Sheet1
| Question # | Question Received from Industry | Answer |
| 86 |
Can the Government better define the term “same physical location” in reference to this contract, as operations will be deployed worldwide?
| See the Final RFP. | ||
| 164 | CLIN 0X04 lists the total scheduled depot inspections. Please identify the specific sites from which the aircraft will come for these inspections for each year. | A list of projected ACIs by Home Site and Fiscal Year (FY), dated 5 Aug 2015, will be posted to FEDBIZOPPs along with updated/revised Airframe Overhaul Projections. |
| 278 | 1. Please identify by bureau number for the FY12-FY14 timeframe the following: |
a. Dates during which the aircraft could not fly due to:
i. Depot inspection and overhaul
ii. Engine inspection and overhauls
iii. Any major modifications to the program aircraft that would have taken aircraft out of flying status for a period of time greater than 2 weeks, for example, installation of Proline 21.
| The information requested in this question is unreleasable. | |
| 279 | 1. Section H, H-1 Reduced Payments for Mission Capable (MC) rate pay adjustments. The previous RFP based the reduced payments as a factor of the Base Operations Support CLINs which did not include parts/material costs. The current RFP bases reduced payments on the Site Operation Requirements CLINs which does include parts/materials. The addition of parts/materials significantly increased the reduced payments for every percent below the 80% minimum requirement. |
a. Please clarify why the government chose to significantly increase the Reduced Payment amount so bidders can understand all the risk associated with this metric.
| The requirement is as stated in the solicitation. | |
| 280 | RFP, Page 144; Amendment 1, Page 37; Amendment 3, Page 23: |
a. Section reads - Ensure that the Model Contract includes:
(1) The original signed SF33 for the basic solicitation and each amendment (as applicable) (including sections B-K)
(2) Section B with proposed pricing;
(3) Section F with delivery dates filled in;
(4) Section H;
(5) Section K: Signed Representations, Certifications, and Acknowledgements and/or Online Representations and Certifications Application (ORCA) reference; and
(6) Small Business Subcontracting Plan
b. Will the Govt provide a conformed RFP to use as a model contract so that all clause changes, etc are incorporated in one document? If not, is the contractor expected to incorporate all changes into one document?
c. Are the items listed as (1) through (6) above to be the only items included in the Model Contract? Or include all sections B-K for the original RFP and all amendments?
a. No response required b. Per Section L, Part B, 5.0 e. (1) (Amendment 003), the Model Contract shall include the original signed SF33 and each amendment; a conformed RFP is not required. c. The Model Contact requirements are as stated in items (1) through (6) of Section L, Part B, 5.0 e. (1) (Amendment 003). Item (1) on the list states to include Sections B - K.