C-12 CLS Formal Request for Proposal

View the file

Other files

File Type Posted
N00019-15-R-5500_Amendment_0004.docx DOCX document
C-12_Responses_to_Questions_from_Industry_Batch_9.xlsx XLSX spreadsheet
N00019-15-R-5500_Batch_8.xlsx XLSX spreadsheet
N00019-15-R-5500_Amendment_003.pdf PDF
Attachment_8.1_Collective_Bargaining_Agreement_-Miramar_and_Yuma.pdf PDF
Att_L-6_Price_Matrix_updated_1_Oct_15.xlsx XLSX spreadsheet
N0001915R5500_amend_2.docx DOCX document
C-12_Responses_to_Questinos_from_Industry_Batch_7.xlsx XLSX spreadsheet
Responses_to_Questions_Batch_6.xlsx XLSX spreadsheet
Att_L-5_PP-1_PP_Cont_Data_Amnd_1_091715.xlsx XLSX spreadsheet
05-2518.pdf PDF
Attachment_1_-_C12_CLS_PWS__Amnd_1_092315.doc DOC document
N0001915R5500__Amend_1.docx DOCX document
05-2508.pdf PDF
TC-12_Production_Slides_2012_ _2013.xls XLS spreadsheet
Att_L-4_PPQ_Amnd_1_092315.docx DOCX document
05-2104.pdf PDF
Att_L-1_ES_Tables.xlsx XLSX spreadsheet
On-wing_Engine_Data_as_of_30_Jun2015.xlsx XLSX spreadsheet
C-12_Service_Life_Events_6_Jul15.xlsx XLSX spreadsheet
Attachment_1_-_C12_CLS_PWS__FINAL.pdf PDF
BuNo_161511_Mission_Equipment_15_July_2015.xlsx XLSX spreadsheet
C-12_CDRLS_N00019-15-R-5500.pdf PDF
Att_L-3_Experience.xlsx XLSX spreadsheet
Attachment_6_-_C-12_Quality_Assurance_Support_Plan_12Aug15.pdf PDF
C12_GFP_11_May15.xlsx XLSX spreadsheet
Attachment_5_-_Appendix_B_C-12_SGFP_Data_Input_Spreadsheet_(XLS)_11_May15.xls XLS spreadsheet
Attachment_9_-_AWD_2005-2104_Revision_15_Washington_DC_and_Maryland.pdf PDF
CDRL_AX03_Formatting_Supplement_5_Feb15.docx DOCX document
Att_L-6_Price_Matrix_updated7July2015.xlsx XLSX spreadsheet
Attachment_8_-_C-12_CBA_current_(two_of_two).PDF PDF
Att_L-7_AC_Mods_Spares_and_Travel_ _Matl_update29July2015.xlsx XLSX spreadsheet
Attachment_7_-_C-12_OA_Work_Request_Word_Doc_25_Feb15.docx DOCX document
Parts_Usage_1_Oct13_thru_30_Sept14_7_Jul15.xlsx XLSX spreadsheet
Att_L-5_PP-1_PP_Cont_Data_22July2015.xlsx XLSX spreadsheet
Attachment_8_-_C-12_CBA_current_(one_of_two).PDF PDF
Attachment_9.1_-_AWD_2005-2508_Revision_15_-_Texas.pdf PDF
ACI_Spec_v_Oct_2011_26_Aug15.doc DOC document
FY16-21_AF_Projs_(rev)_ _ACI_by_Site_ _FY_5_Aug15.xlsx XLSX spreadsheet
Att_L-4_PPQ.docx DOCX document
Att_L-2_Site_Manning_Estimate.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 04:30 PM local time 15 Oct 2015

X

A

X B

X C X D

EX

X

G

F 107 - 120

121 - 144

X H 145 - 150

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

1 150

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00019 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

Bldg 442, Patuxent River, MD conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

TBD

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 62

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

63 - 64

65 - 66

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

67 - 69

70 - 77 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 78 - 82 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 83 - 89 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

90 - 105

PART II - CO NTRACT CLAUSES

NAVAL AIR SYSTEMS COMMAND

AIR-2.3.5.1

21936 BUNDY ROAD BLDG 442

PATUXENT RIVER MD 20670

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

01 Sep 2015

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N00019-15-R-5500

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0001 1 Each Transition Phase in

FFP

See PWS Section 4.0

FOB: Origin

ESTIMATED

NET AMT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002 1 Lot Aircraft Modifications

FFP

See PWS Section 12.1. The unburdened unit price for this CLIN is $6,498,000.

Contractor to add burdens, and may add fee if applicable.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003 1 Lot O&A Spares

FFP

See PWS Section 12.2. The unburdened unit price for this CLIN is $722,000.00.

UNIT UNIT PRICE ESTIMATED AMOUNT

0004 11 Each Scheduled Depot Inspections

FFP

See PWS Section 7.0 - ACI.

UNIT UNIT PRICE ESTIMATED AMOUNT

0005 17 Each Scheduled PT6A Engine Depot Inspection

FFP

See PWS Section 8.0.

UNIT UNIT PRICE ESTIMATED AMOUNT

0006 Each Propeller Depot Overhauls

FFP

See PWS Section 9.0.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006AA 22 Each 3 bladed Hartzell

FFP

0006AB 3 Each 4 bladed Hartzell

0006AC 6 Each 3 bladed McCauley

ITEM NO SUPPLIES/SERVICES MAX

UNIT UNIT PRICE MAX AMOUNT

0007 50,300 Hours O&A Labor

FFP

See PWS Section 12.3.

MAX

UNIT UNIT PRICE MAX AMOUNT

0008 1 Lot O&A Travel and Material

FFP

See PWS Section 12.4. The unburdened unit price for this CLIN is $19,157,972.

Estimated to be 60/40 travel to material. Contractor to add burdens. No fee shall be added.

