Amendment_0001_Posted.pdf
PDF 221 KB Posted
- Attached to
- Power Conversion Module (PCM) for the DDG 51 Class Flight III Air and Missile Defense Radar (AMDR)
- Solicitation number
- N0002414R4200
About this file
Amendment 0001. RFP Changes and Q A.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002413NR59851
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Nov-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-14-R-4200
X 9B. DATED (SEE ITEM 11)
06-Nov-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Nov-2013
CODE
NAVAL SEA SYSTEMS COMMAND
1333 ISAAC HULL AVE SE - MAIL STOP 2030
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-14-R-4200
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this Amendment 0001 to solicitation N00024-14-R-4200:
1. Under Section J - List of Documents, Exhibits and Other Attachments, the following text is modified:
Attachment D: Contract Security Classification Specification, DD Form 254
2. Under Section J - List of Documents, Exhibits and Other Attachments, Attachment E Government
Furnished Information (GFI), the following have been posted on www.fbo.gov under the TDP link:
a. AMDR Integrated Operational Concept Description (IOCD)
b. Model Description Document (MDD) Template
c. NAVSEA Instruction 9400.2
3. Under Section L – Instructions, Conditions and Notices to Bidders, the following is modified:
FACILITY SECURITY CLEARANCE (NAVSEA) (FEB 2012)
(a) No award will be made to any offeror which does not possess a facility security clearance issued by the Defense
Security Service at the CONFIDENTIAL level. Naval Sea Systems Command will initiate appropriate security clearance action for any apparent successful offeror which does not already possess such clearance. The
Government is not obligated to delay award pending security clearance of any offeror.
(b) The security classification of this procurement is specified in the Contract Security Classification Specification, DD
Form 254, attached hereto.
4. The following questions are answered relative to Solicitation N00024-14-R-4200:
Question 1:
Clarification is requested on the definition of "Target Length" as specified in the Determination of Performance
Incentive Paragraphs A and C. The last sentence of paragraph A states, "It is in the Navy’s best interest to incentivize Contractor performance by rewarding Contractor efforts in connection with achieving the length identified in their proposal and also to dis-incentivize not meeting the proposed length." Paragraph C mentions
Target Length (TL) as identified in proposal, but qualifies that with "as defined in the technical specification." Is the
TL to be specified in the proposal or was it intended to be added to Table I (Dimensions and weight for each AMDR
PCM) of Attachment C?
Answer 1:
Reducing the overall length of each of the PCMs, while remaining in compliance with the other dimensional and performance parameters specified in the RFP and Attachment C Technical Performance Specification for DDG 51
Flight III AMDR PCM, is important to the Navy. This is emphasized by both the performance incentive identified in the question and the emphasis placed in the physical length dimension during the proposal evaluation, as noted in
Section M - Evaluation Factors for Award, II. EVALUATION FACTORS, Factor #1: Technical Factor. Table I
(Dimensions and weight for each AMDR PCM) of Attachment C identifies a threshold and a goal for length and other parts of Attachment C identifies the description of the PCM to indicate what is included in that length. For an offer to be considered compliant, the length of the PCM in the proposal shall be less than or equal to the specified threshold length. Once a selection is made, the length identified in the winning offer shall be the Target Length referred to in the Determination of Performance Incentive and the incentive will be determined based on the contractor’s performance against that length.
Question 2 http://www.fbo.gov/
N00024-14-R-4200
Attachment E states that there will be 7 attachments of GFI. The question that we have is where can we access these
7 attachments? Is it available through the TDP link referred to on the FedBizOpps site? If so how does one gain access to this site? If the TDP site is not how to access this information then how does one access the 7 GFI attachments?
Answer 2:
Selected items listed on the Attachment E Government Furnished Information (GFI) list and are now available on the FedBizOpps TDP link. These items are marked with Distribution Statement D (DoD and DoD contractors only) and shall be properly handled as controlled unclassified information. Additional GFI may be released at a later date and an amendment noting this issuance will be released concurrently. The specific items posted include:
a. AMDR Integrated Operational Concept Description (IOCD)
b. Model Description Document (MDD) Template
c. NAVSEA Instruction 9400.2
5. Except as amended herein, all other terms and conditions of this solicitation remain unchanged.