N00019-15-R-5500 Attachment 1
22 July 2015
N00019-15-R-5500
PERFORMANCE WORK STATEMENT (PWS)
FOR
DEPARTMENT OF NAVY C-12 UTILITY LIFT AIRCRAFT
CONTRACTOR LOGISTICS SUPPORT SERVICES
Approved By_________________
Prepared by
PMA-207
Distribution Statement A. Approved for Public Release
1.0 SCOPE
1.1 General Scope
1.2 Background
1.3 Site Operations
1.4 Maintenance Concept
1.5 Government Responsibilities
1.6 Flight Hour Estimate
2.0 APPLICABLE DOCUMENTS and CERTIFICATIONS
3.0 GENERAL REQUIREMENTS (Applies to all Contract Line Item Numbers [CLINs]) . 7
3.1 Certifications
3.2 Site Level Maintenance Personnel Certification
3.3 Quality Assurance Program
3.4 Commercial Quality System
3.5 Hazardous Material and Waste
3.6 Precious Metals Recovery
3.7 Operations Security Program
3.8 Government and Contractor Property
3.9 Government Provided Services
3.10 Access to Federally Controlled Facilities, Unclassified Sensitive or Non-Sensitive
Information, and Unclassified Information Technology System
3.11 Project Management
3.12 Web-Based Information System
3.13 Contractor Personnel
3.14 Subcontractor Management
3.15 Instruction Conflicts
4.0 TRANSITION PHASE-IN (CLIN 0001) (Firm-Fixed Price [FFP])
4.1 Transition Phase-In
5.0 SITE OPERATION REQUIREMENTS (CLINs 0X13-0X21) FFP
5.1 C-12 Aircraft Scheduled and Unscheduled Site Level Maintenance
5.2 Site-Related Services for Guantanamo Bay
5.3 Hazardous Materials
5.4 Overhaul and Rework Projections
5.5 Replacement of Tooling and Support Equipment
5.6 Configuration Management
5.7 Accident and Incident Reporting
5.8 Property and Parts Management
5.9 Transportation
5.10 Maintenance Record Keeping
5.11 Technical Data and Jeppesen Subscriptions
5.12 Meetings and Communication
5.13 Required Enterprise-Wide Contractor Manpower Reporting Application (ECMRA)
Information
6.0 RESERVED
7.0 SCHEDULED C-12 AIRCRAFT DEPOT INSPECTIONS (CLIN 0X04) FFP
7.1 Aircraft Condition Inspections
7.2 Consumables
7.3 Teardown Report
7.4 Final Report
8.0 SCHEDULED PT6A-SERIES ENGINE DEPOT INSPECTIONS (CLIN 0X05) FFP
8.1 PT6A-Series Engine Depot Inspections
8.2 Shipping
8.3 Consumables
8.4 Teardown Report
8.5 Final Depot Report
9.0 PROPELLER DEPOT OVERHAULS (CLIN 0X06, 0X06AA, 0X06AB, 0X06AC) FFP . 28
9.1 Propeller Overhauls
9.2 Shipping
9.3 Consumables
9.4 Final Report
10.0 RESERVED
11.0 RESERVED
12.0 OVER and ABOVE (CLINs 0X02, 0X03, 0X07 and 0X08) FFP
12.1 O&A Aircraft Modification (CLIN 0X02)
12.2 O&A Spares (CLIN 0X03)
12.3 O&A Labor (CLIN 0X07)
12.4 O&A Travel and Material (CLIN 0X08)
12.5 Unscheduled Aircraft Depot Repair
12.6 Unscheduled Engine Repair
12.7 Depot Level Technical Directive and Service Action Incorporations
12.8 C-12 Supplemental Publications
RESERVED
12.9 Error! Bookmark not defined.
12.10 Engineering Technical Services
12.11 Surge Requirements
12.12 Support Equipment
13.0 ENGINES (CLIN 0X09) FFP
14.0 C-12 DEPOT STRIP and PAINT (AIRFRAME) (CLIN 0X10) FFP
15.0 C-12 STRUCTURAL FATIGUE TRACKING (CLIN 0X11) FFP
16.0 TRANSITION PHASE-OUT (CLIN 0422)
16.1 Definition
16.2 Transition Support
16.3 Transition Phase-Out Plan
16.4 Government Property Delivery
16.5 Parts Documentation
16.6 Warranty Data
DEFINITIONS AND ABBREVIATIONS
APPENDIX A – ESTIMATED FLIGHT HOURS
APPENDIX B – GOVERNMENT FURNISHED PROPERTY
APPENDIX C – CRITICAL JOB POSITIONS
APPENDIX D – PERFORMANCE METRICS
APPENDIX E – RELEVANT DEFINITIONS FOR MISSION CAPABLE COMPUTATION
1.0 SCOPE
1.1 General Scope
This contract is for performance based Contractor Logistics Support (CLS) for site support, aircraft Depot maintenance, engine Depot maintenance, modifications, potential new site stand ups and potential closures, and strategies that optimize total system availability while minimizing cost and logistics footprint. Sustainment strategies include the best use of public and private sector capabilities through Government and industry partnering initiatives. The Contractor is responsible for facilities, labor, services, equipment, tools, parts, materials, and consumables not explicity stated as Government
Furnished Property to perform the requirements for this contract.
1.2 Background
Initial C-12 aircraft were procured as a Commercial-off-the-Shelf (COTS) product between
1976 and 1990, with additional aircraft purchased in 2008. The C-12 aircraft are Federal
Aviation Administration (FAA) type-certificated, commercial-derivative aircraft modified with Navy and Marine Corps required items, supported and maintained in accordance with Federal Aviation Regulations (FAR), Original Equipment Manufacturers (OEM), and
Naval Air Forces Instructions. The aircraft provide on-call, rapid response, cargo and passenger transportation as well as forward-deployed logistics support. The C-12
Type/Model/Series (T/M/S) aircraft, manufactured by Beechcraft Corporation as Model
200 Series (military-designated C-12B, -F, or -M) and Model 350 Series (designated UC-
12W), are high-performance, fixed-wing, pressurized, twin-engine turboprops that accommodate a pilot, co-pilot, up to eight passengers, cargo, or a combination of passengers and cargo. The C-12 aircraft program is in the sustainment phase and has been continuously maintained under a competitive CLS services contract since initial fleet introduction. C-12 inventory changes are anticipated during Government fiscal year
(FY)15-FY20. UC-12W is expected to increase from 6 to 12 aircraft via annual procurements and likely divest an equal number of UC-12F during the same timeframe.