UNIT UNIT PRICE ESTIMATED AMOUNT

0009 120 Days Engines

FFP

See PWS Section 13.0. Price on a daily rate.

UNIT UNIT PRICE ESTIMATED AMOUNT

0010 3 Each Strip and Paint

FFP

See PWS Section 14.0.

UNIT UNIT PRICE ESTIMATED AMOUNT

0011 12 Months Fatigue Tracking

FFP

See PWS Section 15.0.

UNIT UNIT PRICE ESTIMATED AMOUNT

Data - NSP

Not separately priced, in accordance with Exhibits A through C.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0013 12 Months

AIRLANT SITE OPERATIONS

FFP

See PWS Section 5.0.

UNIT UNIT PRICE ESTIMATED AMOUNT

0014 12 Months

AIRPAC SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0015 12 Months

EAST MARINES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0016 12 Months

WEST MARINES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0017 12 Months

RESERVES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0018 12 Months

VXS-1/NRL SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0019 12 Months

NAVAIR AIR OPS SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0020 12 Months

NAVY - MANASSAS SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0021 12 Months

CNATRA SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0102 1 Lot Aircraft Modifications

FFP

See PWS Section 12.1. The unburdened unit price for this CLIN is $6,498,000.

UNIT UNIT PRICE ESTIMATED AMOUNT

0103 1 Lot O&A Spares

FFP

See PWS Section 12.2. The unburdened unit price for this CLIN is $722,000.00.

UNIT UNIT PRICE ESTIMATED AMOUNT

0104 13 Each Scheduled Depot Inspections

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0105 17 Each Scheduled PT6A Engine Depot Inspection

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0106 Each Propeller Depot Overhauls

FFP

0106AA 18 Each 3 bladed Hartzell

0106AB 6 Each 4 bladed Hartzell

0106AC 5 Each 3 bladed McCauley

UNIT UNIT PRICE MAX AMOUNT

0107 50,300 Hours O&A Labor

FFP

UNIT UNIT PRICE MAX AMOUNT

0108 1 Lot O&A Travel and Material

FFP

See PWS Section 12.4. The unburdened unit price for this CLIN is $19,157,972.

Estimated to be 60/40 travel to material. Contractor to add burdens. No fee shall

UNIT UNIT PRICE ESTIMATED AMOUNT

0109 120 Days Engines

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0110 3 Each Strip and Paint

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0111 12 Months Fatigue Tracking

FFP

UNIT UNIT PRICE MAX AMOUNT

UNIT UNIT PRICE ESTIMATED AMOUNT

0113 12 Months

AIRLANT SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0114 12 Months

AIRPAC SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0115 12 Months

EAST MARINES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0116 12 Months

WEST MARINES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0117 12 Months

RESERVES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0118 12 Months

VXS-1/NRL SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0119 12 Months

NAVAIR AIR OPS SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0120 12 Months

NAVY - MANASSAS SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0121 12 Months

CNATRA SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0202 1 Lot Aircraft Modifications

FFP

See PWS Section 12.1. The unburdened unit price for this CLIN is $6,498,000.

UNIT UNIT PRICE ESTIMATED AMOUNT

0203 1 Lot O&A Spares

FFP

See PWS Section 12.2. The unburdened unit price for this CLIN is $722,000.00.

UNIT UNIT PRICE ESTIMATED AMOUNT

0204 16 Each Scheduled Depot Inspections

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0205 19 Each Scheduled PT6A Engine Depot Inspection

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0206 Each Propeller Depot Overhauls

FFP

0206AA 10 Each 3 bladed Hartzell

0206AB 2 Each 4 bladed Hartzell

0206AC 3 Each 3 bladed McCauley

UNIT UNIT PRICE MAX AMOUNT

0207 50,300 Hours O&A Labor

FFP

UNIT UNIT PRICE MAX AMOUNT

0208 1 Lot O&A Travel and Material

FFP

See PWS Section 12.4. The unburdened unit price for this CLIN is $19,157,972.

Estimated to be 60/40 travel to material. Contractor to add burdens. No fee shall

UNIT UNIT PRICE ESTIMATED AMOUNT

0209 120 Days Engines

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0210 3 Each Strip and Paint

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0211 12 Months Fatigue Tracking

FFP

UNIT UNIT PRICE MAX AMOUNT

UNIT UNIT PRICE ESTIMATED AMOUNT

0213 12 Months

AIRLANT SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0214 12 Months

AIRPAC SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0215 12 Months

EAST MARINES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0216 12 Months

WEST MARINES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0217 12 Months

RESERVES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0218 12 Months

VXS-1/NRL SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0219 12 Months

NAVAIR AIR OPS SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0220 12 Months

NAVY - MANASSAS SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0221 12 Months

CNATRA SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0302 1 Lot Aircraft Modifications

FFP

See PWS Section 12.1. The unburdened unit price for this CLIN is $6,498,000.

UNIT UNIT PRICE ESTIMATED AMOUNT

0303 1 Lot O&A Spares

FFP

See PWS Section 12.2. The unburdened unit price for this CLIN is $722,000.00.

UNIT UNIT PRICE ESTIMATED AMOUNT

0304 10 Each Scheduled Depot Inspections

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0305 17 Each Scheduled PT6A Engine Depot Inspection

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0306 Each Propeller Depot Overhauls

FFP

0306AA 12 Each 3 bladed Hartzell

0306AB 3 Each 4 bladed Hartzell

0306AC 5 Each 3 bladed McCauley

UNIT UNIT PRICE MAX AMOUNT

0307 50,300 Hours O&A Labor

FFP

UNIT UNIT PRICE MAX AMOUNT

0308 1 Lot O&A Travel and Material

FFP

See PWS Section 12.4. The unburdened unit price for this CLIN is $19,157,972.

