N00024-16-R-4100_Amend_0002.pdf
PDF 134 KB Posted
- Solicitation number
- N00024-16-R-4100
About this file
Amendment 0002
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TBD
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See attached for details.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Oct-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-16-R-4100
X 9B. DATED (SEE ITEM 11)
09-Sep-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Oct-2016
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-16-R-4100
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT BODY
The purpose of Amendment 0002 is to:
1) Update Section A to extend proposal submission to 2 November 2016 3:00PM Washington DC time
2) Update Section C.3.2 Normal Working Hours (INACTSHIPMAINTO Philadelphia and CG/LSD
Modernization Detachment)
3) Update Section H to include insurance language
4) Update Section J for revised Attachment 21 – Pricing Worksheet
5) Update Section L to extend the date for RFP question submissions to no later than 21 October 2016 3:00PM
Washington DC time.
6) Update Section L to remove the requirement for Ceiling Rates
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 24-Oct-2016 03:00 PM to 02-Nov-2016 03:00 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
C.3.2 Normal Working Hours (INACTSHIPMAINTO Philadelphia and CG/LSD Modernization Detachment)
A normal workday is defined as Monday through Friday, excluding Federal holidays as set by the Office of
Personnel Management. Working hours will be set by the Contractor and coordinated with the COR. A normal workday shall be eight (8) hours long, not including lunch. All other hours are non-normal working hours. The
Contractor will maintain work, leave and compensatory time records for all employees and will make them available to the COR, as required in accordance with CDRL A042.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
INSURANCE LANGUAGE
LIABILITY, AUTOMOBILE AND WORKMAN’S COMPENSATION INSURANCE
The following types of insurance are required in accordance with the clause entitled "INSURANCE-LIABILITY TO
THIRD PERSONS" (FAR 52.228-7) and shall be maintained in the minimum amounts shown:
(1) Comprehensive General Liability: $200,000 per person and $500,000 per accident for bodily injury.
No property damage general liability insurance is required.
(2) Automobile Insurance: $200,000 per person and $500,000 per accident for bodily injury and $20,000 per accident for property damage. Comprehensive form of policy is required.
(3) Standard Workmen's Compensation and Employer's Liability Insurance (or, where maritime employment is involved, Longshoremen's and Harbor Worker's Compensation Insurance) in the minimum amount of $100,000.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following document(s), exhibit(s), and other attachment(s) form a part of this contract:
ATTACHMENT 1 List of assigned Vessels
ATTACHMENT 2 Safe Stowage Check-off List
ATTACHMENT 3 Repair Request Work Order (RRWO)(sample)
ATTACHMENT 4 Reserved
ATTACHMENT 5 Janitorial Task and Frequency Chart
ATTACHMENT 6 Government Furnished Equipment
ATTACHMENT 7 Government Furnished Vehicles
ATTACHMENT 8 Government Furnished Tools
ATTACHMENT 9 Reserved
ATTACHMENT 10 Quality Assurance Surveillance Form for Cathodic Protection (C/P) Inspection
ATTACHMENT 11 Quality Assurance Surveillance Form for Dehumidification (D/H) Inspection
ATTACHMENT 12 Quality Assurance Surveillance Form for Fire and Flood (F/F) Inspection
ATTACHMENT 13 Integrity Inspection
ATTACHMENT 14 Arrival Inspection Check-Off Sheet
ATTACHMENT 15 Inspection of Disposal Vessel
ATTACHMENT 16 Security Violation Report
ATTACHMENT 17 CO2 Fire Extinguisher and Dry Chemical Inspection Log
ATTACHMENT 18 Mooring and Security Inspection Log
ATTACHMENT 19 Strike Ship Check-off List
ATTACHMENT 20 Polychlorinated Biphenyl (PCB) Inventory Survey
ATTACHMENT 21 Pricing Worksheet (Updated Amend 0002)
ATTACHMENT 22 Contract Security Classification Specification, DD Form 254
ATTACHMENT 23 Quality Assurance Surveillance Plan
EXHIBIT A DD Form 1423, Contract Data Requirements List
EXHIBIT B Past Performance Data
EXHIBIT C Pas Performance Questionnaire
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
INSTRUCTIONS TO OFFERORS
Volume II will consist of the supplemental information shown below and further described in the following sections.
Section Description
1 General Information
2 Labor Rates
3 Subcontractor Costs
4 Other Direct Costs, Travel, and Materials
5 Indirect Cost Rates and Fee
6 Company Compensation Plan
7 Solicitation Documents
5-INDIRECT RATES AND FEE
Indirect Rates - The Offeror shall identify in Attachment 21 all proposed indirect rates/costs such as Fringe, Overhead (i.e., labor and material), General and Administrative, Facilities Capital Cost of Money (FCCOM), etc. The Offeror shall clearly delineate for each indirect cost(s) the rate proposed for the base year and each option year and the formula used to apply these rates.
Offerors shall provide the supporting information and identify the basis of the proposed rates for indirect costs.
The Offeror shall indicate if the proposed rates are subject to a Forward Pricing Rate Agreement with the
Government. The Offeror shall provide an explanation as to why the proposed rates may differ from those recommended by DCAA (if known). The Offeror shall provide actual indirect rates for overheads, G&A, fringe benefits, etc. for the prior three (3) years and shall explain the basis for any rate difference between the prior three (3) year period and the rates being proposed. The Offeror shall compare the most current DCAA-recommended rates, if any, for the Offeror’s company and for any subcontractor and provide a thorough explanation of the differences. If subcontractors are to submit cost information individually, the subcontractor should conduct this comparison and provide explanations.
When the Offeror elects to claim FCCOM as an allowable cost, the Offeror must submit Form CASB-CMF and show the calculation of the proposed amount. FCCOM will be an allowable cost under the contemplated contract if the criteria for allowability in FAR 31.205-10(a)(2) are met and the resultant contract includes FAR clause
52.215- 16, Facilities Capital Cost of Money. If the Offeror does not propose to claim FCCOM, the resulting contract will include the FAR clause 52.215-17, Waiver of Facilities Capital Cost of Money.
Provide a fixed fee, based on profit, to be paid each period of performance. Submit DD Form 1547, Record of
Weighted Guidelines Application by CLIN and rationale/justification for proposed profit.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .