| TORTUGA QUESTION & ANSWERS ROUND #3 |
| USS TORTUGA (LSD 46) Modernization Period (MODPRD) Bidders' Questions |
| Question | Work Item | Question | PM Answer |
| 86 | 150-11-001 | The subject item requires replacement of 136 kick pipes/stuffing tubes. With the references given it is not possible to determine the sizes of the tubes that require replacement. Please issue a matrix drawing or give a quantity of different sizes of tubes the gov’t would like to have replaced. | The references list the cable and cable type/size and provide guidance as to tube sized based on that information. |
| 87 | 150-11-011 | This item lists a gage board to be replaced however the references furnished do not show any gage board information. There needs to be a machinery or piping drawing invoked to show gage board information for planning and estimating this item. | This question is germaine to work item 150-11-001, perhaps the wrong work item was referenced. |
| 88 | 233-11-006 | In the subject item it has been found that there is an incorrect OEM tech rep being referenced in para 4.1. The correct OEM tech rep is COLFAX Fluid Handling Defense Div. | Contractor is to obtain the services of an authorized Original Equipment |
Manufacturer (OEM) technical representative for the equipment being worked. ERRATA TO BE ISSUED.
89 233-12-006 In the subject item it has been found that there is an incorrect OEM tech rep being referenced in para 4.1. The correct OEM tech rep is COLFAX Fluid Handling Defense Div. Contractor is to obtain the services of an authorized Original Equipment Manufacturer (OEM) technical representative for the equipment being worked. ERRATA TO BE ISSUED.
90 233-13-006 In the subject item it has been found that there is an incorrect OEM tech rep being referenced in para 4.1. The correct OEM tech rep is COLFAX Fluid Handling Defense Div. Contractor is to obtain the services of an authorized Original Equipment Manufacturer (OEM) technical representative for the equipment being worked. ERRATA TO BE ISSUED.
91 233-14-006 In the subject item it has been found that there is an incorrect OEM tech rep being referenced in para 4.1. The correct OEM tech rep is COLFAX Fluid Handling Defense Div. Contractor is to obtain the services of an authorized Original Equipment Manufacturer (OEM) technical representative for the equipment being worked. ERRATA TO BE ISSUED.
| 92 | 233-80-001 | When can we expect to get the 4720 GFM Summary list for the subject item AER 00296? There is long lead time materials that need to be GFM. The materials listed in items 1 thru 4 of reference 2.4 are long lead materials. | ERRATA TO BE ISSUED |
| 93 | 245-10-003 | In para 4.1 the spec item calls for a local COLFAX tech rep. We have been informed that there is no local rep and this office has been closed. It is recommended to change the tech rep info to the San Diego office: |
Colfax Fluid Handling 1827 Main Street/Suite B San Diego, CA 92113 Attention: Rich Sluys Product Support Manager - U.S.A.
Tel: 619.203.9714 richard.sluys@colfaxfluidhandling.com Contractor is to obtain the services of an authorized Original Equipment Manufacturer (OEM) technical representative for the equipment being worked. ERRATA TO BE ISSUED.
| 94 | 262-41-002 | Reference 2.2 S6225-J2-MMA-010 was not provided with the package. Please provide this reference | This reference can be obtained in NMD (Navy Maintenance database) under "references", "tech library list". NAVSEA will provide the reference via email upon request. |
| 95 | 262-90-001 | a) References listed in 2.2 thru 2.11 in spec are showing no revisions. The references provided are all Revision A. Please change specification to revision A. |
| b) Para 3.1.2 directs contractor to provide the services of a qualified on-site technical representative to assist with the removal and installation of the new equipment. Please provide the representative name the contractors are to utilize or remove the requirement. The previously accomplished SCD 71079K SHIPALTs the offeror has done did not require an OEM tech rep. | ERRATA TO BE ISSUED | |||
| 96 | 311-24-030 | In para. 3.1 it is required to replace missing clips and fasteners but there is no quantity. It will be necessary to know how many clips and fasteners are to be replaced? Contractor would recommend that a level of effort be provided for this task. | ERRATA TO BE ISSUED | |
| 97 | 321-11-011 | Para 3.1 states to remove all shore power cables. The references are an Isometric diagram and a Shore Service requirement drawing. These references do not show what needs to be removed? The Title of the item is Shore Power Station, RECEPTACLES, Cables and Access covers. The only removals required are cables in para 3.1 and BUNKER plate in para 3.3. There are no lengths of cable and no references to show terminations. Also a note in 4.2 states that Cable Splice Kits are available from Tidewater Marine. There is no requirement to reinstall anything removed. It is not possible to determine the scope of work on this item. Please clarify scope and add necessary references to estimate and accomplish this work item. | ERRATA TO BE ISSUED | |
| 98 | 443-11-002 | Addendum #1 references did not come with the amendment #1. Please forward these references or make them available on disk for pick-up. | The reference was provided on the addendum 1 CD. | |
| 99 | 512-10-001 | The subject item does not identify the location or quantity of the covers to be removed. The drawing references only HVAC openings to the weather. It will be necessary to know how many covers there are and what the locations are IOT estimate this item. | ERRATA TO BE ISSUED | |
| 100 | 512-11-011 | In para 3.2 the contractor is to inspect the cable associated with the Gaylord Hood Control Vent Damper. For Clarification purposes the cable in 3.1.1 and 3.2 is an electrical cable connected to the Damper Control Switch and the GFM provided is a Damper Control Switch model N-68 as described in the Tech Manual? | In para 3.2, the cable is replaced. GFM is Gaylord Hood Control Vent Damper. For clarification, WN states; A DAMPER LOCATED IN HOOD ABOVE GALLEY COPPERS BURNED UP. THE OLD CREW ORDERED A NEW DAMPER BUT WHEN ATTEMPTED TO REPLACE, S/F NOTICED THE CABLE WAS NOT THERE AND SUSPECTS THE CABLE IS BEHIND THE FALSE BULKHEAD. |
101 529-11-005 1.3.3 Quantity (One EA), Remote Operating Actuator and Well Deck Valve; Valve: WDFD-V-4-72-1, Gate Valve, 12 Inch IPS, 30 PSI, Flange, APL: 882049856
1.3.6 Quantity (One EA), Remote Operating Actuator and Well Deck Valve; Valve: WDFD-V-4-72-1, Gate Valve, 12 Inch IPS, 30 PSI, Flange, APL: 882049856
1) Are the two valves referenced above duplicate? Are is there two valve with the same valve number (WDFD-V-4-72-1) in the space?
