Q&A Cover Sheet
TORTUGA QUESTIONS & ANSWERS ROUND #2
USS TORTUGA (LSD 46) Modernization Period (MODPRD) Bidders' Questions
| Question | Work Item | Question | PM Answer |
| 1 | 120-11-017 | PARA 3.6.2 requires clad welding in tanks listed in para 1.2.4 thru 1.2.9. There are no tanks listed in these locations. Please provide the tank numbers that associated with these repairs. | ERRATA TO BE ISSUED |
| 2 | 120-11-013 | Item 120-11-013 has para 3.2.1 which requires 6 square feet of clad welding. This seems to be excessive whereas a 6 sq. foot insert would be more economical to accomplish. Is this requirement a mistake or is this the correct quantity of clad welding? | ERRATA TO BE ISSUED |
| 3 | VARIOUS | The numerical index that was provided has 5 less items than the items provided in the “Sneak Peek” adobe file The following items were also received that were not on the excel numerical index list: 150-90-001, 150-90-002, 168-80-002, 551-90-001 & 651-90-001. Also the 120-11-026 item number was on the numerical index but was not provided with a written spec. Will a new index with titles that match the specification attachment be provided in the future? | Use the posted solicitation for pricing. A second CD was issued on 5 June which is the solicitation package. |
| 4 | 584-41-003 | Paragraph 3.11 states to replace 10 SF of plating as identified in 3.6. Paragraph 3.6 does not have an inspection called out. Should the plate replacement be from the inspection called out in 3.3 and reported in 3.3.1? | ERRATA TO BE ISSUED |
| 5 | 612-90-001 | There is not an example of cable tags provided. Will one be provided? | Use standard work practices as required by NAVSEA STD ITEMS which also refers to Electric Plant Standard Methods. |
| 6 | 651-80-001 | The reference drawing 2.3 (Ovhd Sheathing Mod) is the same as reference 2.2 (Door Mods). Contractor requests a copy of reference 2.3 for Overhead Sheathing Modification Galley Upgrade be provided. | Reference Drawing 2.3 will be made available. |
| 7 | 120-11-017 | Paragraph 3.1 states to power tool to bare metal the deck and bulkhead surfaces for the locations listed in 1.2.1 thru 1.2.9. |
1. Is it really the intent to have the very large areas listed in 1.2 to be power tooled to bare metal?
2. If the intent is to power tool areas for the NDT called out in 3.2, could the Government narrow the scope to a better defined area? For example paragraphs 1.2.2 thru 1.2.9 are adjacent spaces and therefore do not require all decks and bulkheads to be power tooled to bare metal.
3. After paragraph 3.1 is accomplished the only preservation remaining in this work item is for the newly installed plates. Will the Government allow all the bare decks and bulkheads to be preserved as new and disturbed surfaces?
| Paragraphs 3.9 and 3.10 provide a 009-32 Table and Line for the newly installed plates. Will the Government clarify which paragraph applies to what area of the newly installed plates? What paint system does the Government wish to apply to paragraph 3.6 thru 3.6.2.3 for the welding? | ERRATA TO BE ISSUED | |||
| 8 | 120-11-013 | Paragraph 3.2.1 which requires 6 square feet of clad welding. This seems to be excessive whereas a 6 sq. foot insert would be more economical to accomplish. Does the contractor have the option to insert vice clad weld these areas? How many areas require repairs? | ERRATA TO BE ISSUED | |
| 9 | 120-11-017 | Paragraph 3.1 calls for power tool cleaning of the entire deck and bulkhead surfaces in the locations listed in 1.2.1 thru 1.2.9. This seems extreme to power tool clean the entire Well Deck deck and bulkheads. Please clarify by listing the square footage required in each space listed in 1.2. | ERRATA TO BE ISSUED | |
| 10 | 120-11-017 | Paragraph 3.6.2 requires clad welding in tanks listed in para 1.2.4 thru 1.2.9. There are no tanks listed in these locations. Please provide the tank numbers that are associated with these repairs. | ERRATA TO BE ISSUED | |
| 11 | 123-11-003 | Para 3.8 directs an MT inspection of the “C” links, however paragraph 3.8.1 requires a report of thickness gauging. I shall assume paragraph 3.8.1 is in error and that MT report is requested. | ||
| 12 | 123-16-001 | Paragraph 3.3 tasks Contractor to accomplish an Ultrasonic test inspection of each tank located in 1.2.3, 1.2.6 through 1.2.10 and 1.2.12, at 1000 locations. Is this a total of 1000 locations for all the tanks or 1000 spots in each tank? | For a total of 1000 shots for all tanks listed in 3.3. |
13 J-3 Execution Milestones The Milestone/Key Event on Line 20 is listed as Undocking and has a date of A+218, 14 AUG 18. There currently is not a Milestone/Key Event for the Docking.
Line 42 includes Milestone/Key Event “Dock” states "Offeror to Propose Dock & Undock Dates IAW Specification 997-11-002".
Does the Government intend to modify the J-3 to add a Docking Milestone/Key Event with “TBD” as the date and change the Undocking Milestone/Key Event to also have a date of “TBD”?
14 RFP Section C – Scope of Work Paragraph 3.4 and the subsequent table of reports contain due dates of "D+30" and "A+74", however, these dates do not conform to the availability and docking period durations identified in attachment J-3 Execution Milestones.
Does the Government intend to change "D+30" to read "NLT 20% of Docking Period" and change "A+74" to read "A+97" (20% of 487 day availability duration) in paragraph 3.4 and the subsequent table of reports?
