Attachment_15_-_CSDR.xls
XLS spreadsheet 77 KB Posted
- Solicitation number
- N00019-15-R-0090
About this file
Attachment (15) Cost Summary Data Report
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 2794, Pg 1 (CSDR Plan)
Attachment 15 - COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1. MAJOR PROGRAM | a. NAME: | F/A-18A-D - Naval Strike Fighter | ||||||||||
| b. PHASE/MILESTONE | c. PRIME MISSION PRODUCT | 2. WBS SYSTEM TYPE | 3. SUBMISSION TYPE | 4. CURRENT SUBMISSION DATE (YYYYMMDD) | 5. LAST APPROVED PLAN DATE (YYYYMMDD) | |||||||
| Pre-A | B | C-FRP | FA-18 A/B/C/D Depot Inspection/Modification Line | Aircraft System | X | INITIAL | ||||||
| A | C-LRIP | X | O&S | CHANGE | 6/30/201 | |||||||
| 6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) | 6b. TELEPHONE NUMBER (Include Area Code) | 6c. FAX NUMBER (Include Area Code) | 6d. E-MAIL ADDRESS | |||||||||
| Matthew Urich |
47254 Davis Spur Rd Bldg. 2855
| Patuxent River, MD 20670 | 301-995-7936 | (301) 757-1801 | matthew.urich@navy.mil | |||||||||||
| 7. PLAN TYPE | 8. PREPARING ORGANIZATION | 9a. CONTRACTOR NAME/ADDRESS | 9b. CONTRACT NUMBER | 9c. APPROPRIATION | 10. APPROVED PLAN NUMBER | |||||||||
| PROGRAM | X | CONTRACT (PRIME) | i. PERFORMING ORGANIZATION | ii. DIVISION | N00019-15-R-0090 | RDT&E | ||||||||
| CONTRACT (SUB) | NAVAIR 4.2.2 | The Boeing Company | BDS - Boeing Defense, Space & Security | |||||||||||
| St. Louis, MO | X | PROCUREMENT | ||||||||||||
| O&M | ||||||||||||||
| 11. WBS ELEMENT CODE | 12. | |||||||||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||||||||
| (X if applicable) | DD 1921-3 (CBDR): | |||||||||||||
| X | ||||||||||||||
| a. PROGRAM/ | ||||||||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||||||||||||
| SUBCONTRACT | a. CWBS | |||||||||||||
| DICTIONARY | b. DD 1921 | |||||||||||||
| (CDSR) | c. DD 1921-1 | |||||||||||||
| (FCHR) | d. DD 1921-2 | |||||||||||||
| (PCR) | e. DD 1921-4 | |||||||||||||
| (CSR) | f. SRDR |
FORMATS
| 1.1 | 1.0 | FA-18 A-D Depot Modification Line | X | X | X | |||||
| 1.1 | 1.1 | Air Vehicle (AV) | X | X | X | |||||
| 1.1.1 | 1.1.1 | Airframe | X | X | X | |||||
| 1.1.1 | 1.1.1.1 | Airframe Integration, Assembly, Test and Checkout | X | X | X | |||||
| 1.1.1 | 1.1.1.1.1 | Aircraft Launch and Recovery (FA-18A/B/C/D) | X | X | X | |||||
| 1.1.1 | 1.1.1.1.2 | Weight and Balance (FA-18A/B/C/D) | X | X | X | |||||
| 1.1.1 | 1.1.1.2 | Fuselage | X | X | X | |||||
| 1.1.1 | 1.1.1.2.1 | Forward Fuselage and Leading Edge Extension (LEX) | X | X | X | |||||
| 1.1.1 | 1.1.1.2.1.1 | Inspections/Modifications FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.2.1.2 | Over & Above Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.2.1.3 | In-Service Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.2.2 | Forward Center Fuselage | X | X | X | |||||
| 1.1.1 | 1.1.1.2.2.1 | Inspections/Modifications FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.2.2.2 | Over & Above Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.2.2.3 | In-Service Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.2.3 | Aft Center Fuselage | X | X | X | |||||
| 1.1.1 | 1.1.1.2.3.1 | Inspections/Modifications FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.2.3.2 | Over & Above Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.2.3.3 | In-Service Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.2.4 | Aft Fuselage | X | X | X | |||||