Estimated to be 60/40 travel to material. Contractor to add burdens. No fee shall

UNIT UNIT PRICE ESTIMATED AMOUNT

0309 120 Days Engines

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0310 3 Each Strip and Paint

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0311 12 Months Fatigue Tracking

FFP

UNIT UNIT PRICE MAX AMOUNT

UNIT UNIT PRICE ESTIMATED AMOUNT

0313 12 Months

AIRLANT SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0314 12 Months

AIRPAC SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0315 12 Months

EAST MARINES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0316 12 Months

WEST MARINES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0317 12 Months

RESERVES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0318 12 Months

VXS-1/NRL SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0319 12 Months

NAVAIR AIR OPS SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0320 12 Months

NAVY - MANASSAS SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0321 12 Months

CNATRA SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0402 1 Lot Aircraft Modifications

FFP

See PWS Section 12.1. The unburdened unit price for this CLIN is $6,498,000.

UNIT UNIT PRICE ESTIMATED AMOUNT

0403 1 Lot O&A Spares

FFP

See PWS Section 12.2. The unburdened unit price for this CLIN is $722,000.00.

UNIT UNIT PRICE ESTIMATED AMOUNT

0404 8 Each Scheduled Depot Inspections

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0405 23 Each Scheduled PT6A Engine Depot Inspection

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0406 Each Propeller Depot Overhauls

FFP

0406AA 17 Each 3 bladed Hartzell

0406AB 3 Each 4 bladed Hartzell

0406AC 5 Each 3 bladed McCauley

UNIT UNIT PRICE MAX AMOUNT

0407 50,300 Hours O&A Labor

FFP

UNIT UNIT PRICE MAX AMOUNT

0408 1 Lot O&A Travel and Material

FFP

See PWS Section 12.4. The unburdened unit price for this CLIN is $19,157,972.

Estimated to be 60/40 travel to material. Contractor to add burdens. No fee shall

UNIT UNIT PRICE ESTIMATED AMOUNT

0409 120 Days Engines

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0410 3 Each Strip and Paint

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0411 12 Months Fatigue Tracking

FFP

UNIT UNIT PRICE MAX AMOUNT

UNIT UNIT PRICE ESTIMATED AMOUNT

0413 12 Months

AIRLANT SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0414 12 Months

AIRPAC SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0415 12 Months

EAST MARINES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0416 12 Months

WEST MARINES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0417 12 Months

RESERVES SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0418 12 Months

VXS-1/NRL SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0419 12 Months

NAVAIR AIR OPS SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0420 12 Months

NAVY - MANASSAS SITE OPERATIONS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0421 12 Months

CNATRA SITE OPERATIONS

FFP

0422 Lot Transition Phase Out

FFP

See PWS Section 16.0.

PRICING TABLE

Attachment B-1

Instructions: The Offeror shall provide the proposed price per site as well as the subtotal for each CLIN.

Sponsor CLIN Site(s) Amount

AIRLANT 0013 NSA BAHRAIN

NSA GTMO

Subtotal AIRLANT

AIRPAC 0014 NAF ATSUGI

KADENA AIR BASE

NAF MISAWA

Subtotal AIRPAC

EAST MARINES 0015 MCAS BEAUFORT

MCAS NEW RIVER

Subtotal EAST MARINES

WEST MARINES 0016 MCAS IWAKUNI

MCAS MIRAMAR

MCAS FUTENMA

Subtotal WEST MARINES

RESERVES 0017 JRB BELLE CHASSE

Subtotal RESERVES

VXS-1/NRL 0018 NAS PATUXENT RIVER

Subtotal VXS-1/NRL

NAVAIR AIR OPS 0019 NAS PATUXENT RIVER

Subtotal NAVAIR AIR OPS

NAVY - MANASSAS 0020 MANASSAS

Subtotal NAVY-MANASSAS

CNATRA 0021 CORPUS CHRISTI

Subtotal CNATRA

TOTAL SITE OPS $ -

Instructions: The Offeror shall provide the proposed price per site as well as the subtotal for

AIRLANT 0113 NSA BAHRAIN

AIRPAC 0114 NAF ATSUGI

EAST MARINES 0115 MCAS BEAUFORT

WEST MARINES 0116 MCAS IWAKUNI

RESERVES 0117 JRB BELLE CHASSE

VXS-1/NRL 0118 NAS PATUXENT RIVER

NAVAIR AIR OPS 0119 NAS PATUXENT RIVER

NAVY - MANASSAS 0120 MANASSAS

CNATRA 0121 CORPUS CHRISTI

AIRLANT 0213 NSA BAHRAIN

AIRPAC 0214 NAF ATSUGI

EAST MARINES 0215 MCAS BEAUFORT

WEST MARINES 0216 MCAS IWAKUNI

RESERVES 0217 JRB BELLE CHASSE

VXS-1/NRL 0218 NAS PATUXENT RIVER

NAVAIR AIR OPS 0219 NAS PATUXENT RIVER

NAVY - MANASSAS 0220 MANASSAS

CNATRA 0221 CORPUS CHRISTI

AIRLANT 0313 NSA BAHRAIN

AIRPAC 0314 NAF ATSUGI

EAST MARINES 0315 MCAS BEAUFORT

WEST MARINES 0316 MCAS IWAKUNI

RESERVES 0317 JRB BELLE CHASSE

VXS-1/NRL 0318 NAS PATUXENT RIVER

NAVAIR AIR OPS 0319 NAS PATUXENT RIVER

NAVY - MANASSAS 0320 MANASSAS

CNATRA 0321 CORPUS CHRISTI

AIRLANT 0413 NSA BAHRAIN

AIRPAC 0414 NAF ATSUGI

EAST MARINES 0415 MCAS BEAUFORT

WEST MARINES 0416 MCAS IWAKUNI

RESERVES 0417 JRB BELLE CHASSE

VXS-1/NRL 0418 NAS PATUXENT RIVER

NAVAIR AIR OPS 0419 NAS PATUXENT RIVER

NAVY - MANASSAS 0420 MANASSAS

CNATRA 0421 CORPUS CHRISTI

Section C - Descriptions and Specifications

PWS

SECTION C – Descriptions and Specifications

Item 0001 – Transition Phase In. The contractor shall perform Phase-In for the first 60 days of contract performance in accordance with section 4.0 of the Performance Work Statement (PWS), dated 22 July 2015.

