C-12_Responses_to_Questions_from_Industry_Batch_9.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
C-12 Contractor Logisitics Services
Solicitation number
N00019-15-R-5500
Issued by

About this file

C-12 Questions from Industry Batch 9

View the file

Other files

File Type Posted
N00019-15-R-5500_Amendment_0004.docx DOCX document
N00019-15-R-5500_Batch_8.xlsx XLSX spreadsheet
N00019-15-R-5500_Amendment_003.pdf PDF
Attachment_8.1_Collective_Bargaining_Agreement_-Miramar_and_Yuma.pdf PDF
N0001915R5500_amend_2.docx DOCX document
Att_L-6_Price_Matrix_updated_1_Oct_15.xlsx XLSX spreadsheet
C-12_Responses_to_Questinos_from_Industry_Batch_7.xlsx XLSX spreadsheet
Responses_to_Questions_Batch_6.xlsx XLSX spreadsheet
N0001915R5500__Amend_1.docx DOCX document
05-2508.pdf PDF
TC-12_Production_Slides_2012_ _2013.xls XLS spreadsheet
Att_L-4_PPQ_Amnd_1_092315.docx DOCX document
05-2104.pdf PDF
05-2518.pdf PDF
Att_L-5_PP-1_PP_Cont_Data_Amnd_1_091715.xlsx XLSX spreadsheet
Attachment_1_-_C12_CLS_PWS__Amnd_1_092315.doc DOC document
Att_L-6_Price_Matrix_updated7July2015.xlsx XLSX spreadsheet
C-12_RFP_Final.pdf PDF
Attachment_8_-_C-12_CBA_current_(two_of_two).PDF PDF
Attachment_7_-_C-12_OA_Work_Request_Word_Doc_25_Feb15.docx DOCX document
Att_L-7_AC_Mods_Spares_and_Travel_ _Matl_update29July2015.xlsx XLSX spreadsheet
Parts_Usage_1_Oct13_thru_30_Sept14_7_Jul15.xlsx XLSX spreadsheet
Att_L-1_ES_Tables.xlsx XLSX spreadsheet
C-12_Service_Life_Events_6_Jul15.xlsx XLSX spreadsheet
On-wing_Engine_Data_as_of_30_Jun2015.xlsx XLSX spreadsheet
Att_L-5_PP-1_PP_Cont_Data_22July2015.xlsx XLSX spreadsheet
Attachment_8_-_C-12_CBA_current_(one_of_two).PDF PDF
Attachment_9.1_-_AWD_2005-2508_Revision_15_-_Texas.pdf PDF
FY16-21_AF_Projs_(rev)_ _ACI_by_Site_ _FY_5_Aug15.xlsx XLSX spreadsheet
ACI_Spec_v_Oct_2011_26_Aug15.doc DOC document
Att_L-3_Experience.xlsx XLSX spreadsheet
Attachment_6_-_C-12_Quality_Assurance_Support_Plan_12Aug15.pdf PDF
Att_L-4_PPQ.docx DOCX document
Attachment_1_-_C12_CLS_PWS__FINAL.pdf PDF
BuNo_161511_Mission_Equipment_15_July_2015.xlsx XLSX spreadsheet
C12_GFP_11_May15.xlsx XLSX spreadsheet
C-12_CDRLS_N00019-15-R-5500.pdf PDF
Att_L-2_Site_Manning_Estimate.xlsx XLSX spreadsheet
CDRL_AX03_Formatting_Supplement_5_Feb15.docx DOCX document
Attachment_5_-_Appendix_B_C-12_SGFP_Data_Input_Spreadsheet_(XLS)_11_May15.xls XLS spreadsheet
Attachment_9_-_AWD_2005-2104_Revision_15_Washington_DC_and_Maryland.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question #Question Received from IndustryAnswer
86

Can the Government better define the term “same physical location” in reference to this contract, as operations will be deployed worldwide?

See the Final RFP.
164CLIN 0X04 lists the total scheduled depot inspections. Please identify the specific sites from which the aircraft will come for these inspections for each year.A list of projected ACIs by Home Site and Fiscal Year (FY), dated 5 Aug 2015, will be posted to FEDBIZOPPs along with updated/revised Airframe Overhaul Projections.
2781. Please identify by bureau number for the FY12-FY14 timeframe the following:

a. Dates during which the aircraft could not fly due to:

i. Depot inspection and overhaul

ii. Engine inspection and overhauls

iii. Any major modifications to the program aircraft that would have taken aircraft out of flying status for a period of time greater than 2 weeks, for example, installation of Proline 21.

The information requested in this question is unreleasable.
2791. Section H, H-1 Reduced Payments for Mission Capable (MC) rate pay adjustments. The previous RFP based the reduced payments as a factor of the Base Operations Support CLINs which did not include parts/material costs. The current RFP bases reduced payments on the Site Operation Requirements CLINs which does include parts/materials. The addition of parts/materials significantly increased the reduced payments for every percent below the 80% minimum requirement.

a. Please clarify why the government chose to significantly increase the Reduced Payment amount so bidders can understand all the risk associated with this metric.

The requirement is as stated in the solicitation.
280RFP, Page 144; Amendment 1, Page 37; Amendment 3, Page 23:

a. Section reads - Ensure that the Model Contract includes:

(1) The original signed SF33 for the basic solicitation and each amendment (as applicable) (including sections B-K)

(2) Section B with proposed pricing;

(3) Section F with delivery dates filled in;

(4) Section H;

(5) Section K: Signed Representations, Certifications, and Acknowledgements and/or Online Representations and Certifications Application (ORCA) reference; and

(6) Small Business Subcontracting Plan

b. Will the Govt provide a conformed RFP to use as a model contract so that all clause changes, etc are incorporated in one document? If not, is the contractor expected to incorporate all changes into one document?

c. Are the items listed as (1) through (6) above to be the only items included in the Model Contract? Or include all sections B-K for the original RFP and all amendments?

a. No response required b. Per Section L, Part B, 5.0 e. (1) (Amendment 003), the Model Contract shall include the original signed SF33 and each amendment; a conformed RFP is not required. c. The Model Contact requirements are as stated in items (1) through (6) of Section L, Part B, 5.0 e. (1) (Amendment 003). Item (1) on the list states to include Sections B - K.