Divestiture of all TC-12B aircraft is expected by 30 September 2017.
1.3 Site Operations
As of 12 January 2015, Department of the Navy (DoN) C-12 Utility Lift (UL) aircraft currently operate from the following locations:
Table 1
Operating Site Sponsor Aircraft T/M/S Qty
Naval Support Activity (NSA) Bahrain AIRLANT UC-12M 3
Naval Air Station (NAS) Corpus Christi, Texas*
CNATRA TC-12B 24*
NSA Guantanamo Bay, Cuba AIRLANT UC-12M 3
Marine Corps Air Station (MCAS) Beaufort, South Carolina
EAST MARINES UC-12M 2
MCAS New River, North Carolina EAST MARINES UC-12F 2
Naval Air Facility (NAF) Atsugi, Japan (JP) AIRPAC UC-12F 3
Kadena Airbase (AB), JP AIRPAC UC-12F 2
NAF Misawa, JP AIRPAC UC-12F 1
MCAS Yuma, Arizona WEST MARINES UC-12F 2
MCAS Iwakuni, JP WEST MARINES UC-12W 2
MCAS Miramar, California WEST MARINES UC-12W 1
MCAS Futenma, JP WEST MARINES UC-12W 1
Joint Reserve Base (JRB) Belle Chasse, New Orleans, Louisiana
RESERVES UC-12W 2
NAS Patuxent River, Maryland NAVAIR AIR OPS UC-12M 2
NAS Patuxent River, Maryland VXS-1 / NRL RC-12M 1
Manassas, Virginia NAVY UC-12B 1
* NOTE: Divestiture of all 24 of CNATRA aircraft is expected by 30 September 2017, removing Corpus Christi, TX from site support requirement.
1.4 Maintenance Concept
Depot-level maintenance of airframes, engines, propellers, accessories, and all logistics support are provided through a CLS service contract. The C-12 aircraft are under a FAA
Title 14 CFR Part 21. Maintenance or repair shall be accomplished by the site maintainers, an FAA-certified repair station, an OEM authorized Service Center, or a
European Aviation Safety Agency (EASA) certified Part 145 repair station.
As of 12 January 2015, DoN C-12 UL aircraft are configured with the following turboprop engine and propellers types:
Table 2
T/M/S Engine T/M/S Propeller Type, Manufacturer & Part No.
TC-12B Pratt & Whitney PT6A-41 3-Bladed Hartzell, HCB3TN3GT10178B3R or HCB3TN3GT10178K3R
UC-12B Pratt & Whitney PT6A-41 3-Bladed Hartzell, HCB3TN3GT10178B3R or HCB3TN3GT10178K3R
UC-12F Pratt & Whitney PT6A-42 3-Bladed Hartzell, HCB3TN3GT10178B3R or HCB3TN3GT10178K3R
RC-12M Pratt & Whitney PT6A-42 3-Bladed McCauley, P7025423-0150
UC-12M Pratt & Whitney PT6A-42 3-Bladed McCauley, P7025423-0150
UC-12W Pratt & Whitney PT6A-60A 4-Bladed Hartzell, HCB4MP3C/M10476NSK
1.5 Government Responsibilities
Each site’s Technical Point of Contact (TPOC) is the key Government individual responsible for verifying that the Contractor is providing supplies and services in accordance with this Performance Work Statement (PWS).
1.6 Flight Hour Estimate
The estimated flight hours per month per aircraft at each site is in accordance with
Appendix A, Estimated Flight Hours.
2.0 APPLICABLE DOCUMENTS and CERTIFICATIONS
The Contractor shall comply with the following documents to the extent necessary tomaintain airworthiness certification. The following documents and certifications are applicable:
Aircraft Condition Inspection (ACI) Specification Maintenance Engineering Directive
(MED) (C-12)-065 (all revisions)
Automated Weight and Balance System (AWBS), Air Force/Navy
Beechcraft Super King Air B-200 and B-300-series Maintenance Manuals
COMNAVAIRFORINST (CNAF Instruction) 4790.2B, Naval Aviation Maintenance Plan
(NAMP), Chapter 11
Department of Defense (DoD) 4160.21–M, Defense Materiel Disposition Manual
(Precious Metals)
DoD Joint Travel Regulations (JTR) Volume 2, Civilian Employees
DoDD 5220.22, National Industrial Security Program
DoDI 5220.22-M, National Industrial Security Program Operating Manual
DoD 8570.01-M, Information Assurance Workforce Improvement Program
International Organization for Standardization (ISO) 9001-2008
Military-Standard (MIL-STD)-2161C(AS) Paint Schemes and Exterior Markings for US
Navy and Marine Corps Aircraft
National Aerospace Standard (NAS) 411 Hazardous Materials
National Aerospace Standard (NAS) 412 Foreign Object Debris [FOD] Prevention & Tool
Control
National Industrial Security Program Operating Manual (NISPOM)
Naval Air Training & Operating Procedures Standardization (NATOPS) Manual A1-
C12BM-NFM-000
NATOPS Manual NAVAIR A1-C12WA-NFM-000
Naval Air Systems (NAVAIR) Manual 01-1A-509 (Corrosion)
NAVAIR Manual 01-1B-50 Joint Service Technical Manual Aircraft (Weight and Balance)
NAVY Super King Air B-200 and B-300-series Supplemental Maintenance Manuals
Office of the Chief of Naval Operations Instruction (OPNAVINST) 3710.7 series, NATOPS
General Flight and Operations Instructions
OPNAVINST 8023.24B, Navy Personnel Ammunition and Explosives (A&E) Handling
Qualification and Certification Program
Pratt & Whitney PT6A-series Engine Maintenance Manuals
Secretary of the Navy (SECNAV)INST 5510.30B Department of the Navy (DON)
Personnel Security Program (PSP) Instruction
United States Marine Corps (USMC) Order (MCO) 8023.3B, Personnel Qualification and
Certification Program for Class V Ammunition and Explosives (A&E)
3.0 GENERAL REQUIREMENTS (Applies to all Contract Line Item Numbers [CLINs])
3.1 Certifications
The Contractor shall perform all on-site maintenance and flight support of C-12 T/M/S in accordance with Chapter 11 of Commander, Naval Air Forces (CNAF) Instruction (INST)
4790.2B, OEM maintenance instructions, and Title 14 Code of Federal Regulations (CFR)
Federal Aviation Administration Regulations applicable to maintenance of each type of C-
12 UL aircraft, based upon their specific and unique configurations.
3.2 Site Level Maintenance Personnel Certification
The Contractor shall ensure all personnel performing aircraft and engine maintenance are
FAA certified and possess a current Airframe and Power Plant (A&P) License. The
Contractor shall provide trained, licensed, qualified, and certified A&P mechanics to maintain DoN C-12 aircraft systems and their respective power and propulsion systems, subsystems, ordnance, and support equipment (SE) under varying conditions worldwide.
http://encyclopedia.thefreedictionary.com/Office+of+the+Chief+of+Naval+Operations
3.3 Quality Assurance Program
The Contractor shall maintain an effective Quality Assurance Program (QAP) to ensure proper compliance with the maintenance requirements, practices, and procedures with emphasis on material condition of the aircraft. The Contractor’s QAP shall be part of the
Contractor’s Title 14 CFR Part 145 operations.
3.4 Commercial Quality System
The Contractor shall provide and use a commercial quality system that demonstrates a systems approach for managing quality, safety, and its compliance with all contractual requirements in accordance with American National Standards Institute-American Society of Quality (ANSI-ASQ), International Organization for Standardization (ISO) 9001-2008 and Title 14 CFR Part 145. The Contractor is accountable for all Subcontractors and vendors, and as such, shall require a quality system achieving control of the quality of the services and supplies. The Government will perform any necessary inspections, verifications, and evaluations to the Contractor’s overhaul and repair facilities, and operating sites to ascertain the adequacy of the quality system.
3.4.1 Corrosion Control
The Contractor shall implement Corrosion Control that complies with OEM maintenance requirements and the Naval Air Systems (NAVAIR) Corrosion Manual #01-1A-509.
3.4.2 Tool Control
The Contractor shall implement Tool Control that complies with COMNAVAIRFORINST
(CNAF Instruction) 4790.2B, Naval Aviation Maintenance Plan (NAMP), Chapter 11) and meets the National Aerospace Standard (NAS) 412.
3.4.3 Foreign Object Debris Control
The Contractor shall maintain and enforce Tool and Foreign Object Debris (FOD) control programs that meet the requirements of NAS 412 and COMNAVAIRFORINST (CNAF
Instruction) 4790.2B, Naval Aviation Maintenance Plan (NAMP), Chapter 11. The
Contractor is responsible to ensure that a FOD prevention program, meeting requirements of Title 14 CFR Part 145, is documented and in effect within the
Contractor’s spaces and subcontractor facilities.
3.5 Hazardous Material and Waste
The Contractor shall implement Hazardous Material (HazMat) handling procedures that comply with local, state, and federal laws and regulations concerning the use of Class I
Ozone Depleting Compounds (ODC) and Ozone Depleting Substances (ODS) and conform to NAS 411. Halon has been authorized for use in the engine fire extinguishing systems of the C-12 via a previously approved NAVAIR waiver. If and when a substitute becomes available for replacing the Halon, the Contractor shall submit an Over and
Above proposal for its incorporation, utilizing the Over and Above (O&A) CLINs 0X07 &
0X08.
3.6 Precious Metals Recovery
The Contractor shall comply with Department of Defense (DoD) 4160.21-M, Defense
Materiel Disposition Manual (Precious Metals).
3.7 Operations Security Program
The Contractor shall maintain an Operations Security (OPSEC) Program. There is no classified material requirement.
3.8 Government and Contractor Property
3.8.1 Management of Government Property
The Contractor shall manage and use all Government Property (GP) identified in
Appendix B, Government Furnished Property without rental charge. In accordance with Federal Acquisition Regulations (FAR) 52.245-1 Alt I, the Contractor shall not modify or alter GP. Any misuse or abuse of SE shall be reported in accordance with Office of the
Chief of Naval Operations (OPNAV) Form 4790/108.
3.8.2 Government Furnished Property Delivery and Transportation
The Government will furnish to the Contractor the GFP identified under Appendix B, Government Furnished Property no later than the end of the Transition Phase-in period. The GFP will be delivered at the Government’s expense to the location designated by the Contractor.
3.8.3 Contractor Equipment
The Contractor shall provide all administrative office supplies, equipment, furniture, and fixtures necessary for its use in the performance of the work unless otherwise specified.
Any items not expressly stated as GFP shall be the responsibility of the Contractor.
3.8.4 Lost, Damaged, or Destroyed Government Property
The Contractor shall notify the PCO and Contracting Officer Representative (COR) in writing within 24 hours of discovery of lost, damaged, destroyed, or stolen GP and submit a Financial Liability Investigation of Property Loss form (DD FORM 200) within five business days of discovery to the PCO and COR.
3.8.5 Disposal of Government Property
The Contractor shall turn in surveyed GP to Defense Reutilization and Marketing Office
(DRMO) in accordance with DoDINST 4160.21-M. The GP shall be documented by the
Contractor via DD FORM 1149 with a copy provided to the PCO and COR.