Item 0X02 – Aircraft Modifications. The contractor shall perform Over and Above Aircraft Modifications and

Support Equipment in accordance with section 12.1 of the Performance Work Statement, dated 22 July 2015.

Item 0X03 – O&A Spares. The contractor shall procure spares associated with the aircraft modifications in accordance with Section 12.2 of the Performance Work Statement, dated 22 July 2015.

Item 0X04 – The contractor shall perform Scheduled C-12 Aircraft Depot Inspections in accordance with section 7.0 of the Performance Work Statement (PWS), dated 22 July 2015.

Item 0X05 – The contractor shall perform Scheduled PT6A-Series Engine Depot Inspections in accordance with section 8.0 of the Performance Work Statement (PWS), dated 22 July 2015.

Item 0X06 – The contractor shall perform Propeller Depot Overhauls in accordance with section 9.0 of the

Performance Work Statement (PWS), dated 22 July 2015.

Item 0X07 – Over and Above Labor. The contractor shall perform in accordance with section 12.3 of the

Item 0X08 – Over and Above Travel & Material. The contractor shall perform in accordance with section 12.4 of the Performance Work Statement (PWS), dated 22 July 2015.

Item 0X09 – The contractor shall provide Engines in accordance with section 13.0 of the Performance Work

Statement (PWS), dated 22 July 2015.

Item 0X10 – The contractor shall perform C-12 Depot Strip and Paint in accordance with section 14.0 of the

Item 0X11 – The contractor shall provide C-12 Structural Fatigue Tracking in accordance with section 15.0 of the

Item 0X12 – Data Deliverables in accordance with PWS Exhibits A through C.

Item 0X13 – The contractor shall perform Site Operations for AIRLANT, in accordance with section 5.0 of the

Item 0X14 – The contractor shall perform Site Operations for AIRPAC, in accordance with section 5.0 of the

Item 0X15 – The contractor shall perform Site Operations for EAST MARINES, in accordance with section 5.0 of

Item 0X16 – The contractor shall perform Site Operations for WEST MARINES, in accordance with section 5.0 of

Item 0X17 – The contractor shall perform Site Operations for RESERVES, in accordance with section 5.0 of the

Item 0X18 – The contractor shall perform Site Operations for VXS-1, in accordance with section 5.0 of the

Item 0X19 – The contractor shall perform Site Operations for NAVAIR AIR OPS, in accordance with section 5.0 of

Item 0X20 – The contractor shall perform Site Operations for NAVY MANASSAS, in accordance with section 5.0 of the Performance Work Statement (PWS), dated 22 July 2015.

Item 0X21 – The contractor shall perform Site Operations for CNATRA, in accordance with section 5.0 of the

Item 0422 - Transition Phase Out. The contractor shall perform Phase-Out during the last 60 days of contract performance, in accordance with section 16.0 of the Performance Work Statement (PWS), dated 22 July 2015.

Section D - Packaging and Marking

SECTION D

CLAUSES INCORPORATED BY FULL TEXT

5252.223-9502 HAZARDOUS MATERIAL (NAVAIR)(APR 2009) -

(a) Packaging, Packing, Marking, Labeling and Certification of Hazardous materials for shipment by any mode or combination of transportation modes shall be prepared (properly classed, described, packaged, marked, labeled, transport vehicle placarded, etc.) for shipment in accordance with MIL-STD-129 and Title 49 Code of Federal

Regulations (CFR), Part 100-199 as applicable. In the event of any contradictions between the documents, 49 CFR shall govern or the applicable modal transport regulation.

(b) In the event of a conflict between specific requirements in the contract or order and existing applicable modal transport regulations, the regulations shall take precedence. Under no circumstances shall the contractor knowingly use materials, markings or procedures that are not in accordance with laws and regulations applicable to the mode of transportation employed.

(c) To ascertain which Department of Defense, or local installation regulations, concerning hazardous materials may have impact on this contract, the contractor should contact: Environmental Director NAVAIR HQ, (301)757-

6177; 47013 Hinkle Circle, Building 416, Room 200B, Patuxent River, MD 20670.

5252.247-9507 PACKAGING AND MARKING OF REPORTS (NAVAIR) (OCT 2005)

(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry

Security Program Operating Manual, DoD 5220.22-M.

(b) The contractor shall prominently display on the cover of each report the following information:

(1) Name and business address of contractor.

(2) Contract Number/Delivery/Task order number.

(3) Contract/Delivery/Task order dollar amount.

(4) Whether the contract was competitively or non-competitively awarded.

(5) Name of sponsoring individual.

(6) Name and address of requiring activity.

5252.247-9520 PRESERVATION, PACKAGING, AND PACKING (NAVAIR)(OCT 2005)

(a) The contractor shall preserve, pack and package items procured for system stock, overseas destinations or ships at sea, in accordance with the MIL-STD-2073-1 Level A requirements delineated in the schedule or elsewhere in the contract or order. If specific requirements are not included in the contract or order, the contractor shall preserve and package in accordance with previously approved level A requirements, within the technical parameters contained in MIL-STD-2073-1. Preservation and packing materials shall be fire retardant/non-combustible as prescribed in the specific packaging requirements in the contract or order, and to the maximum extent practicable.

(b) If the packaging materials specified in the contract or order are not fire retardant, and fire retardant varieties are included in commodity specifications for these materials, the contractor shall use fire retardant varieties. Fire retardant packaging materials are not required for items not used aboard ship. The use of plastic packaging materials is prohibited unless prescribed in specific packaging requirements in the contract or order, or unless required to adequately protect the item from damage

(c) For items procured for installation/immediate use, the contractor shall preserve and package in accordance with the Level C requirements of MIL-STD-2073-1. Packing for shipment (i.e., shipping container) shall be in accordance with MIL-STD-2073-1, Level A, for overseas surface shipments that are not containerized and all deliveries to ships at sea; Level B for all remaining overseas shipments; Level C or domestic shipments of items consumed at first destination. Fire retardant materials are not required in packing (i.e., shipping container) operations. All units, intermediate and shipping containers, shall be marked in accordance with MIL-STD-129. The use of shredded paper, excelsior, polystyrene and other loose-fill materials as a cushion is prohibited in all packaging and packing operation

(d) In accordance with 29 CFR, the contractor shall ensure that the following caution label is placed on all unit, intermediate and shipping containers for all items containing asbestos in a form that can be inhaled:

CAUTION

CONTAINS ASBESTOS FIBERS

AVOID CREATING DUST

BREATHING ASBESTOS DUST MAY CAUSE SERIOUS BODILY HARM

(e) All items containing asbestos in a form that can be inhaled shall be packaged in sealed, impermeable bags or other impermeable containers, as required by 29 CFR.

NOTE TO SUPPLIERS: If the supplies to be furnished on this document require the asbestos caution label described above, the contractor shall notify the contract administrator indicated in the schedule prior to shipment.

Section E - Inspection and Acceptance

ACCEPTANCE

Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by DCMA.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Origin Government Origin Government

0002 Origin Government Origin Government

0003 Origin Government Origin Government

0004 Origin Government Origin Government

0005 Origin Government Origin Government

0006 Origin Government Origin Government

0006AA Origin Government Origin Government

0006AB Origin Government Origin Government

0006AC Origin Government Origin Government

0007 Origin Government Origin Government

0008 Origin Government Origin Government

0009 Origin Government Origin Government

0010 Origin Government Origin Government

0011 Origin Government Origin Government

0012 Destination Government Destination Government

0013 Origin Government Origin Government

0014 Origin Government Origin Government

0015 Origin Government Origin Government

0016 Origin Government Origin Government

0017 Origin Government Origin Government

0018 Origin Government Origin Government

0019 Origin Government Origin Government

0020 Origin Government Origin Government

0021 Origin Government Origin Government

0102 Origin Government Origin Government

0103 Origin Government Origin Government

0104 Origin Government Origin Government

0105 Origin Government Origin Government

0106 Origin Government Origin Government

0106AA Origin Government Origin Government

0106AB Origin Government Origin Government

0106AC Origin Government Origin Government

0107 Origin Government Origin Government

0108 Origin Government Origin Government

0109 Origin Government Origin Government

0110 Origin Government Origin Government

0111 Origin Government Origin Government

0112 Destination Government Destination Government

0113 Origin Government Origin Government

0114 Origin Government Origin Government

0115 Origin Government Origin Government

0116 Origin Government Origin Government

0117 Origin Government Origin Government

0118 Origin Government Origin Government

0119 Origin Government Origin Government

0120 Origin Government Origin Government

0121 Origin Government Origin Government

0202 Origin Government Origin Government

0203 Origin Government Origin Government

0204 Origin Government Origin Government

0205 Origin Government Origin Government

0206 Origin Government Origin Government

0206AA Origin Government Origin Government

0206AB Origin Government Origin Government

0206AC Origin Government Origin Government

0207 Origin Government Origin Government

0208 Origin Government Origin Government

0209 Origin Government Origin Government

0210 Origin Government Origin Government

0211 Origin Government Origin Government

0212 Destination Government Destination Government

0213 Origin Government Origin Government

0214 Origin Government Origin Government

0215 Origin Government Origin Government

0216 Origin Government Origin Government

0217 Origin Government Origin Government

0218 Origin Government Origin Government

0219 Origin Government Origin Government

0220 Origin Government Origin Government

0221 Origin Government Origin Government

0302 Origin Government Origin Government

0303 Origin Government Origin Government

0304 Origin Government Origin Government

0305 Origin Government Origin Government

0306 Origin Government Origin Government

0306AA Origin Government Origin Government

0306AB Origin Government Origin Government

0306AC Origin Government Origin Government

0307 Origin Government Origin Government

0308 Origin Government Origin Government

0309 Origin Government Origin Government

0310 Origin Government Origin Government

0311 Origin Government Origin Government

0312 Destination Government Destination Government

0313 Origin Government Origin Government

0314 Origin Government Origin Government

0315 Origin Government Origin Government

0316 Origin Government Origin Government

0317 Origin Government Origin Government

0318 Origin Government Origin Government

0319 Origin Government Origin Government

0320 Origin Government Origin Government

0321 Origin Government Origin Government

0402 Origin Government Origin Government

0403 Origin Government Origin Government

0404 Origin Government Origin Government

0405 Origin Government Origin Government

0406 Origin Government Origin Government

0406AA Origin Government Origin Government

0406AB Origin Government Origin Government

0406AC Origin Government Origin Government

0407 Origin Government Origin Government

0408 Origin Government Origin Government

0409 Origin Government Origin Government

0410 Origin Government Origin Government

0411 Origin Government Origin Government

0412 Destination Government Destination Government

0413 Origin Government Origin Government

0414 Origin Government Origin Government

0415 Origin Government Origin Government

0416 Origin Government Origin Government

0417 Origin Government Origin Government

0418 Origin Government Origin Government

0419 Origin Government Origin Government

0420 Origin Government Origin Government

0421 Origin Government Origin Government

0422 Origin Government Origin Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996

52.246-4 Inspection Of Services--Fixed Price AUG 1996

52.246-16 Responsibility For Supplies APR 1984

252.246-7000 Material Inspection And Receiving Report MAR 2008

5252.246-9512 INSPECTION AND ACCEPTANCE (NAVAIR) (OCT 2005)

(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by the

ACO, COR or TPOC.