15 RFP Section C – Scope of Work Thirteen work items in the Para 3.4 table do not contain report paragraph numbers: 233-11-037, 233-12-012, 233-13-008, 233-13-026, 233-14-012, 242-13-001, 242-13-002, 262-11-001, 262-12-001, 311-90-002, 524-11-003, 562-11-001, & 631-11-005.
If these work items do not contain Required Reports will the Government please remove them from the Table to preclude questions regarding these work items?
16 RFP Section C – Scope of Work Four work items in the Para 3.4 table were not received in the Solicitation, nor are they on the Work Item Index or the J-4 Pricing Sheet (311-90-003, 311-90-004, 311-90-005, & 311-90-006).
If these work items do not exist will the Government please remove them from the table to preclude questions regarding these work items?
17 RFP Section C – Scope of Work Some work items in the Para 3.4 table contain report paragraph numbers that are not open and inspect reports. The type and amount of work required prior to generating some other reports, make them unlikely to be accomplished prior to the due dates (ex. 243-11-002, para 3.11.1 after equipment repairs, completed before D+30).
Work Items (report paragraphs):
123-11-003(3.18.1, 3.20.1, 3.21.1), 123-16-001(3.2.1 and 3.3.1), 123-19-002(3.2.1), 123-22-003(3.2.1), 123-22-004(3.2.1), 130-11-001(3.2.1), 233-11-008(3.4.4), 233-12-008(3.4.4), 233-14-008(3.4.4), 233-14-015(3.3.2), 242-11-001(3.3.1.1), 243-10-001(3.3.1, 3.5.2.1), 243-11-002(3.10.5, 3.11.1.1,3.15.1, 3.18.1), 243-11-003(3.10.5, 3.11.1.1,3.15.1, 3.18.1), 244-10-002(3.2.1.3), 245-11-004(3.7.1), 245-12-001(3.7.1), & 320-22-001(3.1.2.1).
Please remove these reports from the Milestones for Certain Reports table in paragraph 3.4.
| 18 | 120-11-008 | Bulkhead Stiffener and Plating para 3.1 requires a visual inspection of each bulkhead and stiffener listed in paragraph 1.3 for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion in each location in 1.2. There are fourteen locations identified by paragraph 1.3. There could possibly be thermal insulation on areas in some or all of the fourteen location identified in paragraph 1.3. A quantity of repair work is specified for each location, but it is much less than the area shown in each of the referenced details. If there is thermal insulation in each of the 14 areas identified in paragraph 1.2 for the visual inspection, is it the intention to remove all of the insulation in those locations identified by details to perform the visual inspection and to reinstall the thermal insulation as interference to the work item? Please clarify quantity of insulation to be replaced in para 3.4. |
| 19 | 130-11-007 | In para 3.7 it is required to accomplish 009-32 line 11, 11A, 12, 13 AND 13A. The contractor is confused as to what line the gov’t actually wants to have accomplished. Also the location of work is not identified for the preservation repairs, para 1.2.1 is the A/C Machinery Room #2 (3-74-1-E). Is the intent to preserve the entire space? |
| 20 | Milestone | The 50% conference is scheduled for Saturday September 8, 2018 on the milestone sheet. Are we going to keep that date? |
| 21 | Milestone | The 75% conference is scheduled for Tuesday January 8, 2019 on the milestone sheet. Are we going to keep that date as opposed to Wednesday the 9th? |
| 22 | 150-11-009 | Para 3.1 requires installation of retained lockers. There is no paragraph to remove any lockers. Para 3.4 states to install equipment and lockers retained in 3.1. Please clarify that all lockers listed in para 1.3.1 are to be removed and reused. |
| 23 | 167-11-003 | The subject item reads: 3.1.10 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 25, for each newly installed watertight door listed in 1.3.1 through 1.3.9. This requirement is usually reserved for Powder-coating of Intake Louvers. Please validate the watertight doors listed in 1.3.1 thru 1.3.9 require to be preserved by the Fluidized Bed Method as per 009-32- table 2 line 25 requires. |
| 24 | 150-11-015 | Para 3.6 of the subject item requires 009-17 for supply fan 2-20-1. There is no description or identification on this electric motor repair. The contractor needs a description of the nameplate nomenclature for the supply fan 2-20-1 in order to estimate repairs. |
| 25 | 150-11-028 | In para 3.1 it is required to replace the materials listed in 1.3. In para 1.3 the identified material is the Work Maintenance Platform itself. Para 3.1.1 goes on to say replace the following with new parts: One each Hose Stowage Rack; 2 each "U" Staples; 8 each Tie Downs (Short); 2 each Tie Downs (Long); and 48 each 3/8-16 UNC 2A Weld Mounting Studs. |
These parts are attached to the Work Maintenance platform. Please clarify that it is the intent to replace the entire platform or only the materials listed in para 3.1.1 that are attached to the platform?
Also in para 3.1.3 it is required to replace with new the weld base mounting studs. There is no way to estimate this unless there is a quantity of studs to be replaced or level of effort added to accomplish this task. How many studs are to be replaced?