| 1.1.1 | 1.1.1.2.4.1 | Inspections/Modifications FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.2.4.2 | Over & Above Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.2.4.3 | In-Service Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.3 | Wing | X | X | X | |||||
| 1.1.1 | 1.1.1.3.1 | Inner Wing | X | X | X | |||||
| 1.1.1 | 1.1.1.3.1.1 | Inspections/Modifications FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.3.1.2 | Over & Above Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.3.1.3 | In-Service Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.3.2 | Outer Wing | X | X | X | |||||
| 1.1.1 | 1.1.1.3.2.1 | Inspections/Modifications FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.3.2.2 | Over & Above Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.3.2.3 | In-Service Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.4 | Empennage | X | X | X | |||||
| 1.1.1 | 1.1.1.4.1 | Inspections/Modifications FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.4.2 | Over & Above Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.1.4.3 | In-Service Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.2 | 1.1.2 | Propulsion | X | NA | NA | |||||
| 1.1.3 | 1.1.3 | Vehicle Subsystems | X | X | X | |||||
| 1.1.3 | 1.1.3.1 | Airframe Integration, Assembly, Test and Checkout | X | NA | NA | |||||
| 1.1.3 | 1.1.3.2 | Flight Control Subsystem | X | NA | NA | |||||
| 1.1.3 | 1.1.3.3 | Auxiliary Power Subsystem | X | NA | NA | |||||
| 1.1.3 | 1.1.3.4 | Hydraulic Subsystem | X | NA | NA | |||||
| 1.1.3 | 1.1.3.5 | Electrical Subsystem | X | NA | NA | |||||
| 1.1.3 | 1.1.3.6 | Crew Station Subsystem | X | NA | NA | |||||
| 1.1.3 | 1.1.3.7 | Environmental Control Subsystem | X | NA | NA | |||||
| 1.1.3 | 1.1.3.8 | Fuel Subsystem | X | NA | NA | |||||
| 1.1.3 | 1.1.3.9 | Landing Gear | X | X | X | |||||
| 1.1.3 | 1.1.3.9.1 | Nose Landing Gear | X | X | X | |||||
| 1.1.3 | 1.1.3.9.1.1 | Inspections/Modifications FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.3.9.1.2 | Over & Above Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.3.9.1.3 | In-Service Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.3 | 1.1.3.9.2 | Main Landing Gear | X | X | X | |||||
| 1.1.3 | 1.1.3.9.2.1 | Inspections/Modifications FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.3.9.2.2 | Over & Above Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.1 | 1.1.3.9.2.3 | In-Service Repairs FA-18A/B/C/D | X | X | X | |||||
| 1.1.3 | 1.1.3.10 | Rotor Group | X | NA | NA | |||||
| 1.1.3 | 1.1.3.11 | Drive Group | X | NA | NA | |||||
| 1.1.3 | 1.1.3.12 | Vehicle Subsystem Software | X | NA | NA | |||||
| 1.1.3 | 1.1.3.1.2 | Other Subsystems | X | NA | NA | |||||
| 1.1.4 | 1.1.4 | Avionics | X | NA | NA | |||||
| 1.1.5 | 1.1.5 | Armament/Weapons Delivery | X | NA | NA | |||||
| 1.1.6 | 1.1.6 | Auxiliary Equipment | X | NA | NA | |||||
| 1.1.7 | 1.1.7 | Furnishings and Equipment | X | NA | NA | |||||
| 1.1.8 | 1.1.8 | Air Vehicle Software Release, Air Vehicle Integration, Assembly, Test, and Checkout | X | NA | NA | |||||
| 1.2 | 1.2 | Systems Engineering | X | X | X | |||||
| 1.2 | 1.2.1 | Over & Above Engineering Analyses for Repair F-18A/B/C/D | X | X | X | |||||
| 1.2 | 1.2.2 | In-Service Repair Analyses F-18A/B/C/D | X | X | X | |||||
| 1.3 | 1.3 | Program Management | X | NA | NA | |||||
| 1.4 | 1.4 | System Test and Evaluation | X | NA | NA | |||||
| 1.5 | 1.5 | Training | X | NA | NA | |||||
