts are to be installed on. These parts are listed below:

3.5 Remove existing, fit, and install new the following parts, using 2.2 and 2.3 for guidance:

TOTAL

QUANTITY

REQUIRED NAME

OF PART REF

NO. PIECE

NO. FIG/DWG

NO. PART

NO.

One EA Switch, Temperatur e 90-165 Degree 2.2 34 6-5 222-2942NL 6 FT Tubing, 0.840 O.D.

Copper Hard Drawn WW-T-797 2.2 44 6-5 N/A 2 EA Elbow, 90 Degrees, 1/2 Inch, MIL-F- 001183 F 2.2 45 6-5 N/A 2 EA Coupling, 1/2 Inch x 1/4 Inch Red 2.2 46 6-5 N/A

84 529-85-001 In para. 3.1 a list of parts appears to have a duplicate part: Conversion kit, Oil Block p/n 881-735-042 4 ea.

Please confirm that there should be only 4 kits being installed in the 4 deballast compressor listed in 1.3.1 not 8 as shown below:

4 EA Conversion N/A 2.2 N/A 881-735- Kit, Oil Block 042 4 EA Conversion N/A 2.2 N/A 882-735- Kit, Oil Block 042 4 EA Gasket, N/A N/A N/A 839-125- End Cover 041 4 EA Seal, Oil N/A N/A N/A 838-306-

85581-11-015The cover gasket in the work item is no longer available. The new part number is P1H-B85. Please confirm this replacement is acceptable.
130130-11-002Paragraph 3.1.1 states to remove existing and install new foundation for fan (S1-85-1). Please confirm that the existing Resilient Mounts will be re-used on the new foundation.At this time, the GOVT does not plan to replace existing Resilient Mounts.
131201-90-002The reference’s for this work item, 2.29 ( LSD46-LLTM-BOM-18018) & 2.30 (4720-LSD46-18018), were not on the CD provided from the Government. Please provide.GOVT WILL PROVIDE WITH ERRATA PACKAGE
132201-90-002The paragraph 2.3 identifies reference drawing as 432-8683222. Drawing provided is 472-8683222. Please correct spec to reflect correct drawing numberERRATA TO BE ISSUED
133233-80-001It has been found that materials listed in the BOM differs from the spec item para 5. In the attached BOM all material is being designated IAF and LLTM. For example the materials listed in the first page for LSD46-LLTM-BOM-00296 shows flatbar, angle iron and plate as being IAF, in para 5.1 of the item it is GFM. This material is in stock and readily available. The Item reference 2.4 shows the remote trip actuators (item 1, 2, 3 & 4) as being IAF. The contractor has contacted TELEFLEX and has found that these parts are indeed LLTM. This appears to be the opposite of what has customarily been LLTM and supplied as GFM. Please confirm that the materials identified in the 4720 which has not been provided for this AER (Shipalt) will show these LLTM items as GFM. Also it is requested that the 4720 be provided for this and all Shipalts and AERs in the solicitation.BOMs were provided (ref. PDF BOM COMP etc.) on the CD. See errata 2 concerning angle and plate. Errata will be issued to list items 1 through 4 of 2.4 as LLTM in paragraph 5 as BOM lists it as IAF when in fact it is LLTM. See "REVISION ONE 18LSD-46_BOM_MATERIAL TO BE PROCURED" provided by NAVSEA for lastest information.
134260-90-001Spec Item 260-90-001 lists reference 2.17; S9086-RJ-STM-010 Rev 1, however, the reference received is REV 7. Please advise if this is a typo in the spec item or the wrong reference with the package.ERRATA TO BE ISSUED
135262-90-001The subject item has conflicting information on the GFM materials para 5.1 & 5.3. PARA 5.1 lists the LSD46-LLTM-BOM-01079 as GFM LLTM but the material listed on the BOM for this specific SHIPALT are all labeled IAF and PARA 5.3 shows a 4720 with only a few items that are not on the BOM either. Verify that the materials listed on the attached 4720 are the only items that will be supplied by the gov’t and that all of the materials listed on the BOM will be contractor furnished. Please note that there are some materials listed on the BOM that are LLTM and are marked as such.For clarification, Item No. F26 and F31 on DWG 8680517A and 8680518A "Pump/motor assy, 2EA" as well as Items 1,3,and 4 on DWG 8680621A "4 EA CONTROLLER, 2 SPEED; 4 EA CKT BKR, AQB-A253, 500VAC, 100-250A and 4 EA 160A ADJUSTABLE RATING PLUG" Will be provided by the Government and is included on the next 4720 submission.