| 26 | 167-11-003 | The subject item reads: 3.1.10 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 25, for each newly installed watertight door listed in 1.3.1 through 1.3.9. This requirement is usually reserved for Powder-coating of Intake Louvers. Please validate the watertight doors listed in 1.3.1 thru 1.3.9 require to be preserved by the Fluidized Bed Method as per 009-32- table 2 line 25 requires. |
| 27 | 233-10-009 | Is the location for Main 2 in paragraph 1.2.2 incorrectly called out for this work item? (Only the heaters for 1A and 1B are identified for work per this specification in paragraph 1.3.) |
| 28 | 150-90-001 | Para 3.1.2 states to Accomplish the requirement of 009-90. Provided the services of qualified Technical Representative. The Representative recommended in 4.1 is a SPAWAR person that works for the Government. Please confirm the Government will provide this representative. |
| 29 | 233-11-002 | 233-11-002 MPDE Lube Oil and Jacket Water Thermostatic Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 30 | 233-11-002 | Para. 3.2.2.1 refers to the requirements of para. 3.3.2. Contractor recommends changing it to the correct para. 3.2.2. |
| 31 | 233-11-005 | 233-11-005 MPDE Air Start Distributor & Main Air Start Control Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 32 | 233-11-005 | 1. Para. 3.2.1.1 refers to the requirements of para. 3.3.1. Contractor recommends changing it to the correct para. 3.2.1. |
2. Para. 3.3.1.1 refers to the requirements of para. 3.4.1. Contractor recommends changing it to the correct para. 3.3.1.
| 33 | 233-13-015 | 233-13-015 MPDE Cylinder Head and Component; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 34 | 233-11-011 | Para. 3.13 refers to the equipment listed in para. 1.3.1.3. Contractor recommends changing it to the correct para. 1.3.1.2. (Enclosure 9, Section 4 of 2.2 is the Fuel Oil Leak Off System para. 1.3.1.2) |
| 35 | 233-12-002 | 233-12-002 MPDE Lube Oil and Jacket Water Thermostatic Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 36 | 233-12-005 | 233-12-005 MPDE Air Start Distributor & Main Air Start Control Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 37 | 233-12-031 | 233-12-031 MPDE Post Lube Oil Flush; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 38 | 233-12-037 | 233-12-037 MPDE Crankcase Vacuum System; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 39 | 233-13-002 | 233-13-002 MPDE Lube Oil and Jacket Water Thermostatic Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 40 | 233-13-015 | 233-13-015 MPDE Cylinder Head and Component; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 41 | 233-13-026 | 233-13-026 MPDE Camshaft Bearings, Lobes and Flex Drive; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 42 | 233-14-004 | 233-14-004 MPDE Turbocharger Air Intercooler; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 43 | 233-14-005 | 233-14-005 MPDE Air Start Distributor & Main Air Start Control Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 44 | 233-14-012 | 233-14-012 (2B MPDE Overhaul); the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 45 | 233-14-016 | 233-14-016 MPDE Jacket Water Cooling Water Elbow; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 46 | 241-10-001 | The subject item calls for para 3.3 to Remove and retain system oil from equipment listed in 1.3.2 and located in 1.2.1. Para 3.8 states to remove and dispose of systems fluids from the equipment listed in 1.3.3 and located in 1.2.1. Para 3.6 requires the stored oil be used to refill the equipment. It is more cost effective to dispose of the residual oil than it is to store the oil. Please verify that we are to store the oil from the Lube Oil Purifier heater for reuse. |
| 47 | 241-10-002 | The subject item calls for para 3.2 to Remove and retain system oil from equipment listed in 1.3.2 and located in 1.2.1. Para 3.5 requires the stored oil be used to refill the equipment. It is more cost effective to dispose of the residual oil than it is to store the oil. Please verify that we are to store the oil from the Lube Oil Purifier heater for reuse. |
| 48 | 311-21-030 | Item 311-21-030 Ship Service Diesel Generator Engine (SSDG) Cylinder Relief Valve; repair; the government has included the requirements of 009-90 in other similar items, however that requirement is not included for this item. Please confirm that 009-90 is not to be included as a requirement for this item. Also the item para 1.3.1.1 calls for 1 Safety Relief Valve vice 12 that are in similar items (i.e. 311-22-032, 311-24-029). |
| 49 | 311-22-032 | Item 311-22-032 Ship Service Diesel Generator Engine (SSDG) Air Start Piston and Cylinder Safety Relief Valve; repair; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 50 | 311-23-026 | Item 311-23-026 Ship Service Diesel Generator Engine (SSDG) Cylinder Relief Valve; repair; the government has included the requirements of 009-90 in other similar items, however that requirement is not included for this item. Please confirm that 009-90 is not to be included as a requirement for this item. Also the item para 1.3.1.1 calls for 1 Safety Relief Valve vice 12 that are in similar items (i.e. 311-22-032, 311-24-029). |
| 51 | 311-24-029 | Item 311-24-029 Ship Service Diesel Generator Engine (SSDG) Air Start Piston and Cylinder Safety Relief Valve; repair; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. |
| 52 | 320-22-001 | Paragraph 3.1.2.1 states to submit one legible copy, in hard copy or approved transferrable media, of a list of new parts installed, excluding parts specifically listed to be removed in this Work Item or invoked Standard Item, in place of those identified to be missing or defective, with documenting invoices or other substantiating data, to the SUPERVISOR. Is this report referring to Paragraph 3.1, 3.1.1 or 3.1.2? |
| 53 | 512-11-003 | Para 3.1 requires that each fan assembly in 1.3 be cleaned. Para 3.1.3 states to clean each inlet and outlet duct, however para 3.2 and 3.3 states to clean only 1.3.1 thru 1.3.45. There are 155 vent systems listed in 1.3. It appears that the systems referenced in 3.2 and 3.3 should be 1.3.1 thru 1.3.155. Please clarify and revise specification. |
| 54 | 311-23-023 | Paragraph 3.15 reads, “provide 21% mandays of labor and….” Please clarify that the Contractor is to provide 21 mandays of labor. |
| 55 | 321-80-001 | Paragraph 3.11 calls out 009-32 Table 5, Line 18 for new and disturbed piping. This Table and Line is for a SSPC-SP-10 Blast. Will the Government consider changing this work item to Table 5, Line 1 and review the other SHIPALTs for the same change? |
| 56 | 512-11-013 | Paragraph 3.1.3 provides direction to accomplish the requirements of 009-32 of 2.1, including Table 3, Line 15, for interior surfaces of new equipment in 3.1. This preservation is for steel surfaces using SSPC-SP-10 of vent plenums. Is it the Government’s intent for the Contractor to sandblast to near white metal and apply 30 Mils of paint to the interior only of the NEW steel and aluminum diffusers listed in 3.1? Please clarify. |
| 57 | 512-11-020 | Paragraph 3.4 provides direction to accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, for exterior surfaces of natural supply duct, and Table 3, Line 14 for interior surfaces. This Table and Line is for steel surfaces; the replacement duct VD-03 is 050 aluminum. |
Please clarify:
1) Does the Government want the exterior of the duct preserved using the system for the exterior surfaces above the boot-top per Table 2, Line one or the same system for interior surfaces because the duct is in a fan room? If the later, what Aluminum Table and Line should the Contractor use?
