Q&A Cover Sheet
| TORTUGA QUESTION & ANSWERS ROUND #3 |
| USS TORTUGA (LSD 46) Modernization Period (MODPRD) Bidders' Questions |
| Question | Work Item | Question | PM Answer |
| 1 | 120-11-017 | PARA 3.6.2 requires clad welding in tanks listed in para 1.2.4 thru 1.2.9. There are no tanks listed in these locations. Please provide the tank numbers that associated with these repairs. | ERRATA TO BE ISSUED |
| 2 | 120-11-013 | Item 120-11-013 has para 3.2.1 which requires 6 square feet of clad welding. This seems to be excessive whereas a 6 sq. foot insert would be more economical to accomplish. Is this requirement a mistake or is this the correct quantity of clad welding? | ERRATA TO BE ISSUED |
| 3 | VARIOUS | The numerical index that was provided has 5 less items than the items provided in the “Sneak Peek” adobe file The following items were also received that were not on the excel numerical index list: 150-90-001, 150-90-002, 168-80-002, 551-90-001 & 651-90-001. Also the 120-11-026 item number was on the numerical index but was not provided with a written spec. Will a new index with titles that match the specification attachment be provided in the future? | Use the posted solicitation for pricing. A second CD was issued on 5 June which is the solicitation package. |
| 4 | 584-41-003 | Paragraph 3.11 states to replace 10 SF of plating as identified in 3.6. Paragraph 3.6 does not have an inspection called out. Should the plate replacement be from the inspection called out in 3.3 and reported in 3.3.1? | ERRATA TO BE ISSUED |
| 5 | 612-90-001 | There is not an example of cable tags provided. Will one be provided? | Use standard work practices as required by NAVSEA STD ITEMS which also refers to Electric Plant Standard Methods. |
| 6 | 651-80-001 | The reference drawing 2.3 (Ovhd Sheathing Mod) is the same as reference 2.2 (Door Mods). Contractor requests a copy of reference 2.3 for Overhead Sheathing Modification Galley Upgrade be provided. | Reference Drawing 2.3 will be made available. ERRATA TO BE ISSUED |
| 7 | 120-11-017 | Paragraph 3.1 states to power tool to bare metal the deck and bulkhead surfaces for the locations listed in 1.2.1 thru 1.2.9. |
1. Is it really the intent to have the very large areas listed in 1.2 to be power tooled to bare metal?
2. If the intent is to power tool areas for the NDT called out in 3.2, could the Government narrow the scope to a better defined area? For example paragraphs 1.2.2 thru 1.2.9 are adjacent spaces and therefore do not require all decks and bulkheads to be power tooled to bare metal.
3. After paragraph 3.1 is accomplished the only preservation remaining in this work item is for the newly installed plates. Will the Government allow all the bare decks and bulkheads to be preserved as new and disturbed surfaces?
| Paragraphs 3.9 and 3.10 provide a 009-32 Table and Line for the newly installed plates. Will the Government clarify which paragraph applies to what area of the newly installed plates? What paint system does the Government wish to apply to paragraph 3.6 thru 3.6.2.3 for the welding? | ERRATA TO BE ISSUED | |||
| 8 | 120-11-013 | Paragraph 3.2.1 which requires 6 square feet of clad welding. This seems to be excessive whereas a 6 sq. foot insert would be more economical to accomplish. Does the contractor have the option to insert vice clad weld these areas? How many areas require repairs? | ERRATA TO BE ISSUED | |
| 9 | 120-11-017 | Paragraph 3.1 calls for power tool cleaning of the entire deck and bulkhead surfaces in the locations listed in 1.2.1 thru 1.2.9. This seems extreme to power tool clean the entire Well Deck deck and bulkheads. Please clarify by listing the square footage required in each space listed in 1.2. | ERRATA TO BE ISSUED | |
| 10 | 120-11-017 | Paragraph 3.6.2 requires clad welding in tanks listed in para 1.2.4 thru 1.2.9. There are no tanks listed in these locations. Please provide the tank numbers that are associated with these repairs. | ERRATA TO BE ISSUED | |
| 11 | 123-11-003 | Para 3.8 directs an MT inspection of the “C” links, however paragraph 3.8.1 requires a report of thickness gauging. I shall assume paragraph 3.8.1 is in error and that MT report is requested. | ERRATA TO BE ISSUED | |
| 12 | 123-16-001 | Paragraph 3.3 tasks Contractor to accomplish an Ultrasonic test inspection of each tank located in 1.2.3, 1.2.6 through 1.2.10 and 1.2.12, at 1000 locations. Is this a total of 1000 locations for all the tanks or 1000 spots in each tank? | A total of 1,000 spots for all tanks listed in 3.3 |
13 J-3 Execution Milestones The Milestone/Key Event on Line 20 is listed as Undocking and has a date of A+218, 14 AUG 18. There currently is not a Milestone/Key Event for the Docking.
Line 42 includes Milestone/Key Event “Dock” states "Offeror to Propose Dock & Undock Dates IAW Specification 997-11-002".
| Does the Government intend to modify the J-3 to add a Docking Milestone/Key Event with “TBD” as the date and change the Undocking Milestone/Key Event to also have a date of “TBD”? | Contractor may propose docking date. Undocking will be 14 AUG 18 or sooner. | ||
| 14 | RFP Section C – Scope of Work | Paragraph 3.4 and the subsequent table of reports contain due dates of "D+30" and "A+74", however, these dates do not conform to the availability and docking period durations identified in attachment J-3 Execution Milestones. | |
| Does the Government intend to change "D+30" to read "NLT 20% of Docking Period" and change "A+74" to read "A+97" (20% of 487 day availability duration) in paragraph 3.4 and the subsequent table of reports? | The government is requiring reports noted as A+74 by A+74 and reports required by D+30 as D+30. This is in addition to the NAVSEA STD item requirements. | ||
| 15 | RFP Section C – Scope of Work | Thirteen work items in the Para 3.4 table do not contain report paragraph numbers: 233-11-037, 233-12-012, 233-13-008, 233-13-026, 233-14-012, 242-13-001, 242-13-002, 262-11-001, 262-12-001, 311-90-002, 524-11-003, 562-11-001, & 631-11-005. | |
| If these work items do not contain Required Reports will the Government please remove them from the Table to preclude questions regarding these work items? | 233-11-037, 233-12-012, 233-13-026, 233-14-012, 242-13-001, 242-13-002, 262-11-001, 262-12-001, 311-90-002, 524-11-003, 562-11-001, & 631-11-005 will be removed from Sect C para 3.4 table. 233-13-008 Propulsion Diesel Engine (MPDE) Gieslinger Coupling Sect C para 3.4 table will be corrected to reflect report para number 3.4.4. | ||
| 16 | RFP Section C – Scope of Work | Four work items in the Para 3.4 table were not received in the Solicitation, nor are they on the Work Item Index or the J-4 Pricing Sheet (311-90-003, 311-90-004, 311-90-005, & 311-90-006). | |
| If these work items do not exist will the Government please remove them from the table to preclude questions regarding these work items? | These work items are in addendum one. | ||
| 17 | RFP Section C – Scope of Work | Some work items in the Para 3.4 table contain report paragraph numbers that are not open and inspect reports. The type and amount of work required prior to generating some other reports, make them unlikely to be accomplished prior to the due dates (ex. 243-11-002, para 3.11.1 after equipment repairs, completed before D+30). |
Work Items (report paragraphs):
123-11-003(3.18.1, 3.20.1, 3.21.1), 123-16-001(3.2.1 and 3.3.1), 123-19-002(3.2.1), 123-22-003(3.2.1), 123-22-004(3.2.1), 130-11-001(3.2.1), 233-11-008(3.4.4), 233-12-008(3.4.4), 233-14-008(3.4.4), 233-14-015(3.3.2), 242-11-001(3.3.1.1), 243-10-001(3.3.1, 3.5.2.1), 243-11-002(3.10.5, 3.11.1.1,3.15.1, 3.18.1), 243-11-003(3.10.5, 3.11.1.1,3.15.1, 3.18.1), 244-10-002(3.2.1.3), 245-11-004(3.7.1), 245-12-001(3.7.1), & 320-22-001(3.1.2.1).
| Please remove these reports from the Milestones for Certain Reports table in paragraph 3.4. | The following reports will be removed from section C, para 3.4 table: 123-11-003 report 3.18.1 only, 243-10-001 reports 3.3.1 and 3.5.2.1, 243-11-002 reports 3.15.1 and 3.18.1 only, 244-10-002 report 3.2.1.3 only, 245-11-004 report 3.7.1 only, 245-12-001 report 3.7.1 only. Also, 243-11-003 is incorrectly listed and will be corrected to 243-12-003 Port Propulsion Shafting inspect and repair and reports 3.15.1 and 3.18.1 only will be removed. | |||
| 18 | 120-11-008 | Bulkhead Stiffener and Plating para 3.1 requires a visual inspection of each bulkhead and stiffener listed in paragraph 1.3 for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion in each location in 1.2. There are fourteen locations identified by paragraph 1.3. There could possibly be thermal insulation on areas in some or all of the fourteen location identified in paragraph 1.3. A quantity of repair work is specified for each location, but it is much less than the area shown in each of the referenced details. If there is thermal insulation in each of the 14 areas identified in paragraph 1.2 for the visual inspection, is it the intention to remove all of the insulation in those locations identified by details to perform the visual inspection and to reinstall the thermal insulation as interference to the work item? Please clarify quantity of insulation to be replaced in para 3.4. | NAVSEA STD ITEM 009-11 is included in the work specification. Comply with work specification. | |
| 19 | 130-11-007 | In para 3.7 it is required to accomplish 009-32 line 11, 11A, 12, 13 AND 13A. The contractor is confused as to what line the gov’t actually wants to have accomplished. Also the location of work is not identified for the preservation repairs, para 1.2.1 is the A/C Machinery Room #2 (3-74-1-E). Is the intent to preserve the entire space? | The government requires preservation of the deck, newly installed material, and new and disturbed. Use table and line as applicable. | |
| 20 | Milestone | The 50% conference is scheduled for Saturday September 8, 2018 on the milestone sheet. Are we going to keep that date? | Any change will be considered after award. Proposals to move dates to the left will likely be acceptable at no cost to the government. | |
| 21 | Milestone | The 75% conference is scheduled for Tuesday January 8, 2019 on the milestone sheet. Are we going to keep that date as opposed to Wednesday the 9th? | Any change will be considered after award at no cost to the government. | |
| 22 | 150-11-009 | Para 3.1 requires installation of retained lockers. There is no paragraph to remove any lockers. Para 3.4 states to install equipment and lockers retained in 3.1. Please clarify that all lockers listed in para 1.3.1 are to be removed and reused. | ERRATA TO BE ISSUED | |
| 23 | 167-11-003 | The subject item reads: 3.1.10 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 25, for each newly installed watertight door listed in 1.3.1 through 1.3.9. This requirement is usually reserved for Powder-coating of Intake Louvers. Please validate the watertight doors listed in 1.3.1 thru 1.3.9 require to be preserved by the Fluidized Bed Method as per 009-32- table 2 line 25 requires. | 009-32, Table 2, line 25 applies to watertight doors. Comply with work specification, per govt. engineering this method provides prolonged life of equipment. | |
| 24 | 150-11-015 | Para 3.6 of the subject item requires 009-17 for supply fan 2-20-1. There is no description or identification on this electric motor repair. The contractor needs a description of the nameplate nomenclature for the supply fan 2-20-1 in order to estimate repairs. | ERRATA TO BE ISSUED | |
| 25 | 150-11-028 | In para 3.1 it is required to replace the materials listed in 1.3. In para 1.3 the identified material is the Work Maintenance Platform itself. Para 3.1.1 goes on to say replace the following with new parts: One each Hose Stowage Rack; 2 each "U" Staples; 8 each Tie Downs (Short); 2 each Tie Downs (Long); and 48 each 3/8-16 UNC 2A Weld Mounting Studs. |
These parts are attached to the Work Maintenance platform. Please clarify that it is the intent to replace the entire platform or only the materials listed in para 3.1.1 that are attached to the platform?
| Also in para 3.1.3 it is required to replace with new the weld base mounting studs. There is no way to estimate this unless there is a quantity of studs to be replaced or level of effort added to accomplish this task. How many studs are to be replaced? | ERRATA TO BE ISSUED | |||
| 26 | 167-11-003 | The subject item reads: 3.1.10 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 25, for each newly installed watertight door listed in 1.3.1 through 1.3.9. This requirement is usually reserved for Powder-coating of Intake Louvers. Please validate the watertight doors listed in 1.3.1 thru 1.3.9 require to be preserved by the Fluidized Bed Method as per 009-32- table 2 line 25 requires. | 009-32, Table 2, line 25 applies to watertight doors. Comply with work specification, per govt. engineering this method provides prolonged life of equipment. | |
| 27 | 233-10-009 | Is the location for Main 2 in paragraph 1.2.2 incorrectly called out for this work item? (Only the heaters for 1A and 1B are identified for work per this specification in paragraph 1.3.) | ERRATA TO BE ISSUED | |
| 28 | 150-90-001 | Para 3.1.2 states to Accomplish the requirement of 009-90. Provided the services of qualified Technical Representative. The Representative recommended in 4.1 is a SPAWAR person that works for the Government. Please confirm the Government will provide this representative. | ERRATA TO BE ISSUED 009-90 is not required and will be deleted. The Government will provide an on site representative to oversee / assist with removal and relocation of antenna. | |
| 29 | 233-11-002 | 233-11-002 MPDE Lube Oil and Jacket Water Thermostatic Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The government has determined 009-09 is not required for this work. | |
| 30 | 233-11-002 | Para. 3.2.2.1 refers to the requirements of para. 3.3.2. Contractor recommends changing it to the correct para. 3.2.2. | ERRATA TO BE ISSUED | |
| 31 | 233-11-005 | 233-11-005 MPDE Air Start Distributor & Main Air Start Control Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The government has determined 009-09 is not required for this work. | |
| 32 | 233-11-005 | 1. Para. 3.2.1.1 refers to the requirements of para. 3.3.1. Contractor recommends changing it to the correct para. 3.2.1. | ||
| 2. Para. 3.3.1.1 refers to the requirements of para. 3.4.1. Contractor recommends changing it to the correct para. 3.3.1. | ERRATA TO BE ISSUED | |||
| 33 | 233-13-015 | 233-13-015 MPDE Cylinder Head and Component; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task | |
| 34 | 233-11-011 | Para. 3.13 refers to the equipment listed in para. 1.3.1.3. Contractor recommends changing it to the correct para. 1.3.1.2. (Enclosure 9, Section 4 of 2.2 is the Fuel Oil Leak Off System para. 1.3.1.2) | ERRATA TO BE ISSUED | |
| 35 | 233-12-002 | 233-12-002 MPDE Lube Oil and Jacket Water Thermostatic Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The government has determined 009-09 is not required for this work. | |
| 36 | 233-12-005 | 233-12-005 MPDE Air Start Distributor & Main Air Start Control Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The government has determined 009-09 is not required for this work. | |
| 37 | 233-12-031 | 233-12-031 MPDE Post Lube Oil Flush; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task | |
| 38 | 233-12-037 | 233-12-037 MPDE Crankcase Vacuum System; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task | |
| 39 | 233-13-002 | 233-13-002 MPDE Lube Oil and Jacket Water Thermostatic Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The government has determined 009-09 is not required for this work. | |
| 40 | 233-13-015 | 233-13-015 MPDE Cylinder Head and Component; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task | |
| 41 | 233-13-026 | 233-13-026 MPDE Camshaft Bearings, Lobes and Flex Drive; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task | |
| 42 | 233-14-004 | 233-14-004 MPDE Turbocharger Air Intercooler; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard. The 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task | |
| 43 | 233-14-005 | 233-14-005 MPDE Air Start Distributor & Main Air Start Control Valve; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The government has determined 009-09 is not required for this work. | |
| 44 | 233-14-012 | 233-14-012 (2B MPDE Overhaul); the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard the 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task | |
| 45 | 233-14-016 | 233-14-016 MPDE Jacket Water Cooling Water Elbow; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | The work item is to be accomplished IAW an approved NAVSEA Maintenance Standard the 009-09 SI is not required because the Maintenance Standard (MS) provides the appropriate guidance for the KTR to accomplish the task | |
| 46 | 241-10-001 | The subject item calls for para 3.3 to Remove and retain system oil from equipment listed in 1.3.2 and located in 1.2.1. Para 3.8 states to remove and dispose of systems fluids from the equipment listed in 1.3.3 and located in 1.2.1. Para 3.6 requires the stored oil be used to refill the equipment. It is more cost effective to dispose of the residual oil than it is to store the oil. Please verify that we are to store the oil from the Lube Oil Purifier heater for reuse. | ERRATA TO BE ISSUED | |