NOTE: ALL BOM MATERIALS WILL BE PROVIDE BY THE GOVT UNLESS SPECIFICALLY CALLED IN PARA #3 OF THE WORK SPECIFICATION.

136264-11-001KTR questions the intent of paragraph 3.9.4.1 Accomplish the requirements of 009-58 of 2.1 for the equipment listed in 1.3.1.2 and located in 1.2.
The equipment listed in 1.3.1.2 is the electrical magnetic controller for the lube oil purifier, not a coupled pump / driver shaft requiring alignment. In addition, the purifier assembly does not require 009-58 alignment criteria, it operates from a series of pulleys and belts, not coupled pumps / driver shafts. The pulley system alignment should be IAW Chapter 6 of 2.2.ERRATA TO BE ISSUED.
137551-90-001The materials required by reference 2.15 shows a Ships’ Service Air Receiver as being IAF. This item will need to be manufactured. If this item will not be supplied GFM. Does the gov’t have a vendor recommendation for this material? The contractor has reached out to all known sources but has not yet been able to procure pricing for this item (item F1 on ref. 2.15)BOM MATERIAL WILL BE PROVIDED BY THE GOVT UNLESS CALLED OUT IN PARA 3 OF THE WORK ITEM.
138581-11-015The following discrepancies were found in the subject item:

1) Paragraph 3.2 states to disassemble the Port Anchor Windlass Manual Brake assembly listed in 1.3.1.2, this paragraph IDs “Port Manual Brake Lining” There are 2 brakes on each Windlass: Wildcat Manual Brake & Electric Brake w/ Manual release. The Wildcat Brake is addressed in paragraph 3.11(Change paragraph to 1.3.1.2 to ID the correct equipment “Electric Brake Assembly”)

2) Paragraph 3.3 requires to machine the Port Anchor Windlass brake drum. (Delete paragraph 3.2 thru 3.4)

3) In paragraph 3.5.4 A new Brake Wheel is being provided as GFM, paragraph 3.5.4.1 requires that the brake drum be machined. (Delete this paragraph 3.5.4.1)

4) In paragraph 3.19 is it required to Machine the Port Anchor Windlass MANUAL Brake Drum listed in paragraph 1.3.1.7 (Delete paragraph 3.18 thru 3.19)

5) Paragraph 3.21 states to assemble the Port Manual Brake assembly. (Delete 3.21 thru 3.22)ERRATA TO BE ISSUED
139581-11-017In para 3.7 it is required to disassemble the equipment in 1.3.1.4. Para. 1.3.1.4 is the STBD Stroke Handwheel. Please clarify the correct equipment to be disassembled. In paragraph 3.10.4.1 it is required to machine the Port Anchor Windlass brake drum. There is no Brake wheel in para 5.1. Will the new Brake wheel be provided in para 5.1 or is it required to machine the existing?ERRATA TO BE ISSUED FOR PARA 5.
140612-90-001Paragraph 3.1 requires accomplishment of references 2.2-2.6. This does not seem correct as there are other references that are not addressed such as 2.7, 2.8, 2.9, 2.10 & 2.11. It is recommended to invoke and provide these references or delete them from the item.ERRATA TO BE ISSUED
141Can the Navy provide the timeline and geographic location for the USS TORTUGA Activation plan. What facilities and support will the LMA need to provide for the inbound sailors re-manning TORTUGA. Will the LMA be asked to provide shipboard systems operation training (Anchor Windlass, Steering Systems, BBD Operations, HPAC Operations, VCHT Operations, etc.) for the new crewmembers on their ship? Will office space be needed? Will SIPRNET and NIPNET access be required for Crew access on the ship?At this time, Offerors are only reponsible for the requirements of the solicitied work package. All other requirements are beyond the scope of this solicitation.
142GFM ListThe following list of SHIPALT items are missing from the 4720 GFM Summary lists: 110-90-001 (SCD 6578D) 150-90-001 (SCD 80762K) 150-90-002 (SCD 82151K) 168-90-001 (SCD 82631D) 244-80-001 (SCD 72283D) 260-90-001 (SCD 01282K) 321 80-001 (SCD 79858D) 321-90-001 (SCD 3290.2K) 422-80-002 (SCD 80389D) 432-80-001 (SCD 76922D) 511-90-001 (SCD 73290.90K) 512 80-001 (SCD 81394D) 517-90-001 (SCD 73290.12K) 524-80-001 (SCD 82261D) 533-90-001 (SCD 79998) 593-85-004 (SCD 01390D) 651-90 001 (SCD 73290.7) 980-11-002 (SCD 87119)150-90-002 (SCD 82151K), see 12151 provided.

