L-5_Vol_3_ExpTables.xls

XLS spreadsheet 69 KB Posted

Attached to
C-26 CLS RFP
Solicitation number
N00019-15-R-0089
Issued by

About this file

Attachment L-5 Volume 3 Experience Summary

View the file

Other files

File Type Posted
Question_posed_Nov._18th..xlsx XLSX spreadsheet
Question_posted_Nov_16th..xlsx XLSX spreadsheet
N00019-15-R-0089_Amendment_0004.pdf PDF
Questions_posted_in_FBO_on_11-12-15.xlsx XLSX spreadsheet
Att_4_-_Office_Space_Estimates.pdf PDF
Questions_posted_in_FBO_November_6th..xlsx XLSX spreadsheet
Questions_posted_in_FBO_on_November_4th..xlsx XLSX spreadsheet
Att_1E_-_Performance_Metrics_(V3).pdf PDF
RFP_N00019-15-R-0089_Amendment_0003.pdf PDF
L-8_Vol_4_Price_Matrix.xls XLS spreadsheet
Att_2_-_QASP_(V4).pdf PDF
Questions_posted_in_FBO_on_10-29-15.xlsx XLSX spreadsheet
Att_1_PWS_(2015-10-29)_FINAL.pdf PDF
N00019-15-R-0089_Amendment_0002.pdf PDF
CDRL_A011_parts_Usage_List_for_1_March_-_31_May_2015.docx DOCX document
CDRL_A011_Parts_Usage_List_for_June_1_-_Aug_31_2015.docx DOCX document
CDRL_A011_Parts_Usage_List__1_Dec_2014_-_28_Feb_2015.docx DOCX document
CDRL_A011_Parts_Usage_List_for_Sept_1_-_Nov_30_2014.docx DOCX document
CDRL_A011_Parts_Usage_List_for_June_1_-_Aug_31_2015.docx DOCX document
Batch_1_Answers.xlsx XLSX spreadsheet
CDRL_A011_parts_Usage_List_for_1_March_-_31_May_2015.docx DOCX document
Amendment._15_Oct..docx DOCX document
CDRL_A011_Parts_Usage_List__1_Dec_2014_-_28_Feb_2015.docx DOCX document
CDRL_A011_Parts_Usage_List_for_Sept_1_-_Nov_30_2014.docx DOCX document
Att_1E_-_Performance_Metrics_(2).xlsx XLSX spreadsheet
L-1_Vol_1_ES_Tables.xls XLS spreadsheet
L-7_Vol_3_Tech_SB_Goals.xls XLS spreadsheet
C26_Flt_Hrs__MC_Rates_by_Aircraft.xlsx XLSX spreadsheet
L-4_Vol_3_Tech_CRM.docx DOCX document
SECNAVINST_5510.30B.pdf PDF
L-3_Vol_2_PP-1_Contract_Data.xls XLS spreadsheet
MIL-STD-2161C_Paint_Spec.pdf PDF
C-26_Aircraft_Top_Degraders.xlsx XLSX spreadsheet
L-2_Vol_2_PPQ.doc DOC document
Exhibit_C_CDRLs.pdf PDF
Att_1H_-_Depot_Schedule.xlsx XLSX spreadsheet
L-6_Vol_3_Tech_MP_Chart.xls XLS spreadsheet
Att_1B_-_Government_Furnished_Property.xls XLS spreadsheet
OPNAVINST_3710.7U_-_Natops_General_Flight_and_Operating_Instructions_01_Mar04.pdf PDF
C26_DEPOT_SCHEDULE.xlsx XLSX spreadsheet
C26_Annual_Inventory_OCT_31_2014.xls XLS spreadsheet
Att_1D_-_OAWR_Procedures_and_Form.doc DOC document
Att_1C_-_Critical_Job_Positions.docx DOCX document
OPNAVINST_8023.24B_-_Navy_Personnel_Ammunition_and_Explosives_Handling_16_Mar10.pdf PDF
DOD_4145-26M.pdf PDF
Att_1F_-_Aircraft_Appearance_Standards.docx DOCX document
NISPOM_2006-5220_28_Feb06.pdf PDF
DoD_8570.01-M_-_Information_Assurance_Workforce_Improvement_Program_24_Jan12.pdf PDF
Att_1_-_C-26_CLS_PWS.pdf PDF
RFP_(2015-09-10).pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Experience Summary Instructions

Volume 3 Experience
Instructions for completing Summary Experience Data
Complete a separate sheet for each contract that the Offeror is proposing to cite in order to meet the "Attachment L-3 Experience" solicitation requirement.
Example #
Contract Number /
Order NumberN00019-10-D-1234 / 2012
Period of Performance10/1/2012-09/30/2013
Total number of sites supported under contract number cited aboveName Site 1Name Site 2Name Site 3Name Site n
Total number of aircraft supported at each site

(identify sites by name)

(Reference PWS paragraph 1.2)# a/c
CONUS
CONUS or OCONUS (select drop down)

(Reference PWS paragraph 1.2) Monthly average of actual of Flight Hours Flown Per Site during period of Contract (Reference PWS paragraph 1.6) Type/Model/Series (T/M/S) supported at each site (Reference PWS paragraph 1.2)

&L&"Times New Roman,Regular"&10L-5 Vol 3 Tech Exp&R&"Times New Roman,Regular"&10N00019-15-R-0089 List the name of each site that required the offeror to provide aircraft maintenance and flight operations. Add additional columns if needed.

Insert the Contract Number and Order Number Insert the period of performance of the contract or task order Show the total aircraft quantity (sum of all T/M/S) at each specified site List the various T/M/S that were supported at each site. If there were multiple T/M/S at a single site, show them all in the same cell.

Identify each specified site location as CONUS or OCONUS from drop-down list Enter the total number of sites (must equal sum of sites identified in row 7) Enter number of averaged monthly actual flight hours

Experience Summary

Volume 3 Experience
Complete a separate sheet for each contract that the Offeror is proposing to cite in order to meet the "Attachment L-5 Experience" solicitation requirement.
Example #
Contract Number /

Order Number

Period of Performance
Total number of sites supported under contract number cited aboveName Site 1Name Site 2Name Site 3Name Site n
Total number of aircraft supported at each site

(identify sites by name) (Reference PWS paragraph 1.2) CONUS or OCONUS (select drop down) (Reference PWS paragraph 1.2) Monthly average of actual of Flight Hours Flown Per Site during period of Contract (Reference PWS paragraph 1.6) Type/Model/Series (T/M/S) supported at each site (Reference PWS paragraph 1.2)

&L&"Times New Roman,Regular"&10L-5 Exp Tables&R&"Times New Roman,Regular"&10N00019-15-R-0089

List Reference

CONUS
OCONUS

File details come from the government source that posted it. Updated .