3.8.6 Fuel
The Government will provide fuel in support of the DoN C-12 UL program. The
Contractor shall allow the Government contract fuel vendors access to the aircraft. In the event that Government contract fuel vendors are not available, the Contractor shall immediately notify the TPOC for direction.
3.8.7 Material
The Government will provide line fire extinguishers, oxygen, and nitrogen at the home sites and deployment sites.
3.9 Government Provided Services
3.9.1 Government-Provided Services and Items
The Government will provide the following services and logistics support items:
• Physical security, fire protection, law enforcement
• Building and grounds maintenance
• Emergency medical treatment (if available)
• HazMat storage and waste disposal in accordance with operating site instructions
• Basic telephone and data transmission lines on Base or home Site.
• Post-crash damage aircraft recovery
• On-site security briefings
3.9.2 Security Brief
All site-level contractor personnel shall attend security briefings conducted by the site security officer upon initial check-in and final check-out. These briefings will be administered in accordance with local directives at the site and existing U.S. Government security manuals and regulations.
3.10 Access to Federally Controlled Facilities, Unclassified Sensitive or Non-
Sensitive Information, and Unclassified Information Technology System
3.10.1 Base Installation Security Requirements
The Contractor shall comply with applicable DoD, DoN, installation, and command security requirements, adhere to installation traffic regulations, and observe installation military law enforcement personnel and facility security official direction. The Contractor shall comply with the security requirements listed in the Industrial Security Program DODI
5220.22 and DODD 5220.22-M series and documentation to comply with the requirements identified in DD Form 254 if applicable, DoD Contract Security Classification
Specification. When requested by the PCO, the contractor shall provide verification of
DD254 compliance.
3.10.2 Base Access Identification
In accordance with The Secretary of the Navy (SECNAV)INST 5510.30B, the Contractor's security representative or the Contractor's Facility Security Officer (FSO) shall coordinate and ensure the provision of security badges required to allow contractor personnel access to designated workspaces and databases as required by the position. Common Access
Cards (CAC) may not be issued solely for base access; an alternate base access identification card will be issued for personnel not requiring a CAC.
3.10.3 CAC Identification
A CAC will only be issued to contractor personnel that require access to both a DoD facility and DoD networks on site or remotely, or require remote access to DoD networks that use only the CAC log-on for user authentication. In order to obtain a CAC:
3.10.3.1 The Contractor employee shall complete a Federal Bureau of
Investigation (FBI) fingerprint check with favorable results.
3.10.3.2 The Contractor employee shall submit a National Agency Check with
Inquiries (NACI) to the Office of Personnel Management (OPM), or a DoD-determined equivalent investigation.
3.10.4 Control of Common Access Card
The Contractor's security representative or FSO shall repossess and return all CAC(s) to the Government Security Manager or Representative [i.e. COR, Government TPOC, Trusted Agent (TA), or Government Sponsor] upon contractor employee change in status, expiration of the CAC, or completion or expiration of the contract.
3.10.5 Security Requirement
The Contractor shall conduct required background clearances and secure access badges for employees to meet operational requirements. The Contractor shall also secure passports, country clearances, VISAs and physical examinations for employees to meet operational requirements. In accordance with DoN implementation of Homeland Security
Presidential Directive 12 and DoD Standardized Investigation Request Procedures, Non-
National Industrial Security Program (Non-NISP) Investigations are to be conducted for contractors employees requiring access to an installation, require a CAC and access to an Information Technology (IT)-II level system, but DO NOT require security clearance eligibility or access to classified information. The Government security manager will submit an Electronic Questionnaire for Investigations Processing (SF 86), National
Agency Check with Local Agency Check and Credit Checks (NACLC) for IT-II system access to Office of Personnel Management (OPM). The Government security manager will submit required fingerprints for a contractor requiring this Non-NISP process. Once
OPM has completed the initial background check, the determination will come back as
"Favorable" or "No Determination Made" in the Joint Personnel Adjudication System
(JPAS). The Government security manager will notify the COR, TPOC, TA, and the
Contractor's security representative or FSO if a background investigation returns with “No
Determination Made” or derogatory information. All issues regarding derogatory information [i.e., Medical Evaluations, Letter of Intent, Statement of Reasons, 30 Day
JPAS messages, base access, CAC, System Authorization Access Request (SAAR)-N forms, IT system access] shall be addressed between the COR, TPOC, TA, and security representative or FSO. No contractor personnel shall have access to any IT system until resolution of derogatory information. All reinvestigations for non-critical sensitive IT-II designated positions are required every 10 years and will be received via JPAS Network by the Government security manager and contractor security representative or FSO.
ONLY THE GOVERNMENT SECURITY MANAGER WILL SERVICE CONTRACTOR
DATA IN JPAS. The Contractor shall ensure the employee maintains a current, favorably adjudicated Personnel Security Investigation (PSI), at the appropriate level, throughout the performance period.
3.10.6 JPAS Record Maintenance
The Contractor shall maintain an accurate account of the employee's JPAS record for the submission of visit requests as required. The Contractor's security representative or FSO shall provide the Government’s security manager and the Contracting Officer’s
Representative (COR) with the name, title, address, and phone number for the
Contractor's security representative or FSO. The Contractor's security representative or
FSO shall be the primary point of contact on any security matter. When an unfavorable adjudication is returned by Department of the Navy Central Adjudication Facility
(DONCAF), the employee shall not be permitted to work on this effort and if already working, shall be removed without delay. The potential consequences of JPAS requirements, including denial of access for a current or proposed employee who fails to obtain a favorably adjudicated PSI, in no way relieves the Contractor from the requirement to execute performance under the order within the timeframes specified in the order.
3.10.7 Security Violations
The Contractor shall notify the C-12 UL COR, On-Site Government TPOC and installation
Security Department within one hour of discovery of a security violation, suspected security violation, or unauthorized site entry.
3.10.8 Information Assurance
The Contractor shall ensure that personnel accessing information systems have the proper and current Information Assurance (IA) certification to perform IA functions in accordance with DoD 8570.01-M. The Contractor shall meet the applicable IA certification requirements to include:
DoD-approved IA workforce certifications appropriate for each category and level as listed in the current version of DoD 8570.01-M; and appropriate operating system certification for IA technical positions as required by DoD 8570.01-M.
Documentation validating the IA certification status of personnel performing IA functions.
Contractor personnel who do not have proper and current certifications will be denied access to DoD information systems for the purpose of performing IA functions. DoN no longer permits assignment of non-U.S. citizen contractor personnel to IT-II designated positions. Requests to waive the U.S. citizenship requirements for designated IT-II positions may be submitted through the Government Command Security Manager to
SecNav for Plans, Policy, Oversight and Integration. Failure to provide necessary security and IT documentation in a timely manner will prevent proper in-processing and system access for the employee prior to their reporting date.
3.11 Project Management
3.11.1 Project and Risk Management
The Contractor shall provide Project Management to meet the performance requirements of the PWS. The Contractor shall be responsible for work requirements and work in progress at the start of full contract performance with the exception of any work in progress at a depot facility. Accountability in this case shall transfer from the incumbent provider (outgoing contractor) to the Contractor after delivery from Return to Service
(RTS). The Contractor shall establish and maintain a risk management program for the purpose of early identification and mitigation of program risks as to not negatively impact contract performance.
3.11.2 Project Manager
The Contractor shall designate a single point of contact responsible for the overall management and performance of the PWS. The Contractor designee shall be responsible for all contractual and operational requirements. The Contractor shall provide, in writing, the name and contact information of the designee to the PCO on the first day of full contract performance. Any change of Project Manager shall be submitted to the PCO within five business days.
3.12 Web-Based Information System
3.12.1 Management Information System, Data Collection, Documentation and Reporting
Requirements
The Contractor shall provide and maintain a secure Web-Based Information System
(WIS) that provides computerized storage of supply logistics support information with on-line web-based accessible interactive query and update capability on a real-time basis.
This system shall be capable of tracking all supply logistics requirements to include parts repair cycle of GP, and inventory management to include spares usage. It shall be capable of performing full supply logistics queries of all Government owned aircraft and engines, inventories, and SE by site. The Contractor shall develop and maintain this data for the life of the contract. The Contractor shall provide the Government access to this
WIS through a web site via the Internet. The Contractor shall manage the accessibility of the identified Government personnel authorized to use the WIS. The WIS shall be able to be accessed through secure Navy Marine Corps Intranet (NMCI) computers. The
Contractor shall provide the Government the ability to print, view, and download reports from the WIS. The Contractor shall initiate and keep current all records and technical data identified in this PWS, including Supplemental Type Certificate (STC), Major Repair and
Alteration (FAA Form 337), and Authorized Release Certificates/Airworthiness Approval
Tags (FAA Form 8130 series).
3.12.2 WIS Performance
This WIS shall provide real-time accurate information and documentation to include the following:
Over and Above labor and material costs accumulated against the Fixed Price as defined in the task order
Contract Data Requirement List (CDRL) and non-CDRL items
Daily status information: aircraft Bureau Number (BuNo), serial number, site identifier, aircraft status to include maintenance and supply data (if applicable), estimated time for Fully Mission Capable (FMC), current aircraft hours, and comments
High time removal components, aircraft and engine to include time installed and time remaining as referenced in the applicable maintenance manual
Projected scheduled maintenance
Stock Inventory Report of all GFP that shall include Part Number, Serial or Lot
Number, Type, Description, Property Tag or Barcode, Nomenclature, Quantity and Units of Issue, Stock Site Code, Storage Location, and Status
3.12.3 Data Delivery
Data maintained on the WIS website, including CDRLs, shall be considered delivered to the Government upon posting to the website. When Contract Data Requirement List
(CDRL) deliverables are posted on the WIS, the Contractor shall notify the Government upon posting via email in accordance with CDRL Exhibits (A), (B), and (C).
3.13 Contractor Personnel
3.13.1 Critical Job Positions
The Contractor shall ensure the job positions cited within Appendix C, Critical Job
Positions are manned. The Contractor shall ensure the critical job positions are not vacant for more than 30 consecutive days. Any change to these personnel after contract award shall be submitted to the Program Office within five business days after the official change.
3.13.2 Distinctive Attire and Safety Apparel
Contractor personnel directly associated with aircraft maintenance shall wear distinctive attire with the Contractor’s name or emblem that clearly identifies the Contractor and allows for easy identification from a distance. The Contractor shall be responsible for the requirements of, and ensuring the use of, safety shoes and all safety apparel and equipment by Contractor personnel as required by National Occupational Safety and
Health (NOSH), Navy Occupational Safety and Health (NAVOSH), Occupational Safety and Health Administration (OSHA), and other applicable Government regulations.
3.13.3 Contractor Personnel Flying in Government Aircraft
Contractor personnel are authorized to fly in a passenger status in Government aircraft when such flights are in the best interest of the Government. It is the responsibility of the
Contractor to ensure that the requirements of the Military Service are met in order to fly in
Government aircraft.
3.14 Subcontractor Management
The Contractor (Prime) shall oversee and manage its subcontractors in a manner that complies with all requirements of this PWS and associated attachments. In particular, the
Contractor shall ensure that subcontractor(s) problems are identified and resolved to minimize impact to the Government and meet readiness requirements. The Contractor shall ensure subcontractor compliance with labor and safety standards. If the subcontractor is identified as a small business, the Contractor shall assess the subcontractor’s compliance with specified small business guidelines.
3.15 Instruction Conflicts
If the Contractor encounters a conflict between this PWS and the documents cited in paragraph 2.0, contact the C-12 PCO for instruction.
SPECIFIC REQUIREMENTS:
4.0 TRANSITION PHASE-IN (CLIN 0001) (Firm-Fixed Price [FFP])
4.1 Transition Phase-In
The Transition Phase-In period is defined as the first 60 days of contract performance.
The Transition Phase-In shall be the Contractor’s preparation period for the purpose of hiring, relocating, and training of personnel (including site familiarization); ordering material; performing an inventory of GFP; and coordinating all Phase-In matters associated with the Contractor’s execution of the C-12 CLS maintenance and logistics functions to enable the Contractor’s personnel to perform the requirements. During the
Transition Phase-In Period, the Incumbent Contractor shall continue to be fully responsible for continued operations. NOTE: If there is a modification program in work, the Incumbent Contractor will continue with the modification until all scheduled aircraft have been completed and accepted by the Government. The Incumbent Contractor will continue to manage and maintain accountability of material in the pipeline until delivered and accepted by the Government.
4.1.1 Transition Phase-In Plan
The Contractor, in conjunction with the Incumbent Contractor, shall implement its
Transition Phase-In Plan with guidance provided by the Government.
4.1.2 Government Furnished Property Inventory
Within the Transition Phase-In period, the Contractor shall conduct an inventory of GFP with the Incumbent Contractor and a designated Government representative at each primary operating site. The Contractor shall inventory all GFP in accordance with
Appendix B, Government Furnished Property. The Contractor shall submit the
Material Utilization and Forecasting Report in accordance with CDRL A001.
4.1.3 Transition Phase-In Status Reporting
The Contractor shall report transition progress to the UL Integrated Product Team (IPT)
Lead on a weekly basis via teleconference.
4.1.4 Post-Award Conference
The Contractor shall attend a Post-Award Conference at the Government’s facility at
Patuxent River, MD, to include no more than a total of four contracts and management personnel, with the Government no later than 30 days after contract award. The meeting will cover the topics as set forth in Federal Acquisition Regulation Subpart 42.5.
Additionally, the Contractor shall demonstrate its management procedures, provide progress assessments, review technical and other specialty area status, and schedule dates for near term critical meetings and actions. An agenda detailing conference topics will be generated and disseminated by the Government.
4.1.5 Access and Site Familiarization Visits
The Government will allow the Contractor access to all primary operating sites upon issuance of the first task order. The Contractor shall make arrangements for this access through the Government. Designated Contractor personnel will be permitted access to observe all operations such as workflow, priorities, scheduling, equipment handling and processing, parts storage, safety and security. Familiarization visits shall not interfere with the activities of the Incumbent Contractor’s personnel or with squadron or site operations.
4.1.6 Operations
During the Transition Phase-In period, the Contractor shall coordinate with the Incumbent
Contractor those activities required for turnover and continued operations in accordance with the PWS.
4.1.7 Material Accountability
During the Transition Phase-In period, the Contractor shall coordinate with the Incumbent
Contractor all activities required for turnover and continued accountability of material ordered and in shipment until delivered and accepted by the Government.
4.1.8 Export Control Licenses
The Contractor shall have export license requests for the following items that are
International Traffic in Arms Regulation (ITAR) controlled no later than 30 days after contract award:
NOMENCLATURE PART NUMBER
TACAN Transceiver ARN-154 805D0602-43
TACAN Transceiver ARN-153 622-8149-002
TACAN Control Panel 622-2511-003
TACAN Control Panel 805D603-12
IFF Transponder 4079100-0509
IFF Transponder 4079100-0514
IFF Transponder XS-950 7519350-70051
IFF Control Panel 4077156-0504
IFF Control Panel G7300-01
IFF Appliqué (KIV-119) 4079080-0501
TA-24 Precise Positioning System 24835-41-U50G
ARC-210 1851A(C) Transceiver 822-1707-002
ARC-210 Control Panel 822-1276-002
AN/AAR-47B(V)2 Sensor System:
Computer Processor 3313-AS-300-5
Optical Sensors 3313-AS-700-3
Control Indicator 3313-AS-450-1
Countermeasure Signal Simulator (Test Set) 3313-AS-C01-5
AN/ALE-47(V) Dispenser System:
Control Display Unit 179740-0002
Programmer 179730-0006
Sequencer 179250-0003
Safety Switch 179720-0001
Dispenser 179750-0001
AN/ALM-290 Test Set 3738AS100-001
5.0 SITE OPERATION REQUIREMENTS (CLINs 0X13-0X21) FFP
5.1 C-12 Aircraft Scheduled and Unscheduled Site Level Maintenance
The Contractor shall perform all scheduled and unscheduled site-level maintenance on all aircraft, engines, propellers, and SE, providing associated materials and consumables
(not otherwise delineated as an Over and Above in Section 12.0). The Contractor shall perform phase maintenance, flight-line support, inspections, and Service Actions (SA) compliance, whether on-site or during a short-term deployment (30 days or less) or during a detachment, in accordance with applicable documents. Site support shall accommodate 25% temporary variances to the estimated monthly site flying hours cited in
Appendix A, Estimated Flight Hours. At any time that monthly site flying hours are expected to exceed the estimated monthly site flying hours cited in Appendix A by 25%, the contractor shall submit an Over and Above Work Request (O&AWR) in accordance with NAVAIR Clause 5252.217-9507 Over and Above Work Requests, and Section J
Attachment (7) and shall be charged to CLINs 0X07 and 0X08. The Contractor shall meet the performance requirements in accordance with Appendix D, Performance
Metrics.
5.1.1 Service Action Compliance
The Contractor shall perform all maintenance for flight line and Organizational-level related evolutions and Government-directed compliance with SA, including Service
Bulletins (SB), Technical Directives (TD), and Maintenance Engineering Directives
(MED).
5.1.2 Transient Aircraft
The Contractor shall provide scheduled and unscheduled maintenance for transient C-12
UL aircraft on a non-interference basis with home-site mission readiness. Maintenance of transient aircraft encompasses the occasional or infrequent, not routine, support of C-12 aircraft incoming, arriving and resulting in temporary stop-over (including nights and weekends) at another C-12 UL site. The Contractor shall make every effort to meet, service, safeguard and prepare the transient aircraft for departure acceptance on a non-interference basis with home-site mission readiness.
5.1.3 Aircraft Appearance and Servicing
The Contractor shall ensure that the aircraft’s interior and exterior are maintained in a serviceable condition, ensuring aircraft are clean and free of safety hazards, FOD, and corrosion.
5.1.4 Aviation Life Support System and Propeller Maintenance
The Contractor shall maintain Aviation Life Support Systems (ALSS) (e.g., aircrew life vests and rafts, oxygen masks, survival radios and flares) and perform minor on-site propeller repair (e.g., feathering blade damage, prop balancing).
5.1.5 Mission Equipment
The Contractor shall remove and replace the C-12 special mission equipment attached to the Manassas, VA aircraft and the VXS-1 Patuxent River, MD aircraft in accordance with
OEM manuals. The procurement of special mission equipment shall be executed in accordance with NAVAIR Clause 5252.217-9507 Over and Above Work Requests, and
Section J Attachment (7) and shall be charged to CLINs 0X07 and 0X08.
5.1.6 Ammunition and Explosives
The Contractor shall establish and maintain an Ordnance Qualification and Certification program. The program shall include management structure to ensure maintenance technicians are properly trained and certified for safe and secure handling and storage of
Ammunition and Explosives (A&E) in accordance with OPNAV Instruction 8023.24B and
US Order (MCO) 8023.3B. At present, C-12 A&E includes the MK-79 Foliage penetrator
(pencil flares) within survival equipment, fire (extinguisher) bottles for aircraft engines, and
AAR-47/ALE-47 Aircraft Survivability Equipment (ASE) for the UC-12W aircraft. Training and handling shall include flare loading and unloading procedures. The Contractor shall submit an Ordnance Certification Status Report in accordance with CDRL
A002/AA02/AB02/AC02/AD02.
5.1.7 RESERVED
5.1.8 Engine Maintenance
5.1.8.1 Engine Changes. The Contractor shall remove and install engines under
CLIN 0X09, including installing Quick Engine Change (QEC) parts when this work is required to be performed on site. The Contractor shall pre-position replacement engines for scheduled overhauls in order to meet mission requirements.
Replacement engines shall be of the most current engine configuration at the time of installation.
5.1.8.2 PT6A-Series On-Wing Hot Section Inspections (HSI). The Contractor shall perform scheduled HSI on the PT6A engines on-wing, providing any necessary materials and consumables.
5.1.9 Flight Operations and Scheduling
The Contractor shall utilize a flexible work schedule in order to support flight operations.
Flight operation support consists of contractor-performed activities required in order to launch and recover scheduled and unscheduled flights any time, 24 hours a day and 7 days a week. Each site’s TPOC will provide a flight schedule to the Contractor by 1630 hours (local time) the day before operations. (Exception: see 5.1.9.2 Holiday Scheduling).
5.1.9.1 Unscheduled Flight Operations
For unscheduled flights, the TPOC will provide the Contractor 5-hour notice prior to flight. The Contractor shall provide a point of contact for notification of the unscheduled flights to the TPOC.
5.1.9.2 Holiday Scheduling
The TPOC will provide the Contractor 48-hour notice for scheduled flights and five-hour notice for unscheduled flights occurring on U.S. Government holidays.
5.1.9.3 Aircraft Launch Readiness
The Contractor shall ensure that the aircraft is ready for launch one hour prior to the scheduled departure time, which may include cargo preparation and loading.
The Contractor shall remain onsite until successful aircraft departure.
5.1.10 Site Operations Aircraft Recovery
The Contractor shall be on-site one hour before scheduled flight and be available 24 hours a day and seven days a week to perform the following aircraft recovery procedures after mission completion:
5.1.10.1 Post-Flight debrief with the aircrew.
5.1.10.2 Post-Flight inspection of the aircraft.
5.1.10.3 Perform Aircraft Cleaning Checklist.
5.1.10.4 When required at Outside the Continental United States (OCONUS) locations, the Contractor shall ensure that ITAR regulated counter-measure ammunition and explosive items are removed from the aircraft and stored in an approved Ready Service Locker (RSL) while depot level maintenance is performed on the aircraft.
5.1.11 Functional Check Flights
The Contractor shall perform pre-flight briefings to the aircrew, advising of all major work accomplished that may impact the flight characteristics of the aircraft prior to the
Functional Check Flight (FCF). The Contractor shall perform a post-flight debriefing with the aircrew to address FCF discrepancies.
5.1.12 Weight and Balance
The Contractor shall perform aircraft Weight and Balance in accordance with NAVAIR Manual 01-1B-50, OEM, and FAA procedures.
5.1.12.1 Automated Weight and Balance System (AWBS). The Contractor shall use the Air Force/Navy AWBS, Version 10.0 or higher, to document aircraft weight and balance.
5.1.12.2 Weight and Balance Records. The Contractor shall ensure that DD-365 copies are maintained in the aircraft and in the flight planning area for aircrew reference.
5.1.13 Short-Term Deployment
The Contractor shall maintain aircraft during short-term deployments. Short-term deployment is defined as any deployment away from the home base site for up to 30 days. Baseline flight hours (plus 25% variance) shall apply during short-term deployments. Travel and Per Diem for all short-term deployments shall be executed in accordance with NAVAIR Clause 5252.217-9507 Over and Above Work Requests, and
Section J Attachment (7) and shall be charged to CLINs 0X08.
5.1.14 Aircraft Status
The Contractor shall track the status of each aircraft at each site. The Contractor shall report via the WIS the daily status of each aircraft at each site. The Contractor shall submit a monthly Aircraft Status Report in accordance with CDRL
A003/AA03/AB03/AC03/AD03.
5.2 Site-Related Services for Guantanamo Bay
The Contractor shall provide employee housing (including utilities) and parts and personnel transport services at Guantanamo Bay. The Contractor shall establish and maintain aircraft site-related services including utilities such as electrical, computer, phone, and internet communications services.
5.3 Hazardous Materials
The Contractor shall comply with the health and safety requirements of all Bases and
Sites, including those set forth for handling, use, disposal, and bulk storage of HazMat.