2) The requirements of 3.2 states fit and install new gate valve. It doesn’t have a requirement to remove gate valves. Are the old gate valves already removed?
| The question is answered on Errata 2. | ||
| 102 | 529-11-009 | 1) 3.1 Install new each ballast shell discharge valve listed in 1.3 in locations listed in 1.2, using 2.2 through 2.4 for guidance. |
Are ballast sea valves already removed or Are we removing the ballast sea valves?
2) 3.1.2 Accomplish the requirements of 009-71 of 2.1 for an air tightness test, at 5 PSIG, for each ballast shell discharge valve.
Is standard item 009-71 supposed to say 009-25?
| ERRATA TO BE ISSUED | |||
| 103 | 529-11-012 | In para 3.1 of the subject item it is required to remove protective covering of the Ballast System Vents IAW 2.2. Reference 2.2 is a System diagram that does not address protective coverings. Clarification is requested as to what the gov’t wants to accomplish with the Ballast System Overboard protective covering. | ERRATA TO BE ISSUED |
| 104 | 551-85-001 | Missing Ref. below: |
2.2 321-8434502, Power System Modification Incidental to AER-19/02
| This reference can be obtained in NMD (Navy Maintenance database) under "references", "tech library list". NAVSEA will provide the reference via email upon request. | |||
| 105 | 631-11-016 | The area designated in para 1.3.1 appears to include the entire “Well Deck” area. The para 1.3.1 goes on to specify Port and Stbd Enclosed Boat Handling Area. Please provide space designation number or clarification of the location; “Enclosed Boat Handling area” | 1.3.1 states: Well Deck Surfaces, Frames 35-134, Port and Starboard, Overhead, Bulkheads, and Deck, Port and Starboard Enclosed Boat Handling Area Overheads, to Include all Appendages and foundations. These areas can be locate on provided references. |
| 106 | 997-11-001 | In attachment J-3 Milestone schedule there is an UNDOCKING Milestone of 14-AUG-18 (A+218) however in the Constraints column it states that the Offereror is to propose the Dock and Undock dates IAW Spec 997-11-001. Please clarify whether or not the Offereror is to provide an Undocking Date. | Contractor may propose docking date and undocking date. In accordance with the revised J-3, the undock date must be proposed to occur NLT 14 Aug 2018. |
| 107 | 262-90-001 | Paragraph 3.1.3 references paragraph 1.3. Paragraph 1.3 provides no identification, states “Not Applicable”. KTR questions the intent of the paragraph 3.1.3. | ERRATA TO BE ISSUED |
| 108 | 321-90-001 | Ref. 2.8 of work Item 321-90-001 provides production details for Lighting Systems Modifications. Work Item 311-90-002 ref. 2.23 contains same reference for same lighting modification in same locations. Request government provide clarification for which work item lighting modification will be performed under. | The note 4.1: The work accomplished by this work item and Drawings references |
listed as incidental to this ship alteration interfaces with the work requirements of the following ship alteration segments and should be coordinated:
SCD LSD-3290K SCD LSD-3290.3K, SCD LSD-3290.4K, SCD LSD-3290.5K, SCD LSD-
3290.72K, SCD LSD-3290.82K, SCD LSD-3290.9K, and SCD 3396, 3397, SCD 78018K, and SCD 5401K. Also note that 311-90-002 is generator upgrade and 311-90-001 is power distribution upgrades therefore this work must be done in conjunction.
| 109 | 512-11-036 | Para 3.1 of the subject item states to accomplish the requirements of 2.2 thru 2.4. These references are Tech Manuals. It is not possible to accomplish the requirements of a tech manual. Are these documents to be used as guidance to replace the parts listed in 3.1.1? | ERRATA TO BE ISSUED |
| 110 | 521-11-001 | There is no way to know how many and what size Valve Hand-wheels the Supervisor will designate to replace or color code. The references that have been invoked do not give the quantities required. It is recommended that a level of effort paragraph be added to this item or disclose the size and quantity of handwheels to be replaced. | ERRATA TO BE ISSUED |
| 111 | Please confirm the growth work estimate of 391,680 "hours" and $15,000,000 in "material" contained in the RFP represents the amount of growth work the Government expects during the USS TOTUGA EDSRA/MODPRD. These are the same AGR calculations estimates for the USS MAKIN ISLAND EDPMA. The two ships are different class ships with different estimates in mandays in the repair package from their respective Planning Yards, different modernization packages and different availability lengths. Can the Navy provide Industry the model that is used to calculate the AGR for each CNO Availability? | The growth work estimates in the RFP shall be updated with the following figures: 681,759 Hours and $11,107,501 material. | |
| 112 | Each Ship goes through a myriad of Assessments and Inspections during their Operational Cycle that are conducted by personnel in the Fleet Concentration Area. Are these assessments going to be conducted during the EDSRA/MODPRD or will they take place after the ship’s re-introduction Availability. |
• Afloat Training Group (ATG) Training and Assessments (Light Off Exam, Combat Systems Light off, NGFS Team Trainer, On-Board Aviation Fire Fighting Team Trainer, etc.)