2) Does the Government want the interior of the duct preserved using the vent plenum system called out in Table 3, Line 14? If so what Aluminum Table and Line should the Contractor use?
| 58 | 130-11-002 | Paragraph 3.4 calls out Table 3, Line 22 which is preservation for under AFFF stations. Is this the preservation system the Government wishes to use or should the paragraph be changed to Table 3, Line 20 which is for Fan Rooms per 009-32 FY-17 (CH-1)? Please advise. |
| 59 | 130-11-006 | Paragraph 3.4 calls out Table 3, Line 22 which is preservation for under AFFF stations. Is this the preservation system the Government wishes to use or should the paragraph be changed to systems for Interior Surfaces for 2.1 and another table and line for the critical coated tanks on the adjacent sides of the repairs? Please advise. |
| 60 | 150-11-009 | Paragraph 3.1 states to install retained lockers using new fasteners, paragraph 3.1.1 removes the mounting bracket and paragraph 3.4 installs the equipment and lockers retained in 3.1. Contractor requests paragraph 3.1 be re-worded to remove and retain vice install retained. |
| 61 | 167-11-003 | The watertight doors listed in paragraphs 3.1.10, 3.2.2.16 and 3.3.4 have Table 2, Line 25 as the preservation paragraphs. This system is the fluidized bed method. Will the Government consider Table 5, Line 26 or 27 for standard powder coat as the coating method? The standard powder coat method can be done locally and will result in cost savings to the Government. |
| 62 | 150-90-001 | The specification shows reference 2.4 533-8621580 Power System Signal Shelter Removal. After looking at the drawing, the title is COLD POTABLE WATER MODS SIGNAL SHELTER REMOVAL 06 & 07 LEVEL, FRAM 34-38. The Power System Drawing is listed under 2.10. Recommend 2.4 be changed to Cold Potable Water Signal Shelter. |
| 63 | 233-11-023 | NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item. |
| Does this note apply to item 233-11-023? | ERRATA TO BE ISSUED | ||
| 64 | 233-12-014 | NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item. |
| Does this note apply to item 233-12-014? | ERRATA TO BE ISSUED | ||
| 65 | 233-13-035 | NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item. |
| Does this note apply to item 233-13-035? | ERRATA TO BE ISSUED | ||
| 66 | 233-14-035 | NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item. |
| Does this note apply to item 233-14-035? | ERRATA TO BE ISSUED | |||
| 67 | 233-80-001 | In para 3.3 it is required to accomplish testing IAW reference 2.5. The reference 2.5 (S6438-AA-DDT-010) has not been issued to the contractor. | The reference was provided on the addendum 1 CD. | |
| 68 | 243-10-004 | Based on the specification paragraph 3.3 and the reference document paragraph 243-1.5.3; when should the contractor schedule the Main Propulsion Shaft Alignment to be accomplished? | Contractor shall sequence work based on the contents of the work package. | |
| 69 | 244-10-002 | Contractor is questioning the intent of paragraph 3.1.2.2. It appears to be a duplicate of 3.1.2.1. | ERRATA TO BE ISSUED | |
| 70 | 245-11-004 | Contractor suggests using clean, new oil conforming to MIL-PRF-17331 (2190 TEP) ILO water in the CPP hydraulic system. |
| "3.18.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 1135 PSIG, for new and disturbed CPP piping systems." | ERRATA TO BE ISSUED | |
| 71 | 245-90-001 |
Paragraph 1.2 Location of Work does not include the Underwater Hull and Drydock; where the propeller blades are located. Propeller Blades are removed in paragraph 3.3 and installed in 3.4.
| Drydock as a Location of Work is not listed on work items dealing with working in drydock (i.e preservation, tank and sea chest valve work, etc.) as it is part of the contractor facility. | |||
| 72 | 311-21-028 | Para 3.1 requires 009-90 tech rep services for equipment listed in 1.3.1.1. There is no para 1.3.1.1. Please identify the correct paragraph and OEM required. | ERRATA TO BE ISSUED |
| 73 | 311-24-007 | It has been found that SSDG engines #1, #2, & #3 require that the Engine Blowers be uncrated, cleaned, inspected and reinstalled. SSDG Engine #4 has only the Blower Air Bypass being repaired. Please confirm that there will be no work required or reinstallation of the #4 SSDG Blower. | SSDG #4 overhaul is covered under a separate work item included in the work package. |
| 74 | 311-90-003 | This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item: |
1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.
2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.
3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.
4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.
5) Para. 3.19.2 is formatted incorrectly and makes no sense.
Please review and advise soonest so offerors have time to secure pricing.
| ERRATA TO BE ISSUED | ||
| 75 | 311-90-004 | This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item: |
1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.
2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.
3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.
4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.