(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC

0001 POP 02-JAN-2017 TO

02-MAR-2017

N/A N/A

0002 POP 03-MAR-2017 TO

02-JAN-2018

0003 POP 03-MAR-2017 TO

0004 POP 03-MAR-2017 TO

0005 POP 03-MAR-2017 TO

0006 POP 03-MAR-2017 TO

03-JAN-2018

0006AA POP 03-MAR-2017 TO

0006AB POP 03-MAR-2017 TO

0006AC POP 03-MAR-2017 TO

0007 POP 03-MAR-2017 TO

0008 POP 03-MAR-2017 TO

0009 POP 03-MAR-2017 TO

0010 POP 03-MAR-2017 TO

0011 POP 03-MAR-2017 TO

0012 POP 03-MAR-2017 TO

0013 POP 03-MAR-2017 TO

0014 POP 03-MAR-2017 TO

0015 POP 03-MAR-2017 TO

0016 POP 03-MAR-2017 TO

0017 POP 03-MAR-2017 TO

0018 POP 03-MAR-2017 TO

0019 POP 03-MAR-2017 TO

0020 POP 03-MAR-2017 TO

0021 POP 03-MAR-2017 TO

0102 POP 03-JAN-2018 TO

02-JAN-2019

0103 POP 03-JAN-2018 TO

0104 POP 03-JAN-2018 TO

0105 POP 03-JAN-2018 TO

0106 POP 03-JAN-2018 TO

0106AA POP 03-JAN-2018 TO

0106AB POP 03-JAN-2018 TO

0106AC POP 03-JAN-2018 TO

0107 POP 03-JAN-2018 TO

0108 POP 03-JAN-2018 TO

0109 POP 03-JAN-2018 TO

0110 POP 03-JAN-2018 TO

0111 POP 03-JAN-2018 TO

0112 POP 03-JAN-2018 TO

0113 POP 03-JAN-2018 TO

0114 POP 03-JAN-2018 TO

0115 POP 03-JAN-2018 TO

0116 POP 03-JAN-2018 TO

0117 POP 03-JAN-2018 TO

0118 POP 03-JAN-2018 TO

0119 POP 03-JAN-2018 TO

0120 POP 03-JAN-2018 TO

0121 POP 03-JAN-2018 TO

0202 POP 03-JAN-2019 TO

02-JAN-2020

0203 POP 03-JAN-2019 TO

0204 POP 03-JAN-2019 TO

0205 POP 03-JAN-2019 TO

0206 POP 03-JAN-2019 TO

0206AA POP 03-JAN-2019 TO

0206AB POP 03-JAN-2019 TO

0206AC POP 03-JAN-2019 TO

0207 POP 03-JAN-2019 TO

0208 POP 03-JAN-2019 TO

0209 POP 03-JAN-2019 TO

0210 POP 03-JAN-2019 TO

0211 POP 03-JAN-2019 TO

0212 POP 03-JAN-2019 TO

0213 POP 03-JAN-2019 TO

0214 POP 03-JAN-2019 TO

0215 POP 03-JAN-2019 TO

0216 POP 03-JAN-2019 TO

0217 POP 03-JAN-2019 TO

0218 POP 03-JAN-2019 TO

0219 POP 03-JAN-2019 TO

0220 POP 03-JAN-2019 TO

0221 POP 03-JAN-2019 TO

0302 POP 03-JAN-2020 TO

02-JAN-2021

0303 POP 03-JAN-2020 TO

0304 POP 03-JAN-2020 TO

0305 POP 03-JAN-2020 TO

0306 POP 03-JAN-2020 TO

0306AA POP 03-JAN-2020 TO

0306AB POP 03-JAN-2020 TO

0306AC POP 03-JAN-2020 TO

0307 POP 03-JAN-2020 TO

0308 POP 03-JAN-2020 TO

0309 POP 03-JAN-2020 TO

0310 POP 03-JAN-2020 TO

0311 POP 03-JAN-2020 TO

0312 POP 03-JAN-2020 TO

0313 POP 03-JAN-2020 TO

0314 POP 03-JAN-2020 TO

0315 POP 03-JAN-2020 TO

0316 POP 03-JAN-2020 TO

0317 POP 03-JAN-2020 TO

0318 POP 03-JAN-2020 TO

0319 POP 03-JAN-2020 TO

0320 POP 03-JAN-2020 TO

0321 POP 03-JAN-2020 TO

0402 POP 03-JAN-2021 TO

02-JAN-2022

0403 POP 03-JAN-2021 TO

0404 POP 03-JAN-2021 TO

0405 POP 03-JAN-2021 TO

0406 POP 03-JAN-2021 TO

0406AA POP 03-JAN-2021 TO

0406AB POP 03-JAN-2021 TO

0406AC POP 03-JAN-2021 TO

0407 POP 03-JAN-2021 TO

0408 POP 03-JAN-2021 TO

0409 POP 03-JAN-2021 TO

0410 POP 03-JAN-2021 TO

0411 POP 03-JAN-2021 TO

0412 POP 03-JAN-2021 TO

0413 POP 03-JAN-2021 TO

0414 POP 03-JAN-2021 TO

0415 POP 03-JAN-2021 TO

0416 POP 03-JAN-2021 TO

0417 POP 03-JAN-2021 TO

0418 POP 03-JAN-2021 TO

0419 POP 03-JAN-2021 TO

0420 POP 03-JAN-2021 TO

0421 POP 03-JAN-2021 TO

0422 POP 03-JAN-2021 TO

02-MAR-2022

52.242-15 Stop-Work Order AUG 1989

52.242-17 Government Delay Of Work APR 1984

52.247-29 F.O.B. Origin FEB 2006

52.247-34 F.O.B. Destination NOV 1991

52.247-55 F.O.B. Point For Delivery Of Government-Furnished

Property

JUN 2003

252.247-7023 Transportation of Supplies by Sea APR 2014

5252.211-9507 PERIOD OF PERFORMANCE (NAVAIR)(SEP 2013)

(a) The contract shall commence on [insert effective date] and shall continue [insert either “for a period of months” or provide a calendar date ]. However, the period of performance may be extended in accordance with the option provisions contained herein.