| 47 | 241-10-002 | The subject item calls for para 3.2 to Remove and retain system oil from equipment listed in 1.3.2 and located in 1.2.1. Para 3.5 requires the stored oil be used to refill the equipment. It is more cost effective to dispose of the residual oil than it is to store the oil. Please verify that we are to store the oil from the Lube Oil Purifier heater for reuse. | ERRATA TO BE ISSUED | |
| 48 | 311-21-030 | Item 311-21-030 Ship Service Diesel Generator Engine (SSDG) Cylinder Relief Valve; repair; the government has included the requirements of 009-90 in other similar items, however that requirement is not included for this item. Please confirm that 009-90 is not to be included as a requirement for this item. Also the item para 1.3.1.1 calls for 1 Safety Relief Valve vice 12 that are in similar items (i.e. 311-22-032, 311-24-029). | The determination was made to exclude 009-90 in this WI. Para 1.3.1.1 calling for 1 Safety Relief Valve vice 12 is a typo and ERRATA will be issued, the correct quantity of the relief valves is 12. | |
| 49 | 311-22-032 | Item 311-22-032 Ship Service Diesel Generator Engine (SSDG) Air Start Piston and Cylinder Safety Relief Valve; repair; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | 009-09 will be required since the work is not to be accomplished IAW an approved maintenance standard but IAW various sections of the technical manual. ERRATA TO BE ISSUED. | |
| 50 | 311-23-026 | Item 311-23-026 Ship Service Diesel Generator Engine (SSDG) Cylinder Relief Valve; repair; the government has included the requirements of 009-90 in other similar items, however that requirement is not included for this item. Please confirm that 009-90 is not to be included as a requirement for this item. Also the item para 1.3.1.1 calls for 1 Safety Relief Valve vice 12 that are in similar items (i.e. 311-22-032, 311-24-029). | The determination was made to exclude 009-90 in this WI. Para 1.3.1.1 calling for 1 Safety Relief Valve vice 12 is a typo and ERRATA will be issued, the correct quantity of the relief valves is 12. | |
| 51 | 311-24-029 | Item 311-24-029 Ship Service Diesel Generator Engine (SSDG) Air Start Piston and Cylinder Safety Relief Valve; repair; the government has included the requirements of 009-09 in other similar items, however that requirement is not included for this item. Please confirm that 009-09 is not to be included as a requirement for this item. | 009-09 will be required since the work is not to be accomplished IAW an approved maintenance standard but IAW various sections of the technical manual. ERRATA TO BE ISSUED. | |
| 52 | 320-22-001 | Paragraph 3.1.2.1 states to submit one legible copy, in hard copy or approved transferrable media, of a list of new parts installed, excluding parts specifically listed to be removed in this Work Item or invoked Standard Item, in place of those identified to be missing or defective, with documenting invoices or other substantiating data, to the SUPERVISOR. Is this report referring to Paragraph 3.1, 3.1.1 or 3.1.2? | Paragraph 3.1 | |
| 53 | 512-11-003 | Para 3.1 requires that each fan assembly in 1.3 be cleaned. Para 3.1.3 states to clean each inlet and outlet duct, however para 3.2 and 3.3 states to clean only 1.3.1 thru 1.3.45. There are 155 vent systems listed in 1.3. It appears that the systems referenced in 3.2 and 3.3 should be 1.3.1 thru 1.3.155. Please clarify and revise specification. | ERRATA TO BE ISSUED | |
| 54 | 311-23-023 | Paragraph 3.15 reads, “provide 21% mandays of labor and….” Please clarify that the Contractor is to provide 21 mandays of labor. | ERRATA TO BE ISSUED | |
| 55 | 321-80-001 | Paragraph 3.11 calls out 009-32 Table 5, Line 18 for new and disturbed piping. This Table and Line is for a SSPC-SP-10 Blast. Will the Government consider changing this work item to Table 5, Line 1 and review the other SHIPALTs for the same change? | This piping is for elevated temperatures, no change will be processed. | |
| 56 | 512-11-013 | Paragraph 3.1.3 provides direction to accomplish the requirements of 009-32 of 2.1, including Table 3, Line 15, for interior surfaces of new equipment in 3.1. This preservation is for steel surfaces using SSPC-SP-10 of vent plenums. Is it the Government’s intent for the Contractor to sandblast to near white metal and apply 30 Mils of paint to the interior only of the NEW steel and aluminum diffusers listed in 3.1? Please clarify. | ERRATA TO BE ISSUED | |
| 57 | 512-11-020 | Paragraph 3.4 provides direction to accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, for exterior surfaces of natural supply duct, and Table 3, Line 14 for interior surfaces. This Table and Line is for steel surfaces; the replacement duct VD-03 is 050 aluminum. |
Please clarify:
1) Does the Government want the exterior of the duct preserved using the system for the exterior surfaces above the boot-top per Table 2, Line one or the same system for interior surfaces because the duct is in a fan room? If the later, what Aluminum Table and Line should the Contractor use?
| 2) Does the Government want the interior of the duct preserved using the vent plenum system called out in Table 3, Line 14? If so what Aluminum Table and Line should the Contractor use? | ERRATA TO BE ISSUED | |||
| 58 | 130-11-002 | Paragraph 3.4 calls out Table 3, Line 22 which is preservation for under AFFF stations. Is this the preservation system the Government wishes to use or should the paragraph be changed to Table 3, Line 20 which is for Fan Rooms per 009-32 FY-17 (CH-1)? Please advise. | ERRATA TO BE ISSUED | |
| 59 | 130-11-006 | Paragraph 3.4 calls out Table 3, Line 22 which is preservation for under AFFF stations. Is this the preservation system the Government wishes to use or should the paragraph be changed to systems for Interior Surfaces for 2.1 and another table and line for the critical coated tanks on the adjacent sides of the repairs? Please advise. | ERRATA TO BE ISSUED | |
| 60 | 150-11-009 | Paragraph 3.1 states to install retained lockers using new fasteners, paragraph 3.1.1 removes the mounting bracket and paragraph 3.4 installs the equipment and lockers retained in 3.1. Contractor requests paragraph 3.1 be re-worded to remove and retain vice install retained. | ERRATA TO BE ISSUED | |
| 61 | 167-11-003 | The watertight doors listed in paragraphs 3.1.10, 3.2.2.16 and 3.3.4 have Table 2, Line 25 as the preservation paragraphs. This system is the fluidized bed method. Will the Government consider Table 5, Line 26 or 27 for standard powder coat as the coating method? The standard powder coat method can be done locally and will result in cost savings to the Government. | 009-32, Table 2, line 25 applies to watertight doors. Comply with work specification, per govt. engineering this method provides prolonged life of equipment. | |
| 62 | 150-90-001 | The specification shows reference 2.4 533-8621580 Power System Signal Shelter Removal. After looking at the drawing, the title is COLD POTABLE WATER MODS SIGNAL SHELTER REMOVAL 06 & 07 LEVEL, FRAM 34-38. The Power System Drawing is listed under 2.10. Recommend 2.4 be changed to Cold Potable Water Signal Shelter. | ERRATA TO BE ISSUED | |
| 63 | 233-11-023 | NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item. |
Does this note apply to item 233-11-023?
64 233-12-014 NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item.
Does this note apply to item 233-12-014?
65 233-13-035 NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item.
Does this note apply to item 233-13-035?
66 233-14-035 NOTES: 4.3 Work this item in conjunction with the 900 RPM Upgrade Work Item.
Does this note apply to item 233-14-035?
| 67 | 233-80-001 | In para 3.3 it is required to accomplish testing IAW reference 2.5. The reference 2.5 (S6438-AA-DDT-010) has not been issued to the contractor. |
| 68 | 243-10-004 | Based on the specification paragraph 3.3 and the reference document paragraph 243-1.5.3; when should the contractor schedule the Main Propulsion Shaft Alignment to be accomplished? |
| 69 | 244-10-002 | Contractor is questioning the intent of paragraph 3.1.2.2. It appears to be a duplicate of 3.1.2.1. |
| 70 | 245-11-004 | Contractor suggests using clean, new oil conforming to MIL-PRF-17331 (2190 TEP) ILO water in the CPP hydraulic system. |
"3.18.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 1135 PSIG, for new and disturbed CPP piping systems."
71 245-90-001 Paragraph 1.2 Location of Work does not include the Underwater Hull and Drydock; where the propeller blades are located. Propeller Blades are removed in paragraph 3.3 and installed in 3.4.
| 72 | 311-21-028 | Para 3.1 requires 009-90 tech rep services for equipment listed in 1.3.1.1. There is no para 1.3.1.1. Please identify the correct paragraph and OEM required. |
| 73 | 311-24-007 | It has been found that SSDG engines #1, #2, & #3 require that the Engine Blowers be uncrated, cleaned, inspected and reinstalled. SSDG Engine #4 has only the Blower Air Bypass being repaired. Please confirm that there will be no work required or reinstallation of the #4 SSDG Blower. |
| 74 | 311-90-003 | This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item: |
1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.
2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.
3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.
4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.
5) Para. 3.19.2 is formatted incorrectly and makes no sense.
Please review and advise soonest so offerors have time to secure pricing.
75 311-90-004 This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item:
1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.
2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.
3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.
4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.
5) Para. 3.19.2 is formatted incorrectly and makes no sense.
Please review and advise soonest so offerors have time to secure pricing.
76 311-90-005 This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item:
1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.
2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.
3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.
4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.
5) Para. 3.19.2 is formatted incorrectly and makes no sense.
Please review and advise soonest so offerors have time to secure pricing.
77 311-90-006 This item has many errors therefore the following list may not be all inclusive. It is suggested that the item be reviewed for inaccuracies and a corrected version be issued. The following discrepancies have been found in the subject item:
1) Reference 2.12 is listed in para 3.17 but needs to be issued. The contractor has no idea what a Doctor MPU is.
2) Para. 3.5 references equipment listed in 1.3.1.1 thru 1.3.1.15, there is no para. 1.3.1.15.
3) The equipment is not correctly identified that is listed in para 3.5.1, it appears this para refers to 1.3.1.9 vice 1.3.1.10.
4) Para 3.5.1.3, 3.5.1.4, 3.5.6.3 & 3.19.2 does not identify the equipment that the list of new parts are to be installed in.
5) Para. 3.19.2 is formatted incorrectly and makes no sense.
Please review and advise soonest so offerors have time to secure pricing.
| 78 | 443-11-002 | Reference 2.2 (331-8680335) needs to be issued to the contractor for planning and estimating. |
| 79 | 512-11-006 | Missing all References below: |
2.3 139-6102525 Rev E, Unit 441 04 DK Frs 42-53 S/S
2.5 S9512-B6-MMA-010, Duct Cooling Coils, Unit Coolers and Gravity Coils
2.6 S6230-CR-MMM-010/87103, Gravity Coils Sizes 1 GW, 3 GW, and 5 GW
2.7 S6230-CF-MMA-010/38450, Navy Standard Unit Coolers Models 51UW Through 55UW
2.8 S9514-DS-MMA-010, Fan Coil Assemblies (Type III), Models DDG, FCA-21 Through -25
2.9 S6230-A8-MMA-010, Fan Coil Assemblies (Type II) Models FCA-22 and FCA-24, Part Number 81H2573 and (Type III) Models FCA-21, FCA-25
2.10 805-1311397, Air Cooling Coils Duct - Classes DW and DF for Shipboard Mechanical Cooling
80 512-11-039 Missing all References below:
2.2 S9512-B6-MMA-010, Duct Cooling Coils, Unit Coolers and Gravity Coils
2.3 S6230-BB-MMO-010, Fan Coil Unit FCA Sizes 21-25 Types 1 & 2
2.5 514-6101609 Rev B, Diagram of Chill Water System
81 521-11-004 3.1 Accomplish a hydrostatic test of each pump in accordance with Paragraph 4-6.1.1 of 2.2, using 2.3 as guidance. Allowable leakage through the casing and the seal: None.
3.2 Install each fire pump and motor assembly listed in 1.3 and located in 1.2, using 2.2 through 2.4 for guidance.
There is no requirement to remove the old pumps. Are there any old pumps in spaces to remove?
The reference’s doesn’t include a fire main system DWG.
| 82 | 529-11-005 | It was found that the valves in para 1.3.3 and 1.3.4 have the same valve identification numbers. Please verify correct valve numbers or delete duplicate paragraph. |
| 83 | 529-11-007 | Para 3.5 states to install new material listed but it does not identify what equipment that the parts are to be installed on. These parts are listed below: |
3.5 Remove existing, fit, and install new the following parts, using 2.2 and 2.3 for guidance:
TOTAL
QUANTITY
REQUIRED NAME
OF PART REF
NO. PIECE
NO. FIG/DWG
NO. PART
NO.
One EA Switch, Temperatur e 90-165 Degree 2.2 34 6-5 222-2942NL 6 FT Tubing, 0.840 O.D.
Copper Hard Drawn WW-T-797 2.2 44 6-5 N/A 2 EA Elbow, 90 Degrees, 1/2 Inch, MIL-F- 001183 F 2.2 45 6-5 N/A 2 EA Coupling, 1/2 Inch x 1/4 Inch Red 2.2 46 6-5 N/A
84 529-85-001 In para. 3.1 a list of parts appears to have a duplicate part: Conversion kit, Oil Block p/n 881-735-042 4 ea.
Please confirm that there should be only 4 kits being installed in the 4 deballast compressor listed in 1.3.1 not 8 as shown below:
4 EA Conversion N/A 2.2 N/A 881-735- Kit, Oil Block 042 4 EA Conversion N/A 2.2 N/A 882-735- Kit, Oil Block 042 4 EA Gasket, N/A N/A N/A 839-125- End Cover 041 4 EA Seal, Oil N/A N/A N/A 838-306-
| 85 | 581-11-015 | The cover gasket in the work item is no longer available. The new part number is P1H-B85. Please confirm this replacement is acceptable. | |
| 86 | 150-11-001 | The subject item requires replacement of 136 kick pipes/stuffing tubes. With the references given it is not possible to determine the sizes of the tubes that require replacement. Please issue a matrix drawing or give a quantity of different sizes of tubes the gov’t would like to have replaced. | The references list the cable and cable type/size and provide guidance as to tube sized based on that information. |
| 87 | 150-11-011 | This item lists a gage board to be replaced however the references furnished do not show any gage board information. There needs to be a machinery or piping drawing invoked to show gage board information for planning and estimating this item. | This question is germaine to work item 150-11-001, perhaps the wrong work item was referenced. |
| 88 | 233-11-006 | In the subject item it has been found that there is an incorrect OEM tech rep being referenced in para 4.1. The correct OEM tech rep is COLFAX Fluid Handling Defense Div. | Contractor is to obtain the services of an authorized Original Equipment |
Manufacturer (OEM) technical representative for the equipment being worked. ERRATA TO BE ISSUED.
89 233-12-006 In the subject item it has been found that there is an incorrect OEM tech rep being referenced in para 4.1. The correct OEM tech rep is COLFAX Fluid Handling Defense Div. Contractor is to obtain the services of an authorized Original Equipment Manufacturer (OEM) technical representative for the equipment being worked. ERRATA TO BE ISSUED.
90 233-13-006 In the subject item it has been found that there is an incorrect OEM tech rep being referenced in para 4.1. The correct OEM tech rep is COLFAX Fluid Handling Defense Div. Contractor is to obtain the services of an authorized Original Equipment Manufacturer (OEM) technical representative for the equipment being worked. ERRATA TO BE ISSUED.
91 233-14-006 In the subject item it has been found that there is an incorrect OEM tech rep being referenced in para 4.1. The correct OEM tech rep is COLFAX Fluid Handling Defense Div. Contractor is to obtain the services of an authorized Original Equipment Manufacturer (OEM) technical representative for the equipment being worked. ERRATA TO BE ISSUED.
| 92 | 233-80-001 | When can we expect to get the 4720 GFM Summary list for the subject item AER 00296? There is long lead time materials that need to be GFM. The materials listed in items 1 thru 4 of reference 2.4 are long lead materials. | ERRATA TO BE ISSUED |
| 93 | 245-10-003 | In para 4.1 the spec item calls for a local COLFAX tech rep. We have been informed that there is no local rep and this office has been closed. It is recommended to change the tech rep info to the San Diego office: |
Colfax Fluid Handling 1827 Main Street/Suite B San Diego, CA 92113 Attention: Rich Sluys Product Support Manager - U.S.A.