5) Para. 3.19.2 is formatted incorrectly and makes no sense.
Please review and advise soonest so offerors have time to secure pricing.
| ERRATA TO BE ISSUED | ||
| 76 | 311-90-005 | This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item: |
1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.
2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.
3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.
4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.
5) Para. 3.19.2 is formatted incorrectly and makes no sense.
Please review and advise soonest so offerors have time to secure pricing.
| ERRATA TO BE ISSUED | ||
| 77 | 311-90-006 | This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item: |
1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.
2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.
3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.
4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.
5) Para. 3.19.2 is formatted incorrectly and makes no sense.
Please review and advise soonest so offerors have time to secure pricing.
| ERRATA TO BE ISSUED | |||
| 78 | 443-11-002 | Reference 2.2 (331-8680335) needs to be issued to the contractor for planning and estimating. | The reference was provided on the addendum 1 CD. |
| 79 | 512-11-006 | Missing all References below: |
2.3 139-6102525 Rev E, Unit 441 04 DK Frs 42-53 S/S
2.5 S9512-B6-MMA-010, Duct Cooling Coils, Unit Coolers and Gravity Coils
2.6 S6230-CR-MMM-010/87103, Gravity Coils Sizes 1 GW, 3 GW, and 5 GW
2.7 S6230-CF-MMA-010/38450, Navy Standard Unit Coolers Models 51UW Through 55UW
2.8 S9514-DS-MMA-010, Fan Coil Assemblies (Type III), Models DDG, FCA-21 Through -25
2.9 S6230-A8-MMA-010, Fan Coil Assemblies (Type II) Models FCA-22 and FCA-24, Part Number 81H2573 and (Type III) Models FCA-21, FCA-25
2.10 805-1311397, Air Cooling Coils Duct - Classes DW and DF for Shipboard Mechanical Cooling
| The references were provided on the addendum 1 CD. | ||
| 80 | 512-11-039 | Missing all References below: |
2.2 S9512-B6-MMA-010, Duct Cooling Coils, Unit Coolers and Gravity Coils
2.3 S6230-BB-MMO-010, Fan Coil Unit FCA Sizes 21-25 Types 1 & 2
2.5 514-6101609 Rev B, Diagram of Chill Water System
| The references were provided on the addendum 1 CD. | ||
| 81 | 521-11-004 | 3.1 Accomplish a hydrostatic test of each pump in accordance with |
Paragraph 4-6.1.1 of 2.2, using 2.3 as guidance. Allowable leakage through the casing and the seal: None.
3.2 Install each fire pump and motor assembly listed in 1.3 and located in 1.2, using 2.2 through 2.4 for guidance.
There is no requirement to remove the old pumps. Are there any old pumps in spaces to remove?
The reference’s doesn’t include a fire main system DWG.
| Pumps have already been removed. ERRATA TO BE ISSUED TO INCLUDE DRAWING. | |||
| 82 | 529-11-005 | It was found that the valves in para 1.3.3 and 1.3.4 have the same valve identification numbers. Please verify correct valve numbers or delete duplicate paragraph. | ERRATA TO BE ISSUED |
| 83 | 529-11-007 | Para 3.5 states to install new material listed but it does not identify what equipment that the parts are to be installed on. These parts are listed below: |
3.5 Remove existing, fit, and install new the following parts, using 2.2 and 2.3 for guidance:
TOTAL
QUANTITY
REQUIRED NAME
OF PART REF
NO. PIECE
NO. FIG/DWG
NO. PART
NO.
One EA Switch, Temperatur e 90-165 Degree 2.2 34 6-5 222-2942NL 6 FT Tubing, 0.840 O.D.
Copper Hard Drawn WW-T-797 2.2 44 6-5 N/A 2 EA Elbow, 90 Degrees, 1/2 Inch, MIL-F- 001183 F 2.2 45 6-5 N/A 2 EA Coupling, 1/2 Inch x 1/4 Inch Red 2.2 46 6-5 N/A
| ERRATA TO BE ISSUED. | ||
| 84 | 529-85-001 | In para. 3.1 a list of parts appears to have a duplicate part: Conversion kit, Oil Block p/n 881-735-042 4 ea. |
Please confirm that there should be only 4 kits being installed in the 4 deballast compressor listed in 1.3.1 not 8 as shown below:
4 EA Conversion N/A 2.2 N/A 881-735- Kit, Oil Block 042 4 EA Conversion N/A 2.2 N/A 882-735- Kit, Oil Block 042 4 EA Gasket, N/A N/A N/A 839-125- End Cover 041 4 EA Seal, Oil N/A N/A N/A 838-306-
| ERRATA TO BE ISSUED. | ||
| 85 | 581-11-015 | The cover gasket in the work item is no longer available. The new part number is P1H-B85. Please confirm this replacement is acceptable. |
Part Number 23354 (piece 21) is listed as the cover gasket on page 398 from the in TM S9581-AV-MMA-010 (table 7-33). Part number 23354 crosses to NSN 5330-01-014-0196. Although not available in the stock system at this time, use this part number and NSN for quotes from the manufacturer or an open source.
The question references P1H-B85, which is listed as a pressure switch (Table 7-1), page 260, of the reference TM.
Page &P of &N
Q&A BAE
| KEY | POC | Question # | Answer by Date | Answer # | Work Item | Question | Answer | Notes / Action Items | Posted Q&A Question | Posted Q&A Answer |
| Green-Answerd Yellow-Pending Red-Deliquent | Edwin & Doug | BAE-001 | 2 | Multiple | The provided J-4 Pricing Workbook (LPD 18), includes Work Items 324-80-001, 521-11-001, 523-11-001, and 992-11-011. |
The disc provided by SWRMC does not contain these four Work Items.