• Aviation Certification (AVCERT) Team
• TYCOM and ISIC Crew Certification Team
• Total Ship Readiness Assessment (TSRA) Team
• Shipboard Corrosion Assessment Team (S-CAT)
• Shipboard Readiness Engineering Training & Support Teams (ERAT)
| • Combat Systems Readiness Assessment Team (CSRAT) | TORTUGA will be Operationally Ready at the conclusion of the EDSRA. The Ship will be subjected to all required assessments and certification Teams as normally performed during any previous EDSRA (EDPMA). | ||
| 113 | Can the Navy Provide the Manning Plan Sequence for the USS TORTUGA EDSRA? The proposed crew manning plan will be integrated into the Execution Testing Plan for the ship. Part of the execution plan will have Govt Testing oversight for QA Check Points. The LMA would like to know the sequence of crew availability to support the Check Points being inserted into the Integrated Schedule. | The crew is not required to attend check points, therefore this information is not required for bid. The GOVT expects approximately 50% manning by start of availability but this figure is subject to change. | |
| 114 | Were the requirments in Surface Force Readiness Manual (COMNAVSURPACINST/COMNAVSURFLANTINST 3502.3) taken into consideration in the training of the crew and the reactivation of the ship to meet Crew Certification requirments in the Interport Differential Costs? | Yes, the requirments in Surface Force Readiness Manual (COMNAVSURPACINST/COMNAVSURFLANTINST 3502.3) were taken into consideration in the Interport Differential. | |
| 115 | The Navy can now examine AIT costs between several homeports on like availability’s (ARLEIGH BURKE ESRA VS RAMAGE ESRA VS MITSCHER ESRA VS JP JONES ESRA). Has the Navy computed that Delta difference between the ports/FCAs/ Shipyards and has that been looked at in the Interport Differential Costs? | AIT costs are not included in the LSD46 Interport Differential Costs. The Navy doesn’t know 1) Who the successfully awarded AIT contractor(s) will be, 2) what the awarded AIT contractor’s footprint is in the ship’s homeport or 3) what the awarded AIT contractor’s footprint is in the potential out of homeport locations. Therefore, AIT travel requirements cannot be determined with reasonable certainty. |
The costs anticipated to be incurred on contracts for Alteration Installation Teams (AIT) shall not be considered in estimating the foreseeable costs of the contract for ship overhaul, repair, or maintenance that is the subject of the instant source selection. Title 10 U.S.C. 7299a (b) states: "In evaluating bids or proposals for a contract for the overhaul, repair, or maintenance of a naval vessel, the Secretary of the Navy shall, in determining the cost or price of work to be performed in an area outside of the area of the homeport of the vessel, consider foreseeable costs of moving the vessel and its crew from the homeport to the outside area and from the outside area back to the homeport at the completion of the contract." This statutory provision explicitly focuses its mandate of considering foreseeable costs to only those costs that relate to the moving of the vessel and its crew from the homeport to the outside area and from the outside area back to the homeport. Additionally, costs allocable to AIT contracts shall not be considered as foreseeable costs in the instant source selection because those AIT contract-related costs cannot be estimated with reasonable certainty in a timely manner for proper use in the instant source selection. Typically, the AIT contract/task order/delivery order has not been awarded at the time the ship repair solicitation is issued, the evaluation is started, or the source selection is completed. In those cases, the estimation of the AIT contract-related costs would be purely speculative because the identity, location, and resources of the AIT contractor are not known or knowable to the contracting officer in the instant source selection. Given Government Accountability Office guidance, the Navy is constrained to use estimates that can be made with reasonable certainty, rather than estimates based on mere speculation, when determining foreseeable costs for these purposes. See GAO B-229025, “Navy Ships: Evaluating Bids for Maintenance to Be Performed Away From Home Ports,” (February 28, 1989).
| 116 | Does the Interport Differential Cost include storage and shipping costs for material removed from the ship (top side radars, etc.) for the specific purpose of storage in the Fleet Concentration Area (FCA) while the ship goes to an alternate location for repair until their return? | The storage and shipping costs for material removed from the ship are both highly speculative and di minimus. Highly speculative because the cost for shipping is a competitive, continuously changing, market price based on numerous logistical factors beyond the Navy's control. Di minimus because the cost to ship within the homeport and to an out of homeport location are often not significantly different. | |
| 117 | Can the Navy show what variables and associated costs were entered into the model for the calculation of the Interport differential cost calculation? | The types of variables and associated costs used to calculate the IPD were presented at the NAVSEA Industry Day on 30 Nov 2016. The TORTUGA IPD utilizes a similar methodology for calculating the IPD. Specific values are considered sensitive and are not publicly disclosed.disclosed. | |
| 118 | The TORTUGA EDSRA is the most complex and intrusive modernization conducted to date with the HM&E and Combat Systems Modernizations all being conducted together in the avail window. The milestones have LDs associated with the events and many of those milestones will rely on Alteration Installation Teams (AITs) for execution and integration. The TORTUGA EDSRA has in excess of 120 changes planned for installation during this period that have to be integrated by the offeror. Can the POA&Ms /schedules of the outside AITs and organizations be provided to the offerors to measure the risk that will be associated with LDs? | The POA&Ms/schedules are provided on the eference Solicitation CD. Note that the POA&Ms are subject to changes/updates. | |
| 119 | Please indicate what port USS TORTUGA will do the Re-introduction Availability; will it be the homeport of record or the locale the EDSRA/MODPRD is being conducted? | TORTUGA will be Operationally Ready at the conclusion of the EDSRA. | |
| 120 | 511-90-001 | Reference 2.12 (LSD46-LLTM-BOM-03290.09) has not been provided. Contractor requests a copy be provided. | GOVT WILL PROVIDE. SEE ATTACHMENT LSD46-LLTM-BOM-00296, LSD46-LLTM-BOM-03290.02 and LSD46-LLTM-BOM-11394 |
| 121 | 512-80-001 | Reference 2.9 (LSD46-LLTM-BOM-01394) has not been provided. Contractor requests a copy be provided. | GOVT WILL PROVIDE. SEE ATTACHMENT LSD46-LLTM-BOM-00296, LSD46-LLTM-BOM-03290.02 and LSD46-LLTM-BOM-11394 |
| 122 | Contractor would like to request a breakdown of the Interport Differentials listed on page 82, Section L of the solicitation. Please include calculations for fuel cost, towing, berthing, travel and other components included in the calculation. | The breakdown of the IPD was presented at the NAVSEA Industry Day on 30 Nov 2016. The TORTUGA IPD utilizes a similar methodology for calculating the IPD. Specific values used in the calculations are considered sensitive and are not publicly disclosed. | |
| 123 | 233-14-002 | Contractor would like to request clarification on why there is no 009-09 on work item 233-14-002 but is included in sister item 233-12-012. Please advise. | 233-14-002 is Main Propulsion Diesel Engine Lube Oil and Jacket Water |
Thermostatic Valve clean and repair. 233-12-012 is 1B Main Propulsion Diesel Engine (MPDE); overhaul.
