Attachment_12_-_Quality_Assurance_Surveillance_Form_for_Fire_and_Flood_(FF)_Inspection.pdf

PDF 27 KB Posted

Attached to
Operation and Maintenance of Philadelphia Inactive Vessels and CG/LSD Modernization
Solicitation number
N00024-16-R-4100
Issued by

About this file

Attachment 12 - Quality Assurance Surveillance Form for Fire and Flood (FF) Inspection

View the file

Other files

File Type Posted
N0002417C4100_J&A__redacted.pdf PDF
16R4100_Questions_and_Answers__16-17.pdf PDF
N00024-16-R-4100_Amend_0003.pdf PDF
Attachment_21_-_Pricing_Worksheet_(Updated_Amend_0003).xlsx XLSX spreadsheet
16R4100_Questions_and_Answers__10-15.pdf PDF
Attachment_21_-_Pricing_Worksheet_(Updated_Amend_0002).xlsx XLSX spreadsheet
N00024-16-R-4100_Amend_0002.pdf PDF
16R4100_Questions_and_Answers__2 _5-9.pdf PDF
16R4100_Questions_and_Answers__1-4.pdf PDF
N00024-16-R-4100_Amend_0001.pdf PDF
Attachment_17_-_CO2_Fire_Extinguisher_and_Dry_Chemical_Inspection_Log.pdf PDF
Attachment_16_-_Security_Violation_Report.pdf PDF
Exhbt_C_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_18_-_Mooring_and_Security_Inspection_Log.pdf PDF
Attachment_13_-_Integrity_Inspection.pdf PDF
Attachment_14_-_Arrival_Inspection_Check-Off_Sheet.pdf PDF
Attachment_15_-_Inspection_of_Disposal_Vessel.pdf PDF
Attachment_19_-_Strike_Ship_Check-off_List.pdf PDF
Attachment_2_-_Safe_Stowage_Check-off_List.pdf PDF
Exhbt_B_-_Past_Performance_Data.docx DOCX document
Attachment_10_-_Quality_Assurance_Surveillance_Form_for_Cathodic_Protection__(CP)_Inspection.pdf PDF
N00024-16-R-4100.pdf PDF
Attachment_22_-_Contract_Security_Classification_Specification _DD_Form_254.pdf PDF
Attachment_11_-_Quality_Assurance_Surveillance_Form_for_Dehumidification_(DH)_Inspection.pdf PDF
Attachment_5_-_Janitorial_Task_and_Frequency_Chart.pdf PDF
Attachment_3_-_Repair_Request_Work_Order_(RRWO)(sample).pdf PDF
Attachment_20_-_Polychlorinated_Biphenyl_(PCB)_Inventory_Survey.pdf PDF
Attachment_7_-_Government_Furnished_Vehicles.pdf PDF
Attachment_21_-_Pricing_Worksheet.xlsx XLSX spreadsheet
Attachment_23_-_Quality_Assurance_Surveillance_Plan.pdf PDF
Attachment_1_-_List_of_assigned_Vessels.pdf PDF
Attachment_6_-_Government_Furnished_Equipment.pdf PDF
Exhbt_A_-_DD_Form_1423 _Contract_Data_Requirements_List.pdf PDF
Attachment_18_-_Mooring_Report_Diagram.pdf PDF
Attachment_8_-_Government_Furnished_Tools.xls XLS spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 12

Periodicity:Spec Code: Berthed At: Quarter:

NSTM 50 INSPECTION GUIDELINES FF1 Insp Date:

TDLRemarksN/ANOYESDescription Item

1 Check continuity of each heat, smoke and flood alarm circuit at the control panel. Record results below. Are all readings satisfactory?

2 Have all other discrepancies been reported? If not report them here.

F/F Continuity

FWD Draft: AFT Draft: List:

Comments:

Inspector Inspector Inspection Manager

Circuit Continuity Test Results

SW No. Cir Type K Ohm Test Location

Sat Unsat

SW No. Cir Type K Ohm Test Location

Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing

Spec Code:

Line Item # Location Discrepancy Discovery Dt Correction Dt

NSTM 50 INSPECTION GUIDELINES FF2 Insp Date:

TDLRemarksN/ANOYESDescription Item

1 Audible alarm and alarm light are activated by the test switch?

2 Is the power available light energized at all times except during continuity testing ?

3 Does test switch indicate proper vessel and alarm on remote monitoring computer; can alarm be silenced from remote monitoring computer?

4 Have all other discrepancies been reported? If not report them here.

Fire Panel

FWD Draft: AFT Draft: List:

Comments:

Inspector Inspector Inspection Manager

NSTM 50 INSPECTION GUIDELINES FF3 Insp Date:

TDLRemarksN/ANOYESDescription Item

1 Activate all flooding sensors by tipping floats or shorting probes to check for proper operation.

2 Are sensor cutout switches numbered and chart present? Do cutouts isolate alarms circuit as indicated on chart?

3 All sensors operated mannually indicate proper vessel and location on remote monitoring systems.

4 Are Fire/Flood sensors correctly located in respect to electrical power and water tight sub-division of a ship?

5 Visual and audible alarms activate when the sensor is actuated.

6 Each fire wire heat sensor is activated.

7 Each smoke detector is activated using canned smoke to ensure its proper operation.

8 Have all other discrepancies been reported? If not report them here.

Flood Tip Float (MOB B)

FWD Draft: AFT Draft: List:

NSTM 50 INSPECTION GUIDELINES FF4 Insp Date:

TDLRemarksN/ANOYESDescription Item

1 Visual and audible alarms activate when the sensor is actuated.

2 Activate all flooding sensors by tipping floats or shorting probes to check for proper operation.

3 Are sensor cutout switches numbered and chart present? Do cutouts isolate alarms circuit as indicated on chart?

4 All sensors operated mannually indicate proper vessel and location on remote monitoring systems.

5 Are Fire/Flood sensors correctly located in respect to electrical power and water tight sub-division of a ship?

6 Each heat sensor is activated using a hot air gun to ensure its proper operation. (exercise extreme caution to prevent damage to heat dectecting element due to overheating)

7 Each smoke detector is activated using canned smoke to ensure its proper operation.

8 Have all other discrepancies been reported? If not report them here.

Flood Tip Float (Non MOB B)

FWD Draft: AFT Draft: List: