Questions and Answers Batch 7

View the file

Other files

File Type Posted
N00019-15-R-5500_Amendment_0004.docx DOCX document
C-12_Responses_to_Questions_from_Industry_Batch_9.xlsx XLSX spreadsheet
N00019-15-R-5500_Batch_8.xlsx XLSX spreadsheet
N00019-15-R-5500_Amendment_003.pdf PDF
Attachment_8.1_Collective_Bargaining_Agreement_-Miramar_and_Yuma.pdf PDF
N0001915R5500_amend_2.docx DOCX document
Att_L-6_Price_Matrix_updated_1_Oct_15.xlsx XLSX spreadsheet
Responses_to_Questions_Batch_6.xlsx XLSX spreadsheet
N0001915R5500__Amend_1.docx DOCX document
05-2508.pdf PDF
TC-12_Production_Slides_2012_ _2013.xls XLS spreadsheet
Att_L-4_PPQ_Amnd_1_092315.docx DOCX document
05-2104.pdf PDF
05-2518.pdf PDF
Att_L-5_PP-1_PP_Cont_Data_Amnd_1_091715.xlsx XLSX spreadsheet
Attachment_1_-_C12_CLS_PWS__Amnd_1_092315.doc DOC document
Att_L-6_Price_Matrix_updated7July2015.xlsx XLSX spreadsheet
C-12_RFP_Final.pdf PDF
Attachment_8_-_C-12_CBA_current_(two_of_two).PDF PDF
Attachment_7_-_C-12_OA_Work_Request_Word_Doc_25_Feb15.docx DOCX document
Att_L-7_AC_Mods_Spares_and_Travel_ _Matl_update29July2015.xlsx XLSX spreadsheet
Parts_Usage_1_Oct13_thru_30_Sept14_7_Jul15.xlsx XLSX spreadsheet
Att_L-1_ES_Tables.xlsx XLSX spreadsheet
C-12_Service_Life_Events_6_Jul15.xlsx XLSX spreadsheet
On-wing_Engine_Data_as_of_30_Jun2015.xlsx XLSX spreadsheet
Att_L-5_PP-1_PP_Cont_Data_22July2015.xlsx XLSX spreadsheet
Attachment_8_-_C-12_CBA_current_(one_of_two).PDF PDF
Attachment_9.1_-_AWD_2005-2508_Revision_15_-_Texas.pdf PDF
FY16-21_AF_Projs_(rev)_ _ACI_by_Site_ _FY_5_Aug15.xlsx XLSX spreadsheet
ACI_Spec_v_Oct_2011_26_Aug15.doc DOC document
Att_L-3_Experience.xlsx XLSX spreadsheet
Attachment_6_-_C-12_Quality_Assurance_Support_Plan_12Aug15.pdf PDF
Att_L-4_PPQ.docx DOCX document
Attachment_1_-_C12_CLS_PWS__FINAL.pdf PDF
BuNo_161511_Mission_Equipment_15_July_2015.xlsx XLSX spreadsheet
C12_GFP_11_May15.xlsx XLSX spreadsheet
C-12_CDRLS_N00019-15-R-5500.pdf PDF
Att_L-2_Site_Manning_Estimate.xlsx XLSX spreadsheet
CDRL_AX03_Formatting_Supplement_5_Feb15.docx DOCX document
Attachment_5_-_Appendix_B_C-12_SGFP_Data_Input_Spreadsheet_(XLS)_11_May15.xls XLS spreadsheet
Attachment_9_-_AWD_2005-2104_Revision_15_Washington_DC_and_Maryland.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question #Question Received from IndustryAnswer
265Para 5.8.3 of the PWS site level maintenance of material n states that the contractor shall track parts stock, and provide consumable parts required to maintain C-12 aircraft, engines., systems, subsystems and SE. covered under CLINS X013-X021, which CLIN does the Govt anticipated utilizing to cover site level maintenance rotable material?Available rotable stock is included in GFP. See also related Q's #266 and 267.
266If the intent is to use the GFP as rotable material to support site level schedule and unscheduled maintenance, which CLIN covers the repairs / replenishment of Government inventory covers rotables?GFP includes available rotable stock. CLINs 0X13-0X21 are applicable under PWS 5.1: "The Contractor shall perform all scheduled and unscheduled site-level maintenance on all aircraft, engines, propellers, and SE, providing associated materials and consumables (not otherwise delineated as an Over and Above in Section 12.0)." CDRL A001 is also applicable to GFP under PWS 5.8.4.
267Which CLIN covers rotables that are consumed at each operating site that are not part of GFP?GFP includes available rotable stock and rotables are not normally consumed; however, if a GFP item becomes unrepairable, or Beyond Economical Repair, it must be documented in the WIS and via CDRL A001 (PWS 5.8.4) and replaced in accordance with FAR 52.245-1 Alt I. See also PWS 3.8.3 "Any items not expressly stated as GFP shall be the responsibility of the Contractor."
269PWS para 1.3, Site Operations. Please provide the Base Communications Office addresses for each site. This information will allow bidders to determine communication and internet costs.The addresses are not readily available to provide; however, Internet research revealed various contact phone numbers. Contact the Information Technology (IT) Department for the specific Base or Site in question and/or a local Internet Service that provides (non-NMCI) internet access to the Base or Site.