124 245-90-001 Paragraph 1.2, Location of Work, in the spec has the same location listed in 2 different paragraphs. Paragraph 1.2.9 and 1.2.20 both have the (2-63-1-L) PASSAGE location. There are 21 locations listed including this duplicate.
Should 1.2.20 be replaced by Chart Room (06-25-6-C) which is currently 1.2.21?
| This would eliminate the duplicate and reduce the number of locations from 21 to 20. | ERRATA TO BE ISSUED. | |||
| 125 | 120-10-013 | Errata no. 1 changed the repairs from clad weld to replacing plating. The sub paragraphs are still pertaining to clad welding. Also, 009-25 is not invoked in the specification for testing new welds. Are clad weld repairs still expected? If so, can spec be changed to reflect same? | ERRATA TO BE ISSUED ON WI 120-11-013. THE GOVT ASSUMES YOU ARE REFERRING TO WI 120-11-013. THERE IS NO WI 120-10-013 IN THE WORK PACKAGE. | |
| 126 | 233-10-009 | Location 1.2.2 is for Main Machinery Room Number 2, but the only equipment identified in 1.3 is for 1A and 1B MPDE Lube Oil Purifier Heaters. Paragraph 3.1 directs the Contractor to “remove the equipment listed in 1.3 and located in 1.2” and there is no equipment located in 1.2.2. Should there be additional equipment listed or should the second location be removed? | The question is answered on Errata 2. | |
| 127 | 512-11-002 | Paragraph 1.2.1 is showing the ventilation supply system (1-92-1) as the location of the Ventilation Duct Flange. We need to know the location for the ventilation duct flange. | ERRATA TO BE ISSUED | |
| 128 | 512-11-003 | Paragraph 3.2 is requesting the cleaning of vent systems (1.3.1 through 1.3.45). Please provide clarification on what work is to be done with the vent systems (1.3.46 through 1.3.155). | The question is answered on Errata 2. | |
| 129 | 120-10-003 | Contractor found a duplication in spec item 120-10-003. Duplicate locations are: 1.2.167 & 1.2.173, 1.2.168 & 1.2.174, 1.2.171 & 1.2.175, 1.2.173 & 1.2.176. Please clarify correct location and tank usage. | There is no WI 120-10-003 in the work package. |
Page &P of &N
Q&A BAE
| KEY | POC | Question # | Answer by Date | Answer # | Work Item | Question | Answer | Notes / Action Items | Posted Q&A Question | Posted Q&A Answer |
| Green-Answerd Yellow-Pending Red-Deliquent | Edwin & Doug | BAE-001 | 2 | Multiple | The provided J-4 Pricing Workbook (LPD 18), includes Work Items 324-80-001, 521-11-001, 523-11-001, and 992-11-011. |
The disc provided by SWRMC does not contain these four Work Items.
Please provide Work Items 324-80-001, 521-11-001, 523-11-001, and 992-11-011 as well as all applicable drawings, references, etc.
Work Items and references are required to submit responsive proposal.
| Work Items 324-80-001, 521-11-001, 523-11-001 and 992-11-001 were cancelled and not included in the Original Work Package. EDM 6/8/16 *these WI's need to be removed from J-4 | Work Items 324-80-001, 521-11-001, 523-11-001 and 992-11-011 were cancelled and not included in the Original Work Package. EDM 6/8/16 *these WI's need to be removed from J-4 | The provided J-4 Pricing Workbook (LPD 18), includes Work Items 324-80-001, 521-11-001, 523-11-001, and 992-11-011, but the disc provided by SWRMC does not contain these four Work Items. Please provide is applicable | Please see Amendment 0001 . (Section J) Attachment "J-4 Pricing Workbook (LPD 18)(Amendment 0001)" | |||
| Edwin & Doug | BAE-002 | 3 | Multiple | The disc provided by SWRMC, included Work Items 584-90-002 and 992-11-001. |
The provided J-4 Pricing Workbook (LPD 18) does not contain these two Work Items.
If SWRMCs intent is to include Work Items 584-90-002 and 992-11-001 in the proposal, then the contractor requests that the J-4 Pricing Workbook (LPD 18) be updated to include Work Items 584-90-002 and 992-11-001.
Updated J-4 Pricing Workbook (LPD 18) is required to submit responsive proposal As per PMR, Work item 584-90-002 will be cancelled and deferred.
Work Item 992-11-001 (Temporary Air conditioning; provide) will be included/updated in the J-4 pricing workbook. EDM 6/8/16 As per PMR, Work item 584-90-002 will be cancelled and deferred.
