Attachment J-3 Communications Suite Turnkey Approach

View the file

Other files

File Type Posted
N00024-17-R-2207-0006.pdf PDF
N00024-17-R-2207-0005.pdf PDF
N00024-17-R-2207-0004.pdf PDF
J-5_Schedule_C_Government_Furnished_Information_Rev_A_N0002417R2207.pdf PDF
J-3_C4I_Turnkey_Rev_A_N0002417R2207.pdf PDF
N00024-17-R-2207-0003.pdf PDF
N00024-17-R-2207-0002.pdf PDF
T-ATS_Pre-Proposal_Conference_Minutes.pdf PDF
N00024-17-R-2207-0001.pdf PDF
J-16_Contractor_Spec_to_COR_Traceability_Matrix_N0002417R2207.xlsx XLSX spreadsheet
J-10_T-ATS_Preservation_Instructions_N0002417R2207.pdf PDF
N00024-17-R-2207.pdf PDF
J-6_Restrictions_on_Technical_Data_Forms_N0002417R2207.docx DOCX document
J-11_List_of_Prohibited_Materials_N0002417R2207.pdf PDF
J-5_Schedule_C_Government_Furnished_Information_N0002417R2207.pdf PDF
J-13_Special_License_T-ATS_N0002417R2207.doc DOC document
J-14_Past_Performance_Questionnaire_Form_N0002417R2207.doc DOC document
J-9_Cybersecurity_Requirements_N0002417R2207.pdf PDF
J-4_Outfitting_and_Spares_N0002417R2207.pdf PDF
J-8_IDE_Site_Access_and_PKI-IA_Awareness_Attributes_N0002417R2207.pdf PDF
J-17_Financial_Data_Requirements.docx DOCX document
J-12_Commercial_Warranty_N0002417R2207.docx DOCX document
J-1_COR_N0002417R2207.pdf PDF
J-15_Offeror's_Question_Submittal_Form.doc DOC document
J-3_C4I_Turnkey_N0002417R2207.pdf PDF
J-2_DRL_N0002417R2207.pdf PDF
T-ATS_DDC_Draft_RFP_QA_20Mar2017.docx DOCX document
T-ATS_DDC_Draft_RFP_QA_28Feb2017.docx DOCX document
T-ATS_DDC_Draft_RFP_QA_25Jan2017.docx DOCX document
T-ATS_DDC_Draft_RFP_QA_05Jan2017.docx DOCX document
T-ATS_DDC_Draft_RFP_QA_14Dec2016.docx DOCX document
T-ATS_DDC_Draft_RFP_QA_5Dec2016.docx DOCX document
T-ATS_DDC_Draft_RFP_QA_23Nov2016.docx DOCX document
T-ATS_Industry_Studies_Non-Proprietary_Q A_w-Attachments.pdf PDF
J-2_DRL_Draft_N0002417R2207.pdf PDF
J-1_COR_N0002417R2207.pdf PDF
J-9_Cybersecurity_Requirements_N0002417R2207.pdf PDF
J-10_Preservation_Instructions_N0002417R2207.pdf PDF
N00024-17-R-2207_DRAFT_RFP.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWING, SALVAGE, AND RESCUE SHIP (T-ATS)

GOVERNMENT COMMUNICATIONS SUITE

TURNKEY APPROACH

12 August 2016

N00024-17-R-2207

ATTACHMENT J-3 15

DEPARTMENT OF THE NAVY

PROGRAM EXECUTIVE OFFICE, SHIPS

WASHINGTON, DC 20376

N00024-17-R-2207 Attachment J-3 Government Communications Suite Turnkey Approach

1.0 Introduction

This document describes the work to be performed by the Contractor and the Government in support of the Government Communications Suite Turnkey process.

The installation of the Government’s Communications Suite will be done under a Turnkey Approach performed by the Contractor and Government. The Government’s Communications Suite consists of equipment to be located within a dedicated communications space and topside.

The Government will provide drawings for envelopes within the shipboard communications space and Topside arrangements required for the installation of Communication Suite. The main role of the Contractor is to design, construct and prepare the Communication Space and Topside locations, and other related ships services for installation of Government’s communication equipment. The Government shall coordinate the E3 compatibility certification between T-ATS contractor furnished communication suite and the government furnished communication suite.

2.0 Definitions

Government Communications Space – Refers to Government Communications Center, as defined in the Circular of Requirements (COR), Attachment J-1, sections 3.401 and 3.441.

Remote Space – Refers to space that contain Command, Control, Communications, Computers, and Intelligence (C4I) Government Furnished Equipment (GFE) that is external to the Government communications space.