Please provide Work Items 324-80-001, 521-11-001, 523-11-001, and 992-11-011 as well as all applicable drawings, references, etc.
Work Items and references are required to submit responsive proposal.
| Work Items 324-80-001, 521-11-001, 523-11-001 and 992-11-001 were cancelled and not included in the Original Work Package. EDM 6/8/16 *these WI's need to be removed from J-4 | Work Items 324-80-001, 521-11-001, 523-11-001 and 992-11-011 were cancelled and not included in the Original Work Package. EDM 6/8/16 *these WI's need to be removed from J-4 | The provided J-4 Pricing Workbook (LPD 18), includes Work Items 324-80-001, 521-11-001, 523-11-001, and 992-11-011, but the disc provided by SWRMC does not contain these four Work Items. Please provide is applicable | Please see Amendment 0001 . (Section J) Attachment "J-4 Pricing Workbook (LPD 18)(Amendment 0001)" | |||
| Edwin & Doug | BAE-002 | 3 | Multiple | The disc provided by SWRMC, included Work Items 584-90-002 and 992-11-001. |
The provided J-4 Pricing Workbook (LPD 18) does not contain these two Work Items.
If SWRMCs intent is to include Work Items 584-90-002 and 992-11-001 in the proposal, then the contractor requests that the J-4 Pricing Workbook (LPD 18) be updated to include Work Items 584-90-002 and 992-11-001.
Updated J-4 Pricing Workbook (LPD 18) is required to submit responsive proposal As per PMR, Work item 584-90-002 will be cancelled and deferred.
Work Item 992-11-001 (Temporary Air conditioning; provide) will be included/updated in the J-4 pricing workbook. EDM 6/8/16 As per PMR, Work item 584-90-002 will be cancelled and deferred.
Work Item 992-11-001 (Temporary Air conditioning; provide) will be included/updated in the J-4 pricing workbook. EDM 6/8/16
| The disc provided by SWRMC, included Work Items 584-90-002 and 992-11-001 but were not contained in the J-4 Pricing Workbook (LPD-18). | Please see Errata for the cancellation of WI 584-90-002. Please see Amendment 0001 . (Section J) Attachment "J-4 Pricing Workbook (LPD 18)(Amendment 0001)" for WI 992-11-001. | ||||
| Edwin | BAE-003 | 4 | Multiple | Contractor has reviewed Work Items and Reference Material provided on disc from SWRMC and requests the following references be provided. |
123-11-002 Fuel Oil Tank; inspect, repair, and preserve Ref. 2.3 00-2153-0002 Rev 6, UNIT 2153 STBD 153-11-00104 Level Structural Repairs; accomplish Ref. 2.8 13-00732, 04 Level UT Gauging's 233-12-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair
2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017 DSRA, Including Enclosure One 233-13-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair Ref 2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017, Including Enclosure One 233-14-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair Ref. 2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017, Including Enclosure One 243-11-003 Strut Forward and Main Fairwater Fasteners; replace Ref 2.3 LPD-18-1036-2011, Divers Report 436-11-003 Intrusion Alarm Cable; replace Ref 2.5 431-7318863 Rev A, IC SWBD Interties Block Wiring Diagram 441-11-001Bonding and Grounding Straps (Various); replace Ref 2.7 407-8500913 Rev 2 (21 July 2015), Topside Electromagnetic (EM) Control Measures Ship Specific Drawing for USS New Orleans (LPD 18) 453-11-001Crow’s Nest Removal for SPS-48E Antenna Replacement; accomplish Ref 2.4 Appendix One, Ballistic Trunk and Crow’s Nest Cables Ref 2.5 Attachment One, Crow’s Nest Removal Ref 2.11 Raytheon Drawing 37695-995682, Container, Shipping - SBAA Ref 2.12 06-4024-00 Rev F, Piping Arrangement Unit 4024 Ref 2.13 06-4640-00, Piping Arrangement Ref 2.15 01-4024-00, Structural Assy Aft AEM/S Mast Zone 4650 (Unit 4024) Ref 2.17 Attachment 2, AME/S Aft Mast Crow's Nest Removal Cable Trunk Ref 2.21 SE213-UJ-PRO-010, OE-373A and OE-373B/SPS-48E, Antenna Group Shipboard Dockside Antenna Removal/Installation Procedure Ref 2.22 60-00-013, Typical Methods Shielding, Bonding and Grounding (E3) Ref 2.32 60-01-001 Rev A, Electronic ARR & Details Radio Communication Transmission Lines & Waveguide 561-11-001 Port and Starboard Rudder Tiller Linkage Bearing; replace Ref 2.2 505-8292738 Hydraulic Oil Piping System Take-Down Joint Instl Strg Gear Ram Rm (6-188-0-E) Requested references (19) are required to submit a responsive proposal Reference drawings are copied on CDs and will be available for pick up. Four CDs were made for all 4 previously requested potential bidders. POC is Suzanne Shin, SWRMC ACO, Suzanne.j.shin@navy.mil, (619) 556-2069. EDM 6/9/16 Reference drawings are copied on CDs and will be available for pick up. Four CDs were made for all 4 previously requested potential bidders. POC is Suzanne Shin, SWRMC ACO, Suzanne.j.shin@navy.mil, (619) 556-2069. EDM 6/9/16 Can the following References be provided for the corresponding WI's? 123-11-002 Fuel Oil Tank; inspect, repair, and preserve Ref. 2.3 00-2153-0002 Rev 6, UNIT 2153 STBD 153-11-00104 Level Structural Repairs; accomplish Ref. 2.8 13-00732, 04 Level UT Gauging's 233-12-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair
2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017 DSRA, Including Enclosure One 233-13-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair Ref 2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017, Including Enclosure One 233-14-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair Ref. 2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017, Including Enclosure One 243-11-003 Strut Forward and Main Fairwater Fasteners; replace Ref 2.3 LPD-18-1036-2011, Divers Report 436-11-003 Intrusion Alarm Cable; replace Ref 2.5 431-7318863 Rev A, IC SWBD Interties Block Wiring Diagram 441-11-001Bonding and Grounding Straps (Various); replace Ref 2.7 407-8500913 Rev 2 (21 July 2015), Topside Electromagnetic (EM) Control Measures Ship Specific Drawing for USS New Orleans (LPD 18) 453-11-001Crow’s Nest Removal for SPS-48E Antenna Replacement; accomplish Ref 2.4 Appendix One, Ballistic Trunk and Crow’s Nest Cables Ref 2.5 Attachment One, Crow’s Nest Removal Ref 2.11 Raytheon Drawing 37695-995682, Container, Shipping - SBAA Ref 2.12 06-4024-00 Rev F, Piping Arrangement Unit 4024 Ref 2.13 06-4640-00, Piping Arrangement Ref 2.15 01-4024-00, Structural Assy Aft AEM/S Mast Zone 4650 (Unit 4024) Ref 2.17 Attachment 2, AME/S Aft Mast Crow's Nest Removal Cable Trunk Ref 2.21 SE213-UJ-PRO-010, OE-373A and OE-373B/SPS-48E, Antenna Group Shipboard Dockside Antenna Removal/Installation Procedure Ref 2.22 60-00-013, Typical Methods Shielding, Bonding and Grounding (E3) Ref 2.32 60-01-001 Rev A, Electronic ARR & Details Radio Communication Transmission Lines & Waveguide 561-11-001 Port and Starboard Rudder Tiller Linkage Bearing; replace Ref 2.2 505-8292738 Hydraulic Oil Piping System Take-Down Joint Instl Strg Gear Ram Rm (6-188-0-E) Requested references (19) are required to submit a responsive proposal
| The requested References have been made available on CDs for pick up. POC is Suzanne Shin, SWRMC ACO, Suzanne.j.shin@navy.mil, (619) 556-2069. | |||||
| Edwin & Doug | BAE-004 | 5 | Multiple | Contractor has reviewed the provided J-4 Pricing Workbook (LPD 18) and all received Work Item Specifications noting that: |
The J-4 Pricing Workbook (LPD 18) identifies the following thirteen Work Items as Option Items (493-90-001, 857-11-001, 980-90-001, 980-90-002, 980-90-003, 980-90-004, 980-90-005, 980-90-006, 980-90-009, 980-90-011, 980-90-012, 980-90-014, and 992-11-008), yet none of this items are identified as (Option Item) in para 1.1 of the individual Work Item Titles.
Additionally the following five Work Items identify (Option Item) in para 1.1 of the Work Item Title (854-11-002, 857-11-003, 992-21-002, 992-31-002, and 993-31-002), but none of this items are identified as Option Items on the J-4 Pricing Workbook (LPD 18).
Contractor requests that all (Option Items) be correctly identified on both the J-4 Pricing Workbook (LPD 18) and para 1.1 of the individual Work Item Specifications in order to submit a responsive proposal.
The following Work Item's are NOT identified as Option Items 493-90-001, 857-11-001, 980-90-001, 980-90-002, 980-90-003, 980-90-004, 980-90-005, 980-90-006,980-90-009, 980-90-011, 980-90-012 and 980-90-014 in the Original Work Package But Have been edited to read OPTION ITEMS
Work. Work Item 992-11-008 will be an Option Item and Title will be revised to include Option item.
The following Work item's are identified as Option items 854-11-002, 857-11-003, 992-21-002, 992-31-002 and 993-31-002 in the Original Work Package and will be updated in the J-4 Pricing Workbook. EDM 6/18/16 The following Work Item's are NOT identified as Option Items 493-90-001, 857-11-001, 980-90-001, 980-90-002, 980-90-003, 980-90-004, 980-90-005, 980-90-006,980-90-009, 980-90-011, 980-90-012 and 980-90-014 in the Original Work Package.
Work. Work Item 992-11-008 will be an Option Item and Title will be revised to include Option item.
The following Work item's are identified as Option items 854-11-002, 857-11-003, 992-21-002, 992-31-002 and 993-31-002 in the Original Work Package and will be updated in the J-4 Pricing Workbook. EDM 6/18/16
| Requests that all (Option Items) be correctly identified on both the J-4 Pricing Workbook (LPD 18) and para 1.1 of the individual Work Item Specifications in order to submit a responsive proposal. | Please Review the revised "J-4 Pricing Workbook (LPD 18)(Amendment 0001)" and Errata documents for the appropriate Option Items. | ||||
| Edwin | BAE-005 | 10 | 436-90-002 | Contractor has reviewed Work Items and Reference Material provided on disc from SWRMC and requests the following reference be provided. |
436-90-002 ShipAlt LPD17-81855K, Ships Bell and Gong; accomplish Ref. 2.3 4720-LPD18-FY17-SA81855, Install Ship's Bell and Gong
| Reference 2.3 4720-LPD18-FY17-SA81855 will be copied and provided in the CD. The CD will be available for pick up with Suzanne Shin, SWRMC ACO, (619) 556-2069, Suzanne.j.shin@navy.mil. | |||||
| Morgan | BAE-006 | 126 | N/A | Contractor understands the requirement for either ownership of or committed access to a MIL-STD-1625D(SH) certified dry-dock capable of docking the USS New Orleans (LPD 18) during the timeframe necessary to support the completion of the FY17 DSRA. |
Contractor also understands that the solicitation Attachment J-3 Execution Milestones and Key Event Dates depicts the Docking Milestone date of 10 Jan 2017.