Work Item 992-11-001 (Temporary Air conditioning; provide) will be included/updated in the J-4 pricing workbook. EDM 6/8/16
| The disc provided by SWRMC, included Work Items 584-90-002 and 992-11-001 but were not contained in the J-4 Pricing Workbook (LPD-18). | Please see Errata for the cancellation of WI 584-90-002. Please see Amendment 0001 . (Section J) Attachment "J-4 Pricing Workbook (LPD 18)(Amendment 0001)" for WI 992-11-001. | ||||
| Edwin | BAE-003 | 4 | Multiple | Contractor has reviewed Work Items and Reference Material provided on disc from SWRMC and requests the following references be provided. |
123-11-002 Fuel Oil Tank; inspect, repair, and preserve Ref. 2.3 00-2153-0002 Rev 6, UNIT 2153 STBD 153-11-00104 Level Structural Repairs; accomplish Ref. 2.8 13-00732, 04 Level UT Gauging's 233-12-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair
2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017 DSRA, Including Enclosure One 233-13-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair Ref 2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017, Including Enclosure One 233-14-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair Ref. 2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017, Including Enclosure One 243-11-003 Strut Forward and Main Fairwater Fasteners; replace Ref 2.3 LPD-18-1036-2011, Divers Report 436-11-003 Intrusion Alarm Cable; replace Ref 2.5 431-7318863 Rev A, IC SWBD Interties Block Wiring Diagram 441-11-001Bonding and Grounding Straps (Various); replace Ref 2.7 407-8500913 Rev 2 (21 July 2015), Topside Electromagnetic (EM) Control Measures Ship Specific Drawing for USS New Orleans (LPD 18) 453-11-001Crow’s Nest Removal for SPS-48E Antenna Replacement; accomplish Ref 2.4 Appendix One, Ballistic Trunk and Crow’s Nest Cables Ref 2.5 Attachment One, Crow’s Nest Removal Ref 2.11 Raytheon Drawing 37695-995682, Container, Shipping - SBAA Ref 2.12 06-4024-00 Rev F, Piping Arrangement Unit 4024 Ref 2.13 06-4640-00, Piping Arrangement Ref 2.15 01-4024-00, Structural Assy Aft AEM/S Mast Zone 4650 (Unit 4024) Ref 2.17 Attachment 2, AME/S Aft Mast Crow's Nest Removal Cable Trunk Ref 2.21 SE213-UJ-PRO-010, OE-373A and OE-373B/SPS-48E, Antenna Group Shipboard Dockside Antenna Removal/Installation Procedure Ref 2.22 60-00-013, Typical Methods Shielding, Bonding and Grounding (E3) Ref 2.32 60-01-001 Rev A, Electronic ARR & Details Radio Communication Transmission Lines & Waveguide 561-11-001 Port and Starboard Rudder Tiller Linkage Bearing; replace Ref 2.2 505-8292738 Hydraulic Oil Piping System Take-Down Joint Instl Strg Gear Ram Rm (6-188-0-E) Requested references (19) are required to submit a responsive proposal Reference drawings are copied on CDs and will be available for pick up. Four CDs were made for all 4 previously requested potential bidders. POC is Suzanne Shin, SWRMC ACO, Suzanne.j.shin@navy.mil, (619) 556-2069. EDM 6/9/16 Reference drawings are copied on CDs and will be available for pick up. Four CDs were made for all 4 previously requested potential bidders. POC is Suzanne Shin, SWRMC ACO, Suzanne.j.shin@navy.mil, (619) 556-2069. EDM 6/9/16 Can the following References be provided for the corresponding WI's? 123-11-002 Fuel Oil Tank; inspect, repair, and preserve Ref. 2.3 00-2153-0002 Rev 6, UNIT 2153 STBD 153-11-00104 Level Structural Repairs; accomplish Ref. 2.8 13-00732, 04 Level UT Gauging's 233-12-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair
2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017 DSRA, Including Enclosure One 233-13-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair Ref 2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017, Including Enclosure One 233-14-003 Main Propulsion Diesel Engine (MPDE) Foundation Bolt and Chock; repair Ref. 2.8 DM Ser 05D/319, USS New Orleans (LPD 18), Main Propulsion Diesel Engine (MPDE) Foundation Bolts, Chocking, and Crankshaft Alignment, NAVSEA Recommendation for 2017, Including Enclosure One 243-11-003 Strut Forward and Main Fairwater Fasteners; replace Ref 2.3 LPD-18-1036-2011, Divers Report 436-11-003 Intrusion Alarm Cable; replace Ref 2.5 431-7318863 Rev A, IC SWBD Interties Block Wiring Diagram 441-11-001Bonding and Grounding Straps (Various); replace Ref 2.7 407-8500913 Rev 2 (21 July 2015), Topside Electromagnetic (EM) Control Measures Ship Specific Drawing for USS New Orleans (LPD 18) 453-11-001Crow’s Nest Removal for SPS-48E Antenna Replacement; accomplish Ref 2.4 Appendix One, Ballistic Trunk and Crow’s Nest Cables Ref 2.5 Attachment One, Crow’s Nest Removal Ref 2.11 Raytheon Drawing 37695-995682, Container, Shipping - SBAA Ref 2.12 06-4024-00 Rev F, Piping Arrangement Unit 4024 Ref 2.13 06-4640-00, Piping Arrangement Ref 2.15 01-4024-00, Structural Assy Aft AEM/S Mast Zone 4650 (Unit 4024) Ref 2.17 Attachment 2, AME/S Aft Mast Crow's Nest Removal Cable Trunk Ref 2.21 SE213-UJ-PRO-010, OE-373A and OE-373B/SPS-48E, Antenna Group Shipboard Dockside Antenna Removal/Installation Procedure Ref 2.22 60-00-013, Typical Methods Shielding, Bonding and Grounding (E3) Ref 2.32 60-01-001 Rev A, Electronic ARR & Details Radio Communication Transmission Lines & Waveguide 561-11-001 Port and Starboard Rudder Tiller Linkage Bearing; replace Ref 2.2 505-8292738 Hydraulic Oil Piping System Take-Down Joint Instl Strg Gear Ram Rm (6-188-0-E) Requested references (19) are required to submit a responsive proposal
| The requested References have been made available on CDs for pick up. POC is Suzanne Shin, SWRMC ACO, Suzanne.j.shin@navy.mil, (619) 556-2069. | |||||
| Edwin & Doug | BAE-004 | 5 | Multiple | Contractor has reviewed the provided J-4 Pricing Workbook (LPD 18) and all received Work Item Specifications noting that: |
The J-4 Pricing Workbook (LPD 18) identifies the following thirteen Work Items as Option Items (493-90-001, 857-11-001, 980-90-001, 980-90-002, 980-90-003, 980-90-004, 980-90-005, 980-90-006, 980-90-009, 980-90-011, 980-90-012, 980-90-014, and 992-11-008), yet none of this items are identified as (Option Item) in para 1.1 of the individual Work Item Titles.