Topside – Refers to all systems and structures that are installed on the external portion of the ship. Topside also includes space and weight reservations for the installation of topside antennas, with associated foundations, cabling, Radio Frequency switching and coupling hardware and components, and associated inter-dependent systems.

C4I Cabling – Refers to cabling that serves C4I equipment located within Government communications space, remote space, and topside.

Inter-Compartment Cabling – Refers to C4I cabling that terminates one or both ends external to Government communications space, or cabling that terminates one or both ends in non-contiguous Government communications space.

Intra-Compartment Cabling – Refers to C4I cabling that terminates both ends within the Government communications space, or that terminates both ends in contiguous Government communications space.

Government Furnished Government Installed (GFGI) – Refers to a subset of C4I GFE consisting of equipment that will be installed by the Government.

Government Furnished Contractor Installed (GFCI) – Refers to a subset of C4I GFE consisting of equipment that shall be installed by the Contractor.

3.0 General

The C4I system consists of equipment located within Government communications space, remote space, and topside. The work required to deliver a fully operational C4I system will be done under a turnkey approach whereby the work will be performed by both the Contractor and the Government. Section 6.0, Government Furnished Information (GFI), will provide not-to-exceed values for equipment dimensions and access envelope, weight, Heating, Ventilation, and Air Conditioning (HVAC) load, electrical load, and foundation requirements for the C4I systems. The Contractor shall keep access envelopes free of any structure, piping, ventilation ductwork, or any other obstruction that will interfere with the installation, operation, or maintenance access to the C4I equipment. Updated GFI will include Center of Gravity (CG) specified at the envelope and cabinet levels, and will be provided during detail design. Remote spaces that contain C4I GFE shall have envelopes for that equipment provided with not-to-exceed values.

4.0 General Scope of Work

The Contractor shall: The Government will:

Design and construct the Government Communications space, remote space, and topside in accordance with the COR, Attachment J-1; this attachment; and the Project Peculiar Documents.

Provide updates to this attachment and the Project Peculiar Documents, as required for detail design.

4.1 General Shipyard Support Requirements

4.1.1 Equipment Handling

The Contractor shall: The Government will:

Provide material handling services to include but not limited to: lifting, rigging, uncrating, unpacking, moving, and load out of the C4I equipment from the Government’s transport vehicle or Contractor temporary climate controlled storage to the Government communications space, remote space, or topside.

Anticipate twenty six (26) lifts (20 on load, 6 off load). Heaviest on load is estimated at 459 kg.

4.1.2 GFE Load Out

The Contractor shall: The Government will:

Load out the GFE from the Government’s transport vehicle to the ship’s Government communications space or from the contractor’s climate controlled storage facility as per schedule agreed upon between government and contractor

Provide the C4I GFCI and GFGI equipment for load out as per schedule agreed upon between government and contractor.

4.2 C4I Shipboard Requirements

4.2.1 Cabling

The Contractor shall: The Government will:

Provide, install, test, but not terminate C4I inter-compartment non-fiber cables in accordance with section 6.2

Terminate all cable ends and connect the inter-compartment C4I cables to the C4I equipment.

Provide, install, test, but not terminate the C4I inter-compartment fiber cables in accordance with Section 6.2

Terminate all cable ends and connect the inter-compartment C4I fiber cables to the C4I equipment.

Provide 1.5 meters of excess cable length on each cable end to be terminated by the Government Installation Team.

N/A

Seal and coil all non-terminated cable ends upon completion of installation and resealing and coil after completion of testing.

N/A

Install all Classified cables routed external to the Government Communications Center as listed in section 6.2 so they can be physically inspected.

Physically inspect, test and terminate each of the classified cables.

4.2.2 Cable Hangers and Cable Banding

Design, provide, and install cable hangers to support all C4I cabling. This includes hangers for all inter- and intra-compartment cables.

Provide documents referenced in section 6.2

Band all C4I inter-compartment cables. Band all C4I intra-compartment cables.

4.2.3 Deck Covering

Install high voltage deck covering after completion of the Government’s installation but prior to Builder’s Trials (BT) per Attachment J-1 section 3.634.

N/A

4.2.4 Foundations and Sway Bracing

Design, fabricate, and install foundations and sway bracing for all C4I equipment in accordance with section 6.2. This includes all topside, remote space, and Government communications space equipment locations.

Provide in the GFI the weight and CG, of each individual equipment racks, or item to be installed on a foundation.

Drill mounting holes for Contractor-installed C4I equipment in accordance with the GFI Section 6.2. This includes topside, remote space, and Government communications space equipment locations.

4.2.5 Painting and Insulation

Complete the insulation and paint out of Government communications space prior to the Government installation.