321-90-001 (SCD 3290.2K) GFM is provided and installed by the AIT.

980-11-002 is AIT responsible.

110-90-001 (SCD 6578D) - Requires No GFM.

150-90-001 (SCD 80762K) - Requires No GFM.

168-90-001 (SCD 82631D) - Requires No GFM.

244-80-001 (SCD 72283D) - Requires No GFM.

260-90-001 (SCD 01282K) - Requires No GFM.

422-80-002 (SCD 80389D) - Requires No GFM.

432-80-001 (SCD 76922D) - Requires No GFM.

511-90-001 (SCD 73290.90K) - Requires No GFM.

512-80-001 (SCD 81394D) - Requires No GFM.

517-90-001 (SCD 73290.12K) - Requires No GFM.

524-80-001 (SCD 82261D) - Requires No GFM.

593-85-004 (SCD 01390D) - Requires No GFM.

651-90 001 (SCD 73290.7) - Requires No GFM.

143 245-90-001 Please provide a copy of the following references

1. 2.8, LSD46-LLTM-BOM-01338

2. 2.9, 4720-LSD46-0133K

3. 2.23, LSD41CL 616COSS/IP 1. This information has already been provided by the GOVT on CD, PDF file BOM COMP.

2. Reference is 4720-LSD46-01338

3. Refernce was provided on addendum CD.

144314-90-001Please provide a copy of reference 2.11, LSD46-LLTM-BOM-73290.06This information has already been provided, reference is listed in the BOM COMP file on the CD as 03290.06.
145321-80-001Please provide a copy of reference 2.6, LSD-LLTM-BOM 09858This information has already been provided, reference is listed in the BOM COMP file on the CD.
146511-90-001Please provide a copy of reference 2.12, LSD46-LLTM-BOM-0390.09Reference 2.12 is SD46-LLTM-BOM-03290.09 (question has an error); this information has already been provided, reference is listed in the BOM COMP file on the CD.
147512-80-001Please provide a copy of reference 2.9, LSD46-LLTM-BOM-01394This information has already been provided, reference is listed in the BOM COMP file on the CD as 11394.
148514-90-001Please provide a copy of the following references:

1. 2.2, 1749068

2. 2.55, LSD46-LLTM-BOM-047811. Question has error, reference 2.2 is 133-8678902 and was provided on the original CD. 2. This information has already been provided, reference is listed in the BOM COMP file on the CD.
149514-90-001Please provide a copy of reference 2.32, LSD46-LLTM-BOM-05214.This information has already been provided, reference is listed in the BOM COMP file on the CD.
150531-90-001Please provide a copy of the following references:

