ITEM
Document
Reference
COMMENTS TO: Alternative Source - F/A-18A/B/C/D Depot Level Maintenance
SOLICITATION DOCUMENT N00019-15-R-0090 (Dated 16 April 2015) Answer
F1 Attach 1, SOW parag
3.4.1.1
Will the government consider a compromise to the required runway length if an approved arresting system is functional on an otherwise compliant runway of less than 8,000 feet in length?
While the presence of field arresting gear offers potential risk mitigation in certain emergency scenarios, field arresting gear may not be used during normal field operations and its presence does not reduce the minimum runway length requirement of 8,000 ft. In accordance with
Attachment 1, F/A-18A/B/C/D Contractor Depot
Level Maintenance Statement of Work, paragraph 3.4.1.1, the minimum runway length is
8,000 ft.
F2 Attachment 8 -
DD-254
The DD-254, Attachment 8 is still in draft form. Is a formal release still pending?
The DD-254 will remains in draft form until contract award. No changes to the draft DD-254 requirements are anticipated. The approved version will be released at time of contract award.
F3 Final RFP Pg 42 H-3
Clause
The OAWR instructions section (2)(t) references Attachment 16, Labor Hour Matrix but that attachment is no longer included in the solicitation.
The erroneous reference to Attachment 16, Labor Hour Matrix will be deleted in a forthcoming amendment