N/A

Cover and mask equipment to affect repairs to damaged insulation and damaged paint after completion of the Government installation but prior to BT.

4.2.6 Support Systems

The Contractor shall: The Government will:

Design, install, and test the HVAC, lighting, and convenience receptacle systems for the C4I space in accordance with the Attachment J-1 section 4.331, 4.420, 4.512, and GFI Section 6.2.

Provide GFI values required for detail design.

4.2.7 Power System Requirements

Design, install, and test the power distribution systems for the C4I space per GFI Section 6.2.

N/A

Provide ten (10) percent spare circuit breakers for each type installed.

Specify in the GFI the compartment level not-to-exceed electrical power loads, quantities, and ratings of power panels and the number of circuits per power panel required in C4I space.

Install and feed all C4I power panels. Terminate the GFE from space power panel circuit breakers to the equipment.

4.2.8 Labels

Provide and install the necessary labels for all C4I equipment and cabling in accordance with Section 6.2.24 T-ATS Inter-Compartment Cabling List and to include but not be limited to C4I antennas, remote compartment equipment and power panels.

4.2.9 Gyrocompass System

Provide Gyrocompass information to the Government Communication Center in accordance with Attachment J-1 section

3.424d.

4.2.10 Communication Center Space Outfitting

The Contractor shall provide the following items as initial space outfitting:

The Government will adjust Section 6.2.6 GFI once Communications Center dimensions and outfitting equipment dimension identified

GSA approved Class 6-S security container, Four (4) Drawer – Legal Size (H x W x D):

62.5 inches x 20.875 inches x 28 inches, NSN:

7110-01-606-5836

N/A

High Security (classified up to Top Secret) Cross Cut Shredder from NSA Evaluated Products List: Notional shredder is Capital Shredder Corporation Model K-16 Destroyer (H x W x D): 37 inches x 24 inches x 19 inches

N/A

Single Workbench (H x W x D): Notional

62.25 inches x 52 inches x 29 inches

N/A

Desk (H x W x D): Notional 62.5 inches x 72 inches x 29 inches. Notional chair and deck securing methodology same as shipbuilder design.

N/A

File Cabinet, 3 Drawer (H x W x D): Two notional 28 inches x 15 inches x 18 inches

N/A

Storage Locker (H x W x D): Notional 70 inches x 36 inches x 15 inches

N/A

Pigeon Hole Bin Storage (H x W x D):

Notional 32 inches x 53 inches x 11 inches

4.3 C4I Space Completion, Inspection, and Turnover

4.3.1 Completion

The Contractor shall: The Government will:

Complete the Government communications space and ship’s services to these spaces as specified in this attachment no later than 150

Conduct inspections to ensure compartment completion prior to Government acceptance of calendar days prior to Builder’s Trials (BT). the C4I spaces.

Make this space and services available to the Government on a continuing basis from the date 150 calendar days prior to BT.

4.3.2 Government Communications Space Acceptance Requirements

Complete the installation and testing of doors, door locks, door alarms, alarm panels, hatches, safes, hot work, and joiner work prior to turnover of the Government communications space to the Government.

N/A

Complete the installation and testing of cabling for power distribution systems prior to turnover of the Government communications space to the Government.

N/A

Complete the installation and testing of cabling for power distributions systems for Remote Compartment C4I equipment.

N/A

Ensure the power distribution systems remain in operable condition during the Government installation phases.

N/A

Complete the installation and testing of lighting panels, cables, fixtures, and switches prior to turnover of the Government communications space to the Government.

N/A

Demonstrate that the lighting system is operable prior to turnover of the Government communications space to the Government.

N/A

Ensure the lighting system remains in a continuous operable condition during the Government installation phases.

N/A

Complete the installation and testing of the HVAC system prior to turnover of the Government communications space to the Government.

Demonstrate the HVAC system is operational N/A

24 hours prior to the C4I equipment load out.

Ensure the HVAC system remains operational 24 hours a day until ship delivery. This shall include all ducting, alarms, and other components included in the system.

If necessary to meet the 24 hour operational requirement, the Government will accept HVAC provided by portable units, on a temporary basis, provided that the portable units are external to the Government communications space and ducted through the normal system ducting.

Complete the installation and testing of piping, wiring, ductwork, cable-ways, and other systems that either serve or traverse the Government communications space prior to turnover of the Government communications space to the Government.

N/A

Complete the installation and testing of all Contractor furnished items prior to turnover of the Government communications space to the Government.

N/A

Complete all insulation and painting prior to turnover of the Government communications space to the Government.