(b) If DFAR Clause 252.216-7006, “Ordering”, is incorporated into this contract, then the period in which the

Government can issue orders under the contract will be extended at the exercise of an option, and extended to the end of that option period.

5252.247-9505 TECHNICAL DATA AND INFORMATION (NAVAIR) (FEB 1995)

Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data

Requirements List, DD Form 1423, Exhibits A and B, attached hereto, and the following:

(a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13

(date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below.

Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the

DD Form 1423.

(1) PCO, Code AIR-2.3.5

(2) ACO, Code TBD.

(b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO.

(c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6.

(d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements

(i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above.

(e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government.

(f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection.

(g) DD Form 1423, Block 14 Mailing Addresses: to be provided at the post award conference.

5252.247-9521 PLACE OF PERFORMANCE (NAVAIR) (OCT 2005)

The services to be performed herein shall be performed at SEE PWS SECTION 1.3.

Section G - Contract Administration Data

252.204-0001 Line Item Specific: Single Funding SEP 2009

252.204-0002 Line Item Specific: Sequential ACRN Order SEP 2009

252.204-0004 Line Item Specific: by Fiscal Year SEP 2009

252.204-7006 Billing Instructions OCT 2005

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. as used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area

WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

(Contracting Officer: Insert applicable document type(s). Note: If a "Combo" document type is identified but not supportable by the Contractor's business systems, an "Invoice" (stand-alone) and "Receiving Report" (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

_____To be identified under each individual task order______________________________

(Contracting Officer: Insert inspection and acceptance locations or "Not applicable.")

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC: _________________________

Issue By DoDAAC: _________________________

Admin DoDAAC: _________________________

Inspect By DoDAAC: _________________________

Ship To Code: _________________________

Ship From Code: _________________________

Mark For Code: _________________________

Service Approver (DoDAAC): _________________________

Service Acceptor (DoDAAC): _________________________

Accept at Other DoDAAC: _________________________

LPO DoDAAC: _________________________

DCAA Auditor DoDAAC: _________________________

Other DoDAAC(s): _________________________

(*Contracting Officer: Insert applicable DoDAAC information or "See schedule" if multiple ship to/acceptance locations apply, or "Not applicable.")

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send

Additional Email Notifications" field of WAWF once a document is submitted in the system.

___ To be identified under each individual task order ____________________________

(Contracting Officer: Insert applicable email addresses or "Not applicable.")

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact. For Navy WAWF questions call DFAS Customer Care 1-

800-756-4571 option 6

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

5252.201-9500 TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012)

(a) The Technical Point of Contact (TPOC) for this contract is: To be identified under each individual task order.

(b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order

COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order.

Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO).

(c) The contractor may use this technical POC for technical questions related to the existing contract or order.

Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System

(CPARS), clarification of technical requirements, and statement of work inquires.

(d) The contractor shall immediately notify the Procuring Contracting Officer in writing if the contractor interprets any action by the TPOC to be a change to the existing contract.

5252.201-9501 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE (COR)(NAVAIR)

(SEP 2012)

(a) The Contracting Officer has designated To be determined at time of award as the authorized Contracting

Officer’s Representative (COR) to perform the following functions, duties, and/or responsibilities: To be determined at time of award and included as an attachment to this contract under Section J.

(b) The effective period of the COR designation is To be determined at time of award.

5252.201-9502 CONTRACTOR’S AUTHORIZED CONTRACT COORDINATOR AND TECHNICAL

LIAISON (NAVAIR)(OCT 2005)

(a) The contractor shall state below the name and telephone numbers of the contractor’s employees responsible for coordination of contract functions/liaison with the Contracting Officer and/or Contract administrator, and providing technical assistance as required regarding product specifications, functionality, etc.

CONTRACT COORDINATOR:

NAME: _______________________________________

PHONE (BUS): ___________________________________

PHONE (AFTER HOURS): _________________________

ALTERNATE:

NAME: _______________________________________

PHONE (BUS): ___________________________________

PHONE (AFTER HOURS): _________________________

(b) The contractor shall notify the Contracting Officer and/or Contract Administrator in advance, in writing, of any changes in the above listed personnel.

5252.204-9503 EXPEDITING CONTRACT CLOSEOUT (NAVAIR) (JAN 2007)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the

Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party might be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

5252.232-9511 NOTICE OF REQUIREMENTS FOR PROMPT PAYMENT (NAVAIR) (MAR 2006)

The Government anticipates that this contract will be distributed to Defense Finance and Accounting Service

(DFAS) by the DOD Electronic Document Access (EDA) system. DFAS is responsible for payment of contractor invoices.

(a) In accordance with FAR Clause 52.232-33 "Payment By Electronic Funds Transfer--Central Contractor

Registration", the contractor is responsible for providing updated information to the Central Contractor Register

(CCR) database. Additionally, the contractor is responsible for maintaining its active status in the CCR database.

(b) If the DUNS, CAGE code, TIN or address set forth in the contract do not match the information in the CCR, then DFAS will return invoices without payment. Therefore, it is imperative that the contractor ensure the DUNS, CAGE code, TIN and contractor address on the contract are accurate and in compliance with the CCR database.

Additionally, any changes/updates made to the CCR database should be communicated to the Contracting Officer for the purpose of modifying the contract to reflect the new data.

5252.232-9528 REIMBURSEMENT OF COSTS ASSOCIATED WITH OPNAV SERVICES

(NAVAIR)(JUN 2012)

This procurement does not contain the requirement to support the Office of the Chief of Naval Operations

(OPNAV). No such requirement is included in the Statement of Work nor shall be contained in any flow down requirements to subcontractors. Since OPNAV service support is not a requirement of the statement of work, the

Contracting Officer's Representative (COR) is prohibited from endorsing any such costs/charges. The Government will not pay for such costs as they are outside the scope of this contract.