Tel: 619.203.9714 richard.sluys@colfaxfluidhandling.com Contractor is to obtain the services of an authorized Original Equipment Manufacturer (OEM) technical representative for the equipment being worked. ERRATA TO BE ISSUED.
| 94 | 262-41-002 | Reference 2.2 S6225-J2-MMA-010 was not provided with the package. Please provide this reference | This reference can be obtained in NMD (Navy Maintenance database) under "references", "tech library list". NAVSEA will provide the reference via email upon request. |
| 95 | 262-90-001 | a) References listed in 2.2 thru 2.11 in spec are showing no revisions. The references provided are all Revision A. Please change specification to revision A. |
| b) Para 3.1.2 directs contractor to provide the services of a qualified on-site technical representative to assist with the removal and installation of the new equipment. Please provide the representative name the contractors are to utilize or remove the requirement. The previously accomplished SCD 71079K SHIPALTs the offeror has done did not require an OEM tech rep. | ERRATA TO BE ISSUED | |||
| 96 | 311-24-030 | In para. 3.1 it is required to replace missing clips and fasteners but there is no quantity. It will be necessary to know how many clips and fasteners are to be replaced? Contractor would recommend that a level of effort be provided for this task. | ERRATA TO BE ISSUED | |
| 97 | 321-11-011 | Para 3.1 states to remove all shore power cables. The references are an Isometric diagram and a Shore Service requirement drawing. These references do not show what needs to be removed? The Title of the item is Shore Power Station, RECEPTACLES, Cables and Access covers. The only removals required are cables in para 3.1 and BUNKER plate in para 3.3. There are no lengths of cable and no references to show terminations. Also a note in 4.2 states that Cable Splice Kits are available from Tidewater Marine. There is no requirement to reinstall anything removed. It is not possible to determine the scope of work on this item. Please clarify scope and add necessary references to estimate and accomplish this work item. | ERRATA TO BE ISSUED | |
| 98 | 443-11-002 | Addendum #1 references did not come with the amendment #1. Please forward these references or make them available on disk for pick-up. | The reference was provided on the addendum 1 CD. | |
| 99 | 512-10-001 | The subject item does not identify the location or quantity of the covers to be removed. The drawing references only HVAC openings to the weather. It will be necessary to know how many covers there are and what the locations are IOT estimate this item. | ERRATA TO BE ISSUED | |
| 100 | 512-11-011 | In para 3.2 the contractor is to inspect the cable associated with the Gaylord Hood Control Vent Damper. For Clarification purposes the cable in 3.1.1 and 3.2 is an electrical cable connected to the Damper Control Switch and the GFM provided is a Damper Control Switch model N-68 as described in the Tech Manual? | In para 3.2, the cable is replaced. GFM is Gaylord Hood Control Vent Damper. For clarification, WN states; A DAMPER LOCATED IN HOOD ABOVE GALLEY COPPERS BURNED UP. THE OLD CREW ORDERED A NEW DAMPER BUT WHEN ATTEMPTED TO REPLACE, S/F NOTICED THE CABLE WAS NOT THERE AND SUSPECTS THE CABLE IS BEHIND THE FALSE BULKHEAD. |
101 529-11-005 1.3.3 Quantity (One EA), Remote Operating Actuator and Well Deck Valve; Valve: WDFD-V-4-72-1, Gate Valve, 12 Inch IPS, 30 PSI, Flange, APL: 882049856
1.3.6 Quantity (One EA), Remote Operating Actuator and Well Deck Valve; Valve: WDFD-V-4-72-1, Gate Valve, 12 Inch IPS, 30 PSI, Flange, APL: 882049856
1) Are the two valves referenced above duplicate? Are is there two valve with the same valve number (WDFD-V-4-72-1) in the space?
2) The requirements of 3.2 states fit and install new gate valve. It doesn’t have a requirement to remove gate valves. Are the old gate valves already removed?
| The question is answered on Errata 2. | ||
| 102 | 529-11-009 | 1) 3.1 Install new each ballast shell discharge valve listed in 1.3 in locations listed in 1.2, using 2.2 through 2.4 for guidance. |
Are ballast sea valves already removed or Are we removing the ballast sea valves?
2) 3.1.2 Accomplish the requirements of 009-71 of 2.1 for an air tightness test, at 5 PSIG, for each ballast shell discharge valve.
Is standard item 009-71 supposed to say 009-25?