N/A

Complete the installation of all topside C4I hardware, to include antennas and associated couplers or tuners, matching networks enclosures, prior to turnover of the Government communications space to the Government.

N/A

Complete the installation and measurements of all C4I foundations prior to turnover of the Government communications space to the Government.

N/A

Complete the bonding of all C4I GFCI equipment prior to turnover of the Government communications space to the Government.

N/A

Complete the installation and testing of all inter-compartment cables prior to turnover of the Government communications space to the Government.

N/A

Complete the installation and testing of power for remote C4I equipment prior to turnover of the Government communications space to the Government.

Compliance with security requirements identified in Attached J-1 Section 4.402

4.4 Installation

4.4.1 C4I GFE

The Contractor shall: The Government will:

Install C4I GFCI equipment. Install C4I GFGI equipment.

Install foundations, brackets, and mounts per Section 6.2, Outline and Mounting or Outline and Installation drawings.

Provide outline and mounting drawings for C4I

GFE.

Provide, install, and test all inter-compartment cables in accordance with C4I Cable list, Section 6.2.

Terminate those inter-compartment cables that connect to C4I GFE.

N/A Terminate and connect all intra-compartment cables

Complete the installation and testing of furniture and ancillary items no later than 45 days after turnover of the Government communications space to the Government, or as coordinated with PMR.

5. Government Furnished Equipment.

5.1 Projected List of C4I Systems

GFE will be delivered per Schedule A System Nomenclature QTY GFGI GFCI

HF Transmit/Receive System 2 X

RF-7800H-AD400 HF Transceiver

VHF/UHF Line of Sight (LOS)/SATCOM Voice 2 X

RF-300M-V250, Dual Multiband Man pack Vehicular Mount Radio

Naval Messaging 1 X

AN/SYQ-26(V)7 Navy Modular Automated Communications System (NAVMACS)

Next Generation Wideband System 1 X

Tactical Switching 1 X

RF-7800I Intercom System

Combined Enterprise Regional Information Exchange System (CENTRIXS) Fly Away Kit

1 X

Key Management Infrastructure (KMI) Spiral 2 Tier 3 10 X

Secure Data/Voice Devices X

D3 MGUE Military Receiver 1 X

AN/APX-123A(V)3 Identification Friend or Foe (IFF) 1 X

5.2 Projected List of Topside and Remote Systems

GFE will be delivered per Schedule A

Item Description QTY GFGI GFCI 1000 HF Transmit/Receive System 1010 AT-100D, Antenna, Vertical Whip 2 X 1020 RF-382A, Antenna Matching Unit 2 X 2000 Satellite TV Antenna 2010 MS6011-4, Sea Tel COBHAM Direct to Sailor Antenna w/Radome 1 X

3000 VHF/UHF LOS System 3010 AV 457-6, VHF/UHF Antenna, Dipole Array 2 X 4000 UHF SATCOM System 4100 Antenna Group 4110 OE-570B/WSC Antenna (AS-4780/U) 1 X 4120 Amplifier/Filter Unit (AM-7641/U) 1 X 4200 Omni Direction Antenna

4210 GD-2100 MUOS SATCOM ANTENNA 1 X

6000 Next Generation Wideband System 6010 Ku Band Antenna Group Antenna, Parabolic with Radome 1 X 6020 L Band Antenna Group Antenna, Parabolic with Radome 1 X

6030 SYM 851 1 X

7000 Identification Friend or Foe System 7010 AS-177B/UPX Antenna, Vertical Whip 1 X 8000 Tactical Switching 8010 Keyboard Display Unit (RF-7800I-KD200) 6 X 8020 Amplifier Mount Bracket 6 X 8030 Tactical Speaker (RF-5980-SA001) 6 X 8040 DC power supply 1 X

9000 Quality Monitoring System 9010 AS-390/SRC Antenna, Vertical Stub with Ground Plane 1 X

10000 MGUE

10010 AS-4617/SRN Advanced Digital Antenna Production

(ADAP) Global Positioning System (GPS) Anti-jamming Antenna

1 X

6.0 Government Furnished Information.

6.1 List of Inter-Compartment Cables

6.1.1 Forty-three (43) unclassified LAN Ethernet drops required. Section 6.2 contains the projected compartment name and number of drops per compartment list.

6.1.2 Nine (9) secure LAN Ethernet drops required. Section 6.2 contains the projected compartment name and number of drops per compartment list.