Additionally the following five Work Items identify (Option Item) in para 1.1 of the Work Item Title (854-11-002, 857-11-003, 992-21-002, 992-31-002, and 993-31-002), but none of this items are identified as Option Items on the J-4 Pricing Workbook (LPD 18).
Contractor requests that all (Option Items) be correctly identified on both the J-4 Pricing Workbook (LPD 18) and para 1.1 of the individual Work Item Specifications in order to submit a responsive proposal.
The following Work Item's are NOT identified as Option Items 493-90-001, 857-11-001, 980-90-001, 980-90-002, 980-90-003, 980-90-004, 980-90-005, 980-90-006,980-90-009, 980-90-011, 980-90-012 and 980-90-014 in the Original Work Package But Have been edited to read OPTION ITEMS
Work. Work Item 992-11-008 will be an Option Item and Title will be revised to include Option item.
The following Work item's are identified as Option items 854-11-002, 857-11-003, 992-21-002, 992-31-002 and 993-31-002 in the Original Work Package and will be updated in the J-4 Pricing Workbook. EDM 6/18/16 The following Work Item's are NOT identified as Option Items 493-90-001, 857-11-001, 980-90-001, 980-90-002, 980-90-003, 980-90-004, 980-90-005, 980-90-006,980-90-009, 980-90-011, 980-90-012 and 980-90-014 in the Original Work Package.
Work. Work Item 992-11-008 will be an Option Item and Title will be revised to include Option item.
The following Work item's are identified as Option items 854-11-002, 857-11-003, 992-21-002, 992-31-002 and 993-31-002 in the Original Work Package and will be updated in the J-4 Pricing Workbook. EDM 6/18/16
| Requests that all (Option Items) be correctly identified on both the J-4 Pricing Workbook (LPD 18) and para 1.1 of the individual Work Item Specifications in order to submit a responsive proposal. | Please Review the revised "J-4 Pricing Workbook (LPD 18)(Amendment 0001)" and Errata documents for the appropriate Option Items. | ||||
| Edwin | BAE-005 | 10 | 436-90-002 | Contractor has reviewed Work Items and Reference Material provided on disc from SWRMC and requests the following reference be provided. |
436-90-002 ShipAlt LPD17-81855K, Ships Bell and Gong; accomplish Ref. 2.3 4720-LPD18-FY17-SA81855, Install Ship's Bell and Gong
| Reference 2.3 4720-LPD18-FY17-SA81855 will be copied and provided in the CD. The CD will be available for pick up with Suzanne Shin, SWRMC ACO, (619) 556-2069, Suzanne.j.shin@navy.mil. | |||||
| Morgan | BAE-006 | 126 | N/A | Contractor understands the requirement for either ownership of or committed access to a MIL-STD-1625D(SH) certified dry-dock capable of docking the USS New Orleans (LPD 18) during the timeframe necessary to support the completion of the FY17 DSRA. |
Contractor also understands that the solicitation Attachment J-3 Execution Milestones and Key Event Dates depicts the Docking Milestone date of 10 Jan 2017.
Bidder's Question:
With the "Combat Systems PCD (CSPCD)" milestone date remaining unchanged, will the Navy customer accept and evaluate proposals with a later Docking Milestone date due to either Dock usage conflicts and/or a Drydock Certification date that is after the 10 Jan 2017 Dock Milestone date?
| a. Please see Amendment 0005 for the removal of the “Dock” and “Undock” milestones from Attachment J-3 Execution Milestones. Offerors have flexibility to propose “Dock” and “Undock” milestones so long as there is no impact to the Key Event/Milestones remaining in Attachment J-3 Execution Milestones. | 124.With the "Combat Systems PCD (CSPCD)" milestone date remaining unchanged, will the Navy customer accept and evaluate proposals with a later Docking Milestone date due to either Dock usage conflicts and/or a Drydock Certification date that is after the 10 Jan 2017 Dock Milestone date? | a. Please see Amendment 0005 for the removal of the “Dock” and “Undock” milestones from Attachment J-3 Execution Milestones. Offerors have flexibility to propose “Dock” and “Undock” milestones so long as there is no impact to the Key Event/Milestones remaining in Attachment J-3 Execution Milestones. | ||||
| Edwin | BAE-007 | 10 | 456-90-001 | Contractor has reviewed Work Items and Reference Material provided on disc from SWRMC and requests the following reference be provided. |
456-09-001 AN/SPQ-9 Radar Waveguide; repair Ref. 2.2 L3 PacOrd, Inspection/Deficiency Report #50086.033.01.01 Ref 2.6 SE000-01-IMB-010, Navy Installation and Maintenance Book (NIMB); Section IX, Installation Standards
| REF 2.2 will be provided on disk to bidders. The CD will be available for pick up with Suzanne Shin, SWRMC ACO, (619) 556-2069, Suzanne.j.shin@navy.mil. | |||||
| Edwin | BAE-008 | 8 | 123-11-002 | Specification 123-11-002 does not direct to open and close the tanks identified in para 1.2.1 thru 1.2.16 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. |
Contractor recommends a note be added to para 4.X which states to work in conjunction with work item 992-31-001 for the opening, closing, gas free certification, and cleaning of tanks identified in para 1.2.
Government identified the tanks that need to be opened, pumped, cleaned and gas freed in WI 992-31-001.
Government does no concur that items be included in Notes as work in conjunction with as para 4.X is not for direction.
| Specification 123-11-002 does not direct to open and close the tanks identified in para 1.2.1 thru 1.2.16 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. | a. Work Item 992-31-001 identifies the tanks that need to be opened, pumped, cleaned, and gas freed. Paragraph 4.X will remain unchanged and is not for direction. | |||
| Edwin | BAE-009 | 9 | 123-18-003 | Specification 123-18-003 does not direct to open and close the tanks identified in para 1.2.1 thru 1.2.2 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. |
Contractor recommends a note be added to para 4.X which states to work in conjunction with work item 992-31-001 for the opening, closing, gas free certification, and cleaning of tanks identified in para 1.2.