| ERRATA TO BE ISSUED | |||
| 103 | 529-11-012 | In para 3.1 of the subject item it is required to remove protective covering of the Ballast System Vents IAW 2.2. Reference 2.2 is a System diagram that does not address protective coverings. Clarification is requested as to what the gov’t wants to accomplish with the Ballast System Overboard protective covering. | ERRATA TO BE ISSUED |
| 104 | 551-85-001 | Missing Ref. below: |
2.2 321-8434502, Power System Modification Incidental to AER-19/02
| This reference can be obtained in NMD (Navy Maintenance database) under "references", "tech library list". NAVSEA will provide the reference via email upon request. | |||
| 105 | 631-11-016 | The area designated in para 1.3.1 appears to include the entire “Well Deck” area. The para 1.3.1 goes on to specify Port and Stbd Enclosed Boat Handling Area. Please provide space designation number or clarification of the location; “Enclosed Boat Handling area” | 1.3.1 states: Well Deck Surfaces, Frames 35-134, Port and Starboard, Overhead, Bulkheads, and Deck, Port and Starboard Enclosed Boat Handling Area Overheads, to Include all Appendages and foundations. These areas can be locate on provided references. |
| 106 | 997-11-001 | In attachment J-3 Milestone schedule there is an UNDOCKING Milestone of 14-AUG-18 (A+218) however in the Constraints column it states that the Offereror is to propose the Dock and Undock dates IAW Spec 997-11-001. Please clarify whether or not the Offereror is to provide an Undocking Date. | Contractor may propose docking date and undocking date. In accordance with the revised J-3, the undock date must be proposed to occur NLT 14 Aug 2018. |
| 107 | 262-90-001 | Paragraph 3.1.3 references paragraph 1.3. Paragraph 1.3 provides no identification, states “Not Applicable”. KTR questions the intent of the paragraph 3.1.3. | ERRATA TO BE ISSUED |
| 108 | RESERVED | RESERVED | RESERVED |
| 109 | 512-11-036 | Para 3.1 of the subject item states to accomplish the requirements of 2.2 thru 2.4. These references are Tech Manuals. It is not possible to accomplish the requirements of a tech manual. Are these documents to be used as guidance to replace the parts listed in 3.1.1? | ERRATA TO BE ISSUED |
| 110 | 521-11-001 | There is no way to know how many and what size Valve Hand-wheels the Supervisor will designate to replace or color code. The references that have been invoked do not give the quantities required. It is recommended that a level of effort paragraph be added to this item or disclose the size and quantity of handwheels to be replaced. | ERRATA TO BE ISSUED |
| 111 | Please confirm the growth work estimate of 391,680 "hours" and $15,000,000 in "material" contained in the RFP represents the amount of growth work the Government expects during the USS TOTUGA EDSRA/MODPRD. These are the same AGR calculations estimates for the USS MAKIN ISLAND EDPMA. The two ships are different class ships with different estimates in mandays in the repair package from their respective Planning Yards, different modernization packages and different availability lengths. Can the Navy provide Industry the model that is used to calculate the AGR for each CNO Availability? | The growth work estimates in the RFP shall be updated with the following figures: 681,759 Hours and $11,107,501 material. | |
| 112 | Each Ship goes through a myriad of Assessments and Inspections during their Operational Cycle that are conducted by personnel in the Fleet Concentration Area. Are these assessments going to be conducted during the EDSRA/MODPRD or will they take place after the ship’s re-introduction Availability. |
• Afloat Training Group (ATG) Training and Assessments (Light Off Exam, Combat Systems Light off, NGFS Team Trainer, On-Board Aviation Fire Fighting Team Trainer, etc.)
• Aviation Certification (AVCERT) Team
• TYCOM and ISIC Crew Certification Team
• Total Ship Readiness Assessment (TSRA) Team
• Shipboard Corrosion Assessment Team (S-CAT)
• Shipboard Readiness Engineering Training & Support Teams (ERAT)
| • Combat Systems Readiness Assessment Team (CSRAT) | TORTUGA will be Operationally Ready at the conclusion of the EDSRA. The Ship will be subjected to all required assessments and certification Teams as normally performed during any previous EDSRA (EDPMA). | ||
| 113 | Can the Navy Provide the Manning Plan Sequence for the USS TORTUGA EDSRA? The proposed crew manning plan will be integrated into the Execution Testing Plan for the ship. Part of the execution plan will have Govt Testing oversight for QA Check Points. The LMA would like to know the sequence of crew availability to support the Check Points being inserted into the Integrated Schedule. | The crew is not required to attend check points, therefore this information is not required for bid. The GOVT expects approximately 50% manning by start of availability but this figure is subject to change. | |
| 114 | Were the requirments in Surface Force Readiness Manual (COMNAVSURPACINST/COMNAVSURFLANTINST 3502.3) taken into consideration in the training of the crew and the reactivation of the ship to meet Crew Certification requirments in the Interport Differential Costs? | Yes, the requirments in Surface Force Readiness Manual (COMNAVSURPACINST/COMNAVSURFLANTINST 3502.3) were taken into consideration in the Interport Differential. | |
| 115 | The Navy can now examine AIT costs between several homeports on like availability’s (ARLEIGH BURKE ESRA VS RAMAGE ESRA VS MITSCHER ESRA VS JP JONES ESRA). Has the Navy computed that Delta difference between the ports/FCAs/ Shipyards and has that been looked at in the Interport Differential Costs? | AIT costs are not included in the LSD46 Interport Differential Costs. The Navy doesn’t know 1) Who the successfully awarded AIT contractor(s) will be, 2) what the awarded AIT contractor’s footprint is in the ship’s homeport or 3) what the awarded AIT contractor’s footprint is in the potential out of homeport locations. Therefore, AIT travel requirements cannot be determined with reasonable certainty. |
The costs anticipated to be incurred on contracts for Alteration Installation Teams (AIT) shall not be considered in estimating the foreseeable costs of the contract for ship overhaul, repair, or maintenance that is the subject of the instant source selection. Title 10 U.S.C. 7299a (b) states: "In evaluating bids or proposals for a contract for the overhaul, repair, or maintenance of a naval vessel, the Secretary of the Navy shall, in determining the cost or price of work to be performed in an area outside of the area of the homeport of the vessel, consider foreseeable costs of moving the vessel and its crew from the homeport to the outside area and from the outside area back to the homeport at the completion of the contract." This statutory provision explicitly focuses its mandate of considering foreseeable costs to only those costs that relate to the moving of the vessel and its crew from the homeport to the outside area and from the outside area back to the homeport.