The Contractor shall ensure that Contractor-procured HazMat and GFP supplied for C-12 are accounted for separately from non-C-12-procured materials. The Contractor shall provide locked and segregated storage of small quantities of HazMat required for daily and weekly use at or near the aircraft maintenance spaces.
5.4 Overhaul and Rework Projections
The Contractor shall gather, sort, tabulate, and perform trend analysis of source maintenance and fatigue data, providing five-year aircraft, engine, and propeller overhaul and airframe rework projections identified by asset BuNo or serial number. Airframe rework covers areas determined to extend the aircraft’s airworthiness and service life
(e.g., wing spar replacement, adding strengthening doublers to the belly skin). The
Contractor shall submit a five-Year Overhaul and Rework Projections Report in accordance with CDRL A004/AA04/AB04/AC04/AD04.
5.5 Replacement of Tooling and Support Equipment
The Government will replace GP non-Ready-for-Issue (RFI) tools, test equipment, and SE that are determined to be beyond economical repair in accordance with Federal
Acquisition Regulation (FAR) 52.245-1(f)(ix) Alt I unless the Contractor is liable in accordance with Federal Acquisition Regulation (FAR) 52.245-1 Alt I. The Contractor shall provide the cost estimate to the C-12 UL Assistant Program Manager, Logistics
(APML) for review. The APML will disposition the cost estimate. The Contractor shall provide a Firm-Fixed Price Proposal for the replacement items at the request of the PCO and shall be executed in accordance with NAVAIR Clause 5252.217-9507 Over and
Above Work Requests, and Section J Attachment (7) and shall be charged to CLINs
0X08.
5.6 Configuration Management
5.6.1 Configuration Status Accounting
The Contractor shall track configuration status of the C-12 UL aircraft, engine, systems, subsystems, and SE in accordance with ANSI/EIA-649B. The Contractor shall not perform any aircraft configuration modification without approval from the PCO or the
Administrative Contracting Officer (ACO). The Contractor shall submit a Configuration
Status Accounting Report in accordance with CDRL A005/AA05/AB05/AC05/AD05.
5.6.2 Software Incorporations
The Contractor shall purchase and install UL IPT-directed FAA-approved C-12-related software updates into all avionics system equipment and all Flight Management System
(FMS) training devices per site. The Contractor shall submit the Configuration Status
Accounting Report in accordance with CDRL A005/AA05/AB05/AC05/AD05.
5.6.3 Technical Directive Compliance
The Contractor shall track incorporations of all Government approved TD for the T/M/S aircraft, systems and components, including engines, propellers and SE. The Contractor shall submit the TD Compliance Report in accordance with CDRL
A006/AA06/AB06/AC06/AD06.
5.7 Accident and Incident Reporting
The Contractor shall track and report all accidents and incidents that occur in the performance of this contract. The Contractor shall notify the TPOC immediately upon each incident. The Contractor shall submit the Accident/Incident Report in accordance with CDRL A007/AA07/AB07/AC07/AD07.
5.8 Property and Parts Management
5.8.1 Property Management System
The Contractor shall possess and maintain a Property Management System in accordance with FAA Title 14 CFR Part 145 guidelines and Federal Acquisition
Regulations (FAR) 52.245-1 Alt I. Such a system shall be used to maintain property control, procurement, packaging and packing, transportation, and quality assurance
(including receiving inspection and positive control of all defective [not suitable for flight] items) for all parts and material used in support of the C-12 UL aircraft.
5.8.2 Federal Aviation Administration Approved Parts and Material
The Contractor shall provide FAA-approved parts and materials, inspect the parts and materials, and maintain inventory control. All refurbished parts and material shall be refurbished in accordance with FAA standards and shall possess a FAA 8130 tag.
Refurbished or repaired parts that do not have an 8130 tag shall not be installed on a
Government aircraft.
In the absence of available FAA-approved OEM parts, non-OEM parts may be considered on a case-by-case basis by the engineering authority for the C-12 UL aircraft. All
“requests for procurement” of non-OEM Parts and Material will be routed to and reviewed by the appropriate C-12 UL Team members. The Contractor shall include the following information in the request to purchase Parts and Material:
1. Date
2. Nomenclature
3. National Stock Number (if applicable)
4. Proposed Vendor
5. Quantity required
6. Part Number
7. Unit price and Total cost (fully burdened, to include shipping)
8. Quantity on hand (in stock)
9. Parts usage history during the prior 12 months
10. The aircraft T/M/S in which the part will be used
11. Lead time
12. Estimated Delivery Date
If the Government concurs, the Contractor will be directed or authorized to proceed with procurement through the PCO or ACO.
Note: Critical Safety Items (CSI) are designated as such within OEM Maintenance and Illustrated Parts Manuals.
5.8.3 Site-Level Maintenance Material
The Contractor shall track parts, stock, and provide consumable parts required to maintain the C-12 aircraft, engine, systems, subsystems and SE. This shall include all material to accomplish Site-Level inspections and repair-type SB, complete on- wing engine HSI, propeller maintenance, aircraft recovery, Temporary Duty (TDY) or
Temporary Assigned Duty (TAD) and extended detachments. The Contractor shall meet the Mission Capable Rate in accordance with Appendix D, Performance Metrics.
5.8.4 Government Property Inventory
The Contractor shall conduct a semi-annual inventory of all GP at all sites. The Contractor shall submit a Material Utilization and Forecasting Report in accordance with CDRL
A001/AA01/AB01/AC01/AD01.
5.8.5 Cannibalization
The Contractor shall obtain the COR’s written approval prior to any aircraft cannibalization actions. The Contractor shall track the cannibalization actions in the WIS and on the
Aircraft Status Report (CDRL A003/AA03/AB03/AC03/AD03) and document the action in the miscellaneous section of the aircraft logbook.
5.8.6 Obsolescence
The Contractor shall track and resolve parts obsolescence and Diminishing
Manufacturing Sources and Material Shortages (DMSMS). The Contractor shall submit an Obsolescence and DMSMS Summary in accordance with CDRL
A008/AA08/AB08/AC08/AD08.
5.9 Transportation
The…