| 1.6 | 1.6 | Data | X | NA | NA | |||||
| DD FORM 2794, MAY 2011 | PREVIOUS EDITION IS OBSOLETE | |||||||||
| 11. WBS ELEMENT CODE | 12. | |||||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||||
| (X if applicable) | DD 1921-3 (CBDR): | |||||||||
| X | ||||||||||
| a. PROGRAM/ | ||||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||||||||
| SUBCONTRACT | a. CWBS | |||||||||
| DICTIONARY | b. DD 1921 | |||||||||
| (CDSR) | c. DD 1921-1 | |||||||||
| (FCHR) | d. DD 1921-2 | |||||||||
| (PCR) | e. DD 1921-4 | |||||||||
| (CSR) | f. SRDR |
FORMATS
| 1.7 | 1.7 | Peculiar support Equipment | X | NA | NA | |
| 1.8 | 1.8 | Common Support Equipment | X | NA | NA | |
| 1.9 | 1.9 | Operational/Site Activation | X | NA | NA | |
| 1.10 | 1.10 | Industrial Facilities | X | NA | NA | |
| 1.11 | 1.11 | Initial Spares and Repair Parts | X | NA | NA | |
| Subtotal Cost | ||||||
| Reporting Contractor G&A | ||||||
| Reporting Contractor Undistributed Budget | ||||||
| Reporting Contractor Management Reserve | ||||||
| Reporting Contractor FCCM | ||||||
| Total Cost | ||||||
| Reporting Contractor Profit/Loss or Fee | ||||||
| Total Price | ||||||
| DD FORM 2794, MAY 2011 | PREVIOUS EDITION IS OBSOLETE |
DD Form 2794, Pg 2 (CSDR Plan)
| 14. CSDR SUBMISSION DATES | ||||||
| a. | ||||||
| SUBMISSION | b. | |||||
| FORM(S) | c. | |||||
| EVENT | d. AS OF DATE | e. DUE DATE | ||||
| (YYYYMMDD) | (YYYYMMDD) | |||||
| 1 | CWBS Dictionary | FA-18 Modifications CWBS Dictionary | ||||
| 2 | 1921, 1921-1 | First 12 Months Complete (Base Period 1) - FA-18 Modifications | 20161231 | 20170228 | ||
| 3 | 1921, 1921-1 | Second 12 Months Complete (Base Period 1) - FA-18 Modifications | 20171231 | 20180228 | ||
| 4 | 1921, 1921-1 | Third 12 Months or Contract Complete (Base Period 1) - FA-18 Modifications | 20181231 | 20190228 | ||
| 5 | 1921, 1921-1 | First 12 Months Complete (Option Period 1) - FA-18 Modifications | 20171231 | 20180228 | ||
| 6 | 1921, 1921-1 | Second 12 Months Complete (Option Period 1) - FA-18 Modifications | 20181231 | 20190228 | ||
| 7 | 1921, 1921-1 | Third 12 Months or Contract Complete (Option Period 1) - FA-18 Modifications | 20191231 | 20200228 | ||
| 8 | 1921, 1921-1 | First 12 Months Complete (Option Period 2) - FA-18 Modifications | 20181231 | 20190228 | ||
| 9 | 1921, 1921-1 | Second 12 Months Complete (Option Period 2) - FA-18 Modifications | 20191231 | 20200228 | ||
| 10 | 1921, 1921-1 | Third 12 Months or Contract Complete (Option Period 2) - FA-18 Modifications | 20201231 | 20210228 | ||
| 15. REMARKS | ||||||
| 1. The contractor must modify the PMP and WBS element 1.0 for each CCDR submission to reflect the corresponding lot for the submission. (E.g., The name of WBS element 1.0 for submission # 2 must state, "FA-18 ABCD (SLEP C1)) ." |
2. Describe significant accounting changes from previous accounting period, if applicable.
3. DD Form 1921-3 Contractor Business Data Report:
a. The Contractor Business Data Report is prepared by and for the business entity (e,g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.
b. Reports are submitted annually at the end of the contractor's fiscal year.
c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
*Note (Final report when all end items have been delivered to the Government (DD 250) and 95% of contract costs incurred)
DD FORM 2794 (PAGE 2), MAY 2011 PREVIOUS EDITION IS OBSOLETE
File details come from the government source that posted it. Updated .