6.2 Provided Government Furnished Information

GFI will be provided and updated per Schedule C

6.2.1 T-ATS GFI Master Drawing List, 021-000-538702

6.2.2 T-ATS GFI Master Parts List, 022-001-538702

6.2.3 C4I Space, Weight, and Power Technical Data Summary, 023-000-538702

6.2.4 Rack Arrangement System Elevations Drawing, 040-001-538702

6.2.5 Rack Arrangement System Elevations Drawing, 040-002-538702

6.2.6 Antenna ADAP AS-4617/SRN, Antenna Elevations Drawing, 050-001-538702

6.2.7 Antenna HF AT-100D Antenna Elevations Drawing, 050-002-538702

6.2.8 Antenna VHF/UHF AV 457-6 Antenna Elevations Drawing, 050-003-538702

6.2.9 Antenna SATCOM Omni-Directional GD-2100 Antenna Elevations Drawing, 050-004- 538702

6.2.10 Antenna Filter AM-7641/U Elevations Drawing, 050-005-538702

6.2.11 Antenna Unit AS-4780/U Elevations Drawing, 050-006-538702

6.2.12 Antenna VHF/UHF AS-390/SRC Antenna Elevations Drawing, 050-007-538702

6.2.13 Antenna IFF AS-177B/UPX Antenna Elevations Drawing, 050-008-538702

6.2.14 SEATEL 4010W-33, Ku-Band Antenna Elevations Drawing, 050-009-538702

6.2.15 SAILOR 500, Fleet Broadband L-Band Antenna Elevations Drawing, 050-010-538702

6.2.16 MS-6011-4 Antenna Elevations Drawing, 050-011-538702

6.2.17 72 Inch AJ Rack, Mechanical Assembly and Mounting Details Drawing, 171-001-538702

6.2.18 NAVMACS II AN/SYQ-26(V)7 MAD II, Mechanical Assembly and Mounting Details Drawing, 171-002-538702

6.2.19 DC Power Supply, Mechanical Assembly and Mounting Details Drawing, 171-003- 538702

6.2.20 Keypad Display Unit, RF-7800I- KD200, Mechanical Assembly and Mounting Details Drawing, 171-004-538702

6.2.21 Speaker Unit RF-5980-SA001, Mechanical Assembly and Mounting Details Drawing, 171-005-538702

6.2.22 SYM-438 Terminal Box Assembly, Mechanical Assembly and Mounting Details Drawing, 171-006-538702

6.2.23 Antenna Coupler RF-382A, Mechanical Assembly and Mounting Details Drawing, 171- 006-538702

6.2.24 Inter-Compartment Cabling List, 190-000-538702

Unless otherwise stated:

a. Items 6.2.3, and 6.2.24 are supplied as Microsoft Excel workbooks

b. Items 6.2.1, 6.2.2 and 6.2.4 thru 6.2.23 are supplied in CAD and /or Adobe PDF format

6.3 Projected Topside Emitter Summary (GFE)

SYSTEM (QTY) Transmit

Frequency Receive Frequency Transmit Power Polarization Antenna Type

IFF ANTENNA,

AS-177B/UPX (1)

1030 to 1090 MHz 1030 to 1090 MHz 5 W Mean/ 600 W Peak Envelope

Power

Vertical Dipole with Conical Skirt

UHF QUALITY

MONITORING,

AS-390/SRC (1)

(receive only) 240 to 315 MHz (receive only) Vertical Bent Cross Dipole

VHF/UHF LOS

ANTENNA AV 457-6

30 to 512 MHz 30 to 512 MHz 100 W Vertical Center-Fed Dipole

UHF SATCOM

ANTENNA GROUP,

OE-570B/WSC (1)

280 to 322 MHz

243 to 270.5 MHz 338 to 380 MHz

200 W Right Hand Circular Cross-Dipoles Array

UHF Omni-Directional

SATCOM ANTENNA,

GD-2100

292 to 318 MHz

300-320 MHZ

244 to 270 MHz

360-380 MHZ

200 W Right Hand Circular Omni-Directional

SAILOR 500

FLEETBROADBAND

ANTENNA

1626.5 - 1660.5 MHz (L band)

1525.0 - 1559.0 MHz

(L band)

SEATEL 4010W-33

ANTENNA

10.70-12.75 GHz (Ku band)

13.75 – 14.5 GHZ

(Ku band)

Linear Dish- Parabolic

HF

TRANSMIT/RECEIVE

AT-100D

1.6 to 30 MHz 1.6 to 30 MHz 1500 W Vertical Vertical Dipole

Sea Tel COBHAM Direct to Sailor

3.625 to 4.200 GHz

10.7 to 12.75 GHz

3.625 to 4.200 GHz

10.7 to 12.75 GHz

C Band Circular, Ku Band

Linear/Circular

6.0 Government Furnished Information.
6.1 List of Inter-Compartment Cables
6.3 Projected Topside Emitter Summary (GFE)