Government identified the tanks that need to be opened, pumped, cleaned and gas freed in WI 992-31-001.
Government does no concur that items be included in Notes as work in conjunction with as para 4.X is not for direction.
| Specification 123-18-003 does not direct to open and close the tanks identified in para 1.2.1 thru 1.2.2 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. | a. Work Item 992-31-001 identifies the tanks that need to be opened, pumped, cleaned, and gas freed. Paragraph 4.X will remain unchanged and is not for direction. | |||
| Edwin | BAE-010 | 11 | 123-11-003 | Specification 123-11-003 does not direct to open and close the tank identified in para 1.2.1 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. |
Contractor recommends a note be added to para 4.X which states to work in conjunction with work item 992-31-001 for the opening, closing, gas free certification, and cleaning of the tank identified in para 1.2.
Government identified the tanks that need to be opened, pumped, cleaned and gas freed in WI 992-31-001.
Government does no concur that items be included in Notes as work in conjunction with as para 4.X is not for direction.
| Specification 123-11-003 does not direct to open and close the tank identified in para 1.2.1 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. | a. Work Item 992-31-001 identifies the tanks that need to be opened, pumped, cleaned, and gas freed. Paragraph 4.X will remain unchanged and is not for direction. | |||
| Edwin | BAE-011 | 12 | 123-11-001 | Specification 123-11-001 does not direct to open and close the tanks identified in para 1.3.1 thru 1.3.4 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. |
Contractor recommends a note be added to para 4.X which states to work in conjunction with work item 992-31-001 for the opening, closing, gas free certification, and cleaning of tanks identified in para 1.3.
Government identified the tanks that need to be opened, pumped, cleaned and gas freed in WI 992-31-001.
Government does no concur that items be included in Notes as work in conjunction with as para 4.X is not for direction.
| Specification 123-11-001 does not direct to open and close the tanks identified in para 1.3.1 thru 1.3.4 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. | a. Work Item 992-31-001 identifies the tanks that need to be opened, pumped, cleaned, and gas freed. Paragraph 4.X will remain unchanged and is not for direction. | |||
| Edwin | BAE-012 | 13 | 437-80-001 | Specification 437-80-001 does not direct to open and close the tanks identified in para 1.2.1.1 and 1.2.2.1 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. |
Contractor recommends a note be added to para 4.X which states to work in conjunction with work item 992-31-001 for the opening, closing, gas free certification, and cleaning of tanks identified in para 1.2.1.1 and 1.2.2.1.
Government identified the tanks that need to be opened, pumped, cleaned and gas freed in WI 992-31-001.
Government does no concur that items be included in Notes as work in conjunction with as para 4.X is not for direction.
| Specification 437-80-001 does not direct to open and close the tanks identified in para 1.2.1.1 and 1.2.2.1 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. | a. Work Item 992-31-001 identifies the tanks that need to be opened, pumped, cleaned, and gas freed. Paragraph 4.X will remain unchanged and is not for direction. | |||
| Edwin | BAE-013 | 14 | 110-21-002 | Specification 110-21-002 does not direct to open and close the tanks identified in para 1.2.11, 1.2.12, 1.2.13, and 1.2.16 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. |
Contractor recommends a note be added to para 4.X which states to work in conjunction with work item 992-31-001 for the opening, closing, gas free certification, and cleaning of tanks identified in para 1.2.11, 1.2.12, 1.2.13, and 1.2.16.
Government identified the tanks that need to be opened, pumped, cleaned and gas freed in WI 992-31-001.
Government does no concur that items be included in Notes as work in conjunction with as para 4.X is not for direction.
| Specification 110-21-002 does not direct to open and close the tanks identified in para 1.2.11, 1.2.12, 1.2.13, and 1.2.16 to accomplish the specifications work scope. Additionally, there is no Note para 4.X which identifies to work in conjunction with WI 992-31-001. | a. Work Item 992-31-001 identifies the tanks that need to be opened, pumped, cleaned, and gas freed. Paragraph 4.X will remain unchanged and is not for direction. | |||
| Edwin | BAE-014 | 15 | 516-11-001 | Specification 516-11-001 paragraph 3.2.1 states: Accomplish the requirements of 009-12 of 2.1, including Table One, Column B, Lines One through 6. |
Contractor believes this paragraph is not required. The requirements are met during installation in paragraphs 3.3 and 3.3.1.
Contractor recommends removing paragraph 3.2.1 from specification.
| Government concurs that 3.2.1 is not needed and will amend work item to reflect changes. | 15. Please revise Work Item 516-11-001 to delete paragraph 3.2.1 requirement. The requirements under 3.2.1 are met during the installation in paragraphs 3.3 and 3.3.1. | a. Work Item 516-11-001 will be amended to delete paragraph 3.2.1. | ||||
| Edwin | BAE-015 | 16 | 623-90-001 | Specification 623-90-001 paragraph 3.1 states: Accomplish the requirements of 2.2 through 2.6 using 2.7 and 2.8 for guidance. |
Reference 2.6 Test Note T-2 states: New and Disturbed low pressure system piping SHALL be visually inspected for Leakage during the first system pressurization to normal operating pressure. No weeps or leakage allowed.
Specification does not call out testing for this reference/system after repairs have been completed.
Recommend adding Operational Test paragraph to the specification in order to certify the Low Pressure Air piping disturbed by accomplishing reference 2.6.
| Government will update WI to include test requirement incorporated in reference 2.6. | Work Item 623-90-001 does not call out testing for reference 2.6 and the system after repairs have been completed | a. The Work Item has been amended to include Operational Testing requirement incorporated in Reference 2.6. | ||||
| Edwin | BAE-016 | 17 | 584-19-002 | Specification 584-19-002 paragraph 4.1 states; “Shock Mounts are located in Building 3456, Naval Station San Diego.” |
1) Shock Mounts are not identified as GFM in paragraph 5.
