Attachment_5A_--_HFH_Inspection_Results_Summary_(Part_1_of_2).docx

DOCX document 25 KB Posted

Attached to
Alternative Source -F/A-18A/B/C/D Depot Level Maintenance
Solicitation number
N00019-15-R-0090
Issued by

About this file

DRAFT Attachment 5A - HFH Inspection Results Summary

View the file

Other files

File Type Posted
Amendment_0003.pdf PDF
Attachment_13_-_Government_Furnished_Property_List.pdf PDF
Attachment_13_-GFP_List_.pdf PDF
Amendment_0002_-_N00019-15-R-0090.pdf PDF
Site_Visit_Q As.pdf PDF
Final_RFP_Q As_Vol_3.pdf PDF
CDRL_A003_-_Program_Plans_-_Ground_Operations.PDF PDF
Attachment_15_-_CSDR.xls XLS spreadsheet
CDRL_A002_-_Program_Plan_-_CM.PDF PDF
CDRL_A004_-_Program_Plans_-_Airfield_Operations _Flight_Planning _and_Flight_Missions.PDF PDF
Amendment_0001_-_N00019-15-R-0090.pdf PDF
CDRL_A00L_-_IMS.PDF PDF
CDRL_A005_-_Program_Plans_-_Aviation_Safety.PDF PDF
L-5_Vol_4_CSDR.xls XLS spreadsheet
Attachment_1_-_Contractor_Depot_Level_Maintenance_Statement_of_Work.PDF PDF
Final_RFP_Questions_Vol_2.pdf PDF
CDRL_A00Q_-_Parts_and_Material_Summary_Report.PDF PDF
Attachment_13_-_Government_Furnished_Property_List.pdf PDF
CDRL_A00M_-_Contractor_Cost_Data_Reporting.pdf PDF
Final_RFP_Q As.pdf PDF
PASS_ID_FORM_.pdf PDF
Site_Visit_Request.pdf PDF
A00C.PDF PDF
A00Q.PDF PDF
A002.PDF PDF
Attachment_5A_--_HFH_Inspection_Results_Summary_(Part_1_of_2).docx DOCX document
A007.PDF PDF
Attachment_12_Program_Protection_Plan.docx DOCX document
A001.PDF PDF
A003.PDF PDF
A00F.PDF PDF
A006.PDF PDF
A00P.PDF PDF
Attachment_10_NAVAIR_NMCI_process_for_DFCs.docx DOCX document
Attachment_9_Task_Order_Summary.xlsx XLSX spreadsheet
L-5_Vol_4_CSDR.xls XLS spreadsheet
Attachment_4_--_HFH_Induction_Configurations.xlsx XLSX spreadsheet
A008.PDF PDF
Attachment_6B_--_PR_Tracking_(Part_2_of_2).xlsx XLSX spreadsheet
A00D.PDF PDF
Attachment_7_Unit_Price_Matrix_(FFP).xlsx XLSX spreadsheet
A00G.PDF PDF
Supplement_1_-_Supplement_to_the_Exhibits.doc DOC document
Attachment_3_Cybersecurity_Plan.docx DOCX document
Attachment_15_-_CSDR.xls XLS spreadsheet
A00A.PDF PDF
Attachment_6A_--_PR_Tracking_(Part_1_of_2).docx DOCX document
A00K.pdf PDF
N00019-15-R-0090_signed_SOW.PDF PDF
FINAL_RFP_N00019-15-R-0090.pdf PDF
Show 40 more

Latest 50 of 113 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment (5A)

ATTACHMENT 5A

HIGH FLIGHT HOUR (HFH) INSPECTION RESULTS SUMMARY

(The Contractor shall use only one HFH Inspection Results Summary per Bureau Number (BUNO))

The Contractor shall deliver the SLEA request package electronically to the designated F/A-18 A/B/C/ website/server. The submission shall be prepared and delivered in Microsoft Office 2007 compatible (non-.pdf) file format.

1. Cover “TAB”:

a. The Contractor shall add their name in place of “Contractor Name”.

b. The Contractor shall add the name of the Reporting Custodian for the aircraft being inducted.

c. The Contractor shall provide the BUNO of the aircraft.

d. The Contractor shall provide HFH inspection sequence number (e.g. HFH000X).

e. The Contractor shall provide the date the HFH Inspection Results Summary was sent to the Government in DD/MM/YYYY format. The Contractor shall verify receipt by the Government.

f. The Contractor shall provide the “need by” date (DD/MM/YYY format) for which the SLEA message is needed by in order to meet aircraft Functional Check Flight in support of required delivery timeline.

2. Respective Bulletin(s) “TAB”:

a. The Contractor shall provide the following information for each respective HFH Bulletin inspection location:

i. Description of damage found (e.g. Crack, Corrosion, Gouge, Delam, Transverse Micro cracking, Adhesive Microcracking, etc.)

ii. Description of repair implemented (e.g. Reamed oversize, Larger Fastener, Bushing, Blended, Injected, Tub Fitting, etc.)

iii. Justification / analysis summary of repair implemented (e.g. e/D>1.5, positive margins and >10K FH fatigue life, damage is less than similar case, etc.)

Aircraft inducted for HFH Bulletin Inspections shall not be flown prior to receipt of SLEA, including FCFs, unless otherwise approved by the Government.

File details come from the government source that posted it. Updated .