Bidder's Question:
With the "Combat Systems PCD (CSPCD)" milestone date remaining unchanged, will the Navy customer accept and evaluate proposals with a later Docking Milestone date due to either Dock usage conflicts and/or a Drydock Certification date that is after the 10 Jan 2017 Dock Milestone date?
| a. Please see Amendment 0005 for the removal of the “Dock” and “Undock” milestones from Attachment J-3 Execution Milestones. Offerors have flexibility to propose “Dock” and “Undock” milestones so long as there is no impact to the Key Event/Milestones remaining in Attachment J-3 Execution Milestones. | 124.With the "Combat Systems PCD (CSPCD)" milestone date remaining unchanged, will the Navy customer accept and evaluate proposals with a later Docking Milestone date due to either Dock usage conflicts and/or a Drydock Certification date that is after the 10 Jan 2017 Dock Milestone date? | a. Please see Amendment 0005 for the removal of the “Dock” and “Undock” milestones from Attachment J-3 Execution Milestones. Offerors have flexibility to propose “Dock” and “Undock” milestones so long as there is no impact to the Key Event/Milestones remaining in Attachment J-3 Execution Milestones. | ||||
| Edwin | BAE-007 | 10 | 456-90-001 | Contractor has reviewed Work Items and Reference Material provided on disc from SWRMC and requests the following reference be provided. |
456-09-001 AN/SPQ-9 Radar Waveguide; repair Ref. 2.2 L3 PacOrd, Inspection/Deficiency Report #50086.033.01.01 Ref 2.6 SE000-01-IMB-010, Navy Installation and Maintenance Book (NIMB); Section IX, Installation Standards
| REF 2.2 will be provided on disk to bidders. The CD will be available for pick up with Suzanne Shin, SWRMC ACO, (619) 556-2069, Suzanne.j.shin@navy.mil. | |||||
| Edwin | BAE-008 | 8 | 123-11-002 | Specification 123-11-002 does not direct to open and close the tanks identified in para 1.2.1 thru 1.2.16 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. |
Contractor recommends a note be added to para 4.X which states to work in conjunction with work item 992-31-001 for the opening, closing, gas free certification, and cleaning of tanks identified in para 1.2.
Government identified the tanks that need to be opened, pumped, cleaned and gas freed in WI 992-31-001.
Government does no concur that items be included in Notes as work in conjunction with as para 4.X is not for direction.
| Specification 123-11-002 does not direct to open and close the tanks identified in para 1.2.1 thru 1.2.16 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. | a. Work Item 992-31-001 identifies the tanks that need to be opened, pumped, cleaned, and gas freed. Paragraph 4.X will remain unchanged and is not for direction. | |||
| Edwin | BAE-009 | 9 | 123-18-003 | Specification 123-18-003 does not direct to open and close the tanks identified in para 1.2.1 thru 1.2.2 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. |
Contractor recommends a note be added to para 4.X which states to work in conjunction with work item 992-31-001 for the opening, closing, gas free certification, and cleaning of tanks identified in para 1.2.
Government identified the tanks that need to be opened, pumped, cleaned and gas freed in WI 992-31-001.
Government does no concur that items be included in Notes as work in conjunction with as para 4.X is not for direction.
| Specification 123-18-003 does not direct to open and close the tanks identified in para 1.2.1 thru 1.2.2 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. | a. Work Item 992-31-001 identifies the tanks that need to be opened, pumped, cleaned, and gas freed. Paragraph 4.X will remain unchanged and is not for direction. | |||
| Edwin | BAE-010 | 11 | 123-11-003 | Specification 123-11-003 does not direct to open and close the tank identified in para 1.2.1 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. |
Contractor recommends a note be added to para 4.X which states to work in conjunction with work item 992-31-001 for the opening, closing, gas free certification, and cleaning of the tank identified in para 1.2.
Government identified the tanks that need to be opened, pumped, cleaned and gas freed in WI 992-31-001.
Government does no concur that items be included in Notes as work in conjunction with as para 4.X is not for direction.
| Specification 123-11-003 does not direct to open and close the tank identified in para 1.2.1 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. | a. Work Item 992-31-001 identifies the tanks that need to be opened, pumped, cleaned, and gas freed. Paragraph 4.X will remain unchanged and is not for direction. | |||
| Edwin | BAE-011 | 12 | 123-11-001 | Specification 123-11-001 does not direct to open and close the tanks identified in para 1.3.1 thru 1.3.4 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. |
Contractor recommends a note be added to para 4.X which states to work in conjunction with work item 992-31-001 for the opening, closing, gas free certification, and cleaning of tanks identified in para 1.3.
Government identified the tanks that need to be opened, pumped, cleaned and gas freed in WI 992-31-001.
Government does no concur that items be included in Notes as work in conjunction with as para 4.X is not for direction.
| Specification 123-11-001 does not direct to open and close the tanks identified in para 1.3.1 thru 1.3.4 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. | a. Work Item 992-31-001 identifies the tanks that need to be opened, pumped, cleaned, and gas freed. Paragraph 4.X will remain unchanged and is not for direction. | |||
| Edwin | BAE-012 | 13 | 437-80-001 | Specification 437-80-001 does not direct to open and close the tanks identified in para 1.2.1.1 and 1.2.2.1 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. |
Contractor recommends a note be added to para 4.X which states to work in conjunction with work item 992-31-001 for the opening, closing, gas free certification, and cleaning of tanks identified in…