2) Shock mounts are not identified by a part or piece number in paragraph 3. REQUIREMENTS: or in reference 2.2 or 2.3.
Clarification requested.
| Government concurs that parts are not listed in para 5 as GFM. Parts are GFM and will be turned over to winning contractor. Part identification is not available as material has been stored for a long period of time without paperwork. Government is working with PY to try to identify part number of shock mounts. Government will correct WI to reflect GFM. | 17. Work Item 584-19-002 paragraph 4.1 states; “Shock Mounts are located in Building 3456, Naval Station San Diego.” But are not identified as GFM in paragraph 5 | a. The Work Item has been amended to include the GFM in paragraph 5 | ||||
| Edwin | BAE-017 | 18 | 520-11-001 | Specification 520-11-001 paragraph 3.3.7 states to. “…remove existing valves and mechanically disassemble takedown joints listed on ‘Attachment B’ for the hydroblast cleaning of the seawater system, using 2.3 and 2.4 for guidance. Amount greater than or less than this, when authorized by the SUPERVISOR, shall be subject to equitable adjustment.” |
Attachment “B” is identified in paragraph 1.3.2, 3.3.7, 3.5, and 3.5.1, but was not provided.
Please provide Attachment “B”.
Requested reference is required to submit a responsive proposal.
| Attachment “B” is not a valid reference. Government will modify WI to remove all references to attachment “B” | Work Item 520-11-001 paragraph 3.3.7 references Attachment B, but there was no Attachment B provided. | a. Attachment B is not a valid reference and the Work Item has been amended to remove all references to “Attachment B”. | ||||
| Edwin | BAE-018 | 19 | 242-90-001 | Specification 242-90-001 paragraph 3.1 states, “Accomplish the requirements of 2.2 using 2.3 and 2.4 for guidance.” |
Contractor notes: piping that is to be removed on ref 2.2 is connected at MRG sump level. To accomplish work scope the MRG sump must be emptied and cleaned prior to removal of the identified pipe. Access to the MRG will require that Cat II NAVSEA Standard Item 009-57 be invoked and will need to be added to the specification.
Being that the sump will be emptied, it will need to be refilled, refilling the sump is not covered in 009-57. If new fluid is required by the customer, it also needs to be added to the specification.
Additionally, ref 2.2 requires piping modifications to be welded however, the specification does not call out STD Item 009-12.
STD Item 009-12 needs to be added to the specification.
Government concurs that 009-57 is required. Government also concurs that 009-12 table 1, column A or B line item 1.10 is required for reference 2.2
New fluid is required and WI will be modified to reflect. Government will modify WI to reflect all listed changes.
| 19. Work Item 242-90-001 does not call out Standard Item 009-57 additionally reference 2.2 requires piping modifications and welding but doesn’t call out Stand Item 009-12. | a. The Work Item has been amended to call out Standard Item 009-57 and Standard Item 009-12 table 1, column A or B line item 1.10 with respect to Ref. 2.2. | |||
| Edwin | BAE-019 | 20 | 593-11-001 | Specification 593-11-001 paragraph 3.1.2 states “Installation and hydrostatic testing of additional clean-out fitting of 2.2”. |
Contractor notes that the exact number of fittings that will be needed cannot be determined until an actual “hand over hand” inspection of the system is accomplished.
Is it the intent of the customer to have the contractor order all material as identified on reference 2.2 or to treat the material requirements of 2.2 as subject to an equitable adjustment based upon a Condition Found Report (CFR)?
Paragraph 3.1.1 requires a system inspection and identification of cleaning accesses required to accomplish the requirements of hydroblasting. Those will be identified on the marked up system drawing 2.2.
Paragraph 3.1.2 requires installation and testing of the additional fittings identified in the marked up drawing of 3.1.1.
A CFR will be required once the inspection is complete and the Qty of additional fittings is identified in 3.1.1.
Is it the intent of the customer to have the contractor order all material as identified on reference 2.2 or to treat the material requirements of 2.2 as subject to an equitable adjustment based upon a Condition Found Report (CFR)? a. Paragraph 3.1.1 requires a system inspection and identification of cleaning accesses required to accomplish the requirements of hydro-blasting. Those will be identified on the marked up system drawing 2.2.
b. Paragraph 3.1.2 requires installation and testing of the additional fittings identified in the marked up drawing of 3.1.1.
c. A CFR will be required once the inspection is complete and the quantity of additional fittings is identified in 3.1.1.
Edwin BAE-020 20 593-11-002 Specification 593-11-002 paragraph 3.1.2 states “Installation and hydrostatic testing of additional clean-out fitting of 2.2”.
Contractor notes that the exact number of fittings that will be needed cannot be determined until an actual “hand over hand” inspection of the system is accomplished.
Is it the intent of the customer to have the contractor order all material as identified on reference 2.2 or to treat the material requirements of 2.2 as subject to an equitable adjustment based upon a Condition Found Report (CFR)?
Paragraph 3.1.1 requires a system inspection and identification of cleaning accesses required to accomplish the requirements of hydroblasting. Those will be identified on the marked up system drawing 2.2.
Paragraph 3.1.2 requires installation and testing of the additional fittings identified in the marked up drawing of 3.1.1.
A CFR will be required once the inspection is complete and the Qty of additional fittings is identified in 3.1.1.
Is it the intent of the customer to have the contractor order all material as identified on reference 2.2 or to treat the material requirements of 2.2 as subject to an equitable adjustment based upon a Condition Found Report (CFR)? a. Paragraph 3.1.1 requires a system inspection and identification of cleaning accesses required to accomplish the requirements of hydro-blasting. Those will be identified on the marked up system drawing 2.2.
b. Paragraph 3.1.2 requires installation and testing of the additional fittings identified in the marked up drawing of 3.1.1.
c. A CFR will be required once the inspection is complete and the quantity of additional fittings is identified in 3.1.1.
Edwin BAE-021 10 631-13-001 Contractor has reviewed Work Items and Reference Material provided on disc from SWRMC and requests the following reference be provided.
631-13-001 Fan Room; repair and preservation Ref.