5252.242-9511 CONTRACT ADMINISTRATION DATA (NAVAIR)(SEP 2012)

(a) Contract Administration Office.

(1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the

ADMINISTERED BY Block on the face page of the contract, modification, or order.

(b) Special Instructions (see FAR 42.202(b) and (c)):

(1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)):

Functions Retained Retained for Performance By:

Partially retained: FAR 42.302(a)(56) Maintain surveillance of flight operations.

Military base site operation: either the COR, TPOC or GFR at military base site operations.

Non-military sites: DCMA ACO

(2) The following additional contract administration functions are assigned (see FAR 42.302(b)):

Additional Functions Retained for Performance By:

Delegating additional functions:

FAR 42.302(b) Negotiate or negotiate and execute supplemental agreements providing for the deobligation of unexpended dollar balances considered excess to known contract requirements.

PCO or ACO function. See “administered by” block on the face page of the contract, modification, or order.

Delegating additional functions:

FAR 42.302(a)(38) Quality Assurance Inspection and Acceptance of aircraft work done at depot facilities.

DCMA ACO function as alternate of PCO, when required. See “administered by” block on the face page of the contract, modification, or order.

(c) Inquiries regarding payment should be referred to: MyInvoice at https://myinvoice.csd.disa.mil//index.html.

https://myinvoice.csd.disa.mil/index.html

Section H - Special Contract Requirements

H.1

REDUCED PAYMENTS

(a) In accordance with FAR 16.402-2(b), if the Contractor fails to meet the 80% mission capable rate as required in

PWS, Appendix D-Performance Metrics, the Contractor's applicable monthly price shall be proportionally reduced based on the procedures identified in paragraph (e)(1) below. See PWS Appendix E for relevant definitions.

(b) If the Contractor fails to complete the Aircraft Condition Inspections within the 74 consecutive days completion timeframe in accordance with PWS Section 7.1, the Contractor's applicable price for payment shall be proportionally reduced based on the procedures identified in paragraph (e)(2) below.

(c) Notwithstanding any reduction of payment under this clause, if delivery or performance is delayed or deficient under the requirements specified in paragraph (e)(1) and (e)(2) the Government may terminate this contract in whole or in part under the terms of FAR 52.249-8, "Default (Fixed-Price Supply and Service)".

(d) The Contractor shall not incur Reduced Payments when performance metrics in paragraph (e) fall below required levels as a result of causes beyond the control and without the fault or negligence of the Contractor as defined in FAR 52.249-8, "Default (Fixed-Price Supply and Service)”.

(e) The following describes performance metrics and the calculation of Reduced Payments when performance metrics are not met.

(1) Navy C-12 Mission Capable (MC) Rate. MC shall be maintained at 80% per aircraft in accordance with PWS, Appendix D.

(i) MC Computation Examples:

Example: Aircraft #1 (MC Rate Met):

The reporting period was 30 days: 30 X 24 hours = 720 hours Reporting Time (RT)

The allowable Non-Reporting Time (NRT) for aircraft #1 was 7 days

The Non Mission Capable (NMC) time for aircraft #1 for the reporting period was 113 hours:

MC Rate Example Calculation:

30 days x 24 hours = 720 hours………………….……….Total RT hours

7 days NRT x 24 hours = 168 hours..…………………….Total NRT hours

720 (RT) – 168 (NRT) = 552 hours..……………….……..Total Possible MC hours

552 (Possible MC hours) – 113 hours (NMC) = 439 hours.…………Actual MC hours

439 (Actual MC hours) ÷ 552 (Possible MC hours) = .80

.80 x 100 = 80% MC for aircraft #1

Example Aircraft #2 (MC Rate Not Met):

The reporting period was 30 days: 30 X 24 hours = 720 hours Reporting Time (RT)

The allowable Non-Reporting Time (NRT) for aircraft #2 was 12 days

The Non Mission Capable (NMC) time for aircraft #2 for the reporting period was 108 hours:

MC Rate Example Calculation:

30 days x 24 hours = 720 hours………………….……….Total RT hours

12 days NRT x 24 hours = 288 hours…………………… Total NRT hours

720 (RT) – 288 (NRT) = 432 hours..…………………….. Total Possible MC hours

432 (Possible MC hours) – 108 hours (NMC) = 324 hours..………Actual MC hours

324 (Actual MC hours) ÷ 432 (Possible MC hours) = .75

.75 x 100 = 75% MC for aircraft #2

(ii) Payment Adjustment Example:

The Contractor shall reduce its monthly price for Site Operation Requirements CLINs (0X13-0X21) by the same direct percentage difference between the reported aircraft MC rate and the required MC rate, as established in PWS Appendix D, when an aircraft's monthly MC rate is less than the required MC rate.

A = Monthly site operation cost (see Pricing Table (B-1) in Section B).

B = Unit maintenance cost per aircraft = (Monthly site operation cost (see Pricing Table (B-1) in Section

B) ÷ Number of Aircraft assigned in Appendix A.)

C = Percent difference between required per aircraft MC rate and actual per aircraft MC rate.

D = Monthly Price reduction

A = $100,000 (per Pricing Table (B-1) in Section B)

B = $50,000 A÷B (2 aircraft assigned to site)

C = Aircraft 1: N/A (is over 80% MC rate requirement)

Aircraft 2: 5% (80% requirement - 75% actual achieved)

D = Aircraft 1: N/A (is over 80% MC rate requirement)

Aircraft 2: $2,500.00 (B x C = $50,000 x 5%)

(2) Scheduled C-12 Aircraft Depot Inspections. Aircraft Condition Inspection (ACI) (CLIN 0X04)- The

Contractor shall reduce the price for ACI by the same direct duration difference, measured in days, between the actual…