1. 2.39, LSD46-LLTM-BOM-03920.4

2. 2.64, 4C531C3011. This information has already been provided, reference is listed in the BOM COMP file on the CD and is listed as 03290.04. 2. GOVT will provide this reference.
151311-21-001Paragraph 3.5 states that worker is to disassemble equipment removed in 3.4. Paragraph 3.4 removed and installed a new socket welded vent valve. The disassembly is supposed to be for the attached jacket water pump, which was removed in paragraph 3.3. The same thing carries through the reassembly of the pump and the very last portion of paragraph 3.6.2, which directs the use of all fasteners retained in 3.4.1, which should be 3.3.1. Please advise.ERRATA TO BE ISSUED
152123-10-003Fuel Oil Storage Tank 6-93-2-F (paragraph 1.2.9) of 123-11-005 is not opened for cleaning in 123-10-003. Will 6-93-2-F be added to 123-10-003 Cleaning and Pumping item?ERRATA TO BE ISSUED ON WI 123-11-005 to delete 6-93-2-F, tank not covered by WN etc.
153Getting our subcontractor community to provide fixed-price quotes for this extremely large work package has been complicated by an Errata not yet received, and many submitted questions not yet answered. Our subcontractor community has also been overwhelmed by the magnitude of quote requests for other concurrent solicitations. Additionally, on a work package of this size, the financial commitment in our proposal needs to be reviewed at a higher level within the corporation which requires additional time in our proposal process.
In order to have enough time to get competitive quotes on this work package, have sufficient time for a bid review and garner the corporate commitment to our bid price, we request a four week extension to the proposal due date.An extension to 14 August 2017 was issued via Amendment 0004. An additional extension will not be granted.
154584-41-003Please clarify the following areas to be preserved:

1 - Paragraph 3.5 includes the turntable pits and the well deck bulkheads and decks; should this be the turntable bulkheads and decks?

2 - Paragraph 3.13 includes areas listed in 3.5.

3 - Paragraph 3.14 contains Table 2, Line 10, for CVN flight deck non-skid, but lists the turntable pits (repeats of 3.5 & 3.13) and other areas that should not receive non-skid (caster blocks & foundation).

4 - Paragraphs 3.15, 3.16 and 3.16.1 are duplicated in paragraphs 3.32, 3.33 and 3.33.1.

5 - Paragraph 3.39 is installing the portable access covers; does the Government want the covers preserved? If so, will the covers be added to the work item?ERRATA TO BE ISSUED
155631-11-003Please clarify the location of work in 3.1 and 3.3:

1 - Paragraph 3.1; is the intent to preserve the whole space listed in 1.2 or the bilge areas listed in 1.3?

2 - Paragraph 3.3; is the intent to accomplish a 2nd surface prep of the whole bilge area listed in 1.2 or the areas listed in 1.3? 1. Locations in 1.2 are to be preserved.

2. Para 3.3 is requiring power tooling vice water jet/blast in the bilge areas.

156634-11-005Paragraph 3.4.2 – Please clarify the intent. MIL-PRF-32171 and MIL-PRF-24667 are two difference deck systems.
Is the intent of paragraph 3.5.2 to power tool clean (SP-11) 3,700 SF? Will SP-10 or UHP WJ-2 be an acceptable alternative method?ERRATA TO BE ISSUED
157631-21-011Locations 1.2.4, 1.2.5 and 1.2.8 appear to be covered by other items. Can the Government make adjustments to this and/or the other work items where the location of preservation is duplicated?

Duplications:

1.2.4 - Well Longitudinal Bulkhead, 130-11-012, 120-11-017

1.2.5 - Well Deck Overhead, 631-11-016

1.2.8 - Well Deck, Frames 34-145, 130-11-012, 631-11-016ERRATA TO BE ISSUED for 130-11-012, 120-11-017, 631-11-016
158520-11-001The valve repair material in paragraphs 3.4 – 3.4.4 has been identified as Long Lead Time Material with lead times up to 150 days. Will the Government consider making these repair parts GFM?ERRATA TO BE ISSUED
159634-11-003Please clarify the area of well deck that will require preservation.ERRATA TO BE ISSUED
160634-11-002Paragraph 3.1 is to accomplish peel and stick but gives no location. Paragraph 3.2 is for non-skid or peel & stick to areas listed in 1.2 Please identify what type of deck covering is to be replaced.ERRATA TO BE ISSUED
161634-11-005Paragraph 3.4.2 – Please clarify the intent. MIL-PRF-32171 and MIL-PRF-24667 are two difference deck systems.
Is the intent of paragraph 3.5.2 to power tool clean (SP-11) 3,700 SF? Will SP-10 or UHP WJ-2 be an acceptable alternative method?ERRATA TO BE ISSUED