Att_L-3_Experience.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
C-12 Contractor Logisitics Services
Solicitation number
N00019-15-R-5500
Issued by

About this file

Section L Attachment L-3

View the file

Other files

File Type Posted
N00019-15-R-5500_Amendment_0004.docx DOCX document
C-12_Responses_to_Questions_from_Industry_Batch_9.xlsx XLSX spreadsheet
N00019-15-R-5500_Batch_8.xlsx XLSX spreadsheet
N00019-15-R-5500_Amendment_003.pdf PDF
Attachment_8.1_Collective_Bargaining_Agreement_-Miramar_and_Yuma.pdf PDF
N0001915R5500_amend_2.docx DOCX document
Att_L-6_Price_Matrix_updated_1_Oct_15.xlsx XLSX spreadsheet
C-12_Responses_to_Questinos_from_Industry_Batch_7.xlsx XLSX spreadsheet
Responses_to_Questions_Batch_6.xlsx XLSX spreadsheet
Att_L-5_PP-1_PP_Cont_Data_Amnd_1_091715.xlsx XLSX spreadsheet
05-2518.pdf PDF
Attachment_1_-_C12_CLS_PWS__Amnd_1_092315.doc DOC document
N0001915R5500__Amend_1.docx DOCX document
TC-12_Production_Slides_2012_ _2013.xls XLS spreadsheet
Att_L-4_PPQ_Amnd_1_092315.docx DOCX document
05-2104.pdf PDF
05-2508.pdf PDF
Attachment_6_-_C-12_Quality_Assurance_Support_Plan_12Aug15.pdf PDF
C12_GFP_11_May15.xlsx XLSX spreadsheet
Att_L-6_Price_Matrix_updated7July2015.xlsx XLSX spreadsheet
C-12_RFP_Final.pdf PDF
Attachment_8_-_C-12_CBA_current_(two_of_two).PDF PDF
Att_L-7_AC_Mods_Spares_and_Travel_ _Matl_update29July2015.xlsx XLSX spreadsheet
Attachment_7_-_C-12_OA_Work_Request_Word_Doc_25_Feb15.docx DOCX document
Parts_Usage_1_Oct13_thru_30_Sept14_7_Jul15.xlsx XLSX spreadsheet
Att_L-5_PP-1_PP_Cont_Data_22July2015.xlsx XLSX spreadsheet
Attachment_8_-_C-12_CBA_current_(one_of_two).PDF PDF
Attachment_9.1_-_AWD_2005-2508_Revision_15_-_Texas.pdf PDF
ACI_Spec_v_Oct_2011_26_Aug15.doc DOC document
FY16-21_AF_Projs_(rev)_ _ACI_by_Site_ _FY_5_Aug15.xlsx XLSX spreadsheet
Att_L-4_PPQ.docx DOCX document
Att_L-2_Site_Manning_Estimate.xlsx XLSX spreadsheet
Att_L-1_ES_Tables.xlsx XLSX spreadsheet
On-wing_Engine_Data_as_of_30_Jun2015.xlsx XLSX spreadsheet
C-12_Service_Life_Events_6_Jul15.xlsx XLSX spreadsheet
Attachment_1_-_C12_CLS_PWS__FINAL.pdf PDF
BuNo_161511_Mission_Equipment_15_July_2015.xlsx XLSX spreadsheet
C-12_CDRLS_N00019-15-R-5500.pdf PDF
Attachment_5_-_Appendix_B_C-12_SGFP_Data_Input_Spreadsheet_(XLS)_11_May15.xls XLS spreadsheet
Attachment_9_-_AWD_2005-2104_Revision_15_Washington_DC_and_Maryland.pdf PDF
CDRL_AX03_Formatting_Supplement_5_Feb15.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Detailed Instructions

Instructions for completing Summary Experience Data
Complete a separate sheet for each contract that the Offeror is proposing to cite in order to meet the "Attachment L-3 Experience" solicitation requirement.
Example #
Contract Number / Order NumberN00019-10-D-1234 / 2012
Period of Performance10/1/2012-09/30/2013
Total number of sites supported under contract number cited above
Total number of aircraft supported at each site

(identify sites by name)

(Reference PWS paragraph 1.3)Name Site 1Name Site 2Name Site 3Name Site n
# a/c
CONUS or OCONUS (select drop down)
(Reference PWS paragraph 1.3)CONUS
Monthly average of actual of Flight Hours Flown Per Site during period of Contract

(Reference PWS Appendix A) Type/Model/Series (T/M/S) supported at each site (Reference PWS paragraph 1.3)

Volume 2 Technical

N00019-15-R-5500 Attachment L-3

List the name of each site that required the offeror to provide aircraft maintenance and flight operations. Add additional columns if needed.

Insert the Contract Number and Order Number (For multiple award contracts) Insert the period of performance of the contract or delivery order Show the total aircraft quantity (sum of all T/M/S) at each specified site List the various T/M/S that were supported at each site. If there were multiple T/M/S at a single site, show them all in the same cell.

Idenify each specified site location as CONUS or OCONUS from drop-down list Enter the total number of sites (must equal sum of sites identified in row 7 below) Enter number of averaged monthly actual flight hours

RFP Attachment L-3

Complete a separate sheet for each contract that the Offeror is proposing to cite in order to meet the "Attachment L-3 Experience" solicitation requirement.
Example #
Contract Number / Order Number
Period of Performance
Total number of sites supported under contract number cited above
Total number of aircraft supported at each site

(identify sites by name) (Reference PWS paragraph 1.3) Name Site 1 Name Site 2 Name Site 3 Name Site n

CONUS or OCONUS (select drop down) (Reference PWS paragraph 1.3) Monthly average of actual of Flight Hours Flown Per Site during period of Contract (Reference PWS Appendix A) Type/Model/Series (T/M/S) supported at each site (Reference PWS paragraph 1.3)

Volume 2 Technical

N00019-15-R-5500 Attachment L-3

List Reference

CONUS